Background Info – Florida’s Tanks Program

Page 3: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Single-wall ASTs - 20%

ASTs with Secondary Containment

80%Single-wall USTs

60%

Double-wall USTs - 40%

USTs ASTs18,040

3,954

16,286

11,937

Source - STCM, Feb 05

2005

Page 4: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

0

5000

10000

15000

20000

25000

30000

35000

'84 '86 '88 '90 '92 '94 '96 '98 '00 '02 '04

Inspections

Total Facility Inspections Performedin Florida

436,121 Total Inspections Performed

Source: STCM, Feb 05

Page 5: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

4 18 19 53 141326

1010

2341

6303

1374

2330

33853467

18341775

12981206987

1271881

597504537615564

230

1000

2000

3000

4000

5000

6000

7000

'80 '82 '84 '86 '88 '90 '92 '94 '96 '98 '00 '02 '04

Discharges

Petroleum Discharge Report Forms Received

32,769 Total Discharge Report Forms Received

Source: STCM, Feb 05

Page 6: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

1271

881

597504 537

615 564

230

200

400

600

800

1000

1200

1400

'98 '99 '00 '01 '02 '03 '04 '05

Discharges

Post-1998 Petroleum Discharge Report Forms Received

4992 Post-1998 Discharge Report Forms Received

Source: STCM, Feb 05

Page 7: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Summary - Florida Cause of Leak Study

Page 8: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Methodology

Florida Identified Reported Releases (1995-2002)Florida Contracted with County Inspectors to ReviewRelease Sites and Document InformationCompleted Forms Sent to EPA for Data Entry & AnalysisVarious Quality Control StepsCurrent Status - EPA Report is ready for Peer Review

Page 9: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Invalid Files Include:•Releases from Bare Steel UST Systems•Release From Non-Compliant Component•Release of Old UST/AST Found at Closure•Unknown Sources

Page 10: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Size of Study2280 Release Files Reviewed642 Valid Release Files

512 UST Releases 130 AST Releases

Page 11: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

AST Results

Page 12: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Sources of Releases

Tank5%

Other16%

Delivery32%

Dispenser12%

Piping35%

Other Sources Include: Fuel Filters, Outlet Valve, and Human Spilling

Page 13: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Causes of Releases

Phys/Mech Damage

19%

Other16%

Spill/Overfill36%

Unknown8%

Loose Component

12%

Corrosion9%

Other Causes Include: Vandalism, Valve Failure, Contractor Accident, Other Human Error

Page 14: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Causes of Piping Release

Corrosion26%

Phys/Mech Damage

29%

Loose Component

21%

Other9%

Unknown13%

Puncture2%

Page 15: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Method of Detection

Leak Detection

22%

Closure/ Removal

8%

Visual/ Olfactory

68%

Other2%

Page 16: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Success of Leak DetectionLD Detected

22%

LD Failed8%

LD Unable, or Unknow n

70%

LD Unable, or Unknown: Either the release came from a part of the system that a LD system was not designed to detect, or the inspector could not determine whether LD failed to detect.

Page 17: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Overfills and Piping

Page 18: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

UST Results

Page 19: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Sources of Releases - USTs

Tank12%

Other11%

Spill/Overf ill in Fill Area

19%

Turbine Pump10% Dispenser

25%

Piping23%

Page 20: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

- Tank Usage Versus Releases -

0%10%20%30%40%50%60%70%

Steel

Fiberglas

s

C lad

Other

% releases% usage

Clad Tanks Had Relatively Fewer Releases

Page 21: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

- Causes of Tank Releases -

Corrosion16%

Puncture27%

Unknown14%

Other13%

LooseComponent

8%

Phys/MechDamage

22%Primary Cause of Steel Tank Release – Corrosion

Primary Cause of Fiberglass Tank Release - Puncture

Page 22: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

- Piping Usage Versus Releases -

0

20

40

60

80

Steel Fiberglass FlexiblePlastic

% release%usage

Further Analysis Required to Determine Statistical Significance

Page 23: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

- Causes of Piping Releases - Phys/Mech

Damage22%

LooseComponent

20%Unknown20%

Other16%

Puncture15%

Corrosion7%

•Primary Cause of Steel Piping Release – Corrosion•Primary Cause of Fiberglass Piping Release – Loose Component

•Primary Cause of Flexible Plastic Piping – Phys/Mech Damage

Page 24: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Summary of Causes - USTsLoose

Component18%

Corrosion4%

Puncture8%

Spill12%Overfill

12%

Phys/Mech Damage

13%

Unknown17%

Other16%

Other Releases Include: Delivery to Monitoring Well, Vehicle Accident, Improper Installation, Vandalism

Page 25: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

- Success of Leak Detection -LD Detected

25%

LD Failed25%

LD Unable, or Unknown

50%

LD Unable, or Unknown: Either the release came from a part of the system that a LD system was not designed to detect, or the inspector could not determine whether LD failed to detect.

Page 26: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

- Method of Detection -% of Detections

Visual/ Olfactory

Closure/ Removal OtherCompliance

Inspector

Leak Detection

0

10

20

30

40

Other Methods Include: Unscheduled TTT/LTT, Dispenser Upgrades, Maintenance Inspections, Water in Tank

Page 27: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Piping,Dispensers

& Spill Buckets

Page 28: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Florida Leak Autopsy Study•Field-verified, Quality assurance•County Tanks Inspectors Complete Forms•Continuation of Florida Cause of Leak Study•Data compared to Forms submitted by tank owners

Page 29: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Florida Leak Autopsy StudyFour Page Form

Other (Specify)External Liner

No Overfill ProtectionCompartmentedOther (Specify)

Remote FillOther Approved (Tank Bladders, etc.)

Unknown

Alarm SystemSecondary Containment with a liner

PolyethyleneTight FillDouble Wall (different material)Concrete

Flow Shut-OffDouble Wall (same material)Other Approved

Ball Check ValveSingle WallUnprotected SteelOverfill ProtectionInternal LiningCompositeNo Spill ContainmentImpressed Current SystemFiberglass

Spill Containment Bucket

Sacrificial AnodesGalvanized Steel

Ancillary EquipmentOther AttributesMaterial

Page 30: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Florida Leak Autopsy Forms 1 Jan 03 – 1 Mar 05

•859 Forms

Invalid UST Forms

33%

Valid AST Discharges

30%

Valid UST Discharges

34%

Invalid AST Forms2%

Forms under investigation

1%

Page 31: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Piping18%

Overfills5%

Submersible Turbine Pumps

4%

Line Leak Detectors

2%Dispensers16%

Spill Buckets31%

Tanks10%

Vehicles, Vapor

recovery, ventlines,

vandalism andshear valves

6%

Flex connectors & Swing joints

4%

Fill Pipes3%

Dispenser & Piping Sumps

1%

UST Sources

305 Valid Forms

Page 32: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Single-Wall Composite Tanks

Single-Wall Internally Lined

Tanks

Single-Wall Fiberglass Tanks

Single-Wall Protected Steel

Tanks

Double-Wall Fiberglass Tanks

14

51

1 2

Tanks – 10%Double-wall tanks – 2%

2

5Double-Wall

Composite Tanks

Unknown

Page 33: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Single-Wall Protected Steel Piping

Other Single-Wall Pipe – (Copper)

Single-Wall Fiberglass

Piping

Double-Wall Thermoplastic Flexible Piping

Double-Wall Fiberglass Piping

4

1024

3

15

Piping – 18%Double-wall piping –9%

Page 34: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Overfills/Spills/Spill Buckets

39%

Piping22%

Submersible Turbine Pumps

4% Tanks10%

Other13%

Dispensers18%

Piping23%

Overfills/Spills/Spill Buckets

19%

Submersible Turbine Pumps

10%

Tanks12%

Other11%

Dispensers25%

Sources - <2003

Sources - >2003

Page 35: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Overfills/Spills/Spill Buckets

26%

Piping23%

Submersible Turbine Pumps

8%Tanks11%

Dispensers21 %

Other10%

Combined Data

827 Valid UST Forms

Page 36: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

EPA, Office of Underground Storage Tanks

Mark Barolo

[email protected]/oust./

703/603-7141

Page 37: Florida Cause of Leak Study - NEIWPCCneiwpcc.org/neiwpcc_docs/ustlust_shows/mott_smith.pdf · Florida Leak Autopsy Study •Field-verified, Quality assurance •County Tanks Inspectors

Marshall T. Mott-SmithBureau of Petroleum Storage Systems