IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore.
Following were the needs
1. Sunday School Assembly area and Class Rooms2. Church Office and Meeting rooms3. Parsonage for Pastors4. Multipurpose Hall
The Building project has been taken up in 2 phases
Phase 1 – Main Building – Ground + 3 floors ( 4000 Sft/ floor) – Total 16,000 sftPhase 2 - Toilet Block / Stores etc
JULY 2011THE IDEA OF A NEW MULTI PURPOSE BUILDING
BUILDING PLAN APPROVAL MAY 2012
FINAL DESIGN NOV 2012
GROUND BREAKINGCEREMONY BYBishop Dr.Taranath S SagarOn 3rd March 2013
AN ARTIST’S IMPRESSION OF THE BUILDING
79'
45'-6"
26'
31'-5"
15'-1"
4'-6"
9'-8"
15'-6"15'-9"
15'-3"
144'-2"
144'-2"
4'
LIFT
UP
UP
UP
13'-3"
ENTRY
13TH MAIN ROAD
100
FEET
ROAD
EXIS
TING L
AW
N
TEM
PERORY
BARRIC
ADE
EXISTINGCHURCHSILVER
JUBILEE BLOCKPhase-1
TOILET
BLOCK
Ph2
TEMP SUNDAYSCHOOL BLOCK
TEMPCHURCHOFFICE
TEMP TOILETBLOCK
EXISTING
LAWN
PLAN OF THE NEW BUILDING – Phase 1 & Phase 2
LIFT
UP
UP
LOBBY5'0"x6'0"
UP
GATE
1
A
B
B'
1' 1''
A'
A''
2 3 4 5 615'-9"
-5'0" Lvl
BAPTISM TANK
GREENARY
GREENARY
UPRAMP
GREENARY
GREENARY
X
7
GROUND FLOOR PLAN
DRIVE WAY
TOILET(G) TOILET(L) STORES PANTRYMEDICAL/NURSING
TRANSFORMERSECURITY
PORTICO
Ground Floor will consist of CAR PARKING, TOILETS, etc.
LIFT
8'0"x22'0" BALCONY
UP
DN
LOBBY5'0"x6'0"
DN
B
B'
UP
DN
UP
1
A
B'
1' 1''
A'
A''
2 3 4 5 615'-9"
7
FIRST FLOOR PLAN
MULTI PURPOSE HALL
SUNDAYCLASS
STORES
BALCONY
SUNDAYCLASS
STAGE
GREEN ROOM
GREEN ROOM
HALL CAPACITY - 300 ( appx), Will be used by SS, Church services( Virtual Church), VBS programs, retreats, seminars, functions etc.
LIFT
LOBBY
1 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
2 3
I
8'0"x22'0" BALCONY
DN
UP
DN
G'
TOILET (G)PANTRY TOILET (L)
TOILETS (BOARD ROOM)
UP
DN
TOILET
20'0"X34'0"CONFERENCE HALL
DN
SECOND FLOOR PLAN
BALCONY
OPEN TERRACE
CONFERENCE
TOILETS
SUNDAYCLASS
SUNDAYCLASS
SUNDAYCLASS
SUNDAYCLASS
SUNDAYCLASS
SUNDAYCLASS
SUNDAYCLASS
SUNDAYCLASS/
BREAK OUT
SUNDAYCLASS/
BREAK OUT
ASSO PASTORSENIORPASTOR
JR.PASTOR
VISITORS
OFFICE
Sunday School Block, Church offices, Meeting/ Conference rooms etc.
8'0"x22'0" BALCONY
LIFT LOBBY
5'0"x8'0"TOILET
4'0"x9'0" UTILITY
5'0"x8'0"TOILET
10'6"x4'0" UTILITY
8'0"x5'0"
5'0"x8'0"TOILET
TOILET
8'6"x8'6" BALCONY
UP
DN
5'0"x6'0"
5'0"x8'0"TOILET
WM
DN
UP
1
A
B'
1' 1''
A'
A''
2 3 4 5 615'-9"
7
B
THIRD FLOOR PLAN
BALCONYOPEN SPACE
KITCHEN
DINING
BED ROOM BED ROOM
BED ROOM
LIVING
SENIOR PASTOR’sHOUSE
ASSO. PASTOR’sHOUSE
LIVINGDINING
KITCHEN
BED ROOMBED ROOM
Parsonage – Senior Pastor / Asst. Pastor
LIFT LOBBY
DN
5'0"x6'0"
space for 5'0"x10'0"
solar panelspace for 5'0"x10'0" 5'0"x10'0"
solar panelspace for solar panel
DN
WATER TANK
O P E N T E R R A C E8'0"x22'0" BALCONY
ABOVE
HANDWASH
UP
1
A
B'
1' 1''
A'
A''
2 3 4 5 615'-9"
7
B
TERRACE FLOOR PLAN
Open terrace – Planned a temporary roof at a later stageand can be used for functions etc. Capacity – 400 ( appx)
SALIENT FEATURES
PRES
* Multipurpose Hall will be used by Sunday School for Opening session, VBS etc.
* Hall will also be used during Church service as a Virtual Church, and for retreats, seminars, functions etc. * Sunday School Block with 12 classrooms equipped with the latest audio/visual eqpt
* State of art conference room
* Green building – Maximum use of Natural light, Solar energy and rain water harvesting
COST OF CONSTRUCTION
TOTAL COST
Phase I(Main Building- Total area – 16,000 sft)
340 lakhs (appx'ly)
60 lakhs(appx'ly)
Phase 2(Toilet/ Stores)
4 Crore( appx'ly)
ACTUAL WORK STARTED NOV '13
COMPLETION TIME
COMPLETION TIME( Phase I- Main Building )
15 Months(Jan' 2015 )
PRESPRESENT POSITION
Phase 1 FOUNDATION COMPLETED AS ON FIRST WEEK OF FEB'14