it's by faith building project will cater to long felt needs of indiranagar methodist church,...

14

Upload: amy-marjory-bailey

Post on 29-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly
Page 2: IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly

IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore.

Following were the needs

1. Sunday School Assembly area and Class Rooms2. Church Office and Meeting rooms3. Parsonage for Pastors4. Multipurpose Hall

The Building project has been taken up in 2 phases

Phase 1 – Main Building – Ground + 3 floors ( 4000 Sft/ floor) – Total 16,000 sftPhase 2 - Toilet Block / Stores etc

Page 3: IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly

JULY 2011THE IDEA OF A NEW MULTI PURPOSE BUILDING

BUILDING PLAN APPROVAL MAY 2012

FINAL DESIGN NOV 2012

Page 4: IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly

GROUND BREAKINGCEREMONY BYBishop Dr.Taranath S SagarOn 3rd March 2013

Page 5: IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly

AN ARTIST’S IMPRESSION OF THE BUILDING

Page 6: IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly

79'

45'-6"

26'

31'-5"

15'-1"

4'-6"

9'-8"

15'-6"15'-9"

15'-3"

144'-2"

144'-2"

4'

LIFT

UP

UP

UP

13'-3"

ENTRY

13TH MAIN ROAD

100

FEET

ROAD

EXIS

TING L

AW

N

TEM

PERORY

BARRIC

ADE

EXISTINGCHURCHSILVER

JUBILEE BLOCKPhase-1

TOILET

BLOCK

Ph2

TEMP SUNDAYSCHOOL BLOCK

TEMPCHURCHOFFICE

TEMP TOILETBLOCK

EXISTING

LAWN

PLAN OF THE NEW BUILDING – Phase 1 & Phase 2

Page 7: IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly

LIFT

UP

UP

LOBBY5'0"x6'0"

UP

GATE

1

A

B

B'

1' 1''

A'

A''

2 3 4 5 615'-9"

-5'0" Lvl

BAPTISM TANK

GREENARY

GREENARY

UPRAMP

GREENARY

GREENARY

X

7

GROUND FLOOR PLAN

DRIVE WAY

TOILET(G) TOILET(L) STORES PANTRYMEDICAL/NURSING

TRANSFORMERSECURITY

PORTICO

Ground Floor will consist of CAR PARKING, TOILETS, etc.

Page 8: IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly

LIFT

8'0"x22'0" BALCONY

UP

DN

LOBBY5'0"x6'0"

DN

B

B'

UP

DN

UP

1

A

B'

1' 1''

A'

A''

2 3 4 5 615'-9"

7

FIRST FLOOR PLAN

MULTI PURPOSE HALL

SUNDAYCLASS

STORES

BALCONY

SUNDAYCLASS

STAGE

GREEN ROOM

GREEN ROOM

HALL CAPACITY - 300 ( appx), Will be used by SS, Church services( Virtual Church), VBS programs, retreats, seminars, functions etc.

Page 9: IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly

LIFT

LOBBY

1 4 5 6 7 8 9 10 11

A

B

C

D

E

F

G

2 3

I

8'0"x22'0" BALCONY

DN

UP

DN

G'

TOILET (G)PANTRY TOILET (L)

TOILETS (BOARD ROOM)

UP

DN

TOILET

20'0"X34'0"CONFERENCE HALL

DN

SECOND FLOOR PLAN

BALCONY

OPEN TERRACE

CONFERENCE

TOILETS

SUNDAYCLASS

SUNDAYCLASS

SUNDAYCLASS

SUNDAYCLASS

SUNDAYCLASS

SUNDAYCLASS

SUNDAYCLASS

SUNDAYCLASS/

BREAK OUT

SUNDAYCLASS/

BREAK OUT

ASSO PASTORSENIORPASTOR

JR.PASTOR

VISITORS

OFFICE

Sunday School Block, Church offices, Meeting/ Conference rooms etc.

Page 10: IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly

8'0"x22'0" BALCONY

LIFT LOBBY

5'0"x8'0"TOILET

4'0"x9'0" UTILITY

5'0"x8'0"TOILET

10'6"x4'0" UTILITY

8'0"x5'0"

5'0"x8'0"TOILET

TOILET

8'6"x8'6" BALCONY

UP

DN

5'0"x6'0"

5'0"x8'0"TOILET

WM

DN

UP

1

A

B'

1' 1''

A'

A''

2 3 4 5 615'-9"

7

B

THIRD FLOOR PLAN

BALCONYOPEN SPACE

KITCHEN

DINING

BED ROOM BED ROOM

BED ROOM

LIVING

SENIOR PASTOR’sHOUSE

ASSO. PASTOR’sHOUSE

LIVINGDINING

KITCHEN

BED ROOMBED ROOM

Parsonage – Senior Pastor / Asst. Pastor

Page 11: IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly

LIFT LOBBY

DN

5'0"x6'0"

space for 5'0"x10'0"

solar panelspace for 5'0"x10'0" 5'0"x10'0"

solar panelspace for solar panel

DN

WATER TANK

O P E N T E R R A C E8'0"x22'0" BALCONY

ABOVE

HANDWASH

UP

1

A

B'

1' 1''

A'

A''

2 3 4 5 615'-9"

7

B

TERRACE FLOOR PLAN

Open terrace – Planned a temporary roof at a later stageand can be used for functions etc. Capacity – 400 ( appx)

Page 12: IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly

SALIENT FEATURES

PRES

* Multipurpose Hall will be used by Sunday School for Opening session, VBS etc.

* Hall will also be used during Church service as a Virtual Church, and for retreats, seminars, functions etc. * Sunday School Block with 12 classrooms equipped with the latest audio/visual eqpt

* State of art conference room

* Green building – Maximum use of Natural light, Solar energy and rain water harvesting

Page 13: IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly

COST OF CONSTRUCTION

TOTAL COST

Phase I(Main Building- Total area – 16,000 sft)

340 lakhs (appx'ly)

60 lakhs(appx'ly)

Phase 2(Toilet/ Stores)

4 Crore( appx'ly)

Page 14: IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly

ACTUAL WORK STARTED NOV '13

COMPLETION TIME

COMPLETION TIME( Phase I- Main Building )

15 Months(Jan' 2015 )

PRESPRESENT POSITION

Phase 1 FOUNDATION COMPLETED AS ON FIRST WEEK OF FEB'14