JIRA Performance after 300,000 issues"

Claudio Ricardo Ombrella!Senior Technology Architect – Autodesk Development Sàrl – Neuchâtel - Switzerland"

http://www.linkedin.com/pub/claudio-ombrella/0/919/17a

Page 3: JIRA Performance After 300,000 Issues
Page 4: JIRA Performance After 300,000 Issues

Agenda"•  Let’s Get to Know Each Other"•  JIRA at Autodesk"•  JIRA Status and Audit"•  Changes We Implemented and Their Results"•  Process – the Rules of “P”"•  Conclusions "•  Questions and Answers"

Page 5: JIRA Performance After 300,000 Issues

Do you know Autodesk?"

Page 6: JIRA Performance After 300,000 Issues

Probably you know AutoCAD"

Page 7: JIRA Performance After 300,000 Issues

Autodesk in a Nutshell "•  Founded in 1982"•  6800+ employees"•  90 products in 18 languages"•  16 films Academy Award"•  10 mln professional users "•  7 mln consumer users"

•  Revenue: 2.22 billion FY12"•  Markets:"•  Architecture, Engineering,

Environment, Computer Science, Computer Graphics and Animations"

Page 8: JIRA Performance After 300,000 Issues

What about you?"

Page 9: JIRA Performance After 300,000 Issues

JIRA Users & Issues"

Page 10: JIRA Performance After 300,000 Issues

Windows / Linux?"

Page 11: JIRA Performance After 300,000 Issues

JIRA at Autodesk"

Page 12: JIRA Performance After 300,000 Issues

JIRA at Autodesk "

•  2005 – “the year we made contact” – JBoss site"•  2008 – Localization Services migrated Notes to JIRA"•  2009 – Some projects in Global Engineering adopt JIRA"•  2012 – 250,000 issues (Feb 8th), 300,000 issues (May 5th)"

Page 13: JIRA Performance After 300,000 Issues

JIRA at Autodesk - Statistics"

• 302,000+ issues"• 3200+ active users"• 384 projects (340 Agile)"

Page 14: JIRA Performance After 300,000 Issues

JIRA at Autodesk - Infrastructure"

Page 15: JIRA Performance After 300,000 Issues

JIRA Status – Mid 2011"

•  JIRA 4.01 Running on Windows 2008 Server R2"•  Average uptime was 6 to 15 days"

•  Could not assign more than 1248 MB to Java VM"

•  Running on ESX Virtual Farm"

•  Clients"•  90% running on MSIE 8"

Page 16: JIRA Performance After 300,000 Issues

Performance Audit Plan"

PERFORMANCE Server

Client Application

Network

Process

Page 17: JIRA Performance After 300,000 Issues

What Did We Change?"

Page 18: JIRA Performance After 300,000 Issues

Server"

•  Migrated to Linux 64-bit 32GB RAM"•  Next three slides will explain why we made this decision"

•  Virtual server running on VMWare ESX farm"•  Configured as High Priority Pool"

•  6 cores"•  Actually running version 4.4.4 and testing Beta 5.1"

Page 19: JIRA Performance After 300,000 Issues

Java Benchmark – Less is Better"

Page 20: JIRA Performance After 300,000 Issues

Java Benchmark – More is Better"

Page 21: JIRA Performance After 300,000 Issues

Java Benchmark – More is Better"

Page 22: JIRA Performance After 300,000 Issues

Client"

•  Advised users to use Chrome, Firefox and Safari"•  MSIE has the slowest JavaScript engine in the market"

•  Clear browser cache frequently"•  Exclude antivirus on browser cache folder"

Page 23: JIRA Performance After 300,000 Issues

Browser Performance"

Tests by Jacob Gube – Six Revisions

Page 24: JIRA Performance After 300,000 Issues

Application – 12GB RAM to Java VM"

Page 25: JIRA Performance After 300,000 Issues

Application – Activated GZIP "

Page 26: JIRA Performance After 300,000 Issues

Application – GreenHopper Cache"

Page 27: JIRA Performance After 300,000 Issues

Application – Kept MySQL Local "

Page 28: JIRA Performance After 300,000 Issues

Application – SSL Only If Needed"

Page 29: JIRA Performance After 300,000 Issues

Network"

•  Configured SilverPeak for WAN acceleration"•  If you have Packteer - create a Level 5 policy"•  You can also use Riverbed for WAN acceleration"

Page 30: JIRA Performance After 300,000 Issues

Results"

Page 31: JIRA Performance After 300,000 Issues
Page 32: JIRA Performance After 300,000 Issues
Page 33: JIRA Performance After 300,000 Issues
Page 34: JIRA Performance After 300,000 Issues
Page 35: JIRA Performance After 300,000 Issues

What About Process? The Rule of 5 “P”"

Page 36: JIRA Performance After 300,000 Issues

Process"

Proficiency

Proof

Production

Plugins Procrastinate

Proliferate

Page 37: JIRA Performance After 300,000 Issues

Proficiency"

•  Build knowledge about your infrastructure"•  Audit your systems"•  Survey your users"•  Observe new technology trends"

Page 38: JIRA Performance After 300,000 Issues

Proof Production"

•  Never update without testing your production data on a staging environment"

•  Involve your users in the acceptance testing"•  Go live with their consensus"

Page 39: JIRA Performance After 300,000 Issues

Plugins"

•  Never install unsupported or discontinued"•  For commercial ones, have a support contract"•  Install only those that are strictly needed"•  Update plugins on staging first, then production"

Page 40: JIRA Performance After 300,000 Issues

Procrastinate"

•  Do not upgrade “for the press release”"•  Proceed by steps: don’t change in one go, DB, OS,

Application. Let the changes “marinate.”"•  Avoid changes close to important deadlines: product

release, end of quarter."•  Exercise the “change freeze” option."

Page 41: JIRA Performance After 300,000 Issues

Proliferate"

•  Keep users informed:"•  on upcoming system changes"

•  on usage tips – best practices (browsers, settings, etc.)"

•  Newsletter"

Page 42: JIRA Performance After 300,000 Issues

RFC – Request For Change"

•  Track all your changes: allows you to step back in case of problems."•  Record the testing done on

staging environment"•  Document your roll-back

plan"

•  Use an approval workflow"•  Deny implementation in

case of doubt"•  Do maintenance outside

business hours"•  Keep RFC process on

another system, not JIRA"

Page 43: JIRA Performance After 300,000 Issues

RFC – Log"

Page 44: JIRA Performance After 300,000 Issues

RFC – Log"

Page 45: JIRA Performance After 300,000 Issues

Conclusions"

Page 46: JIRA Performance After 300,000 Issues

#summit12

Managing #JIRA Performance is not all about

infrastructure. Also how you manage your enterprise

processes.

Page 47: JIRA Performance After 300,000 Issues

Join me on Linked-in Group JIRA Performance

http://www.linkedin.com/groups?home=&gid=4454622&trk=anet_ug_hm"

Page 48: JIRA Performance After 300,000 Issues

Thank you! [email protected]

http://www.linkedin.com/pub/claudio-ombrella/0/919/17a