Download - locseckpi

Transcript
Page 1: locseckpi

PERFORMANCE MANAGEMENT SYSTEMKEY PERFORMANCE INDICATORS

Assessment year:2014-15

1 | Page

Ranchi Fluid System & Piping

KPI Code KPI Description000 Non Specific / On Leave001 Basic Engineering - Preparation002 Basic Engineering - Checking003 Basic Engineering - Approval004 Design Calculations for Proceeding with Engineering (Internal) 005 Assignment - Preparation006 Assignment - Checking007 Assignment - Approval008 Drawings - Preparation009 Drawings - Checking010 Drawings - Approval011 Concurrence of Drawings012 Revision of Drawings013 New/ Revision of Drawings/ TS due to change in Client Requirements014 Technical/ Ordering Specification - Preparation015 Technical/ Ordering Specification - Checking016 Technical/ Ordering Specification - Approval017 Manuals - Preparation018 Manuals - Checking019 Manuals - Approval020 Technical Input/ Guidance to Working Engineers/ Agencies for

Preparation of Drawings/ Manuals/ Reports/ TS021 Checking/ Approval of Design Calculations, Data Sheets, Procedures,

Test Reports, Manuals022 Checking/ Approval of Vendor Drawings/ Documents025 Project Co - Ordination026 Technical Co - Ordination027 Meeting with Client/ Vendor028 Review of Project030 Preparation of Site Sketches031 Preparation of As -Built Drawings032 Project Engineering033 Construction Supervision034 Designer's Supervision035 Commissioning activities036 Post - Commissioning Activities037 Preparation of Billing Schedule038 Approval of Billing Schedule039 Preparation of Offer (Technical part)041 Preparation of Volume of Work/ Cost Estimates042 Assistance to Marketing for Client Identification/ Relation Building/

Preparation of Offer043 Tender Document - Preparation044 Tender Document - Checking045 Tender Document - Approval047 Tender Scrutiny & Negotiation052 Inspection at Vendor's Works053 Manufacturing Supervision & Expediting for Turnkey/ Supply Jobs058 Post Order Contractual Activities upto Closure of Contracts

Page 2: locseckpi

PERFORMANCE MANAGEMENT SYSTEMKEY PERFORMANCE INDICATORS

Assessment year:2014-15

2 | Page

KPI Code KPI Description059 Vendor Development, Approval, Registration & Listing071 Asset Evaluation074 Data Collection at Site077 Assistance in replying to Audit queries092 Planning and Coordinating093 Training and Presentation106 Maintaining and Updating Database123 Attending Training Program124 Attending Seminars/ Conferences/ Workshops125 Administration (Technical Section Related)126 To & Fro Journey Time During Official Tours (not Limited to

Reimbursable Job Only)127 RTI Activities129 Raising of Invoices152 Preparation of 3D views (unit of output may be kept in Sqm.)155 Coordination with other Engineering offices160 FEASIBILITY REPORT ( FR / TEFR / DPR / CPFR)165 Finalization of progress reporting formats172 Delay analysis198 Concept report199 Developing design aids and tables in EXCEL for repetitive use 200 Knowledge acquiring in new latest codes, standard practices202 Readiness to take up new assignments, new tasks, new postings203 Adaptability to new type of works204 Giving workable solutions timely205 Knowledge acquiring in new latest codes, standard practices,

professional experience in solving difficult problems .206 Checking of vendor design / fabrication drawings208 3D Modelling and generating drgs209 preparation of sketches / giving workable solutions timely210 Preparation of TS, Tender / Asset evaluation, DPRs, TEFRs, estimates232 Conducting Management Trainee Orientation Training


Top Related