locseckpi

2
PERFORMANCE MANAGEMENT SYSTEM KEY PERFORMANCE INDICATORS Assessment year: 2014-15 1 | Page Ranchi Fluid System & Piping KPI Code KPI Description 000 Non Specific / On Leave 001 Basic Engineering - Preparation 002 Basic Engineering - Checking 003 Basic Engineering - Approval 004 Design Calculations for Proceeding with Engineering (Internal) 005 Assignment - Preparation 006 Assignment - Checking 007 Assignment - Approval 008 Drawings - Preparation 009 Drawings - Checking 010 Drawings - Approval 011 Concurrence of Drawings 012 Revision of Drawings 013 New/ Revision of Drawings/ TS due to change in Client Requirements 014 Technical/ Ordering Specification - Preparation 015 Technical/ Ordering Specification - Checking 016 Technical/ Ordering Specification - Approval 017 Manuals - Preparation 018 Manuals - Checking 019 Manuals - Approval 020 Technical Input/ Guidance to Working Engineers/ Agencies for Preparation of Drawings/ Manuals/ Reports/ TS 021 Checking/ Approval of Design Calculations, Data Sheets, Procedures, Test Reports, Manuals 022 Checking/ Approval of Vendor Drawings/ Documents 025 Project Co - Ordination 026 Technical Co - Ordination 027 Meeting with Client/ Vendor 028 Review of Project 030 Preparation of Site Sketches 031 Preparation of As -Built Drawings 032 Project Engineering 033 Construction Supervision 034 Designer's Supervision 035 Commissioning activities 036 Post - Commissioning Activities 037 Preparation of Billing Schedule 038 Approval of Billing Schedule 039 Preparation of Offer (Technical part) 041 Preparation of Volume of Work/ Cost Estimates 042 Assistance to Marketing for Client Identification/ Relation Building/ Preparation of Offer 043 Tender Document - Preparation 044 Tender Document - Checking 045 Tender Document - Approval 047 Tender Scrutiny & Negotiation 052 Inspection at Vendor's Works 053 Manufacturing Supervision & Expediting for Turnkey/ Supply Jobs 058 Post Order Contractual Activities upto Closure of Contracts

Upload: pooja-tripathi

Post on 19-Dec-2015

1 views

Category:

Documents


0 download

DESCRIPTION

KPI

TRANSCRIPT

Page 1: locseckpi

PERFORMANCE MANAGEMENT SYSTEMKEY PERFORMANCE INDICATORS

Assessment year:2014-15

1 | Page

Ranchi Fluid System & Piping

KPI Code KPI Description000 Non Specific / On Leave001 Basic Engineering - Preparation002 Basic Engineering - Checking003 Basic Engineering - Approval004 Design Calculations for Proceeding with Engineering (Internal) 005 Assignment - Preparation006 Assignment - Checking007 Assignment - Approval008 Drawings - Preparation009 Drawings - Checking010 Drawings - Approval011 Concurrence of Drawings012 Revision of Drawings013 New/ Revision of Drawings/ TS due to change in Client Requirements014 Technical/ Ordering Specification - Preparation015 Technical/ Ordering Specification - Checking016 Technical/ Ordering Specification - Approval017 Manuals - Preparation018 Manuals - Checking019 Manuals - Approval020 Technical Input/ Guidance to Working Engineers/ Agencies for

Preparation of Drawings/ Manuals/ Reports/ TS021 Checking/ Approval of Design Calculations, Data Sheets, Procedures,

Test Reports, Manuals022 Checking/ Approval of Vendor Drawings/ Documents025 Project Co - Ordination026 Technical Co - Ordination027 Meeting with Client/ Vendor028 Review of Project030 Preparation of Site Sketches031 Preparation of As -Built Drawings032 Project Engineering033 Construction Supervision034 Designer's Supervision035 Commissioning activities036 Post - Commissioning Activities037 Preparation of Billing Schedule038 Approval of Billing Schedule039 Preparation of Offer (Technical part)041 Preparation of Volume of Work/ Cost Estimates042 Assistance to Marketing for Client Identification/ Relation Building/

Preparation of Offer043 Tender Document - Preparation044 Tender Document - Checking045 Tender Document - Approval047 Tender Scrutiny & Negotiation052 Inspection at Vendor's Works053 Manufacturing Supervision & Expediting for Turnkey/ Supply Jobs058 Post Order Contractual Activities upto Closure of Contracts

Page 2: locseckpi

PERFORMANCE MANAGEMENT SYSTEMKEY PERFORMANCE INDICATORS

Assessment year:2014-15

2 | Page

KPI Code KPI Description059 Vendor Development, Approval, Registration & Listing071 Asset Evaluation074 Data Collection at Site077 Assistance in replying to Audit queries092 Planning and Coordinating093 Training and Presentation106 Maintaining and Updating Database123 Attending Training Program124 Attending Seminars/ Conferences/ Workshops125 Administration (Technical Section Related)126 To & Fro Journey Time During Official Tours (not Limited to

Reimbursable Job Only)127 RTI Activities129 Raising of Invoices152 Preparation of 3D views (unit of output may be kept in Sqm.)155 Coordination with other Engineering offices160 FEASIBILITY REPORT ( FR / TEFR / DPR / CPFR)165 Finalization of progress reporting formats172 Delay analysis198 Concept report199 Developing design aids and tables in EXCEL for repetitive use 200 Knowledge acquiring in new latest codes, standard practices202 Readiness to take up new assignments, new tasks, new postings203 Adaptability to new type of works204 Giving workable solutions timely205 Knowledge acquiring in new latest codes, standard practices,

professional experience in solving difficult problems .206 Checking of vendor design / fabrication drawings208 3D Modelling and generating drgs209 preparation of sketches / giving workable solutions timely210 Preparation of TS, Tender / Asset evaluation, DPRs, TEFRs, estimates232 Conducting Management Trainee Orientation Training