KP1.0
KP1.6
0 500m 1km
File
n
am
e \\U
K.W
SP
GR
OU
P.C
OM
\C
EN
TR
AL
D
AT
A\P
RO
JE
CT
S\6
21
00
XX
X\6
21
00
61
6 - A
QU
IN
D V
O N
O.3
\E
M
OD
EL
S A
ND
D
RA
WIN
GS
\3
00
- S
IT
E\3
40
- T
AS
K 9
M
AR
IN
E R
OU
TE
\C
UR
RE
NT
\E
NV
IR
ON
ME
NT
AL
ST
AT
EM
EN
T\U
K\R
EV
1
\F
IG
UR
E 3
.3
U
K L
AN
DF
AL
L.D
WG
,
Figure 3.3 - UK Landfall
CDL CDL
wsp.com
WSP House, 70 Chancery Lane, London, WC2A 1AF, UK
T+ 44 (0) 207 314 5000, F+ 44 (0) 207 314 5111
APPROVED:
DRAWING No:
PROJECT No:
SCALE AT A3:
TITLE:
PROJECT:
DESIGNED:
CHECKED:
DATE:
REV:
CLIENT:
DRAWING STATUS:
DRAWN:
WSP UK Ltd
c
EN020022-ES-3.3 01
1:10000 CDL CDL
EN020022 SA SA 01/10/2019
AQUIND Interconnector
FINAL
Note: Whilst HDD exit shown as KP1.25, the final
position could be at any location between KP1.0 and
KP1.6 depending on final design hence envelope
shown
EASTNEY
POURVILLE-SUR-MER
CHANNEL
ENGLAND
FRANCE
N
N
KEY
APPROXIMATE HDD DUCT LOCATIONS
MHWS
MARINE CABLE CORRIDOR/ORDER LIMITS
ENVELOPE FOR HDD EXIT (KP1.0-KP1.6)
SPECIAL AREA OF CONSERVATION
Infrastructure Planning (Environmental Impact
Assessment) Regulations 2017 - Regulation 5(2)(a)