marine cable corridor/order limits envelope for hdd …... · kp1.0 kp1.6 0 500m 1km file name...

1
KP1.0 KP1.6 0 500m 1km File name \\UK.WSPGROUP.COM\CENTRAL DATA\PROJECTS\62100XXX\62100616 - AQUIND VO NO.3\E MODELS AND DRAWINGS\300 - SITE\340 - TASK 9 MARINE ROUTE\CURRENT\ENVIRONMENTAL STATEMENT\UK\REV 1\FIGURE 3.3 UK LANDFALL.DWG, Figure 3.3 - UK Landfall CDL CDL wsp.com WSP House, 70 Chancery Lane, London, WC2A 1AF, UK T+ 44 (0) 207 314 5000, F+ 44 (0) 207 314 5111 APPROVED: DRAWING No: PROJECT No: SCALE AT A3: TITLE: PROJECT: DESIGNED: CHECKED: DATE: REV: CLIENT: DRAWING STATUS: DRAWN: WSP UK Ltd c EN020022-ES-3.3 01 1:10000 CDL CDL EN020022 SA SA 01/10/2019 AQUIND Interconnector FINAL Note: Whilst HDD exit shown as KP1.25, the final position could be at any location between KP1.0 and KP1.6 depending on final design hence envelope shown EASTNEY POURVILLE-SUR-MER CHANNEL ENGLAND FRANCE N N KEY APPROXIMATE HDD DUCT LOCATIONS MHWS MARINE CABLE CORRIDOR/ORDER LIMITS ENVELOPE FOR HDD EXIT (KP1.0-KP1.6) SPECIAL AREA OF CONSERVATION Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 - Regulation 5(2)(a)

Upload: others

Post on 21-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MARINE CABLE CORRIDOR/ORDER LIMITS ENVELOPE FOR HDD …... · kp1.0 kp1.6 0 500m 1km file name \\uk.wspgroup.com\central data\projects\62100xxx\62100616 - aquind vo no.3\e models

KP1.0

KP1.6

0 500m 1km

File

n

am

e \\U

K.W

SP

GR

OU

P.C

OM

\C

EN

TR

AL

D

AT

A\P

RO

JE

CT

S\6

21

00

XX

X\6

21

00

61

6 - A

QU

IN

D V

O N

O.3

\E

M

OD

EL

S A

ND

D

RA

WIN

GS

\3

00

- S

IT

E\3

40

- T

AS

K 9

M

AR

IN

E R

OU

TE

\C

UR

RE

NT

\E

NV

IR

ON

ME

NT

AL

ST

AT

EM

EN

T\U

K\R

EV

1

\F

IG

UR

E 3

.3

U

K L

AN

DF

AL

L.D

WG

,

Figure 3.3 - UK Landfall

CDL CDL

wsp.com

WSP House, 70 Chancery Lane, London, WC2A 1AF, UK

T+ 44 (0) 207 314 5000, F+ 44 (0) 207 314 5111

APPROVED:

DRAWING No:

PROJECT No:

SCALE AT A3:

TITLE:

PROJECT:

DESIGNED:

CHECKED:

DATE:

REV:

CLIENT:

DRAWING STATUS:

DRAWN:

WSP UK Ltd

c

EN020022-ES-3.3 01

1:10000 CDL CDL

EN020022 SA SA 01/10/2019

AQUIND Interconnector

FINAL

Note: Whilst HDD exit shown as KP1.25, the final

position could be at any location between KP1.0 and

KP1.6 depending on final design hence envelope

shown

EASTNEY

POURVILLE-SUR-MER

CHANNEL

ENGLAND

FRANCE

N

N

KEY

APPROXIMATE HDD DUCT LOCATIONS

MHWS

MARINE CABLE CORRIDOR/ORDER LIMITS

ENVELOPE FOR HDD EXIT (KP1.0-KP1.6)

SPECIAL AREA OF CONSERVATION

Infrastructure Planning (Environmental Impact

Assessment) Regulations 2017 - Regulation 5(2)(a)

AutoCAD SHX Text
REV
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APP
AutoCAD SHX Text
01
AutoCAD SHX Text
01/10/2019
AutoCAD SHX Text
SMA
AutoCAD SHX Text
FIRST ISSUE