Measurement & Analysis

Maturity Level 2 – Support GroupCMMI V1.2

Process Owner – Ravi21st Dec. 2009

Page 2: Measurement & Analysis CMMI

• Not everything that can be counted counts, and not everything that counts can be counted. Albert Einstein

Page 3: Measurement & Analysis CMMI
Page 4: Measurement & Analysis CMMI

Whose requirement?

• This process is not CMMI requirement but it is OUR requirement.

Page 5: Measurement & Analysis CMMI

Purpose of M&A

• The purpose of Measurement and Analysis (MA) is to develop and sustain a measurement capability that is used to support management information needs.CMMI V1.2 page 178

Page 6: Measurement & Analysis CMMI

• Judgments may need to be made about whether the value of the results will be commensurate with the resources devoted to doing the work.

Page 7: Measurement & Analysis CMMI

Measurement and Analysis Plan

• Measurement and Analysis of Product Performance.• Measurement and Analysis of Project Performance.• Measurement and Analysis of Business Process Performance.• Measurement and Analysis of Training Process Performance.

Page 8: Measurement & Analysis CMMI

Some examples for M&A in L&T Faridabad

• PAL (Present Absent System)• PIP report (performance improvement process)• MIMS (time sheet)• Engineering Progress• CPI (Cost performance index)• SPI (Schedule performance index)• Cash Flow curve• Errors• VDR turnaround time• Team members/ resources (manpower planning)• DAR methods (A decision making technique, tried in WADI)• Printer plotter issues• Use of paper• Stationary use• Travel expenditure• Resource management software used by S&L• FAIR (Appraisal/Bell Curve)• Risk Measurement• Meeting attendance

Page 9: Measurement & Analysis CMMI
Page 10: Measurement & Analysis CMMI
Page 11: Measurement & Analysis CMMI
Page 12: Measurement & Analysis CMMI

Specific Goal and Practice Summary

• SG 1 Align Measurement and Analysis Activities

– SP 1.1 Establish Measurement Objectives– SP 1.2 Specify Measures– SP 1.3 Specify Data Collection and Storage Procedures– SP 1.4 Specify Analysis Procedures

• SG 2 Provide Measurement Results

– SP 2.1 Collect Measurement Data– SP 2.2 Analyze Measurement Data– SP 2.3 Store Data and Results– SP 2.4 Communicate Results

Page 13: Measurement & Analysis CMMI

Measurement objectives

• Measurement objectives document the purposes for which measurement and analysis are done, and specify the kinds of actions that may be taken based on the results of data analyses.

• Example :Maintain time of delivery• SP 1.1

Page 14: Measurement & Analysis CMMI

Measures

• Measures may be either “base” or “derived.” Data for base measures are obtained by direct measurement. Data for derived measures come from other data, typically by combining two or more base measures.

• Example : – Turnaround time for VDR (Base)– Turnaround time for VDR in Mechanical/Total Turnaround time

for VDR from all dept (Derived)• SP 1.2

Page 15: Measurement & Analysis CMMI

Data Collection and Storage Procedures

• Specifying how measurement data will be obtained and stored. Proper attention to storage and retrieval procedures helps ensure that data are available and accessible for future use.

• SP 1.3, SP 2.1 & SP 2.3

Page 16: Measurement & Analysis CMMI

Analysis Procedures

• Specifying how measurement data will be analyzed and reported.• SP 1.4 & SP 2.2

Page 17: Measurement & Analysis CMMI

Communicate Results

• Report results of measurement and analysis activities to all relevant stakeholders.

• The results of the measurement and analysis process are communicated to relevant stakeholders in a timely and usable fashion to support decision making and assist in taking corrective action.

• SP 2.4

Page 18: Measurement & Analysis CMMI
Page 19: Measurement & Analysis CMMI

Generic Goal and Practices Summary

• GG 2 Institutionalize a Managed Process

– GP 2.1 Establish an Organizational Policy– GP 2.2 Plan the Process– GP 2.3 Provide Resources– GP 2.4 Assign Responsibility– GP 2.5 Train People– GP 2.6 Manage Configurations– GP 2.7 Identify and Involve Relevant Stakeholders– GP 2.8 Monitor and Control the Process– GP 2.9 Objectively Evaluate Adherence– GP 2.10 Review Status with Higher Level Management

• GG 3 Institutionalize a Defined Process

– GP 3.1 Establish a Defined Process– GP 3.2 Collect Improvement Information

Page 20: Measurement & Analysis CMMI

• SOP 0803 MEASUREMENT, ANALYSIS AND IMPROVEMENT

– Rev 0 15.06.2002– Pages : 8 no.– SOP Owner: – Project Performance Measures

1. Deliverable attainment status & Delay analysis2. “S” or banana progress & performance curve3. Man-hour consumption status4. Cost performance index (CPI)5. Schedule performance index (SPI)6. Estimate at completion (EAC)7. Look ahead schedule

Page 21: Measurement & Analysis CMMI
Page 22: Measurement & Analysis CMMI

Common Errors in Measurement and Analysis• Missing or Unclear Measurement Goals

– Measurement goals must be documented and reviewed on a regular basis to promote a common and shared understanding across the organization.

• Lack of Resources and Training• Differing Operational Definitions

– If operational definitions are not agreed upon at the start of a project and used consistently across the organization, the data collected will be unreliable when combined or compared.

• The Measurement Method Itself• Lack of Rigor in the Measurement Process

– Guessing rather than measuring.– Biased data collection.– Shifting the purpose associated with a measurement.

• Lack of Priority or Interest in the Measures and Their Analysis• Constrained Precision of Measurement• Failure to Analyze for Variation• Data Entry Errors

Page 23: Measurement & Analysis CMMI

TARGET?!