Transcript
2 © M+W GroupM+W U.S., Inc.
NFX Delay Analysis Report
Critical Status:• >25D Delay
• Overall duration affected
Caution Status:• >5D Delay
• <25D Delay
Controlled Status:• On ScheduleSAMPLESAMPLESAMPLEControlled Status:SAMPLEControlled Status:SAMPLE•SAMPLE• On ScheduleSAMPLEOn Schedule
3 © M+W GroupM+W U.S., Inc.
Mechanical Trestle Piping
SAMPLESAMPLE
4 © M+W GroupM+W U.S., Inc.
P6 Summary – Pipe Trestle Delay Impact
SAMPLE
5 © M+W GroupM+W U.S., Inc.
P6 Summary – Pipe Trestle Delay Impact
SAMPLESAMPLE
6 © M+W GroupM+W U.S., Inc.
Waffle Slab Schedule
SAMPLE