Objectives
• Analyze processes in AHU and buildings
![Page 2: Objectives Analyze processes in AHU and buildings](https://reader035.vdocuments.net/reader035/viewer/2022062720/56649f135503460f94c279dc/html5/thumbnails/2.jpg)
Single-Zone Systems
• Zone – any space with a thermostat
![Page 3: Objectives Analyze processes in AHU and buildings](https://reader035.vdocuments.net/reader035/viewer/2022062720/56649f135503460f94c279dc/html5/thumbnails/3.jpg)
Air conditioning
![Page 4: Objectives Analyze processes in AHU and buildings](https://reader035.vdocuments.net/reader035/viewer/2022062720/56649f135503460f94c279dc/html5/thumbnails/4.jpg)
Recirculation
![Page 5: Objectives Analyze processes in AHU and buildings](https://reader035.vdocuments.net/reader035/viewer/2022062720/56649f135503460f94c279dc/html5/thumbnails/5.jpg)
Reheat
![Page 6: Objectives Analyze processes in AHU and buildings](https://reader035.vdocuments.net/reader035/viewer/2022062720/56649f135503460f94c279dc/html5/thumbnails/6.jpg)
Evaporative Cooler
![Page 7: Objectives Analyze processes in AHU and buildings](https://reader035.vdocuments.net/reader035/viewer/2022062720/56649f135503460f94c279dc/html5/thumbnails/7.jpg)
Air-to-air heat exchanger
![Page 8: Objectives Analyze processes in AHU and buildings](https://reader035.vdocuments.net/reader035/viewer/2022062720/56649f135503460f94c279dc/html5/thumbnails/8.jpg)
![Page 9: Objectives Analyze processes in AHU and buildings](https://reader035.vdocuments.net/reader035/viewer/2022062720/56649f135503460f94c279dc/html5/thumbnails/9.jpg)
![Page 10: Objectives Analyze processes in AHU and buildings](https://reader035.vdocuments.net/reader035/viewer/2022062720/56649f135503460f94c279dc/html5/thumbnails/10.jpg)
![Page 11: Objectives Analyze processes in AHU and buildings](https://reader035.vdocuments.net/reader035/viewer/2022062720/56649f135503460f94c279dc/html5/thumbnails/11.jpg)
Summary
• Show HVAC processes on a psychrometric chart
• Draw condition lines• Define sensible heat ratio
• Draw HVAC processes for real buildings• Single zone• Multiple zone
• Skipping Chapter 9
![Page 12: Objectives Analyze processes in AHU and buildings](https://reader035.vdocuments.net/reader035/viewer/2022062720/56649f135503460f94c279dc/html5/thumbnails/12.jpg)
HW2
Problem #9:An office building has:- Sensible load of 91000Btu/h - Latent load of 16000 BTU/h- Required amount of fresh air of 1000CFM- Supply air temperature is 55 F in winter and 93 F in winter. -Outdoor design parameters are :
-Summer: DBT=105 F and RH=33%- Winter: 22 F and RH=80%
-Surface temperature of the cooling coil in AHU is 45 F (when it operates).
Calculate the energy for cooling and heating coils and steam humidifier for winter and summer design condition for CAV system that:a) control the relative humidity to 50% and room temperature to 74 Fb) control only room temperature to 74 F
Problems from the course book: 7.1, 7.21, 7.3, 7.4, 7.27, 8.5, 8.17, 8.20
Due: February 23rd