PERIODE
MARET 2016
LAPORAN DIVISI ENGINEERING
APARTEMENT TAMAN KEMAYORAN CONDOMINIUM
PERIODE MARET 2016
LAPORAN BULANAN ENGINEERING APARTEMENT
TAMAN KEMAYORAN CONDOMINIUM
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 2
LAPORAN BULANAN ENGINEERING
APARTEMENT TAMAN KEMAYORAN CONDOMINIUM
URAIAN PEKERJAAN
PENGECATAN PAGAR KOLAM RENANG DIKARENAKAN
WARNA CAT PADA PAGAR TELAH MEMUDAR
LOKASI
KOLAM RENANG
JOB DESCRIPTION
PAINTING OF SWIMMING POOL FENCE CAUSE IN THE
FENCE OF COLOUR HAVING OF PALE
LOCATION
SWIMMING POOL
URAIAN PEKERJAAN
PEMASANGAN PINTU TOILET YANG BARU DIKARENAKAN
PINTU YANG LAMA TELAH RUSAK PADA BAGIAN HANDLE
PINTU
LOKASI
TOILET WANITA DASAR ASTER
JOB DESCRIPTION
FIXING OF THE NEW DOOR TOILET CAUSE IN THE PAST DOOR
TOILET THAT’S BROKEN ON THE PART DOOR HANDLE
LOCATION
BASE OF FEMALE ASTER TOILET ROOM
URAIAN PEKERJAAN
PENGECATAN CEROBONG EXHAUST EBONY DIKARENAKAN
KERANGKA BESI YANG BERADA DIATAS CEROBONG TELAH
BERKARAT
LOKASI
EBONY DASAR
JOB DESCRIPTION
PAINTING OF THE SMOKESTACK EBONY EXHAUST CAUSE IN
THE IRON FRAMEWORK HAVING OF RUSTY
LOCATION
BASE OF EBONY
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 3
URAIAN PEKERJAAN
PERBAIKAN PIPA AIR KOTOR YANG MAMPET YANG DISEBABKAN
OLEH KOTORAN LEMAK YANG MENGGUMPAL DIDALAM PIPA
LOKASI
CENDANA BASEMENT
JOB DESCRIPTION
REPAIR OF DIRTY WATER PIPE ISN’T GOING CAUSE BE FOUND AXUNGE
OF SEWAGE HAVING OF CLOT IN THE PIPE
LOCATION
BASEMENT OF CENDANA
URAIAN PEKERJAAN
PEMASANGAN LAMPU PLS YANG BARU DAN INSTALASI LAMPU
PLS DIKARENAKAN TERDAPAT BANYAK LAMPU YANG MATI
LOKASI
TOWER CENDANA LANTAI 23
JOB DESCRIPTION
FIXING ON THE NEW PLS LAMP AND FIXING ON THE LAMP
INSTALLATION CAUSE IN MUCH THERE LAMP IS OFF
LOCATION
CENDANA TOWER ON THE FLOOR TWENTYTHREE
URAIAN PEKERJAAN
PROSES PERBAIKAN KEBOCORAN YANG DILAKUKAN
DENGAN PEMBERIAN SEMEN SIKA DAN AQUAPROOF PADA
SUMBER KEBOCORAN
LOKASI
ATAP RUANG MESIN LIFT BOUGENVILLE
JOB DESCRIPTION
THE IMPROVEMENT PROCESS LEAKING HAVING DO THAT’S
TAKING OF SICA SEMENT AND AQUAPROOF ON THE LEAKING
SOURCE
LOCATION
ON ROOF THE ELEVATOR MACHINE BOUGENVILLE ROOM
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 4
URAIAN PEKERJAAN
BRIEFING CREW ENGINEERING YANG DILAKUKAN SETIAP SORE HARI
MEMBAHAS MENGENAI MASALAH DAN KENDALA DALAM PEKERJAAN
SEHARI-HARI BERSAMA CREW ENGINEERING,LEADER ENGINEERING
,SUPERVISOR ENGINEERING DAN CHIEF ENGINEERING
LOKASI
RUANG ENGINEERING
JOB DESCRIPTION
THE CREW ENGINEERING BRIEFING ON THAT’S EVERY AFTERNOON
DISCUSS OF ABOUT OBSTACLES AND PROBLEM IN THE WORKING
EVERYDAY WITH ENGINEERING CREW ,ENGINEERING LEADER
,ENGINEERING SUPERVISOR AND ENGINEERING CHIEF
LOCATION
ENGINEERING ROOM
URAIAN PEKERJAAN
PROSES PERBAIKAN POMPA YANG RUSAK DIKARENAKAN AS PADA
POMPA MENGALAMI KERUSAKAN
LOKASI
RUANG POMPA CENDANA
JOB DESCRIPTION
THE IMPROVEMENT PROCESS OF PUMP IS BROKEN CAUSE IN PART
ON PUMP HAVING BROKEN
LOCATION
PUMP CENDANA ROOM
URAIAN PEKERJAAN
PROSES PEMASANGAN ACCU YANG BARU DIKARENAKAN ACCU
YANG LAMA SUDAH TIDAK BERFUNGSI
LOKASI
RUANG GENZET ASTER
JOB DESCRIPTION
THE FIXING PROCESS NEW ACCU CAUSE IN THE PAST ACCU HAVEN’T
FUNCTION
LOCATION
ASTER GENZET ROOM
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 5
URAIAN PEKERJAAN
PROSES PERBAIKAN STOPKONTAK YANG DIKARENAKAN POSISI STOPKONTAK
TERLEPAS DARI DUDUKANNYA
LOKASI
TOWER BOUGENVILLE LANTAI 1
JOB DESCRIPTION
THE REPAIR PROCESS OUTLET CAUSE IN THE OUTLET POSITION RELEASED FROM
ON PLACED
LOCATION
BOUGENVILLE TOWER ON THE FIRST FLOOR
URAIAN PEKERJAAN
PENYETTINGAN KARTU AKSES DILAKUKAN OLEH ENGINEERING DALAM
SETIAP PEMBUATAN KARTU AKSES BARU SEBAGAIMANA PERMINTAAN DARI
TENANT/PENGHUNI
LOKASI
DALAM LIFT SETIAP TOWER
JOB DESCRIPTION
THE SETTING ACESS CARD THAT’S BY ENGINEERING IN EVERY THE MAKING A
NEW CARD AS REQUEST FROM TENANT
LOCATION
IN THE LIFT EVERY TOWER
URAIAN PEKERJAAN
PROSES PEMBERIAN GREASE PADA BEARING-BEARING POMPA
TRANSFER AIR BERSIH EBONY DAN CENDANA
LOKASI
RUANG POMPA CENDANA
JOB DESCRIPTION
THE TAKING PROCESS ON GREASE AT THE WATER CLEAN PUMP OF
BEARINGS EBONY ANDA CENDANA
LOCATION
PUMP CENDANA ROOM
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 6
URAIAN PEKERJAAN
PENGAWASAN YANG DILAKUKAN OLEH CREW ENGINEERING PADA
SAAT VENDOR LIFT MELAKUKAN SERVICE HARIAN
LOKASI
LIFT BOUGENVILLE P2
JOB DESCRIPTION
SURVEILLANCE THAT’S DO ENGINEERING CREW WHEN THE ELEVATOR
OF VENDOR HAVING ON DAILY SERVICE
LOCATION
BOUGENVILLE ELEVATOR P2
URAIAN PEKERJAAN
PROSES PERAPIHAN KABEL YANG TERDAPAT PADA PNTU
GARBAGE KORIDOR LANTAI 18 BOUGENVILLE
LOKASI
TOWER BOUGENVILLE LANTAI 18
JOB DESCRIPTION
THE CLEAN-UP PROCESS ON CABLE FINDING IN THE GARBAGE
DOOR CORRIDOR AT BOUGENVILLE ON THE FLOOR EIGHTEEN
LOCATION
BOUGENVILLE TOWER ON THE FLOOR EIGHTEEN
URAIAN PEKERJAAN
PROSES PERBAIKAN PADA POS SECUIRITY YANG DIKARENAKAN
POS TERDAPAT BANYAK KERUSAKAN SEPERTI CAT PADA DINDING
YANG TELAH MEMUDAR DAN TEMBOK DINDING PADA RETAK
LOKASI
POS PINTU MASUK APARTEMEN TKC
JOB DESCRIPTION
THE REPAIR PROCESS ON SECUIRITY POST CAUSE IN THE POST FIND IT
MUCH BROKEN SUCH AS THE PAINT OF WALL HAVING FADING AND
THE STONEWALL HAVING CRACKED
LOCATION
ENTRANCE TKC OF APARTEMENT
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 7
URAIAN PEKERJAAN
PROSES PEMASANGAN POMPA TRANSFER AIR BERSIH CENDANA
NO.1 YANG TELAH DIRAKIT AS PADA BAGIAN POMPA
LOKASI
RUANG POMPA CENDANA
JOB DESCRIPTION
THE FIXING PROCESS ON WATER CLEAN OF PUMP NUMBER ONE AFTER
THAT’S RAFT ON THE PART OF PUMP
LOCATION
CENDANA PUMP ROOM
URAIAN PEKERJAAN
PENYETTINGAN CHANNEL TV DIKARENAKAN SEMUA CHANNEL
PADA TV MENGHILANG DILAKUKAN AUTO-TUNNING PADA TV
LOKASI
TOWER CENDANA LANTAI 05/02
JOB DESCRIPTION
THE SETTING TV ON CHANNEL CAUSE IN ALL THE CHANNEL ON TV
DISAPPEAR THAT’S AUTO-TUNNING ON TV
LOCATION
CENDANA TOWER ON THE FLOOR FIVE ZERO TWO
URAIAN PEKERJAAN
PEMASANGAN LAMPU SOROT UNTUK TULISAN APARTEMENT TKC
GAMBAR TERSEBUT SETELAH PEMASANGAN
LOKASI
PINTU MASUK APARTEMENT TKC
JOB DESCRIPTION
INSTALLATION THE SPOTLIGHTS FOR SCRIPT OF TKC APARTEMENT
THAT’S PICTURE AFTER OF FIXING
LOCATION
ENTRANCE OF TKC APARTEMENT
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 8
URAIAN PEKERJAAN
PENANGANAN/PERBAIKAN SEMENTARA POMPA KOLAM RENANG
YANG BOCOR
LOKASI
RUANG POMPA KOLAM RENANG
JOB DESCRIPTION
HANDLING OR TEMPORARY REPAIRS POOLPUMP IS LEAKING
LOCATION
POOL PUMP ROOM
URAIAN PEKERJAAN
PROSES PENGECATAN TIANG RAMBU YANG DIKARENAKAN
CAT PADA TIANG RAMBU BANYAK YANG TELAH MEMUDAR
LOKASI
AKASIA LANTAI DASAR
JOB DESCRIPTION
THE PAINTING PROCESS OF STAKE SIGN CAUSE IN THE PAINT ON
STAKE SIGN HAVING MUCH OF PALE
LOCATION
BASE ON THE FLOOR AKASIA
URAIAN PEKERJAAN
PERBAIKAN KRAN YANG BERMASALAH DIKARENAKAN BAGIAN
PADA KRAN MENGALAMI KERUSAKAN
LOKASI
TOWER ASTER LANTAI 09/02
JOB DESCRIPTION
REPAIR OF THE SINK IS PROBLEM CAUSE IN THE SINK PART HAVING
BROKEN
LOCATION
ASTER TOWER ON THE FLOOR NINE ZERO TWO
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 9
URAIAN PEKERJAAN
PROSES PERBAIKAN KEBOCORAN DENGAN PENAMBALAN DENGAN
PEMBERIAN AQUAPROOF PADA DINDING TERAS LUAR
LOKASI
TOWER AKASIA LANTAI 16/02
JOB DESCRIPTION
THE REPAIR OF PROCESS LEAKING WITH A TAKING AQUAPROOF ON
THE WALL TERRACE OUTSIDE
LOCATION
AKASIA TOWER ON THE FLOOR SIXTEEN ZERO TWO
URAIAN PEKERJAAN
PENYETTINGAN SALURAN TV YANG DILAKUKAN OLEH ENGINEERING
DIKARENAKAN SALURAN TV MENGALAMI GANGGUAN DARI PUSAT
SIARAN TV
LOKASI
RUANG HEAD-END TV
JOB DESCRIPTION
THE SETTING ON CHANNEL TV THAT’S BY ENGINEERING CAUSE IN THE TV
CHANNEL GO THROUGH INTERFERENCE FROM THE CENTER TV BROADCAST
LOCATION
HEAD-END TV ROOM
URAIAN PEKERJAAN
PERBAIKAN PINTU EXIT LUAR DIKARENAKAN DOOR CLOSE PADA
PINTU TERSEBUT SUDAH TIDAK BERFUNGSI
LOKASI
TOWER CENDANA LANTAI 11
JOB DESCRIPTION
THE REPAIR OF EXIT OUTSIDE DOOR CAUSE IN THE DOOR CLOSE ON
THAT’S DOOR HAVEN’T FUNCTION
LOCATION
ASTER TOWER ON THE FLOOR ELEVEN
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 10
URAIAN PEKERJAAN
PERBAIKAN KEBOCORAN YANG TERDAPAT PADA DINDING
TERAS LUAR BALKON YANG DIKARENAKAN SALURAN DRAIN
YANG MAMPET
LOKASI
TOWER EBONY LANTAI 10/03
JOB DESCRIPTION
THE LEAKING OF REPAIR GET ON TERRACE IN WALL OUTSIDE
BALCONY THAT’S CAUSE THE DRAIN PIPELINE HASN’T GOING
LOCATION
EBONY TOWER ON THE FLOOR TEN ZERO THREE
URAIAN PEKERJAAN
PERBAIKAN INSTALASI SALURAN AIR TAMAN DIKARENAKAN
PIPA MENGALAMI KERUSAKAN (BOCOR PADA BAGIAN PIPA)
LOKASI
TOWER AKASIA LANTAI DASAR
JOB DESCRIPTION
REPAIR IS THE PIPELINE INSTALLATION GARDEN WATER CAUSE IN
PIPE HAS BROKEN GO THROUGH (LEAKING ON THE PART PIPE)
LOCATION
ASTER TOWER ON THE BASE FLOOR
URAIAN PEKERJAAN
PEMASANGAN LAMPU TL YANG BARU DIKARENAKAN
LAMPU TL YANG LAMA TELAH PADAM
LOKASI
TOWER FLAMBOYAN LANTAI 14
JOB DESCRIPTION
THE FIXING OF NEW LAMP CAUSE IN THE PAST OF LAMP HAVE
GO OUT
LOCATION
ASTER TOWER ON THE FLOOR FOURTEEN
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 11
URAIAN PEKERJAAN
PERBAIKAN LUBANG CLOSED DAN LUBANG DRAIN YANG
RUSAK
LOKASI
TOWER AKASIA LANTAI 17/02
JOB DESCRIPTION
REPAIR OF THE HOLE CLOSED AND THE HOLEDRAIN IS BROKEN
LOCATION
AKASIA TOWER ON THE FLOOR SEVENTEEN ZERO TWO
URAIAN PEKERJAAN
PERBAIKAN PINTU TEMPAT SAMPAH YANG TERKUNCI
LOKASI
TOWER ASTER LANTAI 17
JOB DESCRIPTION
REPAIR OF THE DOOR GARBAGE IS LOCKED
LOCATION
ASTER TOWER ON THE FLOOR SEVENTEEN
URAIAN PEKERJAAN
PEMASANGAN LAMPU DI KORIDOR FLAMBOYAN
DIKARENAKAN LAMPU TELAH PADAM
LOKASI
TOWER FLAMBOYAN LANTAI 15
JOB DESCRIPTION
INSTALLATION OF THE LAMP CORRIDOR CAUSE IN THE LAMP
HAVE GO OUT
LOCATION
FLAMBOYAN TOWER ON THE FLOOR FIVETEEN
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 12
URAIAN PEKERJAAN
PEMASANGAN LAMPU DI KORIDOR AKASIA DIKARENAKAN
LAMPU TELAH PADAM
LOKASI
TOWER AKASIA LANTAI 16
JOB DESCRIPTION
INSTALLATION OF THE LAMP CORRIDOR CAUSE IN THE LAMP
HAVE GO OUT
LOCATION
AKASIA TOWER ON THE FLOOR SIXTEEN
URAIAN PEKERJAAN
PEMASANGAN KUNCI KAMAR YANG BARU DIKARENAKAN
KUNCI YANG LAMA TIDAK BERFUNGSI SEBAGAIMANA
MESTINYA
LOKASI
TOWER EBONY LANTAI 21/03
JOB DESCRIPTION
FIXING OF THE NEW KEYROOM CAUSE IN THE PAST KEYROOM NOT
FUNCTION AS CERTAINLY
LOCATION
EBONY TOWER ON THE FLOOR TWENTYONE ZERO THREE
URAIAN PEKERJAAN
PROSES PEMASANGAN SCAFOLDING YANG AKAN
DIGUNAKAN UNTUK PEMASANGAN LAMPU JALAN
LOKASI
TOWER ASTER LANTAI DASAR
JOB DESCRIPTION
THE FIXING OF PROCESS SCAFOLDING IT WILL USED TO FIXING
OF THE STREETLIGHT
LOCATION
ASTER TOWER ON THE BASE FLOOR
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 13
URAIAN PEKERJAAN
PROSES PEMASANGAN LAMPU JALAN YANG DIKARENAKAN
LAMPU JALAN BANYAK YANG PADAM
LOKASI
TOWER ASTER LANTAI DASAR
JOB DESCRIPTION
THE FIXING OF PROCESS THE STREETLIGHT CAUSE IN
STREETLIGHT MANY HAVING GO OUT
LOCATION
ASTER TOWER ON THE BASE FLOOR
URAIAN PEKERJAAN
PERBAIKAN INSTALASI PIPA CUCIAN PIRING MAMPET YANG
DIKARENAKAN TERDAPAT PENGGUMPALAN LEMAK PADA
INSTALASI INDUK PIPA CUCIAN PIRING
LOKASI
TOWER FLAMBOYAN LANTAI 10/01
JOB DESCRIPTION
REPAIR OF THE PIPE DISHWATER INSTALLATION ISN’T GOING
CAUSE IN BE ABLE AXUNGE OF LUMP ON THE MAIN PIPE
INSTALLATION DISHWATER
LOCATION
FLAMBOYAN TOWER ON THE FLOOR TEN ZERO ONE
URAIAN PEKERJAAN
PROSES PERBAIKAN KEBOCORAN DENGAN PEMBERIAN
SEMEN PADA SUMBER KEBOCORAN YANG
DIAKIBATKAN DARI SALURAN BATHUP YANG MAMPET
DAN RUSAK
LOKASI
TOWER BOUGENVILLE LANTAI 08/01
JOB DESCRIPTION
THE LEAKING PROCESS OF REPAIR WITH TAKING A
SEMENT ON LEAKING SOURCE HAVE EFFECTING FROM
BATHUP PIPELINE ISN’T GOING AND BROKEN
LOCATION
EBONY TOWER ON THE FLOOR FIVE ZERO FIVE
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 14
URAIAN PEKERJAAN
PROSES PERBAIKAN KEBOCORAN DENGAN PEMBERIAN
SEMEN PADA SUMBER KEBOCORAN YANG DIAKIBATKAN
DARI SALURAN BATHUP YANG MAMPET DAN RUSAK
LOKASI
TOWER BOUGENVILLE LANTAI 11/03
JOB DESCRIPTION
THE LEAKING PROCESS OF REPAIR WITH TAKING A SEMENT ON
LEAKING SOURCE HAVE EFFECTING FROM BATHUP PIPELINE
ISN’T GOING AND BROKEN
LOCATION
BOUGENVILLE TOWER ON THE FLOOR ELEVEN ZERO THREE
URAIAN PEKERJAAN
PERBAIKAN KEBOCORAN YANG TERDAPAT PADA
BALKON HUNIAN BAWAH DIKARENAKAN REMBESAN
YANG TERJADI DARI TERAS LUAR HUNIAN ATAS
LOKASI
TOWER ASTER LANTAI 02/07
JOB DESCRIPTION
THE REPAIR OF LEAKING GET IT ON UNDER TENANT
BALCONY CAUSE IN GET SEEPAGE HAPPENED FROM THE
TERRACE OUTSIDE ON TENANT
LOCATION
ASTER TOWER ON THE FLOOR TWO ZERO SEVEN
URAIAN PEKERJAAN
PROSES PENGECATAN YANG DILAKUKAN SETELAH PERBAIKAN
PADA PLAFON YANG MENGALAMI KERUSAKAN
LOKASI
DAPUR SERBAGUNA
JOB DESCRIPTION
THE PAINTING OF PROCESS THAT’S DO HAS REPAIR IT ON CEILING
HAVE BROKEN
LOCATION
THE MULTIPURPOSE KITCHEN
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 15
URAIAN PEKERJAAN
PROSES PERBAIKAN STOPKONTAK YANG RUSAK AKIBAT
TERLEPAS DARI DUDUKANNYA
LOKASI
TOWER FLAMBOYAN LANTAI 16
JOB DESCRIPTION
THE REPAIR OF PROCESS A OUTLET HAS BROKEN CAUSE IN
RELEASED FROM PLACED
LOCATION
FLAMBOYAN TOWER ON THE FLOOR SIXTEEN
URAIAN PEKERJAAN
PROSES PERBAIKAN CCTV YANG DIKARENAKAN KABEL
PADA ADAPTOR BAGIAN CCTV TERLEPAS DARI
STOPKONTAK
LOKASI
TOWER AKASIA LANTAI DASAR
JOB DESCRIPTION
THE REPAIR OF PROCESS CCTV THAT’S CAUSE IN THE CABLE
ADAPTOR PART OF CCTV HAS RELEASED FROM OUTLET
LOCATION
AKASIA TOWER ON THE BASE FLOOR
URAIAN PEKERJAAN
PROSES PERBAIKAN LAMPU DINDING YANG RUSAK
DIKARENAKAN TERLEPAS DARI DUDUKANNYA
LOKASI
TOWER FLAMBOYAN LANTAI 16
JOB DESCRIPTION
THE REPAIR OF PROCESS A WALL OF LAMP THAT’S BROKEN
CAUSE IN HAS RELEASED FROM PLACED
LOCATION
FLAMBOYAN TOWER ON THE FLOOR SIXTEEN
DOKUMENTASI ENGINEERING_’PERIODE MARET 2016 HALAMAN 16
URAIAN PEKERJAAN
PELEPASAN STOP KONTAK DAN KIPAS ANGIN SERTA
FASILITAS LISTRIK YANG LAINNYA
LOKASI
RUANG SUPIR BASEMENT AKASIA
JOB DESCRIPTION
THE RELEASED OF FAN AND OUTLET AS THE ELECTRICITY
EACH OTHER
LOCATION
DRIVER BASEMENT AKASIA ROOM
URAIAN PEKERJAAN
PROSES PERBAIKAN SPEAKER YANG RUSAK
DIKARENAKAN SPEAKER TELAH TERLEPAS DARI
DUDUKANNYA
LOKASI
TOWER FLAMBOYAN LANTAI 11
JOB DESCRIPTION
THE REPAIR OF PROCESS A SPEAKER THAT’S BROKEN CAUSE
IN SPEAKER HAS RELEASED FROM PLACED
LOCATION
FLAMBOYAN TOWER ON THE FLOOR ELEVEN
URAIAN PEKERJAAN
PERBAIKAN PLAFON YANG RUSAK DIKARENAKAN PLAFON
TERSEBUT TELAH BOLONG
LOKASI
TOILET WANITA LANTAI DASAR ASTER
JOB DESCRIPTION
THE REPAIR OF CEILING HAS BROKEN CAUSE IN THE CEILING
HAS PERFORATED
LOCATION
THE BASE OF FLOOR ASTER TOILET FEMALE