Transcript
Page 1: TC-64A FORT STREET BROADWAY F O R T S T R E E T · tc-63 tc-63 tc-63 tc-63 tc-63 tc-64a avenue f o r t s t r e e t paver paver paver paver paver paver paver conc. conc. conc. conc

50m

WD

-A

17L

WD

-A

17L

TC

-2

TC

-2

50m

BR

OA

DW

AY

TC

-63

WD

-A

17L

T

C

-

6

4

A

RB-11R

50m

TC

-63

TC

-63

TC

-63

TC

-63

TC

-63

TC

-63

TC

-63

TC

-63

TC

-63

RB

-25

7.75m PAVEMENT

CONSTRUCTION WITH 1.0m

CONSTRUCTION ALLOWANCE

1.9m TEMPORARY BIKE LANE

3.35m VEHICLE TRAFFIC LANE

TC

-70L2F

DE

TO

UR

TC-70R2F

DETOUR

FORT STREET

F O R TS T R E E T

PAVER

PAVER

PAVER

PAVER

PAVER

PAVER

CONC.

PAVER

AS

P.

OLY

.

AS

P.

OLY

.

GR

AS

S

GR

AS

S

PA

VE

R

PA

VE

R

ASP.

ASP LOT

CONC.

CONC.

ASP LOT

RAMP

EX.

PAV

EX. PAV

ASH OVERLAY

191

WAWANESA INSURANCE

120

1X1 ARCHITEXTURE INC

0+

10

0.0

25

0+

16

1.0

92

0+

15

4.9

97

0.45m TYP. OVER

EXCAVATION LIMIT

MAINTAIN PEDESTRIAN ACCESS AT

ALL TIMES ON SIDEWALK OR

NEWLY CONSTRUCTED ROADWAY

COMPLETE 2 SEWER REPAIRS ON

MA20016063 PRIOR TO COMMENCING

STAGE 1 CONSTRUCTION (SEE CT-13

FOR ADDITIONAL DETAIL)

MAINTAIN PEDESTRIAN

CROSSING AT ALL TIMES

MAINTAIN PEDESTRIAN

CROSSING AT ALL TIMES

YO

RK

RB

-25

RB

-11R

7.75m PAVEMENT

CONSTRUCTION WITH 1.0m

CONSTRUCTION ALLOWANCE

1.9m TEMPORARY BIKE LANE

3.35m VEHICLE TRAFFIC LANE

TC-63

TC-63

TC-63

TC-63

TC-63

T

C

-

6

4

A

AV

EN

UE

F O R TS T R E E T

PAVER

PAVER

PAVER

PAVER

PAVER

PAVER

PAVER

CONC.

CONC.

CONC.CONC.

CONC.

CONC.

CONC.

CONC.

CONC.

CONC.

CONC.

ASP LOT

ASP LOT

ASP LOT

ASP LOT

EX. PAV

ASH OVERLAY

EX. PAV

ASH OVERLAY

EX. PAV

ASH OVERLAY

111

THE LOFT SALON

117

VACANT

155

RILEYS

164

PRECISION MOVEMENT & THERAPIES

158

KIDS & COMPANY

234

AVIS CAR RENTAL

130

STAGE CONSTRUCTION TO MAINTAIN

2 LANES OF TRAFFIC ON YORK

AVENUE AT ALL TIMES

PLACE TEMPORARY

ASPHALT PAVEMENT TO

MAINTAIN ACCESS TO

PRIVATE APPROACH

0+

272.821

0+

252.707

0.45m TYP. OVER

EXCAVATION LIMIT

0.45m TYP. OVER

EXCAVATION LIMIT

0.45m TYP. OVER

EXCAVATION LIMIT

NO RIGHT TURNS ALLOWED

DURING STAGED INTERSECTION

CONSTRUCTION

MAINTAIN PEDESTRIAN ACCESS AT

ALL TIMES ON SIDEWALK OR

NEWLY CONSTRUCTED ROADWAY

MAINTAIN PEDESTRIAN ACCESS AT

ALL TIMES ON SIDEWALK OR

NEWLY CONSTRUCTED ROADWAY

REMOVE FLUSHTANK AND

REPLACE MANHOLE MH20014453

PRIOR TO COMMENCING STAGE 1

STAGE CONSTRUCTION OF ALL

APPROACHES TO MAINTAIN

VEHICLE ACCESS AT ALL TIMES

(TYP.)

ENGINEER'S SEAL

CONSTRUCTION BY:

ELEV.

B.M.

RELEASED FOR

NO. REVISIONS DATE BY

DRAWN

BY

HOR. SCALE:

VERTICAL:

DATE

DESIGNED

BY BY

CHECKED

BY

APPROVED

CONSULTANT DRAWING NO.

SHEET OF

CITY DRAWING NUMBER

T H E C I T Y O F W I N N I P E G

ENGINEERING DIVISION

PUBLIC WORKS DEPARTMENTWinnipeg

2019/08/27

P-3527-03

STAGE 1

FORT STREET - BROADWAY TO YORK AVENUE

CONSTRUCTION STAGING

KWR

PAAP

TLF

AS SHOWN

CT-03

3 19

2020 CONSTRUCTION

DOWNTOWN PAVEMENT RENEWALS PROJECT

ISSUED FOR REVIEW KWR

2020/02/10

A

TLF

PLAN - STAGE 1

Scale 1:250

PLAN - STAGE 1

Scale 1:250

MA

TC

HL

IN

E C

T-0

4

MA

TC

HL

IN

E

Certificate of Authorization

AECOM Canada Ltd.

No. 4671 Date:_____________

WORK AREA

NOTES:

1. ALL TEMPORARY SIGNAGE AND TRAFFIC CONTROL TO BE IN ACCORDANCE WITH THE

LATEST EDITION OF THE MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY

STREETS.

2. CONTRACTOR TO MAINTAIN VEHICLE ACCESS TO ALL SIDE STREETS, PRIVATE

APPROACHES AT ALL TIMES. ANY DISRUPTION TO BE APPROVED BY THE CONTRACT

ADMINISTRATOR AND CONTRACTOR TO ADVISE OWNER.

CYCLIST

MA

TC

HL

IN

E

CONTRACTOR TO CLOSE GUTTER LANE OF BROADWAY TO MAINTAIN PEDESTRIAN

ACCESS. CONSTRUCT TEMPORARY ASPHALT RAMPS AT CURB LINE ON BROADWAY,

CONTRACTOR TO UTILIZE PEDESTRIAN CHANNELIZATION BARRIER FOR CORRIDOR.

LEGEND

TRAFFIC PEDESTRIAN

PEDESTRIAN ACCESS DURING

N.T.S.

EXIST.

BLDG.

SIDEWALK CONSTRUCTION

CONTRACTOR TO PLACE

TEMP. WORKING BRIDGES

TO MAINTAIN ACCESS TO

BUSINESSES

UTILIZE CONSTRUCTED

GUTTER LANE FOR

LONGITUDINAL

PEDESTRIAN TRAFFIC

REMOVE

SIDEWALK

CONTRACTOR TO INSTALL ADVANCE LANE CLOSURE SIGNAGE IN ACCORDANCE

WITH THE MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

FINDLAY

N

I

P

R

N

V

O

I

C

E

MF

O

A

B

A

O

T

RE

G

SI

T

E

R

E

D

P

R

O

FES

S

IO

N

A

L

E

N

G

I

N

EE

R

Member

23820

T.L.

TRAFFIC NOTES:

1. CONSTRUCTION ALLOWANCE TO BE MAINTAINED WITH 1.9m TEMPORARY BIKE LANE

AND 3.35m VEHICLE TRAFFIC LANE.

2. CONTRACTOR TO MAINTAIN PEDESTRIAN ACCESS TO BUSINESSES AT ALL TIMES.

3. CONTRACTOR TO RELOCATE EXISTING BICYCLE LANE DETOUR SIGNS AS REQUIRED.

ISSUED FOR TENDER TLF

2020/02/24

0

CLOSURE AS PER CITY OF WINNIPEG MANUAL

OF TEMPORARY TRAFFIC CONTROL ON CITY

STREETS

AutoCAD SHX Text
DATE
AutoCAD SHX Text
DECIMALIZED NUMBERS INDICATE METRES
AutoCAD SHX Text
WHOLE NUMBERS INDICATE MILLIMETRES
AutoCAD SHX Text
METRIC
AutoCAD SHX Text
N
AutoCAD SHX Text
N

Top Related