tc-64a fort street broadway f o r t s t r e e t · tc-63 tc-63 tc-63 tc-63 tc-63 tc-64a avenue f o...

1
50m WD-A17L WD-A17L TC-2 TC-2 50m BROADWAY TC-63 WD-A17L TC-64A RB-11R 50m TC-63 TC-63 TC-63 TC-63 TC-63 TC-63 TC-63 TC-63 TC-63 RB-25 7.75m PAVEMENT CONSTRUCTION WITH 1.0m CONSTRUCTION ALLOWANCE 1.9m TEMPORARY BIKE LANE 3.35m VEHICLE TRAFFIC LANE TC-70L2F DETOUR TC-70R2F DETOUR FORT STREET F O R T S T R E E T PAVER PAVER PAVER PAVER PAVER PAVER CONC. PAVER AS OL AS OLY GRASS GRASS PAVER PAVER ASP. ASP LOT CONC. CONC. ASP LOT RAMP EX. PAV EX. PAV ASH OVERLAY 191 WAWANESA INSURANCE 120 1X1 ARCHITEXTURE INC 0+100.025 0+161.092 0+154.997 0.45m TYP. OVER EXCAVATION LIMIT MAINTAIN PEDESTRIAN ACCESS AT ALL TIMES ON SIDEWALK OR NEWLY CONSTRUCTED ROADWAY COMPLETE 2 SEWER REPAIRS ON MA20016063 PRIOR TO COMMENCING STAGE 1 CONSTRUCTION (SEE CT-13 FOR ADDITIONAL DETAIL) MAINTAIN PEDESTRIAN CROSSING AT ALL TIMES MAINTAIN PEDESTRIAN CROSSING AT ALL TIMES YORK RB-25 RB-11R 7.75m PAVEMENT CONSTRUCTION WITH 1.0m CONSTRUCTION ALLOWANCE 1.9m TEMPORARY BIKE LANE 3.35m VEHICLE TRAFFIC LANE TC-63 TC-63 TC-63 TC-63 TC-63 TC-64A AVENUE F O R T S T R E E T PAVER PAVER PAVER PAVER PAVER PAVER PAVER CONC. CONC. CONC. CONC. CONC. CONC CONC. CONC. CONC. CONC. CONC. ASP LOT ASP LOT ASP LOT ASP LOT EX. PAV ASH OVERLAY EX. PAV ASH OVERLAY EX. PAV ASH OVERLAY 111 THE LOFT SALON 117 VACANT 155 RILEYS 164 PRECISION MOVEMENT & THERAPIES 158 KIDS & COMPANY 234 AVIS CAR RENTAL STAGE CONSTRUCTION TO MAINTAIN 2 LANES OF TRAFFIC ON YORK AVENUE AT ALL TIMES PLACE TEMPORARY ASPHALT PAVEMENT TO MAINTAIN ACCESS TO PRIVATE APPROACH 0+272.821 0+252.707 0.45m TYP. OVER EXCAVATION LIMIT 0.45m TYP. OVER EXCAVATION LIMIT 0.45m TYP. OVER EXCAVATION LIMIT NO RIGHT TURNS ALLOWED DURING STAGED INTERSECTION CONSTRUCTION MAINTAIN PEDESTRIAN ACCESS AT ALL TIMES ON SIDEWALK OR NEWLY CONSTRUCTED ROADWAY MAINTAIN PEDESTRIAN ACCESS AT ALL TIMES ON SIDEWALK OR NEWLY CONSTRUCTED ROADWAY REMOVE FLUSHTANK AND REPLACE MANHOLE MH20014453 PRIOR TO COMMENCING STAGE 1 STAGE CONSTRUCTION OF ALL APPROACHES TO MAINTAIN VEHICLE ACCESS AT ALL TIMES (TYP.) ENGINEER'S SEAL CONSTRUCTION BY: ELEV. B.M. RELEASED FOR NO. REVISIONS DATE BY DRAWN BY HOR. SCALE: VERTICAL: DATE DESIGNED BY BY CHECKED BY APPROVED CONSULTANT DRAWING NO. SHEET OF CITY DRAWING NUMBER T H E C I T Y O F W I N N I P E G ENGINEERING DIVISION PUBLIC WORKS DEPARTMENT Winnipeg 2019/08/27 P-3527-03 STAGE 1 FORT STREET - BROADWAY TO YORK AVENUE CONSTRUCTION STAGING KWR PAAP TLF AS SHOWN CT-03 3 19 2020 CONSTRUCTION DOWNTOWN PAVEMENT RENEWALS PROJECT ISSUED FOR REVIEW KWR 20 20/02/10 A TLF PLAN - STAGE 1 Scale 1:250 PLAN - STAGE 1 Scale 1:250 MATCHLINE CT-04 MATCHLINE Certificate of Authorization AECOM Canada Ltd. No. 4671 Date:_____________ WORK AREA NOTES: 1. ALL TEMPORARY SIGNAGE AND TRAFFIC CONTROL TO BE IN ACCORDANCE WITH THE LATEST EDITION OF THE MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS. 2. CONTRACTOR TO MAINTAIN VEHICLE ACCESS TO ALL SIDE STREETS, PRIVATE APPROACHES AT ALL TIMES. ANY DISRUPTION TO BE APPROVED BY THE CONTRACT ADMINISTRATOR AND CONTRACTOR TO ADVISE OWNER. CYCLIST MATCHLINE CONTRACTOR TO CLOSE GUTTER LANE OF BROADWAY TO MAINTAIN PEDESTRIAN ACCESS. CONSTRUCT TEMPORARY ASPHALT RAMPS AT CURB LINE ON BROADWAY, CONTRACTOR TO UTILIZE PEDESTRIAN CHANNELIZATION BARRIER FOR CORRIDOR. LEGEND TRAFFIC PEDESTRIAN PEDESTRIAN ACCESS DURING N.T.S. EXIST. BLDG. SIDEWALK CONSTRUCTION CONTRACTOR TO PLACE TEMP. WORKING BRIDGES TO MAINTAIN ACCESS TO BUSINESSES UTILIZE CONSTRUCTED GUTTER LANE FOR LONGITUDINAL PEDESTRIAN TRAFFIC REMOVE SIDEWALK CONTRACTOR TO INSTALL ADVANCE LANE CLOSURE SIGNAGE IN ACCORDANCE WITH THE MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS FINDLAY N I P R N V O I C E M F O A B A O T R E G S I T E R E D P R O F E S S I O N A L E N G I N E E R Member 23820 T.L. TRAFFIC NOTES: 1. CONSTRUCTION ALLOWANCE TO BE MAINTAINED WITH 1.9m TEMPORARY BIKE LANE AND 3.35m VEHICLE TRAFFIC LANE. 2. CONTRACTOR TO MAINTAIN PEDESTRIAN ACCESS TO BUSINESSES AT ALL TIMES. 3. CONTRACTOR TO RELOCATE EXISTING BICYCLE LANE DETOUR SIGNS AS REQUIRED. ISSUED FOR TENDER TLF 20 20/02/24 0 CLOSURE AS PER CITY OF WINNIPEG MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

Upload: others

Post on 22-Jul-2020

18 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TC-64A FORT STREET BROADWAY F O R T S T R E E T · tc-63 tc-63 tc-63 tc-63 tc-63 tc-64a avenue f o r t s t r e e t paver paver paver paver paver paver paver conc. conc. conc. conc

50m

WD

-A

17L

WD

-A

17L

TC

-2

TC

-2

50m

BR

OA

DW

AY

TC

-63

WD

-A

17L

T

C

-

6

4

A

RB-11R

50m

TC

-63

TC

-63

TC

-63

TC

-63

TC

-63

TC

-63

TC

-63

TC

-63

TC

-63

RB

-25

7.75m PAVEMENT

CONSTRUCTION WITH 1.0m

CONSTRUCTION ALLOWANCE

1.9m TEMPORARY BIKE LANE

3.35m VEHICLE TRAFFIC LANE

TC

-70L2F

DE

TO

UR

TC-70R2F

DETOUR

FORT STREET

F O R TS T R E E T

PAVER

PAVER

PAVER

PAVER

PAVER

PAVER

CONC.

PAVER

AS

P.

OLY

.

AS

P.

OLY

.

GR

AS

S

GR

AS

S

PA

VE

R

PA

VE

R

ASP.

ASP LOT

CONC.

CONC.

ASP LOT

RAMP

EX.

PAV

EX. PAV

ASH OVERLAY

191

WAWANESA INSURANCE

120

1X1 ARCHITEXTURE INC

0+

10

0.0

25

0+

16

1.0

92

0+

15

4.9

97

0.45m TYP. OVER

EXCAVATION LIMIT

MAINTAIN PEDESTRIAN ACCESS AT

ALL TIMES ON SIDEWALK OR

NEWLY CONSTRUCTED ROADWAY

COMPLETE 2 SEWER REPAIRS ON

MA20016063 PRIOR TO COMMENCING

STAGE 1 CONSTRUCTION (SEE CT-13

FOR ADDITIONAL DETAIL)

MAINTAIN PEDESTRIAN

CROSSING AT ALL TIMES

MAINTAIN PEDESTRIAN

CROSSING AT ALL TIMES

YO

RK

RB

-25

RB

-11R

7.75m PAVEMENT

CONSTRUCTION WITH 1.0m

CONSTRUCTION ALLOWANCE

1.9m TEMPORARY BIKE LANE

3.35m VEHICLE TRAFFIC LANE

TC-63

TC-63

TC-63

TC-63

TC-63

T

C

-

6

4

A

AV

EN

UE

F O R TS T R E E T

PAVER

PAVER

PAVER

PAVER

PAVER

PAVER

PAVER

CONC.

CONC.

CONC.CONC.

CONC.

CONC.

CONC.

CONC.

CONC.

CONC.

CONC.

ASP LOT

ASP LOT

ASP LOT

ASP LOT

EX. PAV

ASH OVERLAY

EX. PAV

ASH OVERLAY

EX. PAV

ASH OVERLAY

111

THE LOFT SALON

117

VACANT

155

RILEYS

164

PRECISION MOVEMENT & THERAPIES

158

KIDS & COMPANY

234

AVIS CAR RENTAL

130

STAGE CONSTRUCTION TO MAINTAIN

2 LANES OF TRAFFIC ON YORK

AVENUE AT ALL TIMES

PLACE TEMPORARY

ASPHALT PAVEMENT TO

MAINTAIN ACCESS TO

PRIVATE APPROACH

0+

272.821

0+

252.707

0.45m TYP. OVER

EXCAVATION LIMIT

0.45m TYP. OVER

EXCAVATION LIMIT

0.45m TYP. OVER

EXCAVATION LIMIT

NO RIGHT TURNS ALLOWED

DURING STAGED INTERSECTION

CONSTRUCTION

MAINTAIN PEDESTRIAN ACCESS AT

ALL TIMES ON SIDEWALK OR

NEWLY CONSTRUCTED ROADWAY

MAINTAIN PEDESTRIAN ACCESS AT

ALL TIMES ON SIDEWALK OR

NEWLY CONSTRUCTED ROADWAY

REMOVE FLUSHTANK AND

REPLACE MANHOLE MH20014453

PRIOR TO COMMENCING STAGE 1

STAGE CONSTRUCTION OF ALL

APPROACHES TO MAINTAIN

VEHICLE ACCESS AT ALL TIMES

(TYP.)

ENGINEER'S SEAL

CONSTRUCTION BY:

ELEV.

B.M.

RELEASED FOR

NO. REVISIONS DATE BY

DRAWN

BY

HOR. SCALE:

VERTICAL:

DATE

DESIGNED

BY BY

CHECKED

BY

APPROVED

CONSULTANT DRAWING NO.

SHEET OF

CITY DRAWING NUMBER

T H E C I T Y O F W I N N I P E G

ENGINEERING DIVISION

PUBLIC WORKS DEPARTMENTWinnipeg

2019/08/27

P-3527-03

STAGE 1

FORT STREET - BROADWAY TO YORK AVENUE

CONSTRUCTION STAGING

KWR

PAAP

TLF

AS SHOWN

CT-03

3 19

2020 CONSTRUCTION

DOWNTOWN PAVEMENT RENEWALS PROJECT

ISSUED FOR REVIEW KWR

2020/02/10

A

TLF

PLAN - STAGE 1

Scale 1:250

PLAN - STAGE 1

Scale 1:250

MA

TC

HL

IN

E C

T-0

4

MA

TC

HL

IN

E

Certificate of Authorization

AECOM Canada Ltd.

No. 4671 Date:_____________

WORK AREA

NOTES:

1. ALL TEMPORARY SIGNAGE AND TRAFFIC CONTROL TO BE IN ACCORDANCE WITH THE

LATEST EDITION OF THE MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY

STREETS.

2. CONTRACTOR TO MAINTAIN VEHICLE ACCESS TO ALL SIDE STREETS, PRIVATE

APPROACHES AT ALL TIMES. ANY DISRUPTION TO BE APPROVED BY THE CONTRACT

ADMINISTRATOR AND CONTRACTOR TO ADVISE OWNER.

CYCLIST

MA

TC

HL

IN

E

CONTRACTOR TO CLOSE GUTTER LANE OF BROADWAY TO MAINTAIN PEDESTRIAN

ACCESS. CONSTRUCT TEMPORARY ASPHALT RAMPS AT CURB LINE ON BROADWAY,

CONTRACTOR TO UTILIZE PEDESTRIAN CHANNELIZATION BARRIER FOR CORRIDOR.

LEGEND

TRAFFIC PEDESTRIAN

PEDESTRIAN ACCESS DURING

N.T.S.

EXIST.

BLDG.

SIDEWALK CONSTRUCTION

CONTRACTOR TO PLACE

TEMP. WORKING BRIDGES

TO MAINTAIN ACCESS TO

BUSINESSES

UTILIZE CONSTRUCTED

GUTTER LANE FOR

LONGITUDINAL

PEDESTRIAN TRAFFIC

REMOVE

SIDEWALK

CONTRACTOR TO INSTALL ADVANCE LANE CLOSURE SIGNAGE IN ACCORDANCE

WITH THE MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

FINDLAY

N

I

P

R

N

V

O

I

C

E

MF

O

A

B

A

O

T

RE

G

SI

T

E

R

E

D

P

R

O

FES

S

IO

N

A

L

E

N

G

I

N

EE

R

Member

23820

T.L.

TRAFFIC NOTES:

1. CONSTRUCTION ALLOWANCE TO BE MAINTAINED WITH 1.9m TEMPORARY BIKE LANE

AND 3.35m VEHICLE TRAFFIC LANE.

2. CONTRACTOR TO MAINTAIN PEDESTRIAN ACCESS TO BUSINESSES AT ALL TIMES.

3. CONTRACTOR TO RELOCATE EXISTING BICYCLE LANE DETOUR SIGNS AS REQUIRED.

ISSUED FOR TENDER TLF

2020/02/24

0

CLOSURE AS PER CITY OF WINNIPEG MANUAL

OF TEMPORARY TRAFFIC CONTROL ON CITY

STREETS

AutoCAD SHX Text
DATE
AutoCAD SHX Text
DECIMALIZED NUMBERS INDICATE METRES
AutoCAD SHX Text
WHOLE NUMBERS INDICATE MILLIMETRES
AutoCAD SHX Text
METRIC
AutoCAD SHX Text
N
AutoCAD SHX Text
N