Transcript
Page 1: Washington D.C.  Update

James Cheatham, P.E.DirectorOffice of Planning

Page 2: Washington D.C.  Update

Recent reorganization HEPI Dissolved Border Planning Team

moved to Office of Planning

Now is the Border and Corridor Planning Team

Page 3: Washington D.C.  Update

Status Oberstar Bill

Performance Measures

Livability

Page 4: Washington D.C.  Update

TIGER I Black River Bridge

Replacement $30m grant/$140m total

TIGER II Niagara Falls Rail Station

$16.5m grant

Page 5: Washington D.C.  Update

Was originally scheduled for Phoenix, Arizona

Rescheduled to be held in San Diego, California

Planned for early February 2011

Hotel TBD

Page 6: Washington D.C.  Update

Minneapolis, MN Mall of America

April 2011 Master Planning

Peer exchange


Top Related