2 1 3 n Alberta government paying $218 million $92.5 million coming from the Building Canada Fund $30 million from Alberta Centenaries Program n Federal government paying $122.5 million ROYAL ALBERTA MUSEUM n Cost $340.5 million n Dates - Construction ocially began Feb. 7, 2014 n Expected completion - 2016 n Expected grand opening date - 2017 DETAILS n Being built on the former site of the downtow n Canada Post building n Of the former building’s materials, 90% is being recycled or re-used n Builders - Ledcor n Designers - Canadian-based DIALOG Design and Lundholm Associates Architects n Will include a theatre, a café, large video screen visible from the street, and outdoor terraces 3 OTHER ARENA ELEMENTS Winter garden: $56.5 million Pedway: $15 million LRT connection: $7 million Community rink: $23 million n Land: $25 million n Total arena project cost: $606.5 million 2a 2a 2b 2c 2c 2b 2d 2d DATES n Construction slated to start in March with an expected opening date before 2016 NHL season  ARENA  VIDE O ONLINE edmontonsun.com/videos 104 AVE SUPPLIED PHOTOS Before and after view of 104 Avenue. BEFORE  AFTER EDMONTONSUN.COM

Upload: edmonton-sun

Post on 04-Jun-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Downtown graphic 1

8/13/2019 Downtown graphic 1

http://slidepdf.com/reader/full/downtown-graphic-1 1/1

2

1

3

n Alberta government paying

$218 million

$92.5 millioncoming from theBuilding CanadaFund

$30 millionfrom AlbertaCentenariesProgram

n Federalgovernmentpaying

$122.5million

ROYAL ALBERTAMUSEUM

n Cost

$340.5millionn Dates - Constructionofficially began Feb. 7, 2014

n Expected completion- 2016

n Expected grandopening date - 2017

DETAILSn Being built on the former siteof the downtown Canada Postbuilding

n Of the former building’smaterials, 90% is beingrecycled or re-used

n Builders - Ledcor

n Designers - Canadian-basedDIALOG Design and LundholmAssociates Architects

n Will include a theatre,a café, large video screenvisible from the street, and

outdoor terraces

3

OTHER ARENAELEMENTS

Winter garden:

$56.5 millionPedway:

$15 millionLRT connection:

$7 millionCommunity rink:

$23 millionn Land:

$25 million

n Total arena project cost:

$606.5million

2a

2a

2b

2c

2c

2b

2d

2d

DATESn Construction slatedto start in March with an

expected opening datebefore 2016 NHL season

 ARENA

 VIDEOONLINEedmontonsun.com/videos

104 AVE

SUPPLIED PHOTOS

Before and after view of 104 Avenue.

BEFORE

 AFTER

EDMONTONSUN.COM