dr phung dinh thuc's presentation slides from the 2010 world national oil companies congress
DESCRIPTION
Dr phung dinh thuc's presentation slides from the 2010 World National Oil Companies Congress that took place in June in London.TRANSCRIPT
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
PETROVIETNAMPETROVIETNAM’’ss COOPERATION COOPERATION ANDAND
PLAN FOR GROWTHPLAN FOR GROWTH
By Dr. Phùng Đình ThựcPresident & CEO, PETROVIETNAM
London, UK
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
OUR VISION
Is to be a Leading Petroleum Group in the Region - A Pride of Vietnam
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
OUR MISION
Is to contribute to ensuring national energy security, develop and add value to the Nation
Resource
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
OUR OBJECTIVE
Is to contribute to the well being of the People and the Nation
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
55
PETROVIETNAM PETROVIETNAM CORE BUSINESSCORE BUSINESS
Oil and Gas Exploration, production, refining, petrochemicals, Oil and Gas Exploration, production, refining, petrochemicals, storage, transportation;storage, transportation;Technical services in the petroleum field;Technical services in the petroleum field;Import and export of petroleum materials, equipment and Import and export of petroleum materials, equipment and products;products;Distributing oil and gas products and hydrocarbon materials;Distributing oil and gas products and hydrocarbon materials;OwnerOwner’’s and operation of power plants.s and operation of power plants.
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
66
PETROVIETNAM OTHER FIELDSPETROVIETNAM OTHER FIELDS
Surveying, design, engineering and construction;Surveying, design, engineering and construction;Consulting in construction and investment of both petroleum and Consulting in construction and investment of both petroleum and civil engineering projects, and manufacturing and trading in civil engineering projects, and manufacturing and trading in construction materials;construction materials;Real estate development and investment;Real estate development and investment;Finance, banking, insurance, and securities;Finance, banking, insurance, and securities;Manpower training and supply in the fields of petroleum and Manpower training and supply in the fields of petroleum and labourlabourexport;export;Hotel, travel and office management businesses;Hotel, travel and office management businesses;Other business fields as stipulated by Vietnamese law.Other business fields as stipulated by Vietnamese law.
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
PETROVIETNAME&P PORTFOLIO
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
DOMESTIC E&PDOMESTIC E&P
57 petroleum contracts in 57 petroleum contracts in effect: effect:
-- 42 exploration42 exploration--15 development/production15 development/production
Cum oil production, May Cum oil production, May 2009: 2009: 250 million tones250 million tonesof crude oil and of crude oil and 50 50 billion mbillion m33 of gasof gas
Partnership with super Partnership with super majors, majors, NOC and majors, majors, NOC and independent IOCindependent IOC
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
OUR COOPERATION IN VIETNAMOUR COOPERATION IN VIETNAM
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
Song Hong
Nhóm bểHoàng sa
Nhóm bể TrườngSa
PhuK
hanhNam Côn Sơn
Cuu Long
Malay-Tho Chu Tu Chinh-Vung May
DISCOVERED
Phu Khanh0%
Tu Chinh-Vung May 0%
Cuu Long1694.4 Tr.m3
59%
Nam Con Son429.5 Tr.m3
15%
Malay-Tho Chu407.3 Tr.m3
14%
Sông Hong359.6 Tr.m3
12%
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
OIL & GAS FIELDS, DISCOVERIES
103
107
108109
104
105
112
114 11
5116
118-2
119-2
117
118-1
119-1
CAM PU CHIA
TRUNG QUỐC
VIỆTNAM
120
121
123124
125
126127
128129
130131132133134
135
WAB-21
04-2
03
04-1
04-315-
206 06-
1
07
08
15-2
15-115-
3 09-2
16-116-2
09-1
09-3
10
11-1
171819
20
12(W)
11-2
12(E)
1314
21222324
25
2627
29
28
30
31
3233
343536
37
38
3940
4142
434445
52/97
48/95 (B)
15°N
10°N
105°E
110°E
Rong
Bach Ho
LanDoLan
Tay
Dai Hung
LÀO
THÁI LAN
N
102
106
20°N
Tien Hai
HANOI BASIN
HainanIsl.
05-1A05-3
Vietnam Claim (1988)
Indonesia Claim
Cambodia Claim (1972)
Joint Historic Waters (1982)
TP HO CHI MINH
HÀ NỘI
0 100
KM
101
110
113
111
010
202/97
01/97
46/02
46-
CaiNuoc
122
Block 06-1: LAN TÂY, LAN ĐỎ
Block 15-2: RẠNG ĐÔNG, PHƯƠNG ĐÔNG
Blocks 05-2&05-3: HẢI THẠCH, MỘC TINH
Block 11-2: RỒNG ĐÔI, RỒNG ĐÔI TÂY
Block 15-1: SƯ TỬ ĐEN, SƯ TỬ VÀNG, SƯ TỬ TRẮNG, SƯ
TỬ NÂU
Block 15-2/01: HẢI SƯ ĐEN, HẢI SỬ TRẮNG
Block 09-1: BẠCH HỔ, RỒNG
PM3-CAA/46-CÁI NƯỚC
Blocks 46/02: SÔNG ĐỐC, NĂM CĂN, NGỌC HIỂN
Blocks B, 48/95, 52/97:KIM LONG, ÁC QUỶ, CÁ VOI
TIỀN HẢI C
Block 05-1a: ĐẠI HÙNG
Blocks 102&106: THÁI BÌNH
Blocks 01&02/97: THĂNG LONG, ĐÔNG ĐÔ
Block 01&02: RUBY, PEARL, TOPAZ, DIAMOND
Block 12E&W: CHIM SÁO, DỪA
Block 09-3: ĐỒI MỒI
Block 16-1: TÊ GIÁC TRẮNG
Block 09-2: CÁ NGỪ VÀNG
Blocks 112&113: BÁO VÀNG
Blocks 103&107: HỒNG LONG, BẠCH LONG
Block 07-03: CA RONG DO
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
INTERNATIONAL PROJECTS
Petrovietnam has been impletmenting and achieved successful outcomes in many overseas exploration and production activities. PETROVIETNAM has taken part in 23 Exploration and Production project all over the world so far.
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
Petrovietnam Projects from 2010 – 2015: Upstream• Keep sustainable annual reserve growth (25-30 millions tons oil equivalent/year), 40.000 km 2D, 30.000 km2 3D and drill 200 exploration-appraisal wells.• Supply sufficient gas into NCS#1 and NCS#2 pipelines in near future.• Expand exploration and speed up appraisal in order to develop gas clusters in northern Song Hong Basin. • Exploration Test for stratigraphic traps in Cuu Long Basin.• Sustain annual production of 30-35 millions tons oil equivalent• Start hydrocarbon system studies for onshore Pre-Tertiary Basins.
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
EXPLORATION ACTIVITY OF VARIOUS PETROLEUM CONTRACTS
= Exploration Priorities
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
Oil under production
New oil discoveries
Gas under production
New gas discoveries
0
5
10
15
20
25
30
35
0
5
10
15
20
25
30
35
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Oil and Gas production target until 2015 (tons of oil equivalent)
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
GAS
PETROVIETNAM has been carrying out a series of large scaled and complex gas projects so as to meet gas demand of not only electricity production but also chemicals, fertilizer, transportation, construction material, and for the public consumption. In the year of 2009, PETROVIETNAM provided 7,9 billion cubic meters of dry gas; 67 thousands tons of Condensate; and nearly 260 thousand tons of LPG for the domestic consumption.
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
PETROVIETNAMPETROVIETNAM’’S GAS VALUE CHAINS GAS VALUE CHAIN
Ca Mau & O Mon Complex
Malay Tho Chu Basin LPG Terminal
Dinh Co GPP
Cuu Long Basin
Nam Con Son BasinLPG
CONDENSATE
PIPELINE GAS - CNG
Condensate Processing Plant
Power Plants
Fertilizer Plants
Industrial
Commercial
LPG Distributor
Industrial
Commercial
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
CAMBODIA
Ca Mau Complex
Vietnam –Malaysia CAA
O Mon
HiepPhuoc
Dinh Co GPP
Cuu Long Basin
Nam Con Son Basin
Ma Lay ThoChu Basin
Bach Ho –Phu My PL:•Capacity: 2 bcmpa•Length: 117 km•PL Diameter: 16”
Nam Con Son PL:•Capacity: 7 bcmpa•Length: 400 km•PL Diameter: 26”
PM3-Ca Mau PL:•Capacity: 2 bcmpa•Length: 330 km•PL Diameter: 18”
Block B – O Mon PL:•Under Construction•Operation in 2014•Capacity: 7 bcmy•Length: 400 km•PL Diameter: 28-30”
Southeast-Southwest PL:•Capacity: 2 bcmpa•Under FS•Expected to operation in 2012
your life
PETROVIETNAMPETROVIETNAM’’ S GAS OFFSHORE PIPE LINESS GAS OFFSHORE PIPE LINES
Nam Con Son 2 PL:•Capacity: 7 bcmpa•Length: 330 km•Under FS
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
VUNG TAU
National Road 51A
Go Dau
My XuanPhu My
Phu My PowerPhu My FertilizerPhu My GDC
BA RIA
Dinh Co Gas Plant
Nhon Trach PowerHiep Phuoc Power
Nhon TrachTan Thuan
Ong Keo
Ba Ria Power
PETROVIETANMPETROVIETANM’’S GAS ONSHORE PIPELINESS GAS ONSHORE PIPELINES
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
LPG MARKET SHARELPG MARKET SHARE
100% PIPED GAS IN VIETNAM SUPPLIED BY PETROVIETNAM100% PIPED GAS IN VIETNAM
SUPPLIED BY PETROVIETNAM
THE DOMINANT ENTITY IN VIETNAM GAS MARKETTHE DOMINANT ENTITY IN VIETNAM GAS MARKET
PVGAS supplied gas to generate 40% of Electricity PVGAS supplied gas to generate 40% of Electricity output and 35% of Urea output of the nationoutput and 35% of Urea output of the nation
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
POWER GENERATED BY FUEL USED IN 2008POWER GENERATED BY FUEL USED IN 2008POWER GENERATED BY FUEL USED IN 2008
GAS TAKING A GROWING SHARE OF VIETNAMGAS TAKING A GROWING SHARE OF VIETNAM’’S S ENERGY MIXENERGY MIX
• Natural gas is playing an in important role in Vietnam’s development• Gas is a key fuel to support power generation growth
GAS SUPPLY FOR POWER GENERATIONGAS SUPPLY FOR POWER GENERATIONGAS SUPPLY FOR POWER GENERATION
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
STRONG GROWTH IN VIETNAMSTRONG GROWTH IN VIETNAM’’S GAS DEMANDS GAS DEMAND
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
VIETNAMVIETNAM’’S LNG IMPORT PROJECT S LNG IMPORT PROJECT -- OBJECTIVESOBJECTIVES
Objectives of the LNG import project: •Enhance national energy security•Diversify the country’s fuel mix•Address the projected gas supply shortfall•Develop the gas market
Potential gas supply shortfall:• Over 2 mmtpa in 2015 & about 5 mmtpa in 2020.
Vietnam Gas Supply Demand BalanceVietnam Gas Supply Demand BalanceVietnam Gas Supply Demand Balance
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
THE LNG IMPORT SCERARIOSTHE LNG IMPORT SCERARIOS
FSRU
Land Base Terminal Stable and continuous operation
Planned to start by 2015 for long term contract
Import volume of 1 MMTPA & expanded to 3-6 MMTPA by 2020/2025 based on gas market development
Allow quick delivery to meet domestic gas demandPlanned to start by 2012 for Fast-track period.LNG import volume is up to 1 MMTPA
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
POWER
To date, PETROVIETNAM has undertaken construction of 10 power projects with a total capacity of about 10 thousand MW. In addition to the Cau Mau Gas fired Power Plan No 1 and No2, Nhon Trach gas-fired Power Plan No 1 (the total capacity of the three plants is 1950 MW) has been completed and put into operation. PETROVIETNAM has also begun construction on the Vung Ang Coal Fired Power Plant No 1 and Hua Na Hydro Power Plant, and is preparing to build the Thai Binh Coal- Fired Power Plant No 2 and Long Phu Coal- Fired Power Plant No 1.
In order to meet the demand for electricity and contribute to ensuring the energy security of the country, PETROVIETNAM is stepping up investment in the electricity sectors, becoming the second largest electricity producer in Vietnam, behind the Electricity of Vietnam Group (EVN)
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
Projects on the Operation
Projects under Construction
Beside that, PETROVIETNAM has participated in a number of hydro-carbon power plant including Hydro Carbon Nam Chien. các dự án phong điện.In the year of 2009, PETROVIETNAM did provide about 8.47 billion kWh for the country network of electricty.
POWER
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
In 2009: Dung Quat Refinery- the first refinery in Vietnam started its commercial production since February, 2009 and contributing to increase the income and benefit of PETROVIETNAM.
Oil and Gas processing activities, one of the core businesses which plays an important parts for the development of PETROVIETNAM, aim to raise the added value of crude oil and gas production, to save foreign currecy, to secure the national energy security, to contribute to the Nation’s industrialisation and modernisation, and to enhance the PETROVIETNAM’scompetitiveness in the world also.
REFINERY, PETROCHEMICAL AND BIO FUEL
Besides the operating plans such as Dung Quat Refinery, DOP Plant, Phu My Fertiliser Plant, Condensate Processing Plant, PETROVIETNAM has been actively carrying out various projects of refinery, petrochemical and bio-fuel as well as studying the upgrading and expansion.
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
REFINERY, PETROCHEMICAL AND BIO FUEL
REFINERY – OPERATING PLANTSDUNG QUAT OIL REFINERYThe first oil refinery in Quang Ngai Province with the Capacity of 6.5 million tons of material crude oil per year, was commercially operated and produced first production in February 2009.
CONDENSATE PROCESSING PLANTThe Plant locates in Ba Ria Vung Tau Province with the Capacity of 130,000 tonnes of condensate per year, started operating in 2003. Its processing capacitty will be increased to 250,000 tons of condensate per year in the year 2011-2012.
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
REFINERY, PETROCHEMICAL AND BIO FUEL
REFINERY – PROJECTS UNDER CONSTRUCTIONNGHI SON REFINERY AND PETROCHEMICAL COMPLEX
Location: Nghi Son Economic Zone, Thanh Hoa ProvinceCapacity: 10 tonnes of crdue oil per year Expectied Operation: 2014-2015
REFINERY NO. 3 (LONG SON REFINERY)Location: Ba Ria- Vung TauCapacity: 10 tonnes of crdue oil per year Expectied Operation: 2016-2020
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
REFINERY, PETROCHEMICAL AND BIO FUEL
PETROCHEMICAL - OPERATING PLANTSDOP PLANT
Location: Dong Nai ProvinceCapacity: 30,000 tons of DOP per yearOperation: since 1997
PHU MY FERTILISERLocation: Ba Ria Vung Tau ProvinceCapacity: 740,000 tons of Urea per yearOperation: since 2004
PETROCHEMICAL - PROJECTS UNDER CONSTRUCTIONDUNG QUAT POLYPROPYLENNE PLANT
Location: Quang Ngai ProvinceCapacity: 150,000 tons of Polypropylenne per yearExpected Operation: 2010
CA MAU FERTILISER PLANTLocation: Ca Mau ProvinceCapacity: 800,000 tons of Urea per yearExpected Operation: 2012
THE SOUTH PETROCHEMICAL COMPLEXLocation: Ba Ria Vung Tau Province Capacity: 3 million of feedstock per year
Expected Operation : 2014DINH VU POLYESTER FIBRE PLANT
Location: Hai Phong CityCapacity: 170,000 tons of fibre product per yearExpected Operation : 2011
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
REFINERY, PETROCHEMICAL AND BIO FUEL
BIO FUEL - PROJECTS UNDER CONSTRUCTIONPHU THO BIO-FUEL PLANT
Location: Phu Tho ProvinceCapacity: 100 million litres of ethanol product per year Expected Operation: 2011-2012
QUANG NGAI BIO-FUEL PLANTLocation: Quang Ngai ProvinceCapacity: 100 million litres of ethanol product per year Expected Operation: 2011-2012
BINH PHUOC BIO-FUEL PLANTLocation: Binh Phuoc ProvinceCapacity: 100 million litres of ethanol product per year Expected Operation: 2012
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
QUALITY, HEALTH, SAFETY AND ENVIRONMENT POLICY OF PETROVIETNAM
PETROVIETNAM always pay much attention to management activites ensuring Quality, Safety, Health, Environment.
Safety – Health – Environment (SHE) are the first responsibility and a component in production and business management..
PETROVIETNAM shall apply all appropriate measures to alleviate or mitigate risks to human life and health, or causing damage to assets or the environment.
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
PLAN FOR GROWTH
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
OBJECTIVEOBJECTIVE
DualDual--Purpose DevelopmentPurpose Development
—— SustainablySustainably/profitably grow all along the petroleum /profitably grow all along the petroleum value chain, domestically and internationally;value chain, domestically and internationally;
—— Ensure energy supply for national economic Ensure energy supply for national economic developmentdevelopment
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
TARGETTARGETNEW RESERVENEW RESERVE
(million ton of oil equivalent)(million ton of oil equivalent)Period 2011Period 2011--20202020
–– Domestic Domestic 390390--470470
–– OverseasOverseas 150150--165165
TOTALTOTAL 540540--635635
PRODUCTION PRODUCTION (million ton (million ton of oil equivalent perof oil equivalent per year)year)
Period 2011Period 2011--20152015 Period 2016Period 2016--20202020
–– Domestic Domestic 2727--3939 3030--3333
–– OverseasOverseas 33--7 7 1010--1515
TOTALTOTAL 3030--4646 4040--5858
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
WAYS TO ACHIEVEWAYS TO ACHIEVE
Domestic:Domestic:–– PromotePromote exploration in exploration in thethe continentialcontinential shelfshelf ofof Vietnam:Vietnam:
•• PartneringPartnering withwith currentcurrent andand new new playersplayers; or; or•• OperatingOperating withwith allall exploration exploration riskrisk..
–– MaintainMaintain//IncreaseIncrease production by:production by:•• OptimizeOptimize production production fromfrom currentcurrent fieldsfields•• Put new Put new fieldsfields onstreamonstream soonestsoonest•• ApplyApply enhancedenhanced recoveryrecovery methodsmethods•• DevelopDevelop marginal marginal fieldsfields, , gasgas withwith highhigh COCO22 contentcontent
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
WAYS TO ACHIEVEWAYS TO ACHIEVE
International:International:
–– ExpandExpand exploration exploration worldwideworldwide, , focusfocus on on RussianRussian,, ,, SouthSouthAmericaAmerica, , NorthNorth/Central /Central AfricaAfrica, , SouthestSouthest AsiaAsia, ,
–– Put new Put new fieldsfields onstreamonstream..–– Acquisition Acquisition ofof producingproducing assetsassets
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
PETROVIETNAMPETROVIETNAM’’S PARTNERSHIPS PARTNERSHIP
One of our important strategic thinking is to One of our important strategic thinking is to collaborate with strategic partners in Vietnam and collaborate with strategic partners in Vietnam and world wideworld wideMany oil and gas cooperation agreements signed Many oil and gas cooperation agreements signed between between PetrovietnamPetrovietnam and and NOCsNOCs, , IOCsIOCs
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
CLOSING NOTES CLOSING NOTES
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
PetrovietnamPetrovietnam has achieved sustainable growth, primarily in has achieved sustainable growth, primarily in domestic oil and gas related businessdomestic oil and gas related business
International expansion as effective way to grow and ensure International expansion as effective way to grow and ensure energy supply for national economic development. energy supply for national economic development.
Improving performance through enhancing its effectiveness and Improving performance through enhancing its effectiveness and efficiency will lead efficiency will lead PetrovietnamPetrovietnam to become a competitive to become a competitive organization, in the region in the immediate future and worldwidorganization, in the region in the immediate future and worldwide e in the longer runin the longer run
PetrovietnamPetrovietnam values its human resource as the most valuable asset values its human resource as the most valuable asset of the group and as the key to future success of the group and as the key to future success
One of our important strategic thinking is to collaborate with One of our important strategic thinking is to collaborate with strategic partnersstrategic partners
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
PetrovietnamPetrovietnam’’ss Development Strategy in the futureDevelopment Strategy in the future
Promote Exploration and Production (Upstream) activities in Promote Exploration and Production (Upstream) activities in VietnameseVietnamese’’s continental shelf;s continental shelf;
Develop refinery gas industry and petrochemical industry and Develop refinery gas industry and petrochemical industry and power industry;power industry;
Step by step expand petroleum activities overseasStep by step expand petroleum activities overseas
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
PETROVIETNAM, with these development strategies, desire PETROVIETNAM, with these development strategies, desire and willing to cooperate with you, the National Oil Companies and willing to cooperate with you, the National Oil Companies and International Oil Companies, for the development and for and International Oil Companies, for the development and for
the sake of each parties and also contributing to the worldthe sake of each parties and also contributing to the world--wide energy securitywide energy security
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
PETROVIETNAM’s policy is to strengthen existing and establish new cooperation/alliance
with a view to create value for all parties
VIETNAM OIL AND GAS GROUP (PETROVIETNAM)
THANK YOU THANK YOU FOR YOUR ATTENTION FOR YOUR ATTENTION !!