draft budget report 2015/16
DESCRIPTION
Macedon Ranges Shire Council's draft budget for the 2015/16 financial year.TRANSCRIPT
Draft Budget Report 2015/16
Draft Budget Report 2015/16 For public display from 1 May to 29 May 2015
Content
Mayor’s Introduction 3
1. Chief Executive Officer’s Summary 4
2. Budget Report Background 10
3. Services, Priority Initiatives and Service Performance 13
4. Analysis of Budgeted Income Statement 30
5. Analysis of Budgeted Balance Sheet 38
6. Analysis of Budgeted Cash Flows 40
7. Analysis of Budgeted Capital Works 41
Appendices
A. Budgeted Financial Statements:
A1 Budgeted Comprehensive Income Statement 47
A2 Budgeted Balance Sheet 48
A3 Budgeted Statement of Cash Flows 49
A4 Budgeted Statement of Capital Works 50
A5 Budgeted Statement of Changes in Equity 51
B. Statutory Disclosures:
B1 Capital Works Program – Asset Types and Funding Sources 52
B2 Statement and Summary of Human Resources 56
B3 Summary of Borrowings 57
B4 Statement of Rates and Charges 58
B5 Statement of Differential Rates 59
C. Additional Information:
C1 Summary of New Initiatives 61
C2 Summary of Financial Reserves 62
C3 Summary of Construction Programs 63
C4 Summary of Customer Fees and Charges 66
Glossary 85
On 29 April 2015, Council approved the draft Budget Report for public display and comment from 1
May to 29 May 2015. If you have any comments please submit them in writing before 11am on 29
May 2015. Your comments should be addressed to Macedon Ranges Shire Council. Our email
address is [email protected] and our postal address is P.O.Box 151, KYNETON VIC 3444.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 3
Mayor’s Introduction
It is a pleasure, on behalf of all Councillors, to present the Draft Budget for your consideration and I look
forward to receiving your comments.
I value the lifestyle that this beautiful place gives us and I think that this budget builds on that sense of
place and invests in our township character, natural environment and community involvement.
I recognise that there is a balance we must achieve in addressing the environmental, infrastructure and
social needs against the economic constraints which we all face. The Draft Budget is the result of a
team effort. I think it creates an affordable response to the needs of our community and it continues the
emphasis that this Council has given to implementing the actions within our strategic plans.
Last year we completed some long term strategic planning including an Open Space Strategy, a Walking
and Cycling Strategy and a Waste Management Strategy. These strategies are already influencing this
budget and I expect they will influence budgets in the future. This year we plan to review the Natural
Environment Strategy and the Leisure Strategy.
The use of renewable energy is important to many of us and I am pleased that Council has budgeted to
start retrofitting our street lights with low energy globes.
We have recently opened the Macedon Ranges Netball Complex in Gisborne and prior to that we
opened the sports precinct in Romsey. We contributed $1.5 million to the Indoor Sports Stadium, at the
Gisborne Secondary College, so that it will be available for public use. We are redeveloping the
Bluestone Theatre in Kyneton and resurfacing the Gilbert Gordon Oval in Woodend. We will commence
construction of the Early Years Centre in Gisborne and we will develop the Community Playground at
the Botanic Gardens in Kyneton.
I believe that the community has elected Councillors to represent them and make decisions on their
behalf. Wherever possible, this should be done in a collaborative way, keeping you informed, working
with you and ensuring you are aware of how you can provide input into the decision making process.
The Draft Budget presents one of those opportunities. We make it available for 4 weeks, during which
time everyone is welcome to make a written submission. We will consider all submissions and we will
listen to anyone who wishes to be heard in support of their submission. Consequently, based on the
submissions, changes may be made and if that’s not possible, the comments may influence our next
Budget.
You can be confident your opinion matters to Councillors. We will listen to what you have to say and we
value your input. We will strive to do what you want but it is not always possible for us to do everything
that everyone wants.
I look forward to discussing the draft Budget with you over the next four weeks and receiving your
comments. I truly believe that we will all benefit from an open discussion about realistic goals and
objectives and how we can responsibly achieve them with the limited funds we have available to us.
Cr Jennifer Anderson
Mayor
29 April 2015
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 4
1. Chief Executive Officer’s Summary
1.1 Introduction
Council has once again prepared a Budget which balances the environmental, infrastructure and social
needs with the community’s capacity to pay. When resources are limited it is essential that those
resources are carefully allocated so Council is able to achieve its objectives and deliver its services.
This Budget does this.
During the past five years, Council has been focussed on community capacity to pay and operational
efficiency and has achieved an average annual rate increase of 4.8%.
Council has worked closely with the community in relation to improving our overall customer service and
the quality of our day-to-day service delivery including extensive road, bridge and footpath
improvements. We have also worked in partnership with our community to improve recreational and
community amenities and preserve our natural environment.
We recognise that we are planning for the future wellbeing of our community by our decisions now. For
responsible financial management we need to look at the long-term implications of what we do and don’t
do. On the following pages, I will highlight the key Budget information that many Residents and
Ratepayers will want to know.
1.2 Balanced Budget
Each year Council prepares and adopts a budget for the following financial year. It is Council’s objective
to prepare a balanced budget each year where income from all sources equals expenditure.
This Budget is once again a balanced budget as follows –
Operating income $66.8 million
Capital Income $13.0 million
Total Income $79.8 million
Operating Expenditure $60.2 million
Capital Expenditure $19.7 million
Total Expenditure $79.8 million
The above summary includes transfers to and from financial reserves, loans, and loan redemption and
interest. It excludes non-cash items such as contributory non-monetary assets and depreciation and it
excludes incomplete capital projects which will be carried forward from 2014/15 to 2015/16.
1.3. Operating Income
Rates and charges are recognised as a significant source of revenue, planning for rate increases is
therefore an important part of the resource planning process. However, it is also necessary to balance
the importance of rate revenue as a funding source with community sensitivity to increases, particularly
given fluctuations in property valuations used for rating purposes, which are recorded in the biennial
General Valuations.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 5
1. Chief Executive Officer’s Summary (continued)
Our Rating Strategy, which establishes a framework by which rates and charges will be shared by the
community, can be found in the Strategic Resource Plan.
Based on recent historical evidence, Council’s long term forecast is that there will be a 1.8% growth
each year in our total revenue due to new subdivisions and new constructions. The corresponding
increase in population leads to an increase in the demand for Council services. Experience has shown
that the cost to Council in providing services to meet the increased demand is greater than the
corresponding growth in rate revenue.
The total revenue that we need to generate from rates, municipal charge and waste service charge in
order to balance the 2015/16 Budget is almost $41.9 million, which is almost 6.6% ($2.5 million) more
than 2014/15.
For most property owners, rates and charges will increase by about 4.8 per cent. The median property
value in the Shire is $445,000 and the following example is based upon the median valued property –
2014/15 2015/16
Median Valuation $445,000 $445,000
General Rate in the Dollar $0.002786 $0.002921
General Rates $1,240 $1,300
Municipal Charge $194 $203
Garbage & Recycling Charge $248 $260
Garden Bin Charge $58 $61
Total $1,740 $1824
Difference $84
Percentage increase 4.8%
The following chart compares the average increase in rates and charges that has applied to most
property owners over a six year period. Importantly, the graph shows that there has been a consistent
and responsible approach to increasing rates and charges over many years.
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
8.0%
9.0%
10.0%
2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 6
Each year, all councils in Australia benefit from the Financial Assistance Grant from the Australian
Government. In the 2014/15 Budget, the Australian Government announced that the indexation applied
to the Financial Assistance Grant programme would be paused for three years (2014/15 to 2016/17).
Financial Assistance Grants are divided amongst Victorian councils by the Victoria Grants Commission
(VGC). In 2014/15 the VGC allocated $2million to our Local Roads and allocated $4.6million as General
Purpose. Both components of the grant are unrestricted, which gives councils complete discretion to
spend the grants according to their needs.
In June each year, we are usually provided with an indication of what our allocation for the following
financial year is likely to be. For the purposes of the Draft Budget, we have assumed that it will remain
the same as it was in 2014/15.
1.4 Operating Expenditure
The growth of our Shire – our population, our facilities, our open spaces and our infrastructure, particularly
footpaths – continues to occur strongly and consistently. New subdivisions increase the costs of
maintenance and cleaning of public open spaces, stormwater drainage and footpaths and street
sweeping. The expenses associated with growth exceed the 1.8% growth in rate revenue.
We have all experienced increases in the costs of utilities and insurance including the fire services
property levy. These costs impact on Council too, for example street lighting has become expensive for
us. It would require us to increase rates by far more than 4.8% each year to cover the rising costs of
delivering services so I ensure that Council Staff focus on creating operational efficiencies and savings
by improving our processes and looking for ways in which to improve our customer service.
The graph below shows the growth in our operating expenditure. It is worth noting that the recent rise in
expenditure between 2012 and 2016 has been at a gradual incline. This demonstrates that in recent years
our effort to control expenditure has been successful.
0
5
10
15
20
25
30
35
40
45
50
55
60
2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
$M
1. Chief Executive Officer’s Summary (continued)
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 7
1. Chief Executive Officer’s Summary (continued)
Our pursuit of operational efficiencies and quality services will ensure we continue to deliver value for
money to our Ratepayers. In 2014/15 we reviewed all of our services. The review looked at the cost,
quality and level of our services as well as the benefits that are derived by our Ratepayers and Residents.
Part Three of the Budget Report provides a description of our services to the community, that is, it provides
you with an answer to the question – What do I get for my rates?
1.5 Capital Expenditure
Capital expenditure is an investment in assets, such as land, buildings, infrastructure and major plant
and equipment.
Capital investment is primarily on the construction of buildings, roads, drains, footpaths and bridges. It
also includes the purchase of land, major plant and equipment, vehicles, IT systems and playgrounds.
Council has a Long Term Capital Plan to assist our planning and decision making. It is a plan to ensure
that, in the future, we will be able to afford what we would like to do.
Despite the Plan, our capital expenditure fluctuates from year to year mainly due to the fluctuating
availability of government grants. The following chart compares this expenditure over the last six years.
The total planned capital expenditure that will occur during 2015/16 will be $26.93 million, of which
$19.65 million will be new budgeted expenditure and $7.28 million is budgeted expenditure from 2014/15,
which did not occur and will be carried forward carried to 2015/16.
At the end of each financial year there are projects which are incomplete because they could not be
undertaken neatly between 1 July and 30 June. This could be due to a variety of factors including
planning, community consultation, objections, tendering, contracting and the magnitude of the project.
0
5
10
15
20
25
30
2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
$M
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 8
1.6 Funding Sources for Capital expenditure
The Statement of Capital Works can be found in Appendix A4. It shows that there will be new capital
expenditure of $19.65 million in 2015/16, which will be funded as follows –
1.6.1. Grants
The level of capital works fluctuates significantly from year to year depending on which grants the
government invites applications. We have successfully applied for (or been allocated) Government grants
of $6 million for projects in 2015/16.
This Draft Budget does not include two Government grants, which we have received in the past. One is
the State Government’s Local Infrastructure Program and the other is the Federal Government’s Country
Roads and Bridges Program. In recent years these grants have contributed $640,000 and $1 million
respectively. At the time of preparing our draft Budget, we had not received any advice about either of
these grants in 2015/16 and therefore they have not been included.
1.6.2. New Loans
The budget includes new borrowings of $4.075 million. This includes $2.3 million for the $3.7 million Early
Years Centre in Gisborne and $1.775 million for the $2.5 million rehabilitation of the former landfill (tip) in
Kyneton.
1.6.3. Financial Reserves
We maintain financial reserves for specific purposes in accordance with our financial reserves policy. The
budget includes and allocation of $2 million from the financial reserves.
1.6.4. Contributions
Lancefield Park Committee will contribute $20,000 towards the construction of the $250,000 Lancefield
Skate Park and the Kyneton Football Netball Club will contribute $70,000 towards the construction of the
$542,000 oval lighting and power upgrade project.
1.6.5. Rates
We will allocate $6.43 million of rate revenue to capital expenditure.
1.7 Victorian Government’s Rating Policy
As mentioned previously, our Rating Strategy, which establishes a framework by which rates and charges
will be shared by the community, can be found in our Strategic Resource Plan. Our financial forecast is
based on the assumption that rate revenue will increase by 6.6%. This assumption is based on two
contributing factors. Firstly, based on historical evidence, we will continue to experience 1.8% growth in
rate revenue from new subdivisions and new constructions. Secondly to retain works and services at
current levels and standards, it is necessary to increase rates and the municipal charge by 4.8%.
Between, 1 January and 31 December 2014, the Consumer Price Index rose by 1.7%.
The costs of providing services, infrastructure and facilities are closely linked to wage costs, construction
costs, material costs and contract costs. These costs have nothing to do with the CPI. These costs often
increase by more than CPI.
1. Chief Executive Officer’s Summary (continued)
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 9
In 1995, the Victorian Parliament gave the Minister (under section 185B of the Act) the authority to limit
the amount by which councils are able to increase their total rate revenue (rates, municipal charge and
waste service charges). The current Victorian Government has said that it will use this authority to restrict
the annual increase in total rate revenue to no more than the CPI.
In January 2015, the Victorian Government asked the Essential Services Commission (ESC) to consider
and report on the development of a state-wide capping and variation framework for council rates. The
Government asked the ESC to prepare a draft report by July, invite comments from local councils and
others and submit its final report by October, with intention that the Government will implement the
framework from 1 July 2016.
There is no doubt that, if the State Government requires local councils to keep the annual increase in total
rate revenue (rates, municipal charge and waste service charges) to no more than the annual CPI, then,
over time, to remain financially sustainable, local councils will have to reduce their expenditure on
services, infrastructure and facilities. However, until the ESC draft report has been released, it is too early
to make any predictions.
If the Government accepts the ESC final report and recommendations, we should know what the impact
will be on our total rate revenue in 2016/17, before we start preparing our 2016/17 Budget.
1.8 Conclusion
I am sure you will agree that once again Council has prepared a Budget which seeks to balance the
demand for services and infrastructure with community capacity to pay. I encourage you to take a look at
the Budget Report to see what we are doing and how much it costs.
Peter Johnston
Chief Executive Officer
29 April 2015
1. Chief Executive Officer’s Summary (continued)
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 10
2. Budget Report Background
2.1 Public Display and Comments (Submissions)
2.1 Introduction
Each year Council prepares and adopts a budget for the following financial year in accordance with the
Local Government Act and the Local Government (Finance and Reporting) Regulations.
We begin budgeting in November by reviewing the proposed projects in the long term capital plan and
the available sources of corresponding income such as grants and loans. During December and
January, we prepare Business Cases for Capital Projects and New Initiatives. Councillors become
involved in the Budget during February and over the course of four Councillor Workshops between
February and April, Councillors look at the Major Initiatives that should be undertaken as a matter of
priority and included in the Council Plan Action Plan and also review the Capital Projects and other New
Initiatives. On the income side, Councillors consider loans, rates, waste charges and customer fees.
The Budget Report is written during April.
2.2 Public Display and Comments (Submissions)
Council approved the draft Budget Report for public display from Friday 1 May to Friday 29 May 2015.
Council welcomes feedback and invites your written comments. If you have any comments please
submit them in writing before 11am on 29 May 2015. Your comments should be addressed to Macedon
Ranges Shire Council. Our email address is [email protected] and our postal address is P.O.Box
151, KYNETON VIC 3444.
There are five matters of process and privacy that all persons intending to submit written comments
should read and be aware of:
1. Any written submission received by 11am on Friday 29 May 2015 shall be presented as an attachment to the
agenda for the Council Meeting to be held at 7.00pm on Wednesday 3 June 2015 and therefore shall be
deemed to be a public document and shall be considered at a meeting which is open to the public.
2. The Submitter’s name, address, telephone number and any other details defined by the Privacy Act shall be
redacted (that is, “blacked out”) from the submission when it is attached to the agenda to protect the
Submitter’s identity and privacy.
3. The Submitter is entitled to appear before Council and make a verbal presentation (of up to 3 minutes) in
support of their submission.
4. The Submitter should state, in their submission, whether they wish to appear in person, or to be represented
by a person named in the submission.
5. The Council meeting at which Submitters are entitled to be heard shall be held at 7.00pm on Wednesday 3
June 2015 in the Council Offices (opposite the Policer Station) at 40 Robertson Street, Gisborne.
It is proposed, subject to any written submissions received and considered, that Council will meet to
adopt the Budget Report, with or without amendment, at 7.00pm on Wednesday 17 June 2015.
In summary, the key stages and dates are –
1) Draft Budget Report approved for public display 29 April
2) Public notice that the Draft Budget Report is available 1 and 5 May
3) Draft Budget available for public display and comment 1 May – 29 May
4) Submissions period closes 11am 29 May
5) Submitters heard by Council 7pm 3 June
6) Submissions and Recommendations considered by Council 7pm 17 June
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 11
2. Budget Report Background (continued)
2.4 Financial statements
The Budget Report includes the Budgeted Financial Statements shown in Appendix A. These
Statements have been prepared for the year ending 30 June 2015 in accordance with the Local
Government Model Financial Report prepared by CPA Australia.
2.5 Planning and Reporting Framework
The Council Plan, Strategic Resource Plan, Budget Report and Annual Report fit within the Planning,
Performance and Reporting Framework as follows –
The Council Plan sets out Council’s Goals for its four year term of office (which concludes in October
2016). It is reviewed annually, when Council sets new Actions upon which Council will measure its
achievement of its Goals.
The Strategic Resource Plan is the long-term financial plan. It is also reviewed annually and expresses
the financial and non-financial resources that the Council requires to achieve its Goals.
The Budget Report is the short-term plan which specifies the resources required to fund Council’s
services and initiatives over the next 12 months.
The Quarterly Report, which is not shown in the above diagram, is produced four times per year and
provides the community with a report on the progress that is being made.
The Annual Report is published in September each year and provides the community with a
comprehensive report of our operations, performance and finances in the previous financial year.
Council Plan Strategic objectives Strategies Strategic indicators
Strategic Resource Plan Financial statements Non-financial resources
Budget Report Financial statements Services and initiatives Service outcome indicators Major initiatives
Annual Report Report of operations
-Service performance -Major initiatives -Governance & management
Financial statements -Financial statements -Capital works statement -Notes
Performance statement -Service performance outcomes -Financial performance
-Sustainable capacity
Community engagement
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 12
2. Budget Report background (continued)
2.6 Legislative Requirements
The “Planning and Accountability” requirements are found in Part 6 of the Local Government Act [the
Act]. In this Part of the Act, the Victorian Parliament requires local councils to prepare a Council Plan; a
Strategic Resource Plan; a Budget and an Annual Report.
The Budget Report complies with the requirements of the Act, which are briefly itemised below.
Section 127 of the Act states Council must ensure that the Budget contains –
1. Financial statements in the form set out in the Local Government Model Financial Report;
2. A description of the services and initiatives to be funded in the budget;
3. A statement as to how those services and initiatives will contribute to achieving the strategic
objectives specified in the Council Plan;
4. The Major Initiatives,
5. The indicators and measures of our service performance, financial performance and sustainable
capacity, the results of which will be reported in our Performance Statement as part of our
Annual Report 2014/15 (to be published in September 2015).
6. Details of the differential rates.
Section 129 requires Council to give public notice that it has prepared its budget; place the budget on
public display; and invite submissions. Section 223 gives a person the right to make a submission and
be heard in support of their submission.
Section 158 requires Council to declare the amount, which it intends to raise by rates. Section 159
permits Council to declare municipal charge to cover the governance costs of Council. Section 161
permits Council to raise rates by the application of differential rates and requires Council to provide an
explanation of the differential rates. Section 162 permits Council to declare service charges for the
collection and disposal of waste.
Regulation 9 requires Council to include the following financial statements in the Budget Report and in
the form set out in the Local Government Model Financial report –
1) Budgeted Comprehensive Income Statement
2) Budgeted Balance Sheet
3) Budgeted Statement of Changes in Equity
4) Budgeted Statement of Cash Flows
5) Budgeted Statement of Capital Works.
Regulation 10 requires Council to include the following information in the Budget Report –
1) Itemised summary of Capital Expenditure and Funding Sources
2) Statement of human resources and a summary of expenditure incurred in employing staff
3) Summary of Borrowings
4) Itemised summary of Rates and Charges.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 13
3. Services, Priority Initiatives and Service Performance
Our “Council Plan” includes nine Goals, which are our firm aspirations to which our endeavours are
directed.
Part 3 of our Budget Report is presented so that it aligns to those nine Goals.
The information within Part 3 demonstrates how we hold ourselves accountable to our Ratepayers and
Residents. Under each Goal there is –
1. A description of our services, which are funded in the budget.
2. A description of our priority initiatives, which are funded in the budget.
3. A statement as to how those services and initiatives will contribute to achieving the Goal.
4. The Victorian Government’s indicators and measures of our service performance; the results of
which will be reported in the Performance Statement in our Annual Report 2015/16, which will be
published in September 2016.
At the conclusion of Part 3 is a high level summary of the budgeted income we expect to generate from
all sources and the expenditure that will be incurred in achieving our Goals. The high level summary
includes transfers to and from financial reserves, loans and loan redemption and interest. It excludes
non-cash items such as non-monetary assets and depreciation and it also excludes incomplete capital
projects which will be carried forward from 2014/15 to 2015/16.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 14
3.1 Goal – Our lifestyle, culture and sense of place is strengthened by best
practice planning and development.
Description of Services –
1. We provide statutory planning information, advice and assessment. We process about 1,000
planning applications and deal with about 10,000 enquiries each year. We also maintain and
manage the relationships with over 20 statutory and advisory agencies directly involved in the
planning permit application process.
2. We control the building regulation and permit process and we provide professional building
permits and advice to residents and builders. We are also responsible for statutory building
compliance and building safety matters for both the residents and visitors.
3. We provide a planning enforcement service for the benefit of all residents, which ensures
compliance with planning controls and planning permit conditions. Our compliance officer
responds to concerns and monitors compliance with permit conditions, which is a significant task
considering over 10,000 permits were issued over the last 10 years.
4. We provide a Heritage Advisory Service which assists the community and staff in assessing
heritage value.
5. We develop policies, strategies and plans to manage growth and development in suitable
locations and to achieve sustainable environmental, economic and social outcomes.
6. We convert policies into the formal decision making framework such as planning scheme
amendments.
Description of Priority Initiatives –
To protect and maintain the integrity of townships within a context of population growth we will present
the revised Planning Scheme Amendments for Kyneton, Riddells Creek and Woodend Town Structure
Plans. We will also prepare new urban design guidelines.
To develop and maintain inclusive public open spaces and enhance access we will extend the shared
path along the Campaspe River in Kyneton.
To protect our cultural heritage we will develop organisational operational protocols to recognise
Aboriginal culture and heritage.
To reach a balance between agricultural and rural/residential lifestyle land use we will present the final
Rural Living Strategy and progress implementation of the adopted actions.
Statement of how we achieve our Goal –
We are responsible for implementation of the Macedon Ranges Planning Scheme as well as land use
planning and control and building regulation. These services should ensure that our lifestyle, culture and
sense of place is strengthened by best practice planning and development.
Indicator and Measure of our service performance –
Service Indicator Measure
Statutory
planning
Decision making Council planning decisions upheld at VCAT.
(Percentage of planning application decisions subject
to review by VCAT and that were upheld in favour of
the Council)
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 15
3.2 Goal – Our environment and landscape is protected and sustained.
Description of Services –
1. We develop policies, strategies and plans to achieve sustainable environmental outcomes.
2. We manage Council's conservation reserves and roadside vegetation, including management of
weed control programs and implementing Environmental Management Plans.
3. We work with the community, 26 Landcare and “Friends of” groups by providing financial and in
kind support, delivering public forums, events and a monthly Environment newsletter.
Description of Priority Initiatives –
To protect the natural diversity and uniqueness of the landscape and wildlife we will present an
Environmental Management Plan for Hanging Rock and we will commence landscape assessments of
proposed residential and commercial developments.
To ensure responsible management of our natural environment we will commence implementation of
the Reserve Environmental Management Plans’ signage strategy.
To plan for, and adapt to climate change we will present a new Natural Environment Strategy and we
will commence the staged street light conversion to modern energy efficient lamps, to improve
environmental sustainability. We will also become members of the Central Victorian Greenhouse
Alliance.
To continue to increase the focus on our environment we will allocate extra funding towards roadside
weed control, bushland reserve management street tree maintenance and drainage. We will also invest
$10,000 in the rehabilitation of Black Hill Reserve following the devastating bushfires.
Statement of how we achieve our Goal –
We provide best practice environmental advice and advocacy. These services should ensure that we
effectively protect and enhance the natural environment and landscape.
Indicator and Measure of our service performance –
The Victorian Government does not have an indicator and measure of environment planning and policy.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 16
3.3 Goal – Our infrastructure supports the needs of future generations.
Description of Services –
Assets
1. We provide accurate, up to date data on Council’s infrastructure assets to ensure informed
decision-making and improve the efficiency with which we manage our infrastructure.
2. We revalue the infrastructure assets in accordance with relevant Australian Accounting Standards
and other State Government requirements to ensure a direct link with Council’s financial position
and Strategic Resource Plan.
3. We ensure Council develops appropriate processes and procedures in asset management and
financial sustainability in accordance with the defined National and State frameworks.
Infrastructure and Projects
1. We investigate the best possible solution for our roads, stormwater drainage, footpaths, bridges,
buildings and street lighting and prepare designs that provide value for money whilst conforming
to latest standards and industry’s best practices.
2. We assess developments and projects proposed by developers and make sure they comply
with relevant Australian Standards, Manuals and Council’s engineering guidelines, and we
supervise the delivery of those works ensuring future generations inherit good quality
infrastructure.
3. We provide project management for capital works projects related to Council-owned buildings as
well as open-space infrastructure.
4. We inspect, maintain and repair 286 Council-owned buildings and structures.
Operations
1. We manage the weekly kerbside collection of garbage and recycling to nearly 18,000 residences
and green waste to 9,800 residences within the urban areas.
2. We undertake maintenance, renewal, upgrades and new construction works on the network of
roads, paths, bridges, drains and kerb and channel.
3. We maintain our iconic street trees together with all of the recreation reserves, sporting fields,
botanic gardens, playgrounds, public open spaces and bushland reserves for the use and
enjoyment of residents and visitors.
Description of Priority Initiatives –
To plan for, develop and maintain facilities that meet the community’s changing needs we will construct
a new soccer and athletics pavilion in Dixon Field, Gisborne, a new Early Learning Centre in Gisborne
and a new netball pavilion in New Gisborne. We will also report on the development of a new Leisure
Strategy.
We will also commence a “People for Places” program, to work with local communities to focus on
identified local community infrastructure needs and facilitate solutions.
To plan for, develop and maintain infrastructure to support the needs of local communities we will
continue to undertake a significant construction program for roads, bridges, footpaths and drains, the
details of which can be found in Appendix C4. Furthermore, we will invest an extra $42,000 towards new
and replacement street trees, construct a detention basin in Woodend and take over maintenance of
the of the Clarkefield recreation reserve, which was previously done on a voluntary basis.
We will purchase the follow plant and equipment –
One street sweeper.
Three trucks for road and park maintenance.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 17
3.3 Goal – Our infrastructure supports the needs of future generations
(continued).
One 10 metre tipping trailer to assist with gravel road maintenance.
One wood chipper to assist with tree maintenance.
One Wide deck mower for oval maintenance.
Five utilities to assist with general operations.
Electronic safety signs to inform road users of any hazards or change to conditions due to road
construction works.
Apart from the electronic safety signs, all items of plant will replace existing plant, which has completed
its planned life cycle within Councils ten year plant replacement program.
Statement of how we achieve our Goal –
We are responsible for the efficient and effective planning and asset management of civil infrastructure.
We provide project management services for the Council’s major capital works to ensure our facilities
and infrastructure meets current and future needs by balancing available funding with scope and quality.
We provide advice and supervision to private developers on the infrastructure standards that must be
incorporated in any subdivisions and other developments.
We construct new infrastructure and most importantly we maintain 1,600km of roads, 162km of
footpaths, 136 road bridges, 58 footbridges, 286 buildings including 22 community centres and halls 2
waste centres plus an airfield and a saleyard.
We rationalise built assets and prioritise the repair and refurbishment of aged facilities before funding
new ones
These services should ensure that our infrastructure will support the needs of future generations.
Service Indicator Performance Measure
Waste
collection
Waste
diversion
Kerbside collection waste diverted from landfill
(Percentage of garbage, recyclables and green organics
collected from kerbside bins that is diverted from landfill)
Roads Satisfaction Satisfaction with sealed local roads
(Community satisfaction rating out of 100 with how Council
has performed on the condition of sealed local roads)
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 18
3.4 Goal – Our Economy is diverse, strong and prosperous.
Description of Services –
1. We deliver an annual program of around 20 training, seminar and networking opportunities for
business in the Macedon Ranges.
2. We provide visitor services including 2 accredited Visitor Information Centres and other
information outlets and manage about 70 Volunteers.
3. We turn policy into action, for example, through implementation of the Economic Development
Strategy, Agribusinesses Plan, Tourism Industry Strategic Plan and Equine Strategy.
4. We provide resources and assistance to local events and business and tourism groups and
networks in support of economic development activity.
Description of Priority Initiatives –
To facilitate and support the development of diverse industry sectors that build on the natural and built
strengths of the Shire we will assist in the development of local business by delivering the Business
Development and Training Program. We will work with the Macedon Ranges Agribusiness Forum to
implement a Local Producers Pairing Program. We will revise the “visitmacedonranges.com” website in
partnership with Tourism Macedon Ranges. We will commence implementation of actions from the
Events and Festivals review and we will complete the Kyneton Saleyards Strategy.
To attract and/or develop skilled labour we will continue to implement the local skills audit in partnership
with the Macedon Ranges Employment & Training Network (5 year project) and we will identify potential
partnerships with training providers to address identified industry needs.
To attract increased investment to the Shire we will continue to assist in the development of local
business by delivering long term business sustainability program (Buy Local). We will also participate in
the State Government Regional Living Program and we will develop a New Business Kit.
Statement of how we achieve our Goal –
We will foster and encourage the expansion and diversification of existing businesses and industry
sectors and actively supports the attraction of sustainable new businesses. We will also work in
partnership with various business groups and forums to maximise employment opportunities and to
capitalise on the economic benefits of tourism. We improve the job prospects of young people by offering
trainee and student placement opportunities.
These services should ensure that the economy of Macedon Ranges remains diverse, strong and
prosperous
Indicator and measure of our service performance –
Service Indicator Measure
Economic
Development
Economic
activity
Change in number of businesses.
(Percentage change in the number of businesses with an ABN
in the municipality)
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 19
3.5 Goal – Our community is inclusive and connected and enjoys strong
mental and physical health and wellbeing.
Description of Services –
Aged and Early Years
1. We provide Early Years Services including management of eight kindergartens, which provide
programs to about 750 children. We also provide Occasional Care in Woodend.
2. We provide Maternal and Child Health support for up to 460 new babies and their families each
year. Our Nurses conduct almost 4,400 developmental assessments each year for infants and
children aged 0 - 6 years.
3. We deliver Home and Community Care services to over 1,600 residents, including domestic
services, personal care, respite care, delivered meals, home maintenance. We also manage and
support about 80 Volunteers.
Community and Culture
1. We provide research and local demographics and develop social policy for Council. We monitor
and report on progress against objectives in the Health and Wellbeing Plan and Community
Safety Plan.
2. We are part of the Goldfields Library Corporation and provide libraries in Gisborne, Kyneton,
Woodend and Romsey.
3. We work in partnerships with community groups to deliver local projects that improve community
wellbeing and respond to community and social needs
4. We provide a variety of programs such as Youth Spaces, Live4Life, Youth leadership and Music
in the Sticks to over 2,000 young people each year.
5. We present a program of performance, visual arts, cultural and heritage events, in five venues,
which are attended by about 45,000 residents and visitors each year.
Recreation
1. Each week, we deliver 50 fitness and aquatic classes. We provide learn to swim classes for over
1,800 children. There are about 90,000 participations in indoor leisure programs every year and
over 11,000 visits to the outdoor pools over summer.
2. We manage Hanging Rock for conservation, picnicking, sightseeing, local sport and recreational
activities plus a small number of major events including the annual car club picnic and
internationally recognised concerts.
3. We manage 20 sporting reserves which are made available to 47 seasonal user groups and we
provide assistance to 133 sporting clubs. We manage numerous facilities including 81 tennis
courts, 40 playgrounds, nine lawn bowling rinks, seven equestrian areas, five skate parks, and
three BMX tracks.
Description of Priority Initiatives –
To promote and maintain strong connected communities we will build the sustainability of Macedon
Ranges Community Hall Committee Inc. by providing two forums. We will strengthen the capacity of
Men’s Sheds to operate autonomously and effectively through a series of action-learning workshops.
We will work with young people to develop an Organisational Youth Charter.
To increase community understanding of, and support for, mental health and wellbeing we will support
the Macedon Ranges Suicide Prevention Action Group as they implement their action plan.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 20
3.5 Goal – Our community is inclusive and connected and enjoys strong mental
and physical health and wellbeing (continued)
To create a healthier, active community and reduce the incidence of obesity-related conditions we will
implement the results of the Healthy Eating Review of food provided at Council’s Aquatic and Leisure
Centres. We will also Work with community groups to further develop active and healthy activities held
across the shire on Australia Day 2016 and we will provide funding opportunities within the adopted
budget to community groups to run healthy, active events or programs.
We will also undertake significant capital projects including – 1. A major upgrade to the museum in Kyneton.
2. Outdoor play spaces at the Romsey and Swinbourne Avenue kindergartens
3. An upgrade to the aquatic centre in Gisborne
4. Outdoor pool works at Woodend and Lancefield
We will also undertake two capital projects in conjunction with other organisations –
1. Skate Park with the Lancefield Park Committee.
2. Oval lighting and power upgrade with the Kyneton Football Netball Club.
Statement of how we achieve our Goal –
We promote the planning, development and provision of programs that build community well-being and
capacity in the Shire. We will do this by delivering seven primary programs being Arts, Emergency
Recovery, Libraries, Prevention of Violence against Women, Rural Access, Transport Connections and
Youth.
We support families and help children grow, learn and develop in a safe and caring environment. We
also support residents who are aged or are living with a disability, assisting them to maintain
independence, participate in community life and be actively involved in decisions about their support
and care needs.
We are responsible for the planning, development, operation, maintenance and support of sporting and
recreational opportunities.
We believe that these services should ensure that our community is inclusive and connected and enjoys
strong mental and physical health and wellbeing.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 21
3.5 Goal – Our community is inclusive and connected and enjoys strong mental
and physical health and wellbeing (continued).
Indicators and measures of our service performance –
Service Indicator Performance Measure
Home and
Community
Care (1)
Participation Participation in HACC service.
(Percentage of the municipal target population that
receive a HACC service)
Home and
Community
Care (2)
Participation Participation in HACC service by people from culturally
and linguistically diverse backgrounds.
(Percentage of the municipal target population in relation
to CALD people that receive a HACC service)
Maternal and
Child Health (1)
Participation Participation in MCH key ages and stages visits.
(Percentage of children attending the MCH key ages and
stages visits)
Maternal and
Child Health (2)
Participation Participation in MCH key ages and stages visits by
Aboriginal children.
(Percentage of Aboriginal children attending the MCH key
ages and stages visits)
Libraries Participation Active library members.
(Percentage of the municipal population that are active
library members)
Pool Facilities Utilisation Utilisation of pool facilities.
(The number of visits to pool facilities per head of
municipal population)
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 22
3.6 Goal – Our community is well prepared, resilient and safe.
Description of Services –
1. We conduct fire hazard inspections on private property within the township areas to identify fire
risks to community safety. We manage the slashing of over 1000 kilometres of roadsides to
reduce the risk of a fire starting and spreading.
2. Our immunisation programs protect people from many infectious diseases. The program runs
over five preschool sessions in Gisborne, Kyneton, Woodend, Riddells Creek and Romsey. The
school program involves three visits to seven secondary colleges.
3. We respond to matters relating to domestic pets, livestock, disturbances, littering and parking
offences to enhance and protect community safety. We register and record over 14,000 dogs and
cats.
Description of Priority Initiatives –
To develop and maintain safe environments, we will, in partnership with emergency management
agencies, facilitate the staged implementation of an action plan to prevent violence against women in
emergencies. We will also, in partnership with committee members, review the Municipal Fire
Management Plan. Once again, we will carry out even more roadside slashing to improve community
safety.
To support communities to meet their wellbeing and health needs we will present the Municipal Early
Years Plan and the Positive Ageing Strategy.
Statement of how we achieve our Goal –
We are responsible for activities and projects that focus on protecting and enhancing community safety
through education and enforcement. In particular this relates to local laws and animal control including
dangerous dogs. We are also responsible for school crossings, waste water management, food
legislation, immunisation and public health.
Macedon Ranges is a high fire risk area and we are responsible for ensuring residents remove fire
hazards from their property and that we are to assist with emergencies when they happen and provide
assistance to affected residents.
We believe that these services will ensure our community is well prepared, resilient and safe.
Indicators and measures of our service performance –
Service Indicator Performance Measure
Animal
Management
Health and
safety
Animal management prosecutions.
(Number of successful animal management prosecutions)
Food safety Health and
safety
Critical and major non-compliance notifications.
(Percentage of critical and major non-compliance notifications
that are followed up by Council)
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 23
3.7 Goals – We proactively engage with and demonstrate accountability to the
community. We build and sustain financial strength.
Description of Services –
Council and Customer Service
1. We provide first point of contact customer services at four offices and manage about 62,500
telephone calls each year. We also receipt payments, register Planning and Building applications,
issue disabled persons parking permits and act as a VicRoads Agency.
2. We support our elected Councillors in performing their role and the decision making process
including Council Meetings, Assemblies of Councillors, Australia Day events and Citizenship
Ceremonies.
3. We provide about 250 media releases, 5 ShireLife newsletters and the Annual Report each year
and manage the website and social media channels
4. We administer and assess about 70 applications under the Community Funding Scheme and
about 25 applications under the Councillor Grants Scheme.
Finance
1. We pay more than 17,000 supplier invoices annually. The purchasing of goods and services is
based on our Procurement Policy which aims to be open and transparent and deliver value for
money.
2. We produce the financial information for the Budget Report, Strategic Resource Plan, Quarterly
Reports and Annual Report according to the requirements of Accounting Standards, the Local
Government Act and Best Practice reporting. We also provide commentary to help our community
understand our financial performance and position.
3. We issue more than 75,000 rate instalments notices annually and carefully undertake the
collection process. We produce valuations for over 20,000 properties every two years and
undertake about 1,500 supplementary valuations each year.
4. We buy and/or sell about three Council’s properties (land and buildings) each year and we also
lease about 100 Council properties to tenants.
Tendering
We publically invite tenders from suitably experienced contractors for about 50 major contracts each
year.
Description of Priority Initiatives –
To deliver fair and open decision-making across the business of Council we will continue to provide
opportunities for the community to provide input into the budget decision-making process.
To deliver online services and information that meets the needs of the community we will further develop
online functionality to improve service delivery and we will implement the electronic booking system for
management of arts and culture venues, upgrade and enhance the website to continue to meet the
needs of users. We will also continue to develop Council’s social media presence to further engage and
communicate with the community.
To collaborate across Council to achieve the best results for the community we will continue to recognise
the value of volunteers, including by holding an annual volunteers' function. We will also hold regular
Place Making Group meetings to align Council projects and consider issues from a place-based
perspective.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 24
3.7 Goals – We proactively engage with and demonstrate accountability to the
community. We build and sustain financial strength (continued).
To ensure Council’s financial resources are sustainable and managed responsibly we will adopt the
2016/17 budget by 30 June 2016 and we will complete the 2016 General Valuation in line with Valuer
General’s Best Practice Guidelines.
Statement of how we achieve our Goal –
We provide governance services, support and resourcing of the elected Council and Council’s civic and
advocacy role including media communications, website and publications.
We provide customer services for the organisation from Kyneton, Gisborne, Romsey and Woodend.
We are responsible for the financial planning (budgets) and financial reporting (quarterly and annual
statements). We also sell, purchase and lease Council’s land and vehicles. We are responsible for the
collecting, banking and investing of Council funds including rates, accounts payable, loans and grants.
We are responsible for all purchases and the payment of Council’s staff, contractors and suppliers.
We believe that these services demonstrate that we proactively engage with our community and make
ourselves accountable to the community. They also demonstrate that we are building and sustaining
financial capacity.
Indicators and Measures of our financial performance –
Indicator Measure Budgeted Result
1. Operating position
Adjusted
underlying result
Adjusted underlying surplus (deficit) / Adjusted
underlying revenue
-0.9%
2. Liquidity
Working Capital Current assets / current liabilities 158.3%
Unrestricted cash Unrestricted cash / current liabilities 31.9%
3. Obligations
Loans and
borrowings
Interest bearing loans and borrowings / rate revenue 33.1%
Loans and
borrowings
Interest and principal repayments / rate revenue 1.9%
Indebtedness Non-current liabilities / own source revenue 34.3%
Asset renewal Asset renewal expenditure / depreciation 87.7%
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 25
3.7 Goals – We proactively engage with and demonstrate accountability to the
community. We build and sustain financial strength (continued).
Indicator Measure Budgeted Result
4. Stability
Rates
concentration
Rate revenue / adjusted underlying revenue 63.8%
Rates effort Rate revenue / property values (CIV) 0.4%
5. Efficiency
Expenditure level Total expenditure / no. of assessments $3,115
Expenditure level Specific purpose grants expended / Specific purpose
grants received
100%
Revenue level Residential rate revenue / No. of residential
assessments
$1,945
Workforce
turnover
No. of resignations and retirements / average no. of staff 15.5%
Indicators and measures of our sustainable capacity –
Indicator Measure Budgeted Result
Own-source
revenue
Own-source revenue / Municipal population $1,158
Recurrent grants Recurrent grants / Municipal population $295
Population (1) Total Expenditure / Municipal Population $1,461
Population (2) Value of infrastructure / Municipal Population $12,724
Disadvantage Index of Relative Socio-Economic Disadvantage by
decile
27
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 26
3.8 Goal – We will provide quality and efficient services that meet community
needs.
Description of Services –
Organisational Development
1. We provide advice and leadership across the Organisation to support Staff in their effort to deliver
excellent service to our community. This includes a Staff Performance and Development Scheme.
2. We oversee the recruitment and induction of new Staff including a training program to ensure
familiarity with organisational systems.
3. We coordinate training in workplace health and safety including the prevention of bullying and
fraud.
4. We undertake risk assessments to reduce the likelihood of incidents and we work in partnership
with WorkSafe to implement safety measures to improve our WorkCover performance.
5. We provide industrial advice to ensure legislative compliance, including negotiation of Enterprise
Agreements, Dispute Resolution and preparation of contracts of employment
Information and Communications
1. We provide and support a computing environment which consists of 64 servers and 310 desktop
computers across 34 facilities within the Shire.
2. We classify and register about 66,000 items of incoming mail each year in accordance with the
Public Records Act 1973.
3. We maintain a Geographic Information System that provides thousands of layers of spatial data
covering more than 100 different themes. The System is accessible by all Staff and a simplified
version is also available through our website.
Internal Reviews
We undertake four reviews each year of different operational areas to identify the degree of internal
control, level of legislative compliance and where improvements can be made.
Description of Priority Initiatives –
To support residents and visitors with well-targeted services we will identify and map “horse friendly”
trails and accommodation options for the development of a brochure and online marketing tools to
promote horse trail-riding tourism in the Macedon Ranges by 30 June 2016.
To ensure that our community benefits from the efficient delivery of our regulatory and operational
responsibilities we will conduct the annual kindergarten survey as part of a process of continuous
improvement. In partnership with local secondary schools, we will develop strategies to improve
immunisation consent card return rates.
To ensure our computer network and systems are secure and to assist our staff to undertake their
responsibilities efficiently and with minimum risk of loss and disruption we will review and update the IT
Strategic Plan. We will also deploy the latest version of our major (non-financial) information system to
ensure increased efficiency and security.
To support and develop staff to enhance service delivery we will conduct regular community consultation
training with relevant staff.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 27
3.8 Goal – We will provide quality and efficient services that meet community
needs (continued).
Statement of how we achieve our Goal –
We provide advice to our Staff on recruitment, induction, training, employee relations, and occupational
health and safety and risk management.
We also provide plan, operate and improve our Corporate Information including Records, Geographic
Information (GIS), Networks, Systems and Help Desk. We also provide support to our Staff associated
with the use and upgrading of their Applications. These services should ensure that our workforce has
the ability to deliver quality and efficient services to the community.
Indicators and measures of our service performance –
The State Government’s reform of local government in 2013/14 did not include an indicator and measure
of the underlying ability to provide quality and efficient services.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 28
3.9 Goal – We will lead and advocate for the best interests of the community.
Description of Services –
1. We deliver additional benefits to Macedon Ranges Shire through leadership and collaboration.
2. We demonstrate the highest standards of civic and community leadership.
3. We advocate for and promote regional solutions.
Description of Priority Initiatives –
To deliver additional benefits to Macedon Ranges Shire through leadership and collaboration we will
meet with state and federal government representatives to advocate for and advance projects and
partnerships for community benefit. We will promote and advocate to government bodies and
community stakeholders about current and future transports needs in our shire. We will continue to
work collaboratively with all stakeholders on improving telecommunications infrastructure.
To demonstrate the highest standards of civic and community leadership we will deliver at least two
Organisational Awareness and Leadership sessions to staff focusing on Council’s cultural and
operational standards.
To advocate for and promote regional solutions we will participate in the development of the Southern
Loddon Mallee Regional Integrated Transport Strategy.
Statement of how we achieve our Goal –
On behalf of our community we advocate for projects and better services from the state and federal
governments. This is often within a regional context particularly in respect to communications,
employment, health and transport.
We are representatives of our community. To lead and advocate for the best interests of the
community, we must have a solid foundation of ethical governance at all times and in all
circumstances.
Indicator and measure of our service performance –
Service Indicator Measure
Governance Satisfaction Satisfaction with Council decisions
(Community satisfaction rating out of 100 with how
Council has performed in making decisions in the
interests of the community)
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 29
3.10 High level summary of the income from all sources and expenditure
GROUP/Department INCOME EXPENSES NET (difference
between income
and expenses)
CEO
Chief Executive Officer $0 $587,796 $587,796
Council and Customer Service ($50,600) $3,024,810 $2,974,210
Organisational Development ($382,300) $2,184,987 $1,802,687
TOTAL CEO ($432,900) $5,797,593 $5,364,693
ASSETS AND OPERATIONS
Assets and Operations $0 $400,814 $400,814
Engineering and Asset Planning ($456) $507,243 $506,787
Engineering Infrastructure and Projects ($408,000) $3,059,636 $2,651,636
Operations ($9,311,675) $16,485,957 $7,174,282
Community Safety ($1,236,514) $2,319,894 $1,083,380
TOTAL ASSETS AND OPERATIONS ($10,956,645) $22,773,544 $11,816,899
COMMUNITY WELLBEING
Community Wellbeing ($46,799) $310,196 $263,397
Community Services ($6,203,638) $7,621,565 $1,417,928
Community and Culture ($263,600) $3,094,625 $2,831,025
Recreation and Sport ($4,084,228) $5,895,964 $1,811,736
TOTAL COMMUNITY WELLBEING ($10,598,265) $16,922,350 $6,324,085
PLANNING AND ENVIRONMENT
Planning and Environment $0 $595,199 $595,199
Statutory Planning and Development ($1,180,500) $2,478,152 $1,297,652
Strategic Planning and Environment ($40,000) $1,896,255 $1,856,254
Economic Development and Tourism ($23,450) $1,255,666 $1,232,216
TOTAL PLANNING AND ENVIRONMENT ($1,243,950) $6,225,273 $4,981,322
CORPORATE SERVICES
Corporate Services, Tendering and Internal Audit $0 $479,082 $479,082
Information and Communications ($12,440) $2,173,574 $2,161,134
Finance ($43,554,604) $5,285,950 ($38,268,654)
TOTAL CORPORATE SERVICES ($43,567,044) $7,938,606 ($35,628,438)
TOTAL OPERATING BUDGETS ($66,798,805) $59,657,366 ($7,141,439)
DRAFT NEW INITIATIVES ($40,000) $549,000 $509,000
DRAFT CAPITAL PROJECTS ($13,022,054) $19,654,300 $6,632,246
GRAND TOTAL ($79,860,859) $79,860,666 ($193)
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 30
4. Analysis of Budget Income Statement (Refer Appendix A1)
The complete Budgeted Income Statement, which has been prepared in accordance with the Local
Government Model Financial Report prepared by CPA Australia, is shown in Appendix A1. The table
below is a brief summary of the Income Statement.
Part 4 of our Budget Report analyses the operating budget including expected revenues and expenses
and provides a brief explanation of the differences between 2014/15 and 2015/16. This section also
includes a summary of federal and state government recurrent and non-recurrent grants.
Budgeted Income Statement
Forecast
Actual Budget Variance
Ref 2014/15 2015/16
$’000 $’000 $’000
Total income 4.2 76,657 84,502 7,845
Total expenses 4.3 (66,868) (67,013) (145)
Surplus (deficit) for the year 9,789 17,489 7,700
Grants – capital non-recurrent 4.2.6 (2,654) (5,008) (2,354)
Contributions - non-monetary assets (9,996) (12,800) (2,804)
Capital contributions - other sources 4.2.4 (462) (170) 610
Adjusted underlying surplus (deficit) 4.1 (3,323) (489) 3,152
4.1 Adjusted underlying deficit ($3.15 million decrease)
The adjusted underlying result is the net surplus or deficit for the year adjusted for non-recurrent capital
grants, non-monetary asset contributions, and capital contributions from other sources
In calculating the adjusted underlying result, Council has excluded grants received for capital purposes
which are non-recurrent and capital contributions from other sources. Contributions of non-monetary
assets are excluded as the value of assets assumed by Council is dependent on the level of development
activity each year.
The adjusted underlying result is an indicator of financial sustainability and our ability to achieve our
service delivery objectives because it is not impacted by capital income items, which can mask the
operating result.
The adjusted underlying result can vary significantly from year to year so looking at this measure over
time provides more of an indication of Council’s longer term financial sustainability. For example, the
forecast actual for 2014/15 is impacted by a one off contribution of $1.5m towards the contribution of the
new Gisborne Indoor Sports Stadium at the Secondary College (see 4.3.6 below). Also, the small
budgeted increase in operating expenses has assist in reducing the budgeted underlying deficit.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 31
4.2 Operating Income Forecast Actual Budget Variance Income Types Ref 2014/15 2015/16 $’000 $’000 $’000
Rates and charges 4.2.1 39,845 42,383 2,538
Statutory fees and fines 4.2.2 2,707 2,505 -202
User fees 4.2.3 5,501 5,861 360
Contributions - cash 4.2.4 462 290 -172
Contributions - Non Monetary Assets 4.2.5 9,996 12,800 2,804
Grants - Recurrent 4.2.6 12,721 13,555 834
Grants - Non Recurrent 4.2.7 3,841 5,481 1,640
Other income 4.2.8 1,584 1,627 43
Total income 76,657 84,502 7,845
Changes in Income Levels – 2014/15 to 2015/16:
4.2.1 Rates and charges ($2.54 million increase)
The budgeted increase in total revenue from rates and charges $2.54 million. Refer Appendix B3 for the
detailed explanation.
4.2.2 Statutory Fees and Charges ($0.20 million decrease)
Statutory fees include fees and fines levied in accordance with legislation and include animal registrations,
Health Act registrations Building Application fees, and Planning Application fees. Increases in statutory
fees are made in accordance with legislative requirements.
A decrease of $0.20 million in statutory fees and charges is expected. This is primarily due to the biannual
payment we receive from the State Revenue Office for our property valuation data.
A General Valuation of all properties within the Shire is completed every two years by Council. The
valuation data is also provided to State Revenue Office who pays Council for the information provided.
The payment for the 2014 General Valuation was received in 2014/15 and the payment for the 2016
General Valuation data will be received in 2016/17. Therefore nothing is included in 2015/16.
Rates &charges
Stat feesUser fees
Conts - Cash
Conts - NonMonGrants - Recurrent
Grants NonRecurrent
Other
0
10,000
20,000
30,000
40,000
50,000
$'000
Budget 15/16 Forecast 14/15
4. Analysis of Operating Budget (continued)
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 32
4.2.3 User Charges ($0.36 million increase)
User charges relate mainly to the charging of fees to users of Council’s services. These include fees from
leisure and aquatic facilities, arts performances, kindergartens and home care. Income is increasing in
most of Council services due to increasing use of these services. The main increases are from aquatic
and leisure facilities ($0.16m), sales of materials from Council’s gravel pit ($0.07m), preschool fees
($0.04m) and tips & transfer station fees ($0.05m).
Refer Appendix C4 for a complete list of all fees and charges.
4.2.4 Contributions – Cash ($0.17 million decrease)
This income relates to contributions from community groups and clubs to Council projects. The income
varies from year to year depending on budgeted projects. A decrease in contributions has been budgeted
in 2015/16.
4.2.5 Contributions – Non Monetary ($2.8 million increase)
This income is mainly related to new roads contributed to Council by developers when new subdivisions
are completed. The non-monetary assets can also be identified as part of an asset revaluation which is
completed on a cyclical basis in line with accounting standards. The level of non-monetary contributions
varies considerably from year to year depending on the number of subdivisions completed and the timing
of their completion. Based on recent historical increases, the level of non-monetary contributions is
expected to increase in 2015/16.
4.2.6 Grants - Recurrent ($0.83 million increase)
Recurrent grants are grants which are ongoing and it is expected that they will be received each year for
the foreseeable future. These grants include all monies received from State and Federal sources for the
purposes of funding the delivery of Council’s services to ratepayers. Some of the largest recurrent grants
are the Financial Assistance Grant – General Purpose ($4.6m), preschools ($2.3m), community support
($2.2m) and Roads to Recovery ($2.0m). All operating grants are considered to be recurrent except for
time limited projects, which have a funding end date.
4.2.7 Grants - Non Recurrent ($1.64 million increase)
Non Recurrent are generally one off grants for specific projects, generally capital works related. Overall it
expected that the level of non-recurrent grants will increase by $1.64 million. The level of grants fluctuates
considerably from year to year depending on the types of capital works and the availability of State and
Federal funding.
All capital grants are considered to be non-recurrent except for the Financial Assistance Grant – Local
Roads ($2.04m) and the Roads to Recovery grant ($2.0m).
Further information: At the conclusion of Part 4.2 is further information of the operating and capital grants.
Also, Part 6 contains our analysis of Capital Works and includes further information on grants and
contributions expected to be received during the 2015/16.
4. Analysis of Budgeted Income Statement (continued)
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 33
4. Analysis of Budget Income Statement (continued)
4.2.8 Other Revenues ($0.08 million increase)
Other revenues include a range of items including interest income, income from insurance claims and
miscellaneous receipts. A small decrease of $0.08m is expected in 2015/16. Some of the biggest sources
of other revenues are interest on investments ($0.42m) and work cover recovery claims ($0.38m).
Break Up of Income for 2015/16:
Rates and charges50%
Stat fees and fines3%User fees
7%
Conts - Non Mon. Assets 15%
Grants - Recurrent16%
Other Income2%
Conts - Cash1%
Grants Non Recurrent 6%
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 34
4. Analysis of Budgeted Income Statement (continued)
Forecast Actual Budget Variance
Operating Grant - Source and Type 2014/15 2015/16
$’000 $’000 $’000
Recurrent - Commonwealth Government:
Financial Assistance Grant (General Purpose) 4,644 4,681 37
Preschools 2,151 2,316 165
Community Support including general home care 2,331 1,907 (424)
Maternal and child health 303 295 (8)
Recurrent - State Government:
Community safety including school crossings 163 164 1
Youth & Culture 115 115 0
Fire Services Property levy collection 50 50 0
Environment 40 40 0
Economic development 10 10 0
Planning 13 10 (3)
Other 2 2 0
Total recurrent grants 9,822 9,590 (232)
Non-recurrent - Commonwealth Government 0 0 0
Non-recurrent - State Government:
Emergency Management 120 120 0
Fire Recovery 585 0 (585)
Recreation 0 280 280
Waste Water project 368 0 (368)
Total non-recurrent grants 1,073 400 (673)
Total operating grants 10,894 9,989 (906)
Forecast Actual Budget Variance Capital Grant – Source and Type 2014/15 2015/16
$’000 $’000 $’000
Recurrent - Commonwealth Government :
Roads to Recovery 1,000 2,000 1000
Finaincial Assistance Grant (local roads) 2,014 2,039 25.2
Recurrent - State Government 0 0 0
Total recurrent grants 3,014 4,039 1025.2
Non-recurrent - Commonwealth Government :
Buildings 1,630 1,630
Recreation Leisure and community facilities 475 475
Parks, open space and streetscapes 1,100 1,100
Non-recurrent - State Government:
Buildings 170 - -170
Country roads & bridges 1,000
Recreation Leisure and community facilities 795 325 -470
Parks, open space and streetscapes 689 1,477 788
Total non-recurrent grants 2,654 5,007 3,353
Total capital grants 5,668 9,047 4,379
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 35
4. Analysis of Budgeted Income Statement (continued)
4.3 Operating Expenditure Forecast Actual Budget Variance Expense Types Ref 2014/15 2015/16 $’000 $’000 $’000
Employee costs 4.3.1 29,553 30,576 1,023
Materials and services 4.3.2 20,232 19,787 -445
Bad and doubtful debts 4.3.3 18 12 -6
Depreciation and amortisation 4.3.4 12,889 13,485 596
Finance costs 4.3.5 334 480 146
Other expenses 4.3.6 3,842 2,673 -1,169
Total expenses 66,868 67,013 145
Changes in Expense Levels – 2014/15 to 2015/16:
4.3.1 Employee costs ($1.02 million increase)
Employee costs include all employee related expenditure paid by the employer including wages,
allowances, leave and superannuation.
Employee costs are forecast to increase by $1.02m. This increase relates to the following key factors:
The expected increase in wages from the Enterprise Agreement which is estimated to increase
wages by $0.97million (3.3%).
New initiatives for 2015/16 include $0.14m of additional resourcing. These new initiatives include
increased resourcing in land-use planning, recreations and the Gisborne Indoor Stadium at the
Secondary College.
There are also some increases in trainees (to create employment experience for young people) and
an increase in casual staffing at the aquatic and leisure centres due to increased demand (these
casual staffing costs are offset by income from paying customers).
Partly offsetting the increases above is a reduction in the WorkCover premium.
Emp.costs
Mat &serv
Bad &D/Debts
Deprec'n
Borrowingcosts
Otherexp's
0
10,000
20,000
30,000
40,000
$'000
Budget 15/16 Forecast 14/15
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 36
4. Analysis of Budgeted Income Statement (continued)
A summary of human resources expenditure categorised according to the organisational structure of
Council is included below:
Comprises
Budget Permanent Permanent
Directorate 2015/16 Full Time Part Time Casual
$'000 $'000 $'000 $'000
Assets & Operations 9,069 8,044 624 402
Chief Executive 3,101 1,960 971 171
Community Wellbeing 11,334 3,115 6,116 2,103
Corporate Services 3,132 2,959 170 3
Planning & Environment 3,941 3,583 337 21
Total 30,576 19,660 8,217 2,698
A summary of the number of full time equivalent (FTE) Council staff in relation to the above expenditure
is included below:
Comprises
Budget Permanent Permanent
Directorate FTE Full Time Part Time Casual
Assets & Operations 118.5 105 8.1 5.4
Chief Executive 24.7 15 7.4 2.3
Community Wellbeing 134.8 36 70.7 28.1
Corporate Services 29.6 28 1.6 0.0
Planning & Environment 40.8 37 3.5 0.3
Total 348.4 221 91.3 36.1
4.3.2 Materials and contracts ($0.45 million decrease)
Materials and Contracts include the purchases of consumables, payments to contractors and consultants
and for the provision of services and utility costs. Materials and services are forecast to decrease by $0.45
million. The level of contractor and consultancy expenditure can vary from year to year depending on the
operating projects undertaken. The 2014/15 budget includes the Mount Macedon waste water project
which is funded by grants and contributions. The contractor expenditure on this project in 2014/15 will be
$0.44m, the project will be completed in 2014/15 and hence no budget is required for 2015/16.
4.3.3 Bad & Doubtful Debts ($0.006 million decrease)
Bad & Doubtful debts relate to debts which are considered to be uncollectable. Council’s processes in
relation to debt recovery are governed by the Debt Management Policy.
4.3.4 Borrowing costs ($0.15 million increase)
Borrowing costs relate to interest charged by financial institutions on funds borrowed. The increase in
borrowing costs is due to $6.6m of borrowings to be taken up in 2015/16. Appendix B2 provides
information on borrowings. Some borrowings will be taken up at the end of the financial year so the full
amount of the annual interest expense will not be included in the budget until 2016/17.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 37
4. Analysis of Budgeted Income Statement (continued)
4.3.5 Depreciation ($0.60 million increase)
Depreciation is an accounting measure which attempts to allocate the value of an asset over its useful
life. Increases in depreciation are generally a result of increasing asset values through capital works.
Increases are also due to asset revaluations, which are conducted on a 3 year rolling program in line with
accounting standards for Council’s property, plant and equipment including infrastructure assets such as
roads and drains.
4.3.6 Other Expenses ($1.17 million decrease)
Other expenses are mainly made up of Council contributions to clubs, community groups and the Goldfield
Library Corporation which operate Council’s libraries. The 2015/16 budget has decreased mainly due to
a one off contribution of $1.5m to the Gisborne Indoor Sports Stadium at the Secondary College, which
was included in the 2014/15 budget. The Gisborne Indoor Stadium is not a Council asset, but it will be
operated by Council.
Break Up of Expenses for 2015/16:
Employee costs46%
Materials and services
29%
Bad and doubtful debts
0%
Depreciation and amortisation
20%
Finance costs1%
Other expenses4%
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 38
5. Analysis of Budgeted Balance Sheet (also refer Appendix A2)
The complete Budgeted Balance Sheet, which has been prepared in accordance with the Local
Government Model Financial Report prepared by CPA Australia, is shown in Appendix A2).
The following table is a brief summary of the Budget Balance Sheet. The Balance Sheet is a reflection of
our Financial Position. Part 5 of our Budget Report analyses the movements in assets, liabilities and
equity between 2014/15 and 2015/16.
5.1 Budgeted balance sheet
5.1.1 Current Assets ($1.54 million decrease)
Current assets includes receivables, assets held for resale, cash and investments such as cash held in
the bank and the value of investments in deposits or other highly liquid investments with short term
maturities of three months or less. The Current Asset balance is projected to decrease as the assumption
is that financial assets (investments) will decrease to fund the higher level of capital works in 2015/16.
5.1.2 Non-Current Assets ($26.11 million increase)
Non-Current assets include property, infrastructure, plant and equipment. Non-Current assets are the
largest component of Council’s worth and represents the value of all the land, buildings, roads, plant,
equipment which has been accumulated over many years. The budgeted increase in the value of non-
current assets is mainly due to the capital works and purchases which increase the total value of Council’s
assets. A contribution of assets, such as roads and footpaths, from developers as part of their
subdivisions also increases the asset values. Partly offsetting these increases is asset depreciation which
reduces asset values as the assets age.
Forecast
Actual Budget Variance
Ref 2014/15 2015/16
$’000 $’000 $’000
Current assets 7.1.1 26,914 25,372 (1,542)
Non-current assets 7.1.2 628,751 654,865 26,114
Total assets 655,665 680,237 24,572
Current liabilities 7.1.3 15,577 16,029 452
Non-current liabilities 7.1.4 11,873 17,390 5,517
Total liabilities 27,450 33,419 5,969
Net assets 628,215 646,818 18,603
Equity 7.1.5 628,215 646,818 18,603
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 39
5. Analysis of Budgeted Balance sheet (continued)
5.1.3 Current Liabilities ($0.45 million increase) and
Liabilities are classed as current or non-current depending on when they are expected to be repaid.
Current liabilities are expected to increase by $0.45m. The increase is mainly due to expected increases
in payables and employee benefits, in accordance with the Budgeted Income Statement. Current
borrowings are also expected to increase due to an overall increase in loans (see below).
5.1.4 Non-Current Liabilities ($5.52 million increase)
Non-Current liabilities are expected to increase by $5.52m. The increase is a result of planned new loans
of $6.6m to be taken up in 2015/16, which is partly offset by loan redemptions. Information on loans is
outlined in Appendix B3. It should be noted that Council’s level of borrowing remains well below prudential
guidelines.
5.1.3 Net Assets ($17.79 million increase)
This term is used to describe the difference between the value of total assets and the value of total
liabilities. It represents the net worth of Council as at 30 June.
As outlined above, the increase in net assets of $17.79 million is mainly a result offset increases in asset
non-current asset levels, partly offset by increased borrowings.
5.1.4 Equity ($18.60million increase)
Total equity always equals net assets and is made up of the following components:
Asset revaluation reserve which represents the difference between the previously recorded value of
assets and their current valuations
Other financial reserves that are funds that Council wishes to separately identify as being set aside
to meet a specific purpose in the future and to which there is no existing liability. These amounts are
transferred from the Accumulated Surplus to be separately disclosed
Accumulated surplus which is the value of all net assets, less financial reserves that have
accumulated over time.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 40
6. Analysis of Budgeted Cash Flows (also refer Appendix A3)
The complete Budgeted Statement of Cash Flows, which has been prepared in accordance with the Local Government Model Financial Report prepared by CPA Australia, is shown in Appendix A3. The table below is a brief summary of the Budgeted Statement of Cash Flows. Part 6 of our Budget Report analyses the expected cash flows from the operating, investing and financing activities. The analysis is based on three main categories of cash flows:
Operating activities - Refers to the cash generated or used in normal service delivery functions.
Investing activities - Refers to cash generated or used in the creation or enhancement of infrastructure and other assets and the acquisition and sale of property, plant and equipment.
Financing activities - Refers to cash generated or used in the financing of Council functions and include borrowings from financial institutions and repayment of the principal component of loan repayments for the year.
Budgeted Statement of Cash Flows
Forecast
Actual Budget Variance
Ref 2014/15 2015/16
$’000 $’000 $’000
Net Cash flows from operating activities 6.1.1 12,697 18,758 6,061
Net Cash flows from investing activities 6.1.2 (12,263) (26,417) (14,154)
Net Cash flows from financing activities 6.1.3 (377) 7,845 8,222
Net decrease in cash and cash equivalents 57 186 129
Cash & cash equivalents at beginning of the year 4,868 4,925 57
Cash & cash equivalents at end of the year 6.1.4 4,925 5,111 186
6.1.1 Operating activities ($6.06 million increase) The increase in cash inflows from operating activities of $6.07m is an increase in capital grants and rate income. This is partly offset by increasing operating expenses, however, the 2014/15 forecast includes a one off contribution of $1.5m the Gisborne Indoor Sports Stadium at the Secondary College. As a result there is a smaller than usual increase in operating expenditure. (Refer 4.2 for more information on expenditure).
6.1.2 Investing activities ($14.15 million decrease) The increase in cash outflows from investing activities is due to planned capital expenditure being higher than it was in 2014/15. Several projects, which were originally included in prior year budgets will be completed in 2015/16 which results in a significant increase in capital works. Refer to Part 6 of our Budget Report for information of the capital works program.
6.1.3 Financing activities ($8.22 million increase) The main reason for the increase in cash flows from financing activities is due a higher level of loans which are forecast to be taken up in 2015/16. Borrowings of $6.1m are expected to be taken up and hence the funding from loans is higher than 2014/15. Adding to the increase in funding from financing activities is a reduction in investments budgeted in 2015/16 to fund the higher capital works program.
6.1.4 Cash and cash equivalents at end of the year ($0.06 million increase) Overall, total cash and investments are projected to decrease by $0.06m to $5.1m as at 30 June 2015. It should be noted that the cash balance does not include investments held for more than 3 months; Council’s investments are budgeted to total $13.87m at the end of 2015/16.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 41
7. Analysis of Budgeted Capital Works (also refer Appendix A4)
The Budgeted Statement of Capital Works, which has been prepared in accordance with the Local Government Model Financial Report prepared by CPA Australia, is shown in Appendix A4. The table below is a summary of the Budgeted Statement of Capital Works. Part 7 of our Budget Report analyses the budgeted capital expenditure and the sources of funding.
7.1 Capital Works Expenditure Forecast
Actual Budget Variance
Capital Works Areas Ref 2014/15 2015/16
$’000 $’000 $’000
Works carried forward 7.1.1
Property
Buildings 475 1,520 1,045
Total property 475 1,520 1,045
Plant and equipment
Plant, machinery & equipment 0 0 0
Computers & telecommunications 47 0 (47)
Total plant and equipment 47 0 (47)
Infrastructure
Roads 0 120 120
Footpaths and cycle paths 0 0 0
Drainage 0 400 400
Rec, leisure & community facilities 764 800 36
Parks, open space & streetscapes 0 4,237 4,237
Off street car parks 0 0 0
Other infrastructure 0 200 200
Total infrastructure 764 5,757 4,993
Total works carried forward 1,286 7,277 5,991
New works
Property 7.1.2
Building improvements 2,087 6,120 3,793
Total property 2,087 5,880 3,793
Plant and equipment 7.1.3
Plant, machinery & equipment 772 1,802 1,030
Fixtures & Fittings 0 29
Computers & telecommunications 688 371 (317)
Total plant and equipment 1,460 2,202 713
Infrastructure 7.1.4
Roads 5,369 5,642 273
Bridges 512 600 88
Footpaths and cycle paths 871 576 (295)
Drainage 300 700 400
Rec, leisure & community facilities 454 370 (84)
Parks, open space & streetscapes 671 924 253
Other infrastructure 655 2,520 1,865
Total infrastructure 8,832 11,332 2,500
Total new works 12,379 19,654 7,246
Total capital works expenditure 13,665 26,931 13,237
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 42
7. Analysis of Budgeted Capital Works (continued)
The capital works expenditure is represented by:
Asset renewal expenditure 7.1.5 6,343 11,829 5,486
New asset expenditure 7.1.5 3,847 8,506 4,659
Asset upgrade expenditure 7.1.5 3,475 5,763 2,288
Asset expansion expenditure 7.1.5 0 833 833
Total capital works expenditure 13,665 26,931 13,266
As previously mentioned, the level of capital works expenditure fluctuates significantly from year to year
depending on grant funding available.
Budgeted Capital Works by Asset Type
The key movements in Capital Expenditure are as follows:
7.1.1 Works Carried Forward ($5.99 million increase)
At the end of each financial year there are projects which are either incomplete or not commenced due to
factors including planning issues, weather delays and extended consultation. For the 2014/15 year it is
forecast that $7.28 million of capital works will be incomplete and be carried forward into the 2015/16
year. The more significant projects include the Hanging Rock East Paddock Development ($2.7m) and
the Gisborne office extension ($1.2m). These two projects are being completed across several years.
7.1.2 Property ($4.05 million increase)
Property assets includes capital expenditure on land and buildings. The major capital works in this asset
type is the construction of the Gisborne Early Learning Centre ($3.3m).
28%
8%64%
Property
Plant and equipment
Infrastructure
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 43
7. Analysis of Budgeted Capital Works (continued)
7.1.3 Plant and Equipment ($0.71 million increase)
The main component of Plant and Equipment spending is in relation to vehicles and other machinery used
to construct and maintain roads and footpaths (such as graders and trucks) and IT systems and hardware.
The level of expenditure in this category will increase in 2015/16 due to the scheduled replacement of
several large plant items.
7.1.4 Infrastructure ($2.50 million increase)
Infrastructure capital works includes roads and streets, footpaths, bridges, drainage, public toilets,
recreation and community facilities and parks and open spaces expenditure.
The level of expenditure on infrastructure is expected to increase in 2015/15, mainly due to rehabilitation
works required at the former Kyneton landfill site ($2.5m).
7.1.5 Asset renewal ($11.83m), new assets ($8.51m), upgrade ($5.76m) and expansion ($0.83m)
Asset expenditure may be one of four types – new, renewal, upgrade and expansion.
New is capital expenditure on a new asset.
Renewal is capital expenditure on an existing asset (or replacing an existing asset) that returns the service
capability of the asset to its original capability.
Upgrade is capital expenditure that upgrades an existing asset to provide a better quality of service.
Expansion is capital expenditure that extends the life of the asset beyond its original life.
Budgeted Capital Works by Asset Expenditure Type
44%
32%
21%
3%
Asset renewal expenditure
New asset expenditure
Asset upgrade expenditure
Asset expansion expenditure
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 44
7. Analysis of Budgeted Capital Works(continued)
7.2 Capital Works Income Council’s Capital Works program is funded through a combination of government grants, net proceeds
from the sale of surplus assets, loans, financial reserves, contributions and rate revenue. The net amount
to be funded from rate revenue (operations) in 2015/16 is $6.63m.
Forecast
Actual Budget Variance
Sources of funding Ref 2014/15 2015/16
$’000 $’000 $’000
Works carried forward
Current year funding
Grants 622 3,078 2,456
Contributions 80 80
Borrowings 0 2,200 2,200
Council cash;
- operations 664 967 303
- proceeds on sale of assets 0 0 0
- reserve cash and investments 0 952 952
Total works carried forward 1,286 7,277 5,991
New works
Current year funding
Grants 5,669 5,969 300
Contributions 183 90 (93)
Borrowings 0 4,075 4,075
Council cash;
- operations 5,204 6,632 1,428
- proceeds on sale of assets 352 514 162
- reserve cash and investments 971 2,374 1,403
Total new works 12,379 19,654 7,275
Total funding sources 7.2.1 13,665 26,931 13,266
7.2.1 Capital Work Funding Sources ($13.27 million increase)
Funding for capital works has increased by $13.27m in line with the larger capital works program (see
Section 7.1 for details). The mix of funding differs each year depending on the types of capital project
and the availability of Government grants. For more information on grant funding see 4.2.6 and 4.2.7.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 45
7. Analysis of Budgeted Capital Works(continued)
Budgeted Capital Works by funding source
44%
37%
2%
16%
Grants
Contributions
Operations
Proceeds on sale of assets
Reserve cash and investments
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 46
Appendices and Glossary
Appendices
A. Budgeted Financial Statements:
A1 Budgeted Comprehensive Income Statement 47
A2 Budgeted Balance Sheet 48
A3 Budgeted Statement of Cash Flows 49
A4 Budgeted Statement of Capital Works 50
A5 Budgeted Statement of Changes in Equity 51
B. Statutory Disclosures:
B1 Capital Works Program – Asset Types and Funding Sources 52
B2 Statement and Summary of Human Resources 56
B3 Summary of Borrowings 57
B4 Statement of Rates and Charges 58
B5 Statement of Differential Rates 59
C. Additional Information:
C1 Summary of New Initiatives 61
C2 Summary of Financial Reserves 62
C3 Summary of Construction Programs 63
C4 Summary of Customer Fees and Charges 66
Glossary 85
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 47
Appendix A1 - Budgeted Comprehensive Income Statement
For the year ending 30 June 20162014/15
Adopted
Budget
2014/15
Forecast
2015/16
Draft
Budget
Budget/
Forecast
Variance
$'000 $'000 $'000 $'000
Income
Rates and charges 39,770 39,845 42,383 2,537
Statutory fees and fines 2,800 2,707 2,505 (202)
User fees 5,882 5,501 5,861 360
Contributions - cash 504 462 290 (172)
Contributions - non-monetary assets 9,996 9,996 12,800 2,804
Grants - operating (recurrent) 9,208 9,707 9,516 (191)
Grants - operating (non-recurrent) 175 1,187 473 (714)
Grants - capital (recurrent) 3,014 3,014 4,039 1,025
Grants - capital (non-recurrent) 5,732 2,654 5,008 2,354
Other income 1,480 1,584 1,627 45
Fair value adjustments for investment property 0 0 0 0
Share of net profits/(losses) of associates and joint ventures
accounted for by the equity method0 0 0 0
Total Revenues 78,561 76,657 84,502 7,845
Expenses
Employee costs 30,144 29,553 30,576 1,023
Materials and services 19,292 20,232 19,787 (445)
Bad and doubtful debts 18 18 12 (6)
Depreciation and amortisation 12,889 12,889 13,485 596
Finance costs 443 334 480 146
Other expenses 2,170 3,842 2,673 (1,169)
Total Expenses 64,956 66,868 67,013 145
Net surplus/(deficit) from operations 13,605 9,789 17,489 7,701
Other comprehensive income
Items that will not be reclassified to surplus or deficit:
Impairment of fire impacted infrastructure 0 0 0 0
Net asset revaluation increment/(decrement) 0 0 0 0
Share of other comprehensive income of associates and joint
ventures accounted for by the equity method0 0 0 0
Total Comprehensive result 13,605 9,789 17,489 7,701
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 48
Appendix A2 - Budgeted Balance Sheet
For the year ending 30 June 2016
2014/15 2014/15 2015/16
$’000 $’000 $’000 $’000
Assets
Current assets
Cash and cash equivalents 5,297 4,925 5,111 186
Trade and other receivables 5,870 5,870 6,123 253
Financial assets 10,262 15,849 13,868 (1,981)
Assets Held for Resale 1,302 - - 0
Other assets 270 270 270 0
Total current assets 23,001 26,914 25,372 (1,542)
Non-current assets
Investments in regional library corporation 1,426 1,426 1,549 123
Property, infrastructure, plant & equipment 591,323 623,109 649,100 25,991
Investment property 4,069 4,216 4,216 0
Total non-current assets 596,818 628,751 654,865 26,114
Total assets 619,819 655,665 680,237 24,572
Liabilities
Current liabilities
Trade and other payables 5,806 5,806 6,086 280
Trust funds and deposits 3,695 3,695 3,695 0
Provisions 5,733 5,733 5,888 155
Interest-bearing loans and borrowings 1,023 343 360 17
Total current liabilities 16,257 15,577 16,029 452
Non-current liabilities
Provisions 4,413 4,413 4,532 119
Interest-bearing loans and borrowings 9,282 7,460 12,858 5,398
Total non-current liabilities 13,695 11,873 17,390 5,517
Total liabilities 29,952 27,450 33,419 5,969
Net assets 589,867 628,215 646,818 18,603
Equity
Accumulated surplus 288,678 285,755 304,715 18,960
Reserves 301,189 342,460 342,103 (357)
Total equity 589,867 628,215 646,818 18,603
Adopted
Budget
BudgetForecast
Actual
Budget/
Forecast
Variance
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 49
Appendix A3 Budgeted Statement of Cash Flows
For the year ending 30 June 2016Adopted
Budget
Forecast
Actual
Budget
2014/15 2014/15 2015/16
$’000 $’000 $’000 $’000
Cash flows from operating activities
Rates and charges 39,666 39,666 42,226 2,560
Statutory fees and fines 2,793 2,793 2,496 (297)
User fees 5,363 5,363 5,840 477
Contributions - cash 504 504 504 0
Grants - operating 9,359 9,359 9,951 592
Grants - capital 8,723 5,645 9,013 3,368
Interest 731 731 421 (310)
Other receipts 1,247 1,247 985 (262)
Net GST refund / payment 0 0 0 0
Employee costs (29,869) (29,704) (30,527) (823)
Payments to Suppliers (19,181) (19,345) (19,755) (410)
Other payments (2,062) (3,562) (2,396) 1,166
Net cash provided by operating activities 17,274 12,697 18,758 6,061
Cash flows from investing activities
Payments for property, plant and equipment (20,942) (13,665) (26,931) (13,266)
Proceeds from sale of property, plant and equipment 1,402 1,402 514 (888)
Net cash used in investing activities (19,540) (12,263) (26,417) (14,154)
Cash flows from financing activities
Finance costs (443) (334) (480) (146)
Proceeds from borrowings 2,600 1,500 6,575 5,075
Repayment of borrowings (627) (343) (343) 0
Net Increase/Decrease in Longer Term Investments 603 (1,200) 2,093 3,293
Net cash provided by (used in) financing activities 2,133 (377) 7,845 8,222
Net (decrease) increase in cash & cash equivalents (133) 57 186 129
Cash and cash equivalents at beginning of the financial year 5,430 4,868 4,925 57
Cash and cash equivalents at end of the financial year 5,297 4,925 5,111 186
Budget/
Forecast
Variance
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 50
For the year ending 30 June 2016
2014/15
Forecast
2015/16
New
Budgeted
Works
Projects
Carried
Forward
From
Previous
Years
Total
2015/16
Budget
Budget/
Forecast
Variance
$'000 $'000 $'000 $'000 $'000
Property
Land and land improvements 0 0 0 0 0
Buildings and building improvements 2,562 6,120 1,520 7,640 5,078
Total property 2,562 6,120 1,520 7,640 5,078
0
Plant and equipment 0
Plant, machinery and equipment 772 1,802 0 1,802 1,030
Fixtures, fittings and furniture 0 29 0 29 29
Computers and telecommunications 735 371 0 371 (364)
Total plant and equipment 1,507 2,202 0 2,202 695
0
Infrastructure 0
Roads 5,369 5,642 120 5,762 393
Bridges 512 600 0 600 88
Footpaths, kerbs and channels 871 576 0 576 (295)
Drainage 300 700 400 1,100 800
Recreational, leisure and community facilities 1,218 370 800 1,170 (48)
Parks, open space and streetscapes 671 924 4,237 5,161 4,490
Other infrastructure 655 2,520 200 2,720 2,065
Total infrastructure 9,596 11,332 5,757 17,089 7,493
0
Total capital works expenditure 13,665 19,654 7,277 26,931 13,266
Represented by:
Asset renewal expenditure 6,343 10,927 902 11,829 5,486
New asset expenditure 3,847 2,964 5,542 8,506 4,659
Asset upgrade expenditure 3,475 5,763 833 5,763 2,288
Asset expansion expenditure 0 0 0 833 833
0
Total capital works expenditure 13,665 19,654 7,277 26,931 13,266
Appendix A4 - Budgeted Statement of Capital Works
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 51
TotalAccumulated
Surplus
Asset
Revaluation
Reserve
Other
Reserves
$'000 $'000 $'000 $'000
2015/16
Balance at beginning of the financial year 628,215 285,755 334,776 7,684
Adjustment on change in accounting policy 0 0 0 0
Comprehensive result 17,489 17,489 0 0
Net asset revaluation increment/(decrement) 0 0 0 0
Impairment losses on revalued assets 0 0 0 0
Reversal of impairment losses on revalued assets 0 0 0 0
Transfer to reserves 2,017 (102) 0 2,119
Transfer from reserves (903) 1,573 0 (2,476)
Balance at end of the financial year 646,818 304,715 334,776 7,327
Appendix A5 - Budgeted Statement of Changes In Equity
For the year ending 30 June 2016
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 52
Capital Works Area
New Renewal Upgrade GrantsReserves/
Asset SalesLoans Contributions Council Cash
PROPERTY
Buildings
Gisborne Early Learning Centre construction $ 3,300,000 $ 950,000 $ 1,175,000 $ 1,175,000 650,000$ 50,000$ 2,300,000$ 300,000$
Dixon Field Pavilion upgrade construction $ 815,000 $ 815,000 440,000$ 100,000$ 275,000$
Gisborne Office Extension construction $ 800,000 $ 800,000 $ - 500,000$ 300,000$
Council building renewal $ 460,000 $ 460,000 460,000$
Safe roof access equipment $ 40,000 $ 40,000 40,000$
Building essential services upgrade $ 30,000 $ 30,000 30,000$
Roof & insulation replacement - Romsey Rec Centre $ 35,000 $ 35,000 35,000$
Kyneton Museum upgrade construction* $ 400,000 $ 400,000 300,000$ 100,000$
Romsey Kindergarten outdoor play space $ 120,000 $ 120,000 120,000$ -$
Swinbourne Avenue Kindergarten, Gisborne outdoor play space $ 120,000 $ 120,000 120,000$ -$
Total buildings and building improvements $ 6,120,000 2,215,000$ 1,635,000$ 2,270,000$ 1,630,000$ 150,000$ 2,800,000$ -$ $ 1,540,000
TOTAL PROPERTY $ 6,120,000 $ 2,215,000 $ 1,635,000 $ 2,270,000 $ 1,630,000 $ 150,000 $ 2,800,000 $ - $ 1,540,000
Plant and equipment
Plant, machinery and equipment $ 1,634,000 $ 1,634,000 1,220,000$ 414,000$ -$
Motor vehicle replacement program $ 168,000 $ 168,000 68,000$ 100,000$ -$
A0 scanner $ 17,000 $ 17,000 -$ 17,000$
Audio visual upgrade $ 12,000 $ 12,000 -$ 12,000$
Total plant, machinery and equipment $ 1,831,000 12,000$ 1,802,000$ 17,000$ -$ 1,288,000$ -$ 514,000$ $ 29,000
Computers and telecommunications
Network infrastructure renewal $ 40,000 $ 40,000 -$ 40,000$
Desktop and notebook computer replacement program $ 145,000 $ 145,000 -$ 145,000$
Server replacement program $ 126,000 $ 126,000 -$ 126,000$
Asset management system (part1) $ 60,000 $ 60,000 -$ 60,000$
Total computers and telecommunications $ 371,000 60,000$ 311,000$ -$ -$ -$ -$ $ 371,000
TOTAL PLANT AND EQUIPMENT $ 2,202,000 $ 72,000 $ 2,113,000 $ 17,000 $ - $ 1,288,000 $ - $ 514,000 $ 400,000
Total
Estimated
Capital Cost
2015/16
Funding sources - 2015/16Asset expenditure types
Appendix B1 - Capital Works Program - Asset Types and Funding Sources
For the year ending 30 June 2016
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 53
Capital Works Area
New Renewal Upgrade GrantsReserves/
Asset SalesLoans Contributions Council Cash
Total
Estimated
Capital Cost
2015/16
Funding sources - 2015/16Asset expenditure types
INFRASTRUCTURE
Roads
Road improvement program $ 1,346,400 $ 1,346,400 550,000$ 796,400$
Road rehabilitation program $ 1,203,000 $ 1,203,000 1,450,000$ 247,000-$
Grants commission road funding 2,039,054$ 2,039,054-$
Reseal/final seal program $ 1,327,000 $ 1,327,000 1,327,000$
Gravel road renewal program $ 806,500 $ 806,500 806,500$
Minor capital stabilisation works $ 206,000 $ 206,000 206,000$
Retrofit Streetlights for environmental benefits $ 50,000 $ 50,000 50,000$
Kerb & channel renewal program $ 137,000 $ 137,000 137,000$
Guard rail installation program $ 64,000 $ 32,000 $ 32,000 64,000$
Minor Traffic Management Works $ 42,200 $ 21,100 $ 21,100 42,200$
Minor Road Works $ 60,000 $ 20,000 $ 40,000 60,000$
Asphalt resurfacing program $ 265,000 $ 265,000 265,000$
Intersection rehabilitation program $ 64,000 $ 32,000 $ 32,000 64,000$
Intersection upgrade program $ 41,200 $ 41,200 41,200$
Replace tourism signs - Malmsbury, Romsey and Macedon $ 30,000 $ 30,000 30,000$
Total roads $ 5,642,300 196,300$ 5,446,000$ $ - 4,039,054$ -$ -$ -$ $ 1,603,246
Bridges
Bridge renewal program $ 600,000 $ 600,000 600,000$
Total bridges $ 600,000 -$ 600,000$ $ - -$ -$ -$ -$ $ 600,000
Footpaths, kerbs and channels
Campaspe River trail construction (section only) $ 100,000 $ 50,000 $ 50,000 50,000$ 50,000$
Footpath renewal program $ 220,000 $ 220,000 -$ 220,000$
New footpath construction program $ 256,000 $ 256,000 36,000$ 220,000$
Total footpaths, kerbs and channels $ 576,000 50,000$ 270,000$ $ 256,000 -$ 86,000$ -$ -$ $ 490,000
Drainage
Minor drainage works emergent $ 50,000 $ 25,000 $ 25,000 50,000$
Minor drainage works planned $ 250,000 $ 50,000 $ 150,000 $ 50,000 250,000$
Quarry Road Woodend - detention basin (part 2) $ 400,000 $ 400,000 400,000$
Total drainage $ 700,000 75,000$ 175,000$ $ 450,000 -$ -$ -$ -$ $ 700,000
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 54
Capital Works Area
New Renewal Upgrade GrantsReserves/
Asset SalesLoans Contributions Council Cash
Total
Estimated
Capital Cost
2015/16
Funding sources - 2015/16Asset expenditure types
Recreational, leisure and community facilities
Gisborne Aquatic Centre - amenity upgrade $ 130,000 $ 65,000 $ 65,000 130,000$ -$
Outdoor pool works $ 40,000 $ 20,000 $ 20,000 -$ 40,000$
Public toilet renewal program $ 200,000 $ 200,000 -$ 200,000$
Total recreational, leisure and community facilities $ 370,000 65,000$ 285,000$ $ 20,000 -$ 130,000$ -$ -$ $ 240,000
Parks, open space and streetscapes
Street bin and park bin renewal program $ 27,000 $ 27,000 27,000$
Parks infrastructure renewal program $ 50,000 $ 50,000 50,000$
Playground infrastructure renewal $ 40,000 $ 40,000 40,000$
Safety upgrade to portable event equipment $ 5,000 $ 5,000 5,000$
Lancefield skate park construction* $ 250,000 $ 250,000 100,000$ 130,000$ 20,000$ -$
Oval lighting and power upgrade - Kyneton Football Netball
Club* $ 542,000 $ 271,000 $ 271,000 200,000$ 70,000$ 272,000$
Bus shelter/bus access program $ 10,000 $ 10,000 10,000$
Total parks, open space and streetscapes $ 924,000 281,000$ 393,000$ $ 250,000 300,000$ 130,000$ -$ 90,000$ $ 404,000
Other infrastructure
Kyneton Saleyards renewal and upgrade program $ 20,000 $ 10,000 $ 10,000 20,000$
Kyneton landfill rehabilitation $ 2,500,000 $ 2,500,000 290,000$ 1,775,000$ 435,000$
Total other infrastructure $ 2,520,000 10,000$ 10,000$ $ 2,500,000 -$ 290,000$ 1,775,000$ -$ $ 455,000
TOTAL INFRASTRUCTURE $ 11,332,300 677,300$ 7,179,000$ $ 3,476,000 4,339,054$ 636,000$ 1,775,000$ 90,000$ $ 4,492,246
TOTAL NEW WORKS 19,654,300$ 2,964,300$ 10,927,000$ 5,763,000$ 5,969,054$ 2,074,000$ 4,575,000$ 604,000$ $ 6,432,246
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 55
Capital Works Area
New Renewal Upgrade GrantsReserves/
Asset SalesLoans Contributions Council Cash
Total
Estimated
Capital Cost
2015/16
Funding sources - 2015/16Asset expenditure types
WORKS EXPECTED TO BE CARRIED FORWARD FROM
PRIOR YEARS
PROPERTY
Buildings and building improvements
Gisborne Office Extension construction $ 1,200,000 $ 1,200,000 200,000$ 1,000,000$ -$
Gisborne Early Years Hub (stage 1) $ 320,000 $ 90,000 $ 115,000 $ 115,000 320,000$ -$
Total Buildings and building improvements $ 1,520,000 $ 1,290,000 $ 115,000 $ 115,000 -$ 520,000$ 1,000,000$ -$ $ -
TOTAL PROPERTY $ 1,520,000 $ 1,290,000 $ 115,000 $ 115,000 -$ 520,000$ 1,000,000$ -$ $ -
INFRASTRUCTURE
Roads
McGregor Road Gisborne upgrade $ 120,000 $ 120,000 $ 120,000
Total Roads $ 120,000 $ - $ - $ 120,000 -$ -$ -$ -$ $ 120,000
Drainage
Quarry Road dention basin (part 1) $ 400,000 $ 400,000 $ 400,000
Total Drainage $ 400,000 $ - $ - $ 400,000 -$ -$ -$ -$ $ 400,000
Recreational, leisure and community facilities
New Gisborne Netball Complex $ 800,000 $ 800,000 800,000$ $ -
Total recreational, leisure and community facilities $ 800,000 $ 800,000 $ - $ - 800,000$ -$ -$ -$ $ -
Parks, open space and streetscapes
Kyneton Community Park $ 390,000 $ 390,000 300,000$ 80,000$ 10,000$
Riddells Creek access and inclusion project $ 395,000 $ 197,500 $ 197,500 300,000$ 95,000$
Romsey open space playground project $ 752,000 $ 752,000 200,000$ 432,000$ 120,000$
Hanging Rock east paddock infrastructure development $ 2,700,000 $ 2,700,000 1,477,750$ 1,000,000$ 222,250$
Total parks, open space and streetscapes $ 4,237,000 $ 3,452,000 $ 587,500 $ 197,500 2,277,750$ 432,000$ 1,000,000$ 80,000$ $ 1,447,250
Other Infrastructure
Kyneton landfill rehabilitation 200,000$ 200,000$ 200,000$ -$
TOTAL INFRASTRUCTURE $ 5,757,000 $ 4,252,000 $ 787,500 $ 717,500 3,077,750$ 632,000$ 1,000,000$ 80,000$ $ 1,967,250
TOTAL WORKS EXPECTED TO BE CARRIED FORWARD
FROM PRIOR YEARS 7,277,000$ 5,542,000$ 902,500$ 832,500$ 3,077,750$ 1,152,000$ 2,000,000$ 80,000$ 967,250$
TOTAL CAPITAL WORKS PROGRAM 26,931,300$ 8,506,300$ 11,829,500$ 6,595,500$ 9,046,804$ 3,226,000$ 6,575,000$ 684,000$ 7,399,496$
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 56
Appendix B2 - Budgeted Statement of Human Resources
2014/15 2015/16
$’000 $’000 $’000
Staff expenditure
Employee costs - operating 29,553 30,576 1,023
Employee costs - capital 715 729 14
Total staff expenditure 30,268 31,305 1,037
EFT EFT EFT
Staff numbers
Employees 346.9 348.4 1.5
Total staff numbers 346.9 348.4 1.5
Budget/
Forecast
Forecast
Actual
Budget
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 57
Appendix B3 – Summary of Borrowings
The 2015/16 Budget includes new borrowings* of $4.075 million to complete the Gisborne Early Learning
Centre construction and to fund rehabilitation works at the former landfill site in Kyneton.
The $1.5 million loan for the first stages of the Office extension and the $1million loan for the Hanging
Rock East Paddock development were approved in the 2013/14 and 2014/15 Budgets but take up of the
loans has been postponed because the projects will not be completed until 2015/16.
In accordance with the Local Government (Planning and Reporting) Regulations 2014, the following
information is disclosed:
Estimated loan liability as at 1 July 2015 $7,803,000
Less principal repayments during 2015/16
$343,300
Plus previously approved borrowings $2,500,000
Plus new borrowings in 2015/16 (1) $4,075,000
Balance as at 30 June 2016 $14,035,000
Less amounts transferred to the Debt Repayment Reserve (2)
$817,200
Net Debt as at 30 June 2016
$13,217,500
Interest payable in 2015/16
$480,562
Notes:
(1) New borrowings
Gisborne Early Learning Centre construction $2,300,000
Kyneton Landfill Rehabilitation $1,775,000
Total $4,075,000
(2) Council has borrowed some funds via the Local Government Funding Vehicle. These borrowing
are interest only, the principal on these borrowings is not payable for 5 years after the draw down date.
It is intended that half the original amount will be repaid in five years and the remaining half will be repaid
in ten years. Therefore each year one-tenth of the original amount will be transferred to the Debt
repayment reserve to pay the principal when it fall due.
More information on Council’s borrowing strategy and debt ratios can be found in the Strategic Resource
Plan.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 58
Appendix B4 – Statement of Rates and Charges
Rates 2014/15 Budget 2015/16 Budget Difference % Increase
General Rate
Rate in $ (on CIV) 0.002786 0.002921
Capital Improved Value (CIV) $9,318,245,230 $9,489,724,000 $171,478,770 1.8%
Revenue $25,963,790 $27,718,174 $1,754,384 6.8%
No. of Assessments 18,807 19,093 286 1.5%
Agricultural Land Rate
Rate in $ (on CIV) 0.002229 0.002337
Capital Improved Value (CIV) $922,638,000 $914,302,000 ($8,336,000) -0.9%
Revenue $2,056,626 $2,136,440 $79,815 3.9%
No. of Assessments 1,072 1,061 -11 -1.0%
Relationship to General Rate 80.00% 80.00%
Commercial /Industrial Rate
Rate in $ (on CIV) 0.003344 0.003505
Capital Improved Value (CIV) $546,725,000 $553,126,000 $6,401,000 1.2%
Revenue $1,828,034 $1,938,725 $110,692 6.1%
No. of Assessments 1,033 1,058 25 2.4%
Relationship to General Rate 120.00% 120.00%
Recreational Land Rate
Rate in $ (on CIV) 0.001393 0.001460
Capital Improved Value (CIV) $15,811,000 $15,811,000 $0 0.0%
Revenue $22,027 $23,091 $1,063 4.8%
No. of Assessments 10 10 0 0.0%
Relationship to General Rate 50.00% 50.00%
Inappropriate Subdivision Rate
Rate in $ (on CIV) 0.002786 0.002921
Capital Improved Value (CIV) $2,122,400 $2,058,300 ($64,100) -3.0%
Revenue $5,914 $6,012 $98 1.7%
No. of Assessments 145 137 -8 -5.5%
Relationship to General Rate 100.00% 100.00%
Not for Profit Housing Rate
Rate in $ CIV 0.001393 0.001460
Capital Improved Value (CIV) $36,501,000 $36,258,000 ($243,000) -0.7%
Revenue $50,852 $52,952 $2,100 4.1%
No. of Assessments 155 154 -1 -0.6%
Relationship to General Rate 50.00% 50.00%
LESS Trust For Nature Rebate
Rebate ($16,782) ($16,782) $0 0.0%
No. of Assessments 16 21 5 31.3%
Capital Improved Value $10,842,042,630 $11,011,279,300 $169,300,770 1.6%
Revenue $29,910,460 $31,858,613 $1,948,153 6.5%
No. of Rateable Assessments 21,222 21,513 291 1.4%
Charges
Municipal Charge
Charge per Assessment $194 $203 $9 4.6%
Revenue $4,023,948 $4,298,322 $274,374 6.8%
No. of Assessments 20,742 21,174 432
Garbage Collection & Recycling Charge
Charge per Service $248 $260 $12 4.8%
Revenue $4,344,960 $4,605,000 $260,040 6.0%
Green Waste Collection Charge
Charge per Service $58 $61 $3 5.2%
Revenue $557,786 $603,000 $45,214 8.1%
Victorian Government EPA Landfill Levy*
Charge per Service $28 $28 $0 0.0%
Revenue collected on behalf of Government $490,560 $508,600 $18,040 3.7%
Total Charges $9,417,254 $10,014,922 $597,668 6.3%
Total Rates & Charges $39,327,714 $41,873,535 $2,545,821 6.5%
Median value property $445,000 $445,000 0 0.0%
Rates and charges payable * $1,740 $1,824 $84 4.8%
Note: GST is applicable for both Garbage Collection & Recycling Charge and Landfill Recovery Charge for Commercial Properties
Total Rates
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 59
Appendix B5 - Statement of Differential Rates
Council’s Rating Strategy can be found in its Strategic Resource Plan. In summary, Council has
established a rating structure, which is comprised of three key elements. These are:
Property Rates; which are based on the value of the property.
Municipal Charge; which reflects a common contribution to the governance costs of Council.
Service charges; which reflect availability and usage of waste services provided by Council.
Striking a proper balance between these elements aims for equity in the distribution of rates and charges
across ratepayers. Council makes a further distinction, within the property value element, which is a
differential rate. That is, rates based on the purpose for which the property is used. This distinction is
based on the concept that property owners should pay a fair and equitable contribution to rates taking
into account the benefit that may be derived from the services Council provides.
There are three major differential rates. The General Rate applies to most residential property and vacant
land. The Business Rate applies to properties that are used for commercial, industrial or professional
purposes. The Business Rate is 20 per cent more than the General Rate. The Agricultural Land Rate
applies to land that is defined as farm land and for which the owner or occupier is regarded as a Primary
Producer by the Australian Taxation Office. The Agricultural Land is 20 per cent less than the General
Rate.
Section 161 of the Local Government Act allows a council to raise rates by a differential rate if the council
uses the capital improved value system of valuing land and if it considers that the differential rate will
contribute to the equitable and efficient carrying out of the council's functions.
In accordance with Section 161 of the Local Government Act 1989, Council specified the following
objectives and characteristics in relation to the General Rate:
1. The types and classes of land to which the rate applies is all rateable land other than agricultural
land, recreational land, commercial/industrial land and land used by Not for Profit Organisations to
provide low-income residential housing.
2. The Differential Rate is considered fair and equitable having regarded:
(a) The amount of revenue required to be raised is in accordance with the Council Plan, Strategic
Resource Plan and Budget;
(b) The range and quality of infrastructure, physical services, health services and community
services available to the owners and occupiers of residential properties and vacant land.
In accordance with Section 161 of the Local Government Act 1989 Council specified the following
objectives and characteristics in relation to the Agricultural Land Rate:
1. The types and classes of land to which the rate applies is agricultural land which means any
rateable land within the Council’s municipal district defined as farm land under Section 2 of the
Valuation of Land Act 1960 on the condition that the owner or occupier of the land is a person
carrying on the activities defined by the Valuation of Land Act 1960, who is regarded as a Primary
Producer by the Australian Taxation Office.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 60
Appendix B5 - Statement of Differential Rates (continued)
2. The Differential Rate is considered fair and equitable having regarded:
(a) The amount of revenue required to be raised is in accordance with the Council Plan, Strategic
Resource Plan and Budget;
(b) The range and quality of infrastructure, physical services, health services and community
services available to the owners and occupiers of agricultural land;
(c) The restrictions upon the use and development of agricultural land in the Planning Scheme;
(d) The need to encourage the retention of viable agricultural land for agricultural purposes.
In accordance with Section 161 of the Local Government Act 1989, Council specified the following
objectives and characteristics in relation to the Commercial/Industrial Rate:
1. The types and classes of land to which the rate will apply is all rateable land which is not agricultural
land and which is used predominantly for carrying on one or more of the following activities for the
purpose of generating income – commercial, industrial, business, wholesale trade, retail trade,
manufacturing, professional or administrative.
2. The Differential Rate is considered fair and equitable having regarded:
(a) The amount of revenue required to be raised in accordance with the Council Plan, Strategic
Resource Plan and Budget;
(b) The range and quality of infrastructure, physical services (including street lighting and street
cleaning, car parking) and facilities available to the owners and occupiers of land described
in paragraph 1.
In accordance with Section 161 of the Local Government Act 1989, Council specified the following
objectives and characteristics in relation to the Not for Profit Housing Rate:
1. The types and classes of land to which the rate will apply are properties containing low-income
residential housing owned and/or managed by a volunteer, charitable or not-for-profit organisation
for which the organisation is responsible for the payment of rates and for which a State Government
pension concession is not claimed.
2. The Differential Rate is considered as fair and equitable having regarded:
(a) The amount of revenue required to be raised in accordance with the Council Plan, Strategic
Resource Plan and Budget;
(b) The public service that volunteer, charitable or not-for-profit organisations are delivering to
the community by providing low-income residential housing.
In accordance with Section 2 of the Cultural and Recreational Lands Act 1963, Council declared all
rateable Cultural and Recreational Land to be rated at 50% of the General Rate.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 61
Appendix C1 - Summary of New Initiatives
No. Department New Initiative DetailsIncome/
SavingExpense
Net Cost
2015/16
Running
net total
2015/16
1 Community & Culture Seniors housing project 20,000$ $20,000 $20,000
2 Community & Culture Places for people program $ 45,000 $45,000 $65,000
3 Community & Culture Cultural event management (new system module) 5,000$ $5,000 $70,000
4 Community & Culture PopUpArt - stage 2 7,500$ $7,500 $77,500
5 Community & Culture Woodend Winter Arts Festival contribution $ 10,000 $10,000 $87,500
6 Community Safety Additional funding for roadside slashing for fire prevention 30,000$ $30,000 $117,500
7 Economic Development & Tourism Events & festivals coordination $ 55,000 $55,000 $172,500
8 Economic Development & Tourism Review of MRSC tourism industry strategic plan 2011-16 $ 20,000 $20,000 $192,500
9 Engineering & Asset Planning Road sign data capture and mapping project (stage 2) 35,000$ $35,000 $227,500
10 Operations New Gisborne netball complex maintenance 15,000$ $15,000 $242,500
11 Operations Landscape assessment resource $ 20,000 $20,000 $262,500
12 Operations New street trees $ 40,000 $40,000 $302,500
13 Recreation & Sport Leisure strategy preparation 30,000$ 60,000$ $30,000 $332,500
14 Recreation & Sport Clarkefield recreation reserve maintenance 20,000$ $20,000 $352,500
15 Recreation & Sport Recreation officer (Part time) 43,000$ $43,000 $395,500
16 Recreation & Sport Romsey Recreation Reserve recycled water $ 10,000 $ 10,000 $0 $395,500
17 Strategic Planning & Environment Natural environment strategy preparation $ 35,000 $35,000 $430,500
18 Strategic Planning & Environment Urban design services $ 60,000 $60,000 $490,500
19 Strategic Planning & Environment Blackhill Reserve rehabilitation $ 10,000 $10,000 $500,500
20 Strategic Planning & Environment Central Victorian Greenhouse Alliance membership $ 8,500 $8,500 $509,000
TOTAL MRSC $40,000 $549,000 $509,000
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 62
Discretionary Reserves
Balance @
01/07/15
Transfers
to
Reserve
Transfer
from
Reserve
Balance @
30/06/16
Plant Replacement $758,799 $731,557 $1,288,000 $202,356
Waste Management Facilities $24,095 $24,095
Asset conversion $221,830 $221,830
Management Property Disposals $2,824,147 $350,000 $2,474,147
Gravel Pit Operations $434,709 $113,020 $547,729
Hanging Rock $205,112 $205,112
Maintenance Seniors Accommodation $250,280 $250,280
Landfill Recovery $205,000 $188,000 $382,450 $10,550Debt Repayment $148,929 $817,222 $966,151
TOTAL $5,072,901 $1,849,799 $2,020,450 $4,902,250
Statutory Reserves
Public Open Space - South $905,799 $87,000 $240,000 $752,799
Public Open Space - East $192,149 $40,000 $130,000 $102,149
Public Open Space - Central $244,107 $25,000 $269,107Public Open Space - West $89,853 $25,000 $114,853
Public Open Space $1,431,908 $177,000 $370,000 $1,238,908
Community Facilities - South $66,724 $5,000 $71,724
Community Facilities - East $184,503 $10,000 $194,503
Community Facilities - Central $17,697 $17,697Community Facilities - West $12,657 $12,657
Community Facilities $281,581 $15,000 $0 $296,581
Car Parking $20,000 $20,000
Roads $206,347 $206,347
Drainage $274,375 $10,000 $284,375
Gisborne Development Plan $186,976 $50,000 $236,976
Romsey Development Plan $29,391 $29,391Footpaths $180,581 $18,000 $86,000 $112,581
TOTAL $2,611,159 $270,000 $456,000 $2,425,160
GRAND TOTAL $7,684,060 $2,119,799 $2,476,450 $7,327,410
Plant Replacement Purchases $1,220,000
Vehicle Replacement $68,000
Gisborne Aquatic Centre $130,000 Public Open Space Reserve
Lancefield Skate Park $130,000 Public Open Space Reserve
Dixon Field $100,000 Public Open Space Reserve
Romsey Recreation Reserve Recycled Water $10,000 Public Open Space Reserve
Gisborne Early Learning Centre $350,000 Management Property Disposals
Campaspe River trail $50,000 Footpath Reserve
Footpath program $36,000 Footpath Reserve
$2,094,000
Waste Management $382,450 Landfill Recovery Reserve
$382,450
Total funding from Financial Reserves 2015/16 $2,476,450
Appendix C2 - Statement of Financial Reserves
Capital Works Projects to be funded from Financial Reserves in 2015/16
Plant Replacement Reserve
Recurrent Programs to be funded from Financial Reserves in 2015/16
Plant Replacement Reserve
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 63
Appendix C2 - Statement of Financial Reserves (Continued)
Brief Summary of Purpose of each Reserve (refer Financial Reserves Policy for full details)
Plant Replacement Reserve - funding from plant operations for capital replacements.
Fire Prevention Reserve - funding towards fire prevention works.
Waste Management Facilities Reserve - funding for development of waste management facilities.
Management Property Disposals Reserve - net proceeds of property sales for capitals works projects.
Gravel Pit Operations Reserve - surplus from Gravel Pit operations for capital works.
Landfill Recovery Reserve - funding from landfill recovery charge for landfills and transfer stations.
Public Open Space Reserve - contributions from subdivisional works for funding of open space projects.
Community Facilities Reserve - developer contributions for community infrastructure facilities.
Car Parking Reserve - developer contributions for car parking projects.
Roads Reserve - developer contributions for roads works.
Drainage Reserve - comprises developer contributions for drainage works. Gisborne Development Plan Reserve - includes developer contributions for development works within Gisborne.
Hanging Rock Reserve - surplus funding from Hanging Rock operations directed towards capital works.
Footpaths Reserve - developer contributions for footpath works.
Maintenance Seniors Accommodation Reserve - contributions towards maintenance of units.
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 64
Appendix C3 – Summary of Construction Programs
Location Locality Brief Outline Estimated
Cost
Proposed Major Road Construction Program
Kyneton-Springhill Road Kyneton 2.14km including pavement reconstruction, widening and resealing.
$495,000
Kyneton-Baynton Road Baynton 1.06km including pavement reconstruction, widening and resealing
$440,000
Brady Rd Gisborne 480m including pavement reconstruction and asphalt works.
$230,000
Templeton Street Woodend 130m including widening, kerb and channel and resealing
$155,000
High Street Lancefield 290m including pavement reconstruction, kerb reinstatement and footpath reconstruction.
$130,000
Ochiltrees Road Romsey 750m including pavement reconstruction and widening
$390,000
Fisher Street Gisborne 130m including kerb and channel, pavement reconstruction and sealing of shoulder
$95,000
Sandy Creek Road Riddells Creek
500m including pavement reconstruction, widening and resealing
$195,000
Redesdale Road Kyneton 800m including pavement reconstruction and resealing
$419,400
Total $2,549,400
Proposed Footpath Construction Program
Scenic Court from Mountain View Way to Hilltop Way (south side)
Gisborne 20m x 1.5m Concrete $3,600
Mount Gisborne Road (west side) between Carinya Drive and Glenton Court
Gisborne 120m x 1.5m Concrete $21,600
Fisher Street from Calthorpe Street to Rodney Street
Gisborne 200m x 1.5m Concrete $36,000
Preparation works for future path over Howey Creek on Fersfield Road
Gisborne 50m x 2.5m $27,700
Wedge Street from Yaldwyn Street to Piper Street including pram crossings
Kyneton 60m x 1.5m Concrete $10,800
Victoria Street between Market street and Lauriston Street (part construction)
Kyneton 50m x 1.5m Concrete $9,000
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 65
Appendix C3 – Summary of Construction Programs (Continued)
Location Locality Brief Outline Estimated
Cost
Proposed Footpath Construction Program (continued)
Raglan Street between Dunsford Street and High Street (east side)
Lancefield 115m x 1.5m Concrete $20,700
Bruce Street from Victoria Street to Kinder (east side)
Macedon 300m x 1.5m Asphalt $54,000
Stawell Street (west) north side from Main Road to Pohlman Street
Romsey 40m x 1.5m Concrete $7,200
Stawell Street (east) south side from Main Road to William Street
Romsey 50m x 1.5m Concrete $9,000
Pram crossing: Kathryn Street and Main Street intersection
Romsey Concrete $2,500
Brooke Street from Templeton Street to Wood Street inclusing pram crosings
Woodend 230m x 1.5m Concrete $41,400
Blair Drive and Edgecombe Street intersection including pram crossings
Kyneton 20m x 1.5m Concrete $12,500
Total $256,000
Proposed Bridge/Major Culvert Reconstruction Program
Kyneton Baynton Road Pastoria Twin Cell 1500mm diameter precast RC Pipe $100,000
Romsey Road Romsey Single cell 1100mm diameter galvanised corrugated steel culvert and concrete pipe combination
$150,000
Mission Hill Road Baynton Twin cell 1500mm diameter precast RC Pipe $125,000
Romsey Road Hesket Twin Cell 1500mm diameter precast RC Pipe $125,000
Major culverts/bridge repairs various various repairs and replacments $60,000
Footbridges various various identified works $40,000
Total $600,000
Proposed Drainage Construction Program
Noonan Grove Woodend Stormwater drain $36,500
Tucker Street and Daylesford Road
Malmsbury Underground drainage from existing culvert $65,000
Templeton Street Woodend Underground drainage at rear of properties $107,500
Brewster St and High Street Woodend Underground drainage and swale $41,000
Total $250,000
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 66
Appendix C4 – Summary of Customer Fees and Charges
Id No
Unit Description of charge S/NS* 2015/16 Charge
General
1 Council & Customer Service Cake Stall Hire NS 10.50
Photocopying - Private per copy:
2 Council & Customer Service A4 (per side) NS 0.70
3 Council & Customer Service A3 (per side) NS 1.00
4 Council & Customer Service Colour (per side) NS 5.00
Photocopying - Service Clubs per copy:
5 Council & Customer Service A4 (per side) NS 0.50
6 Council & Customer Service A3 (per side) NS 0.80
7 Council & Customer Service Colour (per side) NS 3.40
8 Council & Customer Service FOI Application Fee S 25.70
9 Council & Customer Service FOI Search fee per hour S 20.00
10 Council & Customer Service FOI Access Supervision fee per 1/4 hour S 5.00
Activities on Roads ( Not for Profit )
11 Council & Customer Service Activities on Roads ( Sporting ) NS 155.00
Activities on Roads ( Commercial )
12 Council & Customer Service Activities on Roads ( Sporting /Commercial ) NS 570.00
13 Council & Customer Service Activities on Roads ( Filming / Commercial ) NS 570.00
Woodend Community Hub
Hall Hire (Category 4 HH)
14 Council & Customer Service Not for Profit - Full Day (8hrs) NS 212.00
15 Council & Customer Service Not for Profit - Half Day/ Evening (4hrs) NS 132.00
16 Council & Customer Service Not for Profit - Hourly NS 34.00
17 Council & Customer Service Commercial - Full Day (8hrs) NS 281.00
18 Council & Customer Service Commercial - Half Day/ Evening (4hrs) NS 176.00
19 Council & Customer Service Commercial - Hourly NS 37.00
Multipurpose Room (Category 2 MP)
20 Council & Customer Service Not for Profit - Full Day (8hrs) NS 105.00
21 Council & Customer Service Not for Profit - Half Day/ Evening (4hrs) NS 95.00
22 Council & Customer Service Not for Profit - Hourly NS 24.00
23 Council & Customer Service Commercial - Full Day (8hrs) NS 159.00
24 Council & Customer Service Commercial - Half Day/ Evening (4hrs) NS 130.00
25 Council & Customer Service Commercial - Hourly NS 30.00
Hall and Multipurpose Room
26 Council & Customer Service Not for Profit - Full Day (8hrs) NS 254.00
27 Council & Customer Service Not for Profit - Half Day/ Evening (4hrs) NS 153.00
28 Council & Customer Service Not for Profit - Hourly NS 48.00
29 Council & Customer Service Commercial - Full Day (8hrs) NS 302.00
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 67
30 Council & Customer Service Commercial - Half Day/ Evening (4hrs) NS 229.00
31 Council & Customer Service Commercial - Hourly NS 70.00
Romsey Hub
Mt William Room
32 Council & Customer Service Not for Profit - Full Day (8hrs) NS 105.00
33 Council & Customer Service Not for Profit - Half Day/ Evening (4hrs) NS 71.00
34 Council & Customer Service Not for Profit - Hourly NS 30.00
35 Council & Customer Service Commercial - Full Day (8hrs) NS 139.00
36 Council & Customer Service Commercial - Half Day/ Evening (4hrs) NS 106.00
37 Council & Customer Service Commercial - Hourly NS 40.00
Monegeetta Room
38 Council & Customer Service Not for Profit - Full Day (8hrs) NS 88.00
39 Council & Customer Service Not for Profit - Half Day/ Evening (4hrs) NS 58.00
40 Council & Customer Service Not for Profit - Hourly NS 25.00
41 Council & Customer Service Commercial - Full Day (8hrs) NS 129.00
42 Council & Customer Service Commercial - Half Day/ Evening (4hrs) NS 88.00
43 Council & Customer Service Commercial - Hourly NS 35.00
Mt William Room/ Monegeetta Room Combined
44 Council & Customer Service Not for Profit - Full Day (8hrs) NS 176.00
45 Council & Customer Service Not for Profit - Half Day/ Evening (4hrs) NS 105.00
46 Council & Customer Service Not for Profit - Hourly NS 46.00
47 Council & Customer Service Commercial - Full Day (8hrs) NS 262.00
48 Council & Customer Service Commercial - Half Day/ Evening (4hrs) NS 158.00
49 Council & Customer Service Commercial - Hourly NS 71.00
Library Office/Meeting Room
50 Council & Customer Service Not for Profit - Full Day (8hrs) NS 88.00
51 Council & Customer Service Not for Profit - Half Day/ Evening (4hrs) NS 59.00
52 Council & Customer Service Not for Profit - Hourly NS 25.00
53 Council & Customer Service Commercial - Full Day (8hrs) NS 129.00
54 Council & Customer Service Commercial - Half Day/ Evening (4hrs) NS 88.00
55 Council & Customer Service Commercial - Hourly NS 35.00
Note - there is some availability of free meeting room hire for Not for Profit Groups (see details below after line 529)
Residential
56 Engineering Infrastructure & Projects
Permit to enter a building site by means of a motor vehicle having a gross weight exceeding two tonnes.
NS 422.00
57 Engineering Infrastructure & Projects
Permit to occupy a road for works NS 422.00
58 Engineering Infrastructure & Projects
Permit to install/connect to stormwater drain NS 316.00
59 Engineering Infrastructure & Projects
Permit to alter or open the road (including Vehicle Crossing) NS 316.00
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 68
60 Engineering Infrastructure & Projects
Permit to access a building site from a point other than a vehicle crossing NS 422.00
61 Engineering Infrastructure & Projects
Temporary Storage of material NS 422.00
Rural
62 Engineering Infrastructure & Projects
Permit to enter a building site by means of a motor vehicle having a gross weight exceeding two tonnes (Vehicle Crossing).
NS 106.00
63 Engineering Infrastructure & Projects
Permit to occupy a road for works NS 106.00
64 Engineering Infrastructure & Projects
Permit to install/connect to stormwater drain NS 106.00
65 Engineering Infrastructure & Projects
Permit to alter or open road (including Driveway Construction) NS 106.00
66 Engineering Infrastructure & Projects
Permit to access a building site from a point other than a vehicle crossing NS 106.00
67 Engineering Infrastructure & Projects
Temporary Storage of material NS 106.00
68 Engineering Infrastructure & Projects/Building
Legal Point of Discharge S 60.90
General Waste
69 Operations Per Bag (120 litres) NS 6.20
70 Operations Drum (200 litres) NS 13.50
71 Operations Wheelie Bin (240 litres) NS 13.50
72 Operations Small Boot NS 15.50
73 Operations Small Ute/Station Wagon NS 29.00
74 Operations Small Tray Ute NS 44.50
75 Operations Trailer (6x4x1) NS 29.00
76 Operations Heaped trailer(6x4x2) NS 58.00
77 Operations Vehicle/Trailer (6x4x3) NS 86.00
78 Operations Vehicle/Trailer (6x4x4) NS 115.00
79 Operations Vehicle/Trailer (8x5x1) NS 44.50
80 Operations Vehicle/Trailer (8x5x2) NS 89.00
81 Operations Vehicle/Trailer (8x5x3) NS 133.50
82 Operations Vehicle/Trailer (8x5x4) NS 178.00
83 Operations Vehicle/Trailer (10x6x1) NS 71.50
84 Operations Vehicle/Trailer (10x6x2) NS 142.00
85 Operations Vehicle/Trailer (10x6x3) NS 213.00
86 Operations Vehicle/Trailer (10x6x4) NS 284.50
87 Operations Vehicle/Trailer (12x7x1) NS 97.50
88 Operations Vehicle/Trailer (12x7x2) NS 194.50
89 Operations Vehicle/Trailer (12x7x3) NS 292.50
90 Operations Vehicle/Trailer (12x7x4) NS 389.50
91 Operations Engine Oil over 20 litres- per litre NS 0.52
Green Waste - Commercial (non residential quantities)
92 Operations Per Bag NS 5.50
93 Operations Drum (200 litres) NS 11.50
94 Operations Wheelie Bin (240 litres) NS 11.50
95 Operations Small Boot NS 15.50
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 69
96 Operations Small Tray Ute NS 53.00
97 Operations Small Ute/Station Wagon NS 27.00
98 Operations Trailer (6x4x1) NS 27.00
99 Operations Heaped trailer(6x4x2) NS 54.00
100 Operations Vehicle/Trailer (6x4x3) NS 80.00
101 Operations Vehicle/Trailer (6x4x4) NS 105.50
102 Operations Vehicle/Trailer (8x5x1) NS 54.00
103 Operations Vehicle/Trailer (8x5x2) NS 105.50
104 Operations Vehicle/Trailer (8x5x3) NS 159.50
105 Operations Vehicle/Trailer (8x5x4) NS 212.00
106 Operations Vehicle/Trailer (10x6x1) NS 63.00
107 Operations Vehicle/Trailer (10x6x2) NS 127.00
108 Operations Vehicle/Trailer (10x6x3) NS 191.00
109 Operations Vehicle/Trailer (10x6x4) NS 254.00
110 Operations Vehicle/Trailer (12x7x1) NS 85.00
111 Operations Vehicle/Trailer (12x7x2) NS 169.50
112 Operations Vehicle/Trailer (12x7x3) NS 254.00
113 Operations Vehicle/Trailer (12x7x4) NS 339.00
114 Operations Per cubic metre NS -
Tyres
115 Operations Car NS 7.50
116 Operations Light Truck NS 19.00
117 Operations Truck NS 33.50
118 Operations Tractor NS 82.00
Mulch Sales
119 Operations Delivered within Macedon Ranges Shire 6m3 loads
NS 181.00
120 Operations Delivered within Macedon Ranges Shire 10m3 loads
NS 265.00
121 Operations Per Cubic metre loaded by Council NS 26.00
122 Operations Self service NS 10.00
Recycling Materials
123 Operations Cardboard Paper Commercial Quantities Per m3
NS 18.00
124 Operations Ute/Station Wagon Per m3 NS 18.00
125 Operations Trailer (6x4Single) Per m3 NS 18.00
126 Operations Heaped trailer(6x4) Per m3 NS 18.00
127 Operations Trailer (10x6 single) Per m3 NS 18.00
128 Operations Heaped Trailer (10x6) Per m3 NS 18.00
129 Operations Per cubic metre NS 18.00
130 Operations Gas Bottles - Small NS 5.50
131 Operations Gas Bottles - Large NS 7.50
132 Operations Single bed mattress NS 24.00
133 Operations Double bed mattress NS 24.00
Gravel Pit Operations
134 Operations Crushed (external) NS 18.00
135 Operations Crushed (internal) NS 9.50
136 Operations Uncrushed (external) NS 11.30
137 Operations Uncrushed (Internal) NS 6.35
138 Operations Clay Fill NS 2.50
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 70
Community Safety
139 Community Safety Fire Hazard re inspection Fee NS 157.00
140 Community Safety Animal Business Name Registrations NS 151.00
141 Community Safety Animal Call Out Fees (Council Roads only) NS 162.00
142 Community Safety Vic Roads Livestock Call Out Fee NS 532.00
143 Community Safety Cat Cage Hire Fees per hire NS 10.00
144 Community Safety Animal Fines (Unregistered) S 294.00
145 Community Safety Animal Fines (Wandering Day) S 221.00
146 Community Safety Animal Fines (Wandering Night) S 294.00
147 Community Safety Animal Fines (Unregistered - Wearing Tag) S 74.00
148 Community Safety Animal Fines (Not wearing Tag) S 74.00
149 Community Safety Replacement Tag NS 6.50
150 Community Safety Cat Registrations - (complete) Full NS 102.00
151 Community Safety Cat Registrations - (complete) Concession NS 51.00
152 Community Safety Cat Registrations - (desexed/microchip/etc) NS 34.00
153 Community Safety Cat Registrations - (desexed/microchip/etc) Concession NS 17.00
154 Community Safety Cat Registration - Over 10 Years NS 34.00
155 Community Safety Cat Registration - Over 10 Years - Concession
NS 17.00
156 Community Safety Cat Registration - Initial registration for adopted cat from shelter NS 10.00
157 Community Safety Dog Registrations - (complete) Full NS 126.00
158 Community Safety Dog Registrations - (complete) Pensioner NS 63.00
159 Community Safety Dog Registrations - (desexed/micro chipped/etc) Full NS 42.00
160 Community Safety Dog Registrations - (desexed/micro chipped/etc) Concession NS 21.00
161 Community Safety Dog Registration - Over 10 Years NS 42.00
162 Community Safety Dog Registration - Over 10 Years - Concession
NS 21.00
163 Community Safety Dog Registration - Working Dog category only NS 42.00
164 Community Safety Dog Registration - Working Dog Concession only
NS 21.00
165 Community Safety Dog Registration - Assistance Dogs (Guide, Hearing) NS FREE
166 Community Safety Dog Registration - Initial registration for adopted dog from shelter NS 10.00
167 Community Safety Impound Release Fee - Dogs/Cats NS 52.50
168 Community Safety Pound Release Fees subsequent days NS 26.50
169 Community Safety
Impound Release Fee - Dogs/Cats - subsequent impoundment within 6 months of initial impoundment
NS 88.00
170 Community Safety Microchipping Fee - Impounded Animals NS 55.00
171 Community Safety Dog Registration Declared Dangerous NS 500.00
172 Community Safety Dog Registration Declared Menacing NS 500.00
173 Community Safety Dog Registration Restricted Breed NS 500.00
174 Community Safety Dog Registration Concession (not dangerous) NS 250.00
175 Community Safety Dog Registration - Guard Dog NS 126.00
176 Community Safety EPA Litter Fines S 294.00
177 Community Safety Normal Local Laws Fines S 200.00
178 Community Safety Local Law Busking Fee (over 18yrs age) NS 30.00
179 Community Safety Local Laws Fees - General Permit NS 135.00
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 71
180 Community Safety Local Laws Fees - Permit to burn NS FREE
181 Community Safety Local Laws Fees - Additional Animal Permit (Domestic) NS 86.00
182 Community Safety Local Laws Fees - Additional Animal Permit (Commercial) NS 137.00
183 Community Safety Local Laws Fees - Keeping of Animal Permit - Livestock NS 86.00
184 Community Safety Local Laws Fees - Outdoor Eating Permit up to 8 tables NS 140.00
185 Community Safety Local Laws Fees - Display Stand/Goods Per Application NS 74.00
186 Community Safety Parking Fines, Exceed Time Limit etc. NS 74.00
187 Community Safety Parking Fines, Double Parked, Fire Hydrant, Driveway etc. S 89.00
188 Community Safety Parking Fines, School Crossing, Disabled zone etc.
S 89.00
189 Community Safety A frames NS 74.00
190 Community Safety Skip Bin Permit NS 74.00
191 Community Safety Bull/Stallion Impound Release Fee (per head)(excludes transport costs) NS 155.00
192 Community Safety Other Large Livestock Impound Release Fee (per head)(excludes transport)(horse/cattle) NS 93.00
193 Community Safety Livestock Impound Release Fee (per head)(excludes transport costs)(sheep/goat/alpaca/pig)
NS 46.00
194 Community Safety Small Livestock Impound Release Fee (per head) (rabbit/ferret/chicken) NS 22.00
195 Community Safety Livestock Impounded Fee - Per Day Cattle/Horses
NS 40.00
196 Community Safety Livestock Impounded Fee - Per Day Sheep/Goats
NS 20.00
197 Community Safety Owner handover of Dog or Cat (S.33A) NS 70.00
198 Community Safety Animal Information Fee (Section 18) Charged at rate of FOI request NS -
199 Community Safety General Items Impound Fee (excludes all transport costs) NS 73.00
200 Community Safety Vehicle Impound Release Fee (excludes transport costs)
NS 142.00
201 Community Safety Vehicle Impound Daily Fee after owner notified
NS 15.50
Saleyards
202 Saleyards Lambs/Sheep - per head NS 1.06
203 Saleyards Store Sheep - per head NS 0.74
204 Saleyards Goats - per head NS 1.50
205 Saleyards Fat Cattle - per head NS 10.38
206 Saleyards Cow/calf - per head NS 12.09
207 Saleyards Bulls - per head NS 14.82
208 Saleyards B/Calf - per head NS 3.82
209 Saleyards Store Cattle - per head NS 10.38
210 Saleyards Truck wash Fees per minute NS 1.19
211 Saleyards Horses - per head NS 29.23
212 Saleyards Agents fees cattle NS 0.01
213 Saleyards Agents fees sheep and goats NS 0.01
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 72
214 Saleyards Agent fees horses NS 0.01
215 Saleyards NLIS Buyer Fee NS 2.07
216 Saleyards Saddlery - per sale event NS 330.56
217 Saleyards Private Weighing of cattle NS 3.31
218 Saleyards Private use of saleyards - per head NS $62.50/hour
Health
219 Health Application for exemption from obtaining a Land Capability study
NS 148.00
220 Health Public Health & Wellbeing Act Premises Renewal of Registrations
NS 129.00
221 Health Public Health & Wellbeing Act Premises Registrations - Late fee after 31 December NS 61.00
222 Health Septic Tank - New Application NS 599.00
223 Health Septic Tank - Alteration to existing NS 424.00
224 Health Septic Tank - Amend permit NS 80.00
225 Health Septic Tank - minor alterations NS 125.00
226 Health Septic Tank - Search Fee post 1995 NS 39.00
227 Health Septic Tank - Search Fee pre 1995 NS 79.00
228 Health Septic Tank - Fees for inspection NS 139.00
229 Health Food Act Premises Renewal Fees Class 1 NS 392.00
230 Health Food Act Premises Registration- New Bus Class 1
NS 533.00
231 Health Food Act Premises Renewal Fees Class 1 - Late Fee after 31 December NS 61.00
232 Health Food Act Premises Renewal Fees Class 2 NS 386.00
233 Health Food Act Premises Registration - New Business Class 2 NS 526.00
234 Health Food Act Premises Renewal Fees Class 2 - late fee after 31 December NS 61.00
235 Health Food Act Premises Renewal Fees Class 3 NS 169.00
236 Health Food Act Premises Registration - New Business Class 3 NS 308.00
237 Health Food Act Premises Renewal Fees Class 3 - Late fee after 31 December NS 61.00
238 Health Food Act Premises Registration Fees Class 4 NS -
239 Health Fees for Inspection requested by purchaser/solicitor
NS 139.00
240 Health Food Act Premises Registration Fees - Temporary premises 1-3 events NS 39.00
241 Health Food Act Premises Registration Fees - Temporary premises 4-11events NS 79.00
242 Health Public Health & Wellbeing Act Registration - New Business NS 201.00
243 Health
Caravan Park site - 3 year registration and renewal fee - Total number of sites not exceeding 25 (other than camp sites)
S 170.00
244 Health
Caravan Park site - 3 year registration and renewal fee - Total number of sites exceeding 25 but not exceeding 50 (other than camp sites)
S 340.00
245 Health
Caravan Park site - 3 year registration and renewal fee - Total number of sites exceeding S 680.00
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 73
50 but not exceeding 100 (other than camp sites)
246 HACC Home Care Single - Hrly Rate (Low) NS 7.75
247 HACC Home Care Single - Hrly Rate (Medium) NS 13.50
248 HACC Home Care Single - Hrly Rate (High) NS 18.20
249 HACC Personal Care - Hrly Rate (Low) NS 5.10
250 HACC Personal Care - Hrly Rate (Medium) NS 8.60
251 HACC Personal Care - Hrly Rate (High) NS 9.25
252 HACC Respite Care - Hrly Rate (Low) NS 3.65
253 HACC Respite Care - Hrly Rate (Medium) NS 5.40
254 HACC Respite Care - Hrly Rate (High) NS 9.00
255 HACC Delivered Meals (Low) NS 9.80
256 HACC Delivered Meals (Medium) NS 10.80
257 HACC Delivered Meals (High) NS 13.00
258 HACC Social Support Donations - (Transport within Shire)
NS 9.50
259 HACC Social Support Donations - (Transport to 100km)
NS 24.00
260 HACC Social Support Donations - (Transport to Melb/Bendigo) NS 40.00
261 Full cost recovery Home care - After Hours NS 82.50
262 Full cost recovery Home care - Public Holidays NS 95.00
263 Full cost recovery Personal care - core NS 57.50
264 Full cost recovery Personal care - After Hours NS 90.00
265 Full cost recovery Personal care - Public Holidays NS 100.00
266 Full cost recovery Respite care - core NS 57.00
267 Full cost recovery Respite care - After Hours NS 85.00
268 Full cost recovery Respite care - Public Holidays NS 100.50
269 Full cost recovery Private Business - Delivered Meals NS 23.50
270 Full cost recovery Full cost travel per km NS 1.30
Community Buses
271 Community Support Non Community Group Booking NS 49.00
272 Community Support Non Community Group km rate NS 1.20
273 Community Support Non Community Group E-Tag NS 14.00
274 Community Support Community Group Booking NS 17.20
275 Community Support Community Group km rate NS 1.05
276 Community Support Community Group E-Tag NS 13.90
277 Community Support Internal Group Booking Fee NS 15.00
278 Community Support Internal Group Km rate NS 0.95
279 Community Support Bond Social Functions NS 325.00
Family & Childrens Services
Fees effective for period 1Jan 2016 to 31 December 2017
280 Family & Childrens Services 4 year old Kindergartens per term 15 hours NS 325.00
281 Family & Childrens Services 4 year old kindergartens per term 15 hrs (Twins)
NS 490.00
282 Family & Childrens Services Pre Kindergarten per term - 2 hrs per week NS 190.00
283 Family & Childrens Services Pre Kindergarten per term - 2.5 hrs per week NS 225.00
284 Family & Childrens Services Preschool enrolment application fee - non-refundable
NS 28.00
285 Family & Childrens Services Preschool enrolment application fee - non-refundable - health care holders NS
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 74
286 Family & Childrens Services Occasional Care fee per child (3 hr session) NS 26.00
287 Family & Childrens Services Occasional Care fee per additional child or Health Care Card Holder (3 hr session) NS 20.00
288 Community Development Freeza Events NS 10.00
Hall hire and community events
See General Meeting Rooms & Halls Section for these types of facilities at this centre.
289 Cultural Development Richardson Room Standard Rate (Hourly) NS 41.50
290 Cultural Development Richardson Room Standard Rate (Daily) NS 187.00
291 Cultural Development Richardson Room Not For Profit Rate (Hourly min 3hrs)
NS 18.00
292 Cultural Development Richardson Room Internal Rate (Hourly min 3hrs)
NS 18.00
293 Cultural Development Kyneton Town Hall first 3 hours NS 1,075.00
294 Cultural Development Kyneton Town Hall Additional hours NS 65.00
295 Cultural Development Kyneton Town Hall Additional during events NEW
NS 115.00
296 Cultural Development Kyneton Town Hall (Set up / Rehearsal Rate) first 3 hours NS 350.00
297 Cultural Development Kyneton Town Hall (Not For Profit Rate) first 3 hours
NS 545.00
298 Cultural Development Kyneton Town Hall Internal Use (Base Cost) first 3 hours NS 335.00
299 Cultural Development Richardson Room NOT FOR PROFIT (When Hiring the Kyneton Town Hall) NS 71.00
300 Cultural Development
Kyneton Town Hall Hourly Performance Large Groups (above 50 occupants) min 4 hours Not For Profit
NS 160.00
301 Cultural Development Kyneton Town Hall Hourly Rehearsal Large Groups (above 50 occupants) Not For Profit NS 120.00
302 Cultural Development
Kyneton Town Hall Hourly Rehearsal Small Groups Groups (less than 50 occupants) min 4 hours Not For Profit
NS 100.00
303 Cultural Development Kyneton Town Hall Internal includes 1 FOH Staff and 1 Tech Staff (min 4 hours) NS 120.00
304 Cultural Development Balcony NOT FOR PROFIT (When Hiring the Kyneton Town Hall) NS 71.00
305 Cultural Development Kitchen Facilities Hire NOT FOR PROFIT (When Hiring the Kyneton Town Hall) NS 137.00
306 Cultural Development Dressing Rooms NOT FOR PROFIT - per Room (When Hiring the Kyneton Town Hall) NS 35.50
307 Cultural Development Tea & Coffee NS 40.00
308 Cultural Development Kitchen Facilities Hire NS 320.00
309 Cultural Development Dias - Mobile Stage NS 100.00
310 Cultural Development Venue/Technical Supervisor NS 60.00
311 Cultural Development Red Brick Building Hrly Rate NS 40.00
312 Cultural Development Red Brick Building Day Rate NS 170.00
313 Cultural Development Red Brick Building Hrly Rate Not For Profit NS 18.00
314 Cultural Development Red Brick Building Day Not For Profit NS 105.00
315 Cultural Development Bluestone Theatre Rehearsals / Set up Daily NS 150.00
316 Cultural Development Bluestone Theatre Performance NS 250.00
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 75
317 Cultural Development Bluestone Theatre Rehearsals / Set up Daily Not for Profit NS 150.00
318 Cultural Development Bluestone Theatre Performance Not for profit NS 200.00
319 Cultural Development Blue Stone Theatre Stage Only Not For Profit 50.00
320 Cultural Development Blue Stone Theatre Auditorium Only Not For Profit
100.00
321 Cultural Development Blue Stone Theatre Stage Only (set storage) 100.00
322 Cultural Development Blue Stone Theatre Auditorium Only 150.00
323 Cultural Development Blue Stone Theatre Not For Profit Hourly 30.00
324 Cultural Development Blue Stone Theatre Hourly 50.00
325 Cultural Development Museum - Adults NS 7.00
326 Cultural Development Museum - Concession NS 6.00
327 Cultural Development Museum - Child NS 3.00
328 Cultural Development Museum - Family NS 15.00
329 Cultural Development Museum - Group Booking with activities (per person)
NS 6.00
Kyneton Mechanics Institute Theatre
330 Cultural Development Kyneton Mechanics Institute THEATRE commercial EVENT rate NS 270.00
331 Cultural Development Kyneton Mechanics Institute THEATRE Not For Profit EVENT rate NS 235.00
332 Cultural Development Kyneton Mechanics Institute THEATRE Internal EVENT rate NS 235.00
333 Cultural Development Event Bond NS 1,000.00
Kyneton Mechanics Institute Large Meeting Room /Studio
334 Cultural Development Kyneton Mechanics Institute SUPPER ROOM regular user hourly rate NS 21.00
335 Cultural Development Kyneton Mechanics Institute SUPPER ROOM casual hourly rate NS 26.00
336 Cultural Development Kyneton Mechanics Institute SUPPER ROOM internal hourly rate NS 21.00
Kyneton Mechanics Institute Small Meeting Rooms
337 Cultural Development Kyneton Mechanics Small Meeting Room / Studio per Hour Not For Profit NS 15.50
338 Cultural Development Kyneton Mechanics Small Meeting Room / Studio per Hour NS 18.00
339 Cultural Development Kyneton Mechanics Small Meeting Room / Studio per Hour Internal NS 15.50
Kyneton Mechanics Institute - Daily Room/Hall Charges
Small Meeting Rooms
340 Cultural Development Kyneton Mechanics Small Meeting Room / Studio per day Not For Profit NS 71.50
341 Cultural Development Kyneton Mechanics Small Meeting Room / Studio per day NS 131.00
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 76
342 Cultural Development Kyneton Mechanics Small Meeting Room / Studio per day Internal NS 61.50
Large Meeting Rooms
343 Cultural Development Kyneton Mechanics Large Meeting Room / Studio per day Not For Profit NS 85.00
344 Cultural Development Kyneton Mechanics Large Meeting Room / Studio per day NS 148.00
345 Cultural Development Kyneton Mechanics Large Meeting Room / Studio per day Internal NS 76.50
Sound Equipment Commercial
346 Cultural Development Portable PA System - per Day, including; NS 160.00
Yamaha 10ch mixer/Amp
2 x JBL Eon 10/2 pass spkrs w/ stands
2 x Microphones w/ stands
cables to suit
347 Cultural Development Portable PA System - per additional Day NS 78.00
Not for Profit Community Events
348 Cultural Development Portable PA System - per Day, including; NS 80.00
Yamaha 10ch mixer/Amp
2 x JBL Eon 10/2 pass spkrs w/ stands
2 x Microphones w/ stands
cables to suit
349 Cultural Development Portable PA System - per additional Day NS 41.50
Lighting Equipment Not For Profit Community Events
350 Cultural Development Portable Lighting Rig Par 56 8 x par 56s Dimmer bars and winch up stands NS 128.00
351 Cultural Development Portable Lighting Rig Par 56 8 x par 56s Dimmer bars and winch up stands Add Day NS 64.00
352 Cultural Development Portable Lighting Rig 8 X LED Pars and Push Up Stands NS 128.00
353 Cultural Development Portable Lighting Rig 8 X LED Pars and Push Up Stands Add Day NS 64.00
354 Cultural Development Event Trailer Including Delivery and Pick Up (Office Hours Only / Max travel distance 40 km each way)
NS 545.50
Hanging Rock Reserve User Fees
355 Recreation & Leisure Admission Car NS 10.00
356 Recreation & Leisure Admission Coach NS 50.00
357 Recreation & Leisure Admission Minibus NS 20.00
358 Recreation & Leisure Admission Motorbike NS 10.00
359 Recreation & Leisure Admission Person not in car or bus NS 4.00
Hanging Rock Reserve Site Fees Non Commercial
360 Recreation & Leisure Petanque Shelter NS 118.00
361 Recreation & Leisure South West & South East BBQ Sites NS 75.00
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 77
362 Recreation & Leisure BBQ's - 2 Plates NS 75.00
363 Recreation & Leisure Cricket Oval (Exclusive Use) NS 208.00
Hanging Rock Reserve Site Fees Commercial
364 Recreation & Leisure Site reservation fee plus normal entry charge (negotiable) NS 307.00
Hanging Rock Reserve
365 Recreation & Leisure Annual Pass NS 64.00
366 Recreation & Leisure Farm Stay - Annual Pass NS 74.00
367 Recreation & Leisure 1/2 Day Film Crew + Bond determined by Management. Fee may be negotiated. NS 850.00
368 Recreation & Leisure Full Day Film Crew + Bond determined by Management. Fee may be negotiated. NS 1,411.00
369 Recreation & Leisure Guided Tours Minibus 1 hr (12 people) NS 110.00
370 Recreation & Leisure Guided Tours Coach 1 hr (40 people) NS 155.00
371 Recreation & Leisure Nightwalks Adults NS 22.00
372 Recreation & Leisure Nightwalks Children (per child) NS 11.00
373 Recreation & Leisure Nightwalks Family (2 Adults & 2 Children) NS 55.00
374 Recreation & Leisure Silver Service Tour per person for conferences etc.
NS 17.50
375 Recreation & Leisure Wedding Service & Photographs held at H'Rock
NS 420.00
376 Recreation & Leisure Local School & Charity Groups - 20% Discount off normal entry fees NS
Hanging Rock Film Night
377 Recreation & Leisure Per paying Adult NS 25.00
378 Recreation & Leisure Per paying Child NS 10.00
379 Recreation & Leisure Family Pass - 2 Adults, 2 Children NS 60.00
Hanging Rock - Other events as they occur
380 Recreation & Leisure Subject to negotiation and approval by Director CWB where over $2000. Manager under $2000.
NS
Hanging Rock Camp Out at the Rock
381 Recreation & Leisure Per paying Adult NS 21.00
382 Recreation & Leisure Per paying Child NS 12.50
383 Recreation & Leisure Per paying Family (2 adults, 2 children) NS 54.00
Gisborne Fitness Centre and Kyneton Sports & Aquatic Centre Gym Fees
384 Recreation & Leisure 3 Month Membership NS 264.00
385 Recreation & Leisure 6 Month Membership NS 408.00
386 Recreation & Leisure 12 Month Membership NS 680.00
387 Recreation & Leisure Casual Visit (Includes Gym & Sauna) NS 15.00
388 Recreation & Leisure Casual Visit Gym Concession NS 13.00
389 Recreation & Leisure Casual Visit Gym/Swim NS 17.80
390 Recreation & Leisure Casual Visit Gym/Swim Concession NS 14.70
391 Recreation & Leisure Casual Visit Aerobics NS 12.80
392 Recreation & Leisure Casual Visit Aerobics Concession NS 11.30
393 Recreation & Leisure Casual Circuit 1/2 Hour class NS 7.50
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 78
394 Recreation & Leisure Gym Visit 10 Pass Card NS 135.00
395 Recreation & Leisure Gym Visit 10 Pass Card Concession NS 117.00
396 Recreation & Leisure Teens Hour & Off peak (12-2pm) Casual NS 7.40
397 Recreation & Leisure Teens Hours & Off Peak (12-2pm) 10 Pass Card
NS 66.60
398 Recreation & Leisure Gym Direct Debit Membership NS 34.07
399 Recreation & Leisure Gym Direct Debit Membership 10% Concession
NS 30.95
400 Recreation & Leisure Gym Direct Debit Membership 25% Concession
NS 25.69
401 Recreation & Leisure Casual Assessment Fee NS 42.00
402 Recreation & Leisure Aerobics 10 Pass Card NS 115.20
403 Recreation & Leisure Aerobics 10 Pass Card Concession NS 101.70
404 Recreation & Leisure Strength Training Casual NS 6.90
405 Recreation & Leisure Strength Training 10 Pass Card NS 62.10
406 Recreation & Leisure Strength Training 20 Pass Card NS 127.00
407 Recreation & Leisure Personal Training 30 min session Member NS 38.90
408 Recreation & Leisure Personal Training 45 min session Member NS 55.80
409 Recreation & Leisure Personal Training 10 sessions 30 min Member
NS 350.00
410 Recreation & Leisure Personal Training 10 sessions 45 min Member
NS 502.20
Gisborne Community Centre - Other
411 Recreation & Leisure Office One Regular NS 15.90
412 Recreation & Leisure Office One Casual NS 18.50
413 Recreation & Leisure Storeroom One NS 97.00
414 Recreation & Leisure PA system hire NS 112.50
Buffalo Sports Stadium / Romsey Recreation Centre / Riddells Creek Leisure Centre / Kyneton Toyota Sports & Aquatic Centre Dry
See General Meeting Rooms & Halls Section for these types of facilities at this centre.
Stadium Hire (Category 1 SH)
415 Recreation & Leisure Social Functions NS 467.50
416 Recreation & Leisure Peak NS 46.00
417 Recreation & Leisure Off Peak NS 30.00
418 Recreation & Leisure Bond for Social Function NS 330.00
Other
419 Recreation & Leisure Kitchen/Kiosk Per Day NS 51.00
420 Recreation & Leisure Club Rooms Per Season Half Year / Junior NS 495.00
421 Recreation & Leisure Club Rooms Per Season NS 960.00
422 Recreation & Leisure Amenities hire per season NS 280.00
Squash Courts
423 Recreation & Leisure Regular Use Per Hour NS 19.00
424 Recreation & Leisure Casual Use Per Hour NS 21.00
425 Recreation & Leisure Junior Use Per Hour NS 18.00
Macedon Community Centre Stadium
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 79
See General Meeting Rooms & Halls Section for these types of facilities at this centre.
Stadium Hire (Category 1 SH)
426 Recreation & Leisure Social Functions NS 467.50
427 Recreation & Leisure Bonds NS 330.00
428 Recreation & Leisure Peak NS 42.00
429 Recreation & Leisure Off Peak NS 27.00
Other
430 Recreation & Leisure Kitchen Per Day NS 51.00
431 Recreation & Leisure Kitchen Per Day Commercial Use NS 123.00
432 Recreation & Leisure Bond Commercial Hirer NS 1,000.00
Gisborne Aquatic Centre and Kyneton Sports & Aquatic Centre Pool Fees
433 Recreation & Leisure Casual Swim Adult NS 5.90
434 Recreation & Leisure Casual Swim Child NS 4.80
435 Recreation & Leisure Casual Swim Family NS 18.00
436 Recreation & Leisure Casual Swim Full Time Student NS 4.80
437 Recreation & Leisure Casual Swim Pensioner NS 4.80
438 Recreation & Leisure Casual Swim Concession Adult NS 4.80
439 Recreation & Leisure Casual Swim Concession Child NS 4.20
440 Recreation & Leisure Casual Swim 10 Session Adult NS 53.10
441 Recreation & Leisure Casual Swim 10 Session Child NS 43.20
442 Recreation & Leisure Casual Swim 25 Session Adult Swim NS 88.00
443 Recreation & Leisure Casual Swim 25 Session Adult Concession Swim
NS 79.50
444 Recreation & Leisure Parent Supervising Toddler U5 NS 4.80
445 Recreation & Leisure Learn to Swim School Age NS 14.80
446 Recreation & Leisure Learn to Swim Pre School Age NS 14.80
447 Recreation & Leisure Learn to Swim 2nd Child in Lesson NS 14.20
448 Recreation & Leisure Learn to Swim 3rd Child in Lesson NS 13.50
449 Recreation & Leisure LTS Re-enrolment Deposit NS 41.00
450 Recreation & Leisure LTS Administration Fee NS 41.00
451 Recreation & Leisure Learn to Swim Special Needs NS 21.00
452 Recreation & Leisure Learn to Swim Private Lesson NS 41.50
453 Recreation & Leisure Programs Aqua Exercise NS 11.50
454 Recreation & Leisure Programs Aqua Exercise Concession NS 10.50
455 Recreation & Leisure Programs Aqua Exercise 10 Pass Card NS 103.50
456 Recreation & Leisure Programs Aqua Exercise Concession 10 Pass Card
NS 94.50
457 Recreation & Leisure Programs Aqua Exercise 3 Month Membership
NS 195.50
458 Recreation & Leisure Birthday Parties (per child) NS 16.00
459 Recreation & Leisure Swim Membership 12 Months Adult NS 430.50
460 Recreation & Leisure Swim Membership 6 Months Adult NS 259.00
461 Recreation & Leisure Swim Membership 3 Months Adult NS 166.50
462 Recreation & Leisure Swim Membership 12 Months Child NS 314.00
463 Recreation & Leisure Swim Membership 6 Months Child NS 188.00
464 Recreation & Leisure Swim Membership 3 Months Child NS 123.00
465 Recreation & Leisure Gym & Swim 12 Months NS 808.00
466 Recreation & Leisure Gym & Swim 6 Months NS 486.00
467 Recreation & Leisure Gym & Swim 3 Months NS 315.00
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 80
468 Recreation & Leisure Direct Debit Gym and Swim Membership NS 40.56
469 Recreation & Leisure Direct Debit Gym and Swim Membership 10% Concession NS 36.47
470 Recreation & Leisure Direct Debit Gym and Swim Membership 25% Concession NS 30.43
471 Recreation & Leisure Direct Debit Swim Membership NS 20.97
472 Recreation & Leisure Direct Debit Swim Membership 10% Concession
NS 18.87
473 Recreation & Leisure Direct Debit Swim Membership 25% Concession
NS 15.75
474 Recreation & Leisure Family Membership 12 Months NS 953.50
475 Recreation & Leisure Family Membership 6 Months NS 581.00
476 Recreation & Leisure Family Membership 3 Months NS 371.50
477 Recreation & Leisure Direct Debit Family Swim Membership NS 47.21
478 Recreation & Leisure Direct Debit Family Swim Membership 10% Concession NS 42.45
479 Recreation & Leisure Direct Debit Family Swim Membership 25% Concession NS 35.34
480 Recreation & Leisure Swimming Lesson Ratio 1:6 per lesson per student
NS 8.70
481 Recreation & Leisure Swim Lesson Ratio 1:10 per lesson per student
NS 7.50
482 Recreation & Leisure Full Centre Hire (other group) per hour NS 204.50
483 Recreation & Leisure Full Centre Hire (other group) - half day NS 649.50
484 Recreation & Leisure Full Centre Hire (community group) per hour NS 157.00
485 Recreation & Leisure Full Centre Hire (community group) half day NS 567.50
486 Recreation & Leisure 25m & teaching pools one hour (other group) NS 158.50
487 Recreation & Leisure 25m & teaching pools half day (other group) NS 567.50
488 Recreation & Leisure 25m & teaching pools one hour (school group) NS 129.50
489 Recreation & Leisure 25m Carnival Hire per hour NS 107.50
490 Recreation & Leisure 25m Carnival Student Entry Fee NS 2.20
491 Recreation & Leisure 25m & teaching pools half day (school group) NS 467.50
492 Recreation & Leisure 25m Pool Lane hire per hour NS 51.00
493 Recreation & Leisure 25m Pool Lane hire per hour (Off Peak) NS 41.00
494 Recreation & Leisure 25m Pool Lane hire per half hour NS 29.50
495 Recreation & Leisure 25m Pool Lane hire per half hour (Off Peak) NS 23.50
496 Recreation & Leisure LTS Pool per hour NS 27.50
497 Recreation & Leisure LTS Pool Lane 3rd lane half hour NS 15.00
498 Recreation & Leisure WWE Pool per hour NS 37.50
499 Recreation & Leisure WWE Pool per half hour NS 25.50
500 Recreation & Leisure Extra staff member per hour NS 44.50
Outdoor Pools
501 Recreation & Leisure Casual Swim Adult NS 5.00
502 Recreation & Leisure Casual Swim Child NS 3.50
503 Recreation & Leisure Casual Swim Full Time Student NS 3.50
504 Recreation & Leisure Casual Swim Pensioner NS 3.50
505 Recreation and Sport Parent Supervising Child U5 NS 5.00
506 Recreation and Sport Family Swim pass NS 15.00
507 Recreation & Leisure Season Ticket Adult NS 102.50
508 Recreation & Leisure Season Ticket Child U18 NS 66.50
509 Recreation & Leisure Season Ticket Family NS 205.00
510 Recreation & Leisure Season Ticket Concession NS 66.50
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 81
Council offers the following discounts:
*10% Seniors Card - 25% Students, Teens, Pensioner, Carers & Corporate - 30% Staff Kiosk/Merchandise
*30% Discount to Community Groups who are fundraising for good will events
*Free use annually for each swim club to run a fundraising swimathon.
*Free use for companion card holders.
GENERAL MEETING ROOMS AND HALLS
Small Meeting Room
(up to 20 people)
511 Recreation & Leisure Regular Use per hour NS 15.80
512 Recreation & Leisure Casual Use per hour NS 18.50
513 Recreation & Leisure Social / Commercial per hour NS 33.50
Applicable facilities:
Buffalo Sports Stadium - Utility Room
Romsey Rec Centre - Upstairs Utility Room
KTSAC - The Den Squash Room
Macedon Community Centre - Utility Room
Gisborne Community Centre - Meeting Rooms
Kyneton Mechanics Institute - Meeting Rooms
Large Meeting Room (up to 50 people)
514 Recreation & Leisure Regular Use per hour NS 20.00
515 Recreation & Leisure Casual Use per hour NS 22.00
516 Recreation & Leisure Social / Commercial per hour NS 37.90
Applicable facilities:
Kyneton Mechanics Institute - Supper Room & any joined meeting rooms
Multipurpose / Small Hall
(up to approx. 100 people)
517 Recreation & Leisure Regular Use per hour NS 23.00
518 Recreation & Leisure Casual Use per hour NS 27.20
519 Recreation & Leisure Social Functions (food & drink consumed) - evening
NS 266.00
520 Recreation & Leisure Bond NS 330.00
Applicable facilities:
Buffalo Sports Stadium - Rotary Room
Romsey Rec Centre - Multipurpose Room
Riddells Creek Leisure Centre - Multipurpose Rm
KTSAC - The Studio / Jack Walker Room
Macedon Community Centre - Multipurpose Rm
Gisborne Community Centre - Senior Citz Hall
Large Hall
(up to approx. 150+ people)
521 Recreation & Leisure Regular Use per hour NS 33.80
522 Recreation & Leisure Casual Use per hour NS 37.50
523 Recreation & Leisure Social Functions (food & drink consumed) - evening
NS 358.00
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 82
524 Recreation & Leisure Commercial Event - day NS 272.00
525 Recreation & Leisure Community Event - day NS 237.50
526 Recreation & Leisure Bond NS 327.50
Applicable facilities:
Gisborne Community Centre - Mechanics Hall
Kyneton Mechanics Institute - Hall
Large Catering Kitchen
(capacity to cater for 100+)
527 Recreation & Leisure Per Day NS 51.00
528 Recreation & Leisure Commercial Hire per day NS 123.00
529 Recreation & Leisure Bond Commercial Hire NS 1,000.00
Applicable facilities:
Gisborne Community Centre - Kitchen
Kyneton Mechanics Institute - Kitchen
** Community Meetings
Selected small meeting rooms at all facilities are available free of charge for meetings (NOT activities) for local community groups that are based in the Shire and who operate entirely on a voluntary not for profit community basis. Only groups who do not engage paid personnel may be eligible. The following conditions apply -
Conditions:
1. Limit up to 6 bookings per annum however more may be considered depending upon demand.
2. Bookings must be made at least 7 days in advance.
3. A hire form must be completed for each booking & PL insurances provided (properly constituted groups will have this).
4. Paid hirings take precedence (ie. Non paying hirer may have to reschedule/relocate booking if a paid hirer requires the room at the same time - at least 7 days notice will be provided).
5. The Facility manager has authority to determine eligibility.
6. Applicable small meetings rooms are: Gisborne Community Centre - library building meeting room, Buffalo Sports Stadium - front utility room, Macedon Community Centre - front utility room, Riddells Creek Leisure Centre - creche, Romsey Recreation Centre - creche, Kyneton Mechanics Institute - meeting room library corner (Board room).
7. Conditions subject to review after 12 months.
530 Planning Request for Extension to Permit - First Request
NS 250.00
531 Planning Request for Extension to Permit - Second Request
NS 500.00
532 Planning Request for Extension to Permit - Third Request
NS 600.00
533 Planning Request for amendment to permit S Various
534 Planning Request to endorse amended plans NS Various
535 Planning Secondary Consent NS 200.00
536 Planning Miscellaneous Consent NS 400.00
537 Planning Written Planning Enquiry NS 130.00
538 Planning Request for copy of Planning Permit (number provided and file in the system) NS 80.00
539 Planning Development Plan ( that does not create a road)
NS 450.00
540 Planning Development Plan ( that does create a road) NS 800.00
541 Planning Amend a development Plan NS 300.00
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 83
542 Planning Request for copy of Planning Permit (no number provided) NS 150.00
543 Planning Advertising Amended S173 (maximum 10 letters)
NS 100.00
544 Planning Advertising Amended S173 (per letter after 10)
NS 5.00
545 Planning Permit - Use only S 502.00
546 Planning Permit - Single dwelling under $100,000 S 239.00
547 Planning Permit - Single dwelling over $100,000 S 490.00
548 Planning Permit to develop land S Various
549 Planning Permit - Tree Removal S 102.00
550 Planning Permit - Dam [under 3 Megalitres] S 102.00
551 Planning Permit to subdivide existing building S 386.00
552 Planning Permit to subdivide land into 2 lots S 384.00
553 Planning Permit to re-align boundary or consolidate lots S 386.00
554 Planning Permit to subdivide land into more than 2 lots S 781.00
555 Planning Permit to remove a restriction from land S 249.00
556 Planning Permit to create, vary or remove restriction S Various
557 Planning Permit to create, vary or remove an easement S 404.00
558 Planning Amendment of applications S 102.00
559 Planning Amendment permits under Section 72 S Various
560 Planning Certificates of Compliance S 147.00
561 Planning Planning Certificate S 18.20
562 Planning Determining if action is to the satisfaction Council /other agency S 102.00
563 Building House Relocation/Re-erection
NS $1,200+(Cost of Works/200)
564 Building Extension of time to permit for 12 months NS 350.00
565 Building Restumping of Dwelling
NS $400+(Cost
of Works/200)
566 Building Class 1 A Building Works [by Registered Builder] NS
$500+(Cost of Works/210)
567 Building Class 1A Building Works [by Owner Builder]
NS $550+(Cost
of Works/200)
568 Building Class 1 - Multiple units
NS $500+(Cost
of Works/200)
569 Building Other building work - Outbuildings, Sheds, Carport NS
$550+(Cost of Works/200)
570 Building Other building work - demolition
NS $550+(Cost
of Works/200)
571 Building Other building work - swimming pools
NS $550+(Cost
of Works/200)
572 Building Commercial and Industrial - Class 2-9
NS $1,200+(Cost of Works/150)
573 Building
State Government Levy
S
0.00128% per $ of cost
$10,000 and over
574 Building Building over an easement
S 18.43 Fee
Units
575 Building Property Information
S 3.67 Fee
Units
576 Building Lodgement Fee Class 1 & 10
S 2.75 Fee
Units
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 84
577 Building Consent and Reports
S 18.43 Fee
Units
578 Building Protection of the public ( ie Hoardings)
S 18.43 Fee
Units
579 Building Building Search Fees and copies of plans and permits NS 160.00
580 Building Variation of Building permit NS 210.00
581 Building Demolition report ( Section 29A )
S 4.60 Fee
Units
582 Building Assessment non compliant building matter
NS Permit Fee by
200%
583 Building Additional inspections NS 180.00
584 Building Fences (including pool, barriers and retaining walls)
NS 400.00
585 Building
Place of Public Entertainment (POPE). Fees are on a sliding scale up to this amount.
NS
Under 5000 people, $500; 5001 to 15000 people, $750,
Over 15000 people, $1500
586 Building
Commercial Permits for Council Owned Buildings NS
50% of the fee (see 781
above)
587 Economic Development & Tourism
Tourism signage application fee NS 80.00
Strategic Planning
588 Strategic Planning Planning Scheme Amendment - Considering a request S 798.00
589 Strategic Planning Planning Scheme Amendment - Considering submissions S 798.00
590 Strategic Planning Planning Scheme Amendment - Adopting amendment S 524.00
591 Strategic Planning Planning Scheme Amendment - Ministerial approval
S 798.00
592 Strategic Planning Proponent costs for Council consideration - Strategic Planner NS 113.63
593 Strategic Planning Proponent costs for Council consideration - Consultant NS At cost
594 Strategic Planning Proponent costs for Council consideration - Administration NS 36.16
595 Strategic Planning Public notice letter by mail NS 1.59
596 Strategic Planning Public notice - advertisement in local newspaper
NS At cost
597 Strategic Planning Public notice - advertisement in Government Gazette NS At cost
598 Strategic Planning Independent Panel fees NS At cost
599 Council Finances Admin Fee - Dishonoured Payments NS 16.50
600 Rates Land Information Certificates S 20.00
601 Rates Rate Search (10 Years) NS 26.50
602 Rates Rate Search (20 Years) NS 105.00
603 Rates Rate Search (30 Years) NS 158.00
604 Rates Re-issue Rate Notice - Fee to post. E-mail no charge. NS 5.00
* S - Statutory, NS - Non-Statutory
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 85
Glossary
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 86
Act means the Local Government Act 1989
Annual report means a report of the activities of the previous financial year and contains a report
of operations, audited financial statements and an audited performance statement
Asset expansion
expenditure
means expenditure that extends the capacity of an existing asset to provide
benefits to new users at the same standard as is provided to existing beneficiaries
Asset expenditure
type
means the following types of asset expenditure:
(a) asset renewal expenditure;
(b) new asset expenditure;
(c) asset upgrade expenditure;
(d) asset expansion expenditure
Asset renewal
expenditure
means expenditure on an existing asset or on replacing an existing asset that
returns the service capability of the asset to its original capability
Asset upgrade
expenditure
means expenditure that:
(a) enhances an existing asset to provide a higher level of service; or
(b) increases the life of the asset beyond its original life
Australian
Accounting
Standards (AASB)
means the accounting standards published by the Australian Accounting Standards
Board
Budget means a plan setting out the services and initiatives to be funded for the financial
year and how they will contribute to achieving the strategic objectives specified in
the council plan
Capital works
expenditure
means expenditure on non-current assets and includes new assets, asset renewal,
asset expansion and asset upgrade
Council plan means a plan setting out the medium-term strategic objectives, strategies, strategic
indicators and resources reflecting vision and aspirations of the community for the
next four year
Financial resources means income, expenditure, assets, liabilities, equity, cash and capital works
required to deliver the services and initiatives in the budget
Financial statements means the financial statements and notes prepared in accordance with the
Australian Accounting Standards as they apply to the general purpose financial
reports of local governments and a statement of capital works and included in the
annual report
Financial year means the period of 12 months ending on 30 June each year
Human resources means the staff employed by a council
Indicator means what will be measured to assess performance
Initiatives means actions that are one-off in nature and/or lead to improvements in service
Major initiatives means significant initiatives that will directly contribute to the achievement of the
council plan during the current year and have a major focus in the budget
Minister means the Minister for Local Government
Model budget means the Victorian City Council Model Budget prepared annually by the Institute of
Chartered Accountants in Australia
Draft Budget Report 2015/16 for public display and comment until 29 May 2015 Page 87
New asset
expenditure
means expenditure that creates a new asset that provides a service that does not
currently exist
Non-financial
resources
means the resources other than financial resources required to deliver the services
and initiatives in the budget
Non-recurrent grant means a grant obtained on the condition that it be expended in a specified manner
and is not expected to be received again during the period covered by a Council’s
Strategic Resource Plan
Planning and
accountability
framework
means the key statutory planning and reporting documents that are required to be
prepared by councils to ensure accountability to local communities in the
performance of functions and exercise of powers under the Act
Performance
statement
means a statement including the results of the prescribed service outcome
indicators, financial performance indicators and sustainable capacity indicators for
the financial year and included in the annual report
Recurrent grant means a grant other than a non-recurrent grant
Regulations (LGR) means the Local Government (Planning and Reporting) Regulations 2014
Report of operations means a report containing a description of the operations of the council during the
financial year and included in the annual report
Services means assistance, support, advice and other actions undertaken by a council for
the benefit of the local community
Statement of capital
works
means a statement which shows all capital expenditure of a council in relation to
non-current assets and asset expenditure type prepared accordance to the model
statement of capital works in the Local Government Financial Report
Strategic objectives means the Goals in the Council Plan, which Council is seeking to achieve over the
next four years and
Strategic Resource
Plan
means a plan of the financial and non-financial resources for at least the next four
years required to achieve the strategic objectives in the council plan
Strategies means high level actions directed at achieving the strategic objectives in the council
plan
Statement of human
resources
means a statement which shows all council staff expenditure and numbers of full
time equivalent council staff