Reasoned Document for Revision of Specification of 8 Wheeler Tower Wagon (DETC) Sub: Revision of Specification No. TI/SPC/OHE/8WDEIC/0090(02/09) to manufacture the self propelled 8 Wheeler Inspection & Maintenance Car of Diesel Electric under slung type for operation on Broad Gauge (1676 mm). Ref: Railway Board‟s letter no.84/RE/158/1/2 (FTS 2862) dated: 4.04.2011& 13.09.2011 1. RDSO have issued a Specification[ No. TI/SPC/OHE/8WDEIC/0090(02/09)] to manufacture self propelled 8 Wheeler Inspection & Maintenance Car of Diesel Electric under slungtype for operation on Broad Gauge (1676 mm) during May,2010. 2. Railway Board, vide their letter dated 04.04.2011, desired a need to evaluate the Specification as per latest requirement. A meeting of RDSO & Zonal Railways was called at Railway Board on 04.04.2011. 3. For considering various aspects and for evaluation of above Specification a “DRAFT” was uploaded on RDSO‟s Official Website on 20.05.2011 for suggestion/comment of probable Vendors and Outside Agencies as per Detailed Guide lines to Change of Equipment, Item Specification as per RDSO’s QMS Document No. QO-D-7.1-2 Ver.-3. (letter in this regard had been sent to Railway Board on 13.05.2011). 4. After considering the comments of Motive Power Directorate, Carriage Directorate, PS & EMU Directorate, Zonal Railways and Outside Agencies, a Reasoned Document along with DRAFTof Revision of Specification was uploaded on website for 15 days on 13.07.2011. As per extent guidelines (QMS Document No. QO-D-7.1-2 Ver.-3), after approval of HOD and DG/RDSO; Draft Specification was sent to Railway Board for their approval; vide this office letter No.TI/OHE/8WDETW/GEN/11 dated:08.08.2011 5. Railway Board, vide letter No.84/RE/158/1/2-FTS-2862 dated 13.09.2011 have advised RDSO to freeze certain Designs/Specifications/sources which are similar to EMU/MEMU so that maintenance in Railway‟s existing EMU/MEMU Car Sheds may be done. 6. Again DRAFTfor revision was prepared, after approval it was sent to Motive Power Directorate, carriage Directorate, and PS & EMU Directorate, for evaluation and comments. Same have been uploaded on RDSO‟s Web Site on 24.10.2011 for obtaining comments of outside agencies.

Upload: others

Post on 17-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Reasoned Document for Revision of Specification of 8 Wheeler Tower Wagon (DETC)

    Sub: Revision of Specification No. TI/SPC/OHE/8WDEIC/0090(02/09) to manufacture the self propelled 8 Wheeler Inspection & Maintenance Car of Diesel Electric under slung type for operation on Broad Gauge (1676 mm).

    Ref: Railway Board‟s letter no.84/RE/158/1/2 (FTS 2862) dated: 4.04.2011& 13.09.2011

    1. RDSO have issued a Specification[ No. TI/SPC/OHE/8WDEIC/0090(02/09)] to manufacture self propelled 8 Wheeler

    Inspection & Maintenance Car of Diesel Electric „under slung‟ type for operation on Broad Gauge (1676 mm) during

    May,2010.

    2. Railway Board, vide their letter dated 04.04.2011, desired a need to evaluate the Specification as per latest requirement.

    A meeting of RDSO & Zonal Railways was called at Railway Board on 04.04.2011.

    3. For considering various aspects and for evaluation of above Specification a “DRAFT” was uploaded on RDSO‟s Official

    Website on 20.05.2011 for suggestion/comment of probable Vendors and Outside Agencies as per Detailed Guide lines to „Change of Equipment, Item Specification as per RDSO’s QMS Document No. QO-D-7.1-2 Ver.-3. (letter in this regard

    had been sent to Railway Board on 13.05.2011).

    4. After considering the comments of Motive Power Directorate, Carriage Directorate, PS & EMU Directorate, Zonal Railways and Outside Agencies, a Reasoned Document along with „DRAFT‟ of Revision of Specification was uploaded on website for

    15 days on 13.07.2011. As per extent guidelines (QMS Document No. QO-D-7.1-2 Ver.-3), after approval of HOD and

    DG/RDSO; Draft Specification was sent to Railway Board for their approval; vide this office letter No.TI/OHE/8WDETW/GEN/11 dated:08.08.2011

    5. Railway Board, vide letter No.84/RE/158/1/2-FTS-2862 dated 13.09.2011 have advised RDSO to freeze certain

    Designs/Specifications/sources which are similar to EMU/MEMU so that maintenance in Railway‟s existing EMU/MEMU Car

    Sheds may be done. 6. Again „DRAFT‟ for revision was prepared, after approval it was sent to Motive Power Directorate, carriage Directorate, and

    PS & EMU Directorate, for evaluation and comments. Same have been uploaded on RDSO‟s Web Site on 24.10.2011 for

    obtaining comments of outside agencies.

  • 7. Comments/ suggestions received so far have been compiled below along with RDSO‟s views:

    Sl.

    No.

    Clause

    No.

    Description

    in Specification

    Comments of PS & EMU, Motive

    Power and Carriage Directorates.

    Comments of BHEL, BEML, CGL &

    Phooltas, Titagarh Wagons & Tractor India Private Limited

    Views of

    Traction Installation Directorate

    1

    2.

    1.2

    1.2.1.3

    Climatic Condition,

    Atmospheric temperature,

    Minimum

    temperature:

    - 10°C (Also snow fall in certain areas

    during winter

    season). Reference Site

    Conditions

    i) Ambient

    Temperature : 50°C ii) Humadity:100%

    iii)Altitude:1000 m

    above mean sea level

    Carriage Directorate

    -10°C is too low. In Specification No.

    TI/SPC/OHE/8WDHTW/0070 the

    range is 0°C to 55°C.

    This may be reviewed.

    Tractors India (P) Limited

    Reference site conditions to be

    basis for the Generator set

    package which includes all performances and Specifications

    of items and major Components

    are to fully comply reference site conditions.

    Comment

    Above is suggested to be added in view of critical importance of

    Prime mover (Engine) and

    Alternator (Generator)

    performances and availability of outputs at reference site

    conditions.

    Climatic conditions mentioned in Specification may retain

  • 3.

    1.2.2

    (c)

    Maximum train

    Acceleration 2.0g (g-being acceleration

    due to Gravity)

    Phooltas

    There seems to be typographical error in place of maximum train

    acceleration. “It should be

    maximum lateral or transversal

    acceleration”. Further, the maximum lateral/transversal

    acceleration shall be 1 g in place

    of 2 g.

    2.0 g is correct.

    4. 1.3.4 The evaluation of bids

    shall, inter-alia, take

    into consideration the

    Fuel efficiency of the Diesel Engine. For

    this purpose the bids

    shall be loaded by capitalised cost of

    additional fuel and

    lubricating oil

    consumption over and above the base

    consumption at 75%

    of the rated output of the diesel engine.

    The lowest values of

    fuel and lubricating oil consumption quoted

    by the technically

    suitable Tenderer

    shall form the basis for the purpose of

    comparison. The

    bidders shall enclose

    Tractors India (P) Limited

    From the nature of application and

    work to be carried out by the OHE

    Car, there may be long idle operating hours for the

    Equipments.

    Hence, a performance review @ 25% of rated power of the Diesel

    Engine, Alternator & packaged

    Generator set may be considered.

    This is a suggestion only. Operating hours for 25% of rated

    power should also be mentioned

    likewise 2000 hours is mentioned for 75% of rated power.

    Both performances for Diesel Fuel

    consumption as reported shall be demonstrated during routine tests

    & also performance tests. Test

    Reports for such fuel rates shall

    be confirmed by the OEM of respective items.

    The OEM shall also certify fuel

    consumption performances at

    Provisions in the Specification

    may retain

  • Fuel and Lubricating

    oil consumption in litres per hour at 75%

    of the rated output of

    the Diesel Engine as

    issued by the OEM of the Diesel Engine.

    The fixed parameters for evaluating the

    capitalized cost shall

    be as under :-

    Life of the diesel engine :18 years

    Annual operating

    period :2000 hrs. -Cost of fuel per litre

    -Cost of lubricating oil / litre

    Prevalent on the date

    of opening of bid

    Rate of interest:12%

    Reference site Conditions for

    evaluation purposes.

    5.

    1.2(v)

    Atmosphere during

    hot weather Extremely dusty and

    desert terrain in

    certain areas.

    The dust concentration in air

    may reach as high as

    of 1.6 mg/m³.

    Phooltas

    Please clarify whether wagon weight is 120 t each or both

    together.

    Each wagon shall be weighing

    60 t. Two Wagons weighing 60 tonne each in gross load

    condition i.e. total load would

    be 120 t for two wagons

  • 1.2.3

    In many iron ore and

    coalmine areas, the dust concentration is

    very high affecting

    the filter and air

    ventilation system.

    The OHE car shall be

    able to negotiate water logged tracks

    at 10 kmph, with

    water level of 102

    mm above the rail top, for which the

    equipment shall be

    suitably designed.

    Tractors India (P) Limited

    Any and all items, components, Assemblies should be above a

    safe margin from the water

    logging at 102 mms over rail top.

    While the car is in movement, there may be ripples and the

    water level may increase to cause

    damages. Hence, the minimum clearance of 120 mms from rail-

    top is to be maintained during

    assembly. Comment

    Clearance should be left over un-

    answered for this critical issue.

    Provisions in the Specification

    may retain

    6. 1.19 A Themovision Camera as per

    RDSO‟s Specification

    ,Video Camera to capture picture at

    100 kmph along with

    software to transfer

    the picture and video shoots on the

    Computer, one

    Hydraulic Jack of 5 t

    Carriage Directorate “A Thermovision camera as per

    RDSO‟s specification No….

    to be mentioned and “thermovision” may be corrected

    BHEL Specification for Thermo vision

    Camera, Tirfer,Pull-lift is required.

    BEML Specification for Camera may be

    included.

    1. Thermo vision camera as per RDSO‟s Specification

    No.TI/Spec/OHE/0100.

    2. Tirfor as per RDSO‟s Specification No.

    TI/SPC/OHE/TOOLPL/0990

    3. Pull- lifts as per RDSO‟s

    Specification No. TI/SPC/OHE/TOOLPL/1990

  • capacity, one tirfer

    (3t), two tirfer (3/2 t), three pull-lift 3/4t,

    two pull-lift (3/2 t)

    and one pull-lift (3t)

    shall be supplied along with OHE Car.

    7 1.2.1 Climatic conditions

    1. Atmospheric temperature--

    2. Humidity--100%

    saturation during

    Rainy season 3. Reference site

    conditions

    4. Rain fall 5. Atmosphere during

    hot weather

    Motive Power Directorate

    The range & Maximum permissible limits for the Item

    no 1,2,3,4,5 may be advised

    Already provided in the

    Specification

    8 1.16.2

    (iv)

    Motorised Bogie

    (complete with Break Gear)

    BEML

    Include Motor or without Motor

    Traction Motors have been

    included in specific para

    9 1.21.1 AMC

    The Tenderer shall quote for AMC

    comprehensive of all

    in all inclusive of all

    Equipments including Traction Motors

    Alternators, Diesel

    Engine complete with transmission,

    Compressor unit and

    Cooling system for 3

    Motive Power Directorate

    In the clause, it is not mentioned that whether Engine

    parts shall also be in the scope

    of AMC.

    The AMC shall cover all the

    Equipments of Diesel Engine, Traction Motors and

    Alternators.

  • years during the

    warranty period of 36 months and

    separately for 5 years

    after warranty is

    over. The Tenderer shall

    quote year wise rates

    of AMC detailing the various Schedule

    enlisting the

    requirement of

    material/ spare parts and services to be

    rendered by him after

    regular intervals. The Tenderer shall

    keep adequate spares

    in stock for regular Schedule of AMC so

    that maintenance

    schedules are

    completed timely. AMC shall be all

    inclusive of

    replacement of parts, if required either due

    to breakdown or

    wear. The AMC cost shall be considered

    while evaluating the

    inter-se tender

    position.

  • It shall be compulsory

    for the tenderer to quote for AMC.

    However, the decision

    to enter into AMC

    shall vest with Railway alone.

    10. 12 (ii)

    Page 13

    Performance

    Capabilities

    Carriage Directorate

    110 km/h to be changed to 105 km/h

    11. 2.0

    12 vii

    Page 13

    Weight of Wagons Carriage Directorate

    “Wagon weighing 120 ton” may

    be replaced by “Two wagons weighing 60t each in gross load

    condition”

    Two wagons weighing 60t

    each in gross load condition

    -Acceptable

    12. 2.3.1 (ix)

    Page

    14

    Driving Cab Full width single piece

    Stone proof lookout

    glass with Sun Screen shall be provided at

    the end wall of each

    Driver‟s compartment and these shall be

    glazed, clear,

    colourless polyOHE

    carbonate to ICF spec no.ICF/MD/SPEC-159

    (latest revision).

    Carriage Directorate “PolyOHE carbonate” to be

    replaced by Poly carbonate

    Acceptable as “Polycarbonate”

    13. 2.3.5 (iv)

    Page

    16

    Facility on roof

    Carriage Directorate “PolyOHE carbonate” to be

    replaced by Polycarbonate

    Acceptable as “Polycarbonate”

  • 14. 2.3.5 (v) (b) page 17

    Lifting and Swivelling

    Platform width

    Carriage Directorate

    Platform width 1600 mm but as per the Diagram 1 D of BG IR

    SOD revised 2004 the width on

    the top of MMD is 1520mm.

    Therefore the width may be suitably reduced to avoid

    infringement.

    Acceptable. The width of the

    Swivelling Platform shall be corrected as 1500 mm which

    has been accepted during the

    Design approval 8Wheeler

    Diesel Hydraulic Tower Wagon of M/s. BEML

    15. 2.3.1 (X)

    Provision of Wind Screen Wiper Arm

    and Blade Assembly

    to be provided.

    BHEL Wiper Assembly to RDSO

    Specification No. C-K306 will be

    provided. This Wiper to RDSO

    Specification No. C-K306. However, doesn‟t have provision

    of water spraying.

    Acceptable.

    16. 3.1.6 Page 20

    Under Frame The underframe

    material shall be of

    corrosion resistant

    Structural Steel to IRS: M 41 or Copper

    bearing quality Steel

    to IS: 2062 Cu WC, of welded integral

    Structure. The under

    frame design shall be

    as per ICF Drawing No AC/DC/EMU/C2-1-

    1-201 with latest

    alteration. They shall be assembled in jigs

    and fabricated by

    welding. Trough floor

    Carriage Directorate ICF Drawing No.

    AC/DC/EMU/C2-1-1-201 is for

    3660 mm wide EMU Stock and it

    may not be suitable for 3250 mm wide stock. Therefore

    Drawing No. may be deleted.

    In above reference, the bogie has been suggested vide note No.SV.EMU.RAS dated 08.02.2012 by Director/VDG.

    As far as under-frame suitable to DETC is concerned, it is stated that this specification is for purchase of DETC from trade and IR is not offering complete design to the manufacturers. Hence,

    Acceptable The Drawing of Under Frame

    of 8 wheeler Diesel Electric

    Tower Car can be finalised at

    the stage of Design/Drawing approval Stage.

  • of 2.0 mm thick of

    Steel to IRS: M 41 steel shall be

    provided in covered

    area.

    manufacturers should develop their own design of under-frame keeping in mind the layout of DETC. The firm should submit design to RDSO for approval at the time of design approval stage.

    17. 3.1.11 Page 20

    Sole Bar

    These shall be

    continuous members from headstock to

    headstock,

    adequately braced together to withstand

    the head on loading

    and cross racking forces and shall be

    capable to withstand

    jacking for the

    purpose of lifting the OHE Car. The Sole

    Bar shall be of

    corrosion resistant Structural Steel to

    IRS: M 41 steel.

    The Design of Sole Bar shall be as per

    ICF Drawing No

    EMU/M2-1-1-541.

    Carriage Directorate

    The Drawing No. EMU/M2-1-1-

    541 may be deleted. Sole bar drawing may be finalized at

    design stage.

    Acceptable.

    The Drawing of Sole Bar of 8

    Wheeler Diesel Electric Tower Car can be finalized at the

    stage of Design/Drawing

    approval Stage.

    18. 3.2.2 Four openings shall be provided in the

    roof for erection of

    catenary and contact wires in either

    Phooltas Please confirm whether 4 opening

    are required or 2 opening as

    mentioned in Clause 2.3.2.

    Two openings are acceptable on roof

  • direction. The

    openings shall be of suitable size to permit

    paying out of the

    conductors in any

    direction, when the OHE Car is moving

    slowly at 5-10 km/h

    speed, without any obstruction, rubbing

    or scrapping.

    19. 2.3.4.4 Staff Cabins

    One Cabin for officers/staff with four

    cushioned Berths

    shall be provided. The Cabins shall have

    separate entry and

    have windows on

    both sides. The Cabins shall

    preferably be not

    over the wheels and made sound proof as

    far as possible. An

    Indian style WC with separate over tank,

    Stainless Steel Sink

    and other accessory

    fitting and a folding cushioned seat

    including shower with

    flexible Hose shall be

    BHEL

    Kindly confirm whether a single Staff/Officer cabin is required or

    two Cabin each one for staff and

    officer.

    Single cabin is required.

  • provided. The WC

    shall be provided with an Exhaust Fan.

    The Officers/Staff

    Cabin shall be

    insulated properly and shall be air

    conditioned. Provision

    of two Mobile charging points to be

    made in

    Officer/Staff‟s Cabin

    as well as in both the Driving Cab and

    Working area.

    In addition two folding Berths shall

    be provided at

    suitable location without Cabin.

    Air Conditioned is not

    required

    20. 3.1.6 The Under frame

    material shall be of

    corrosion resistant Structural Steel to

    IRS: M 41 or Copper

    bearing quality Steel to IS: 2062 Cu WC, of

    welded integral

    Structure. The Under

    frame design shall be as per ICF Drawing

    No AC/DC/EMU/C2-1-

    1-201 with latest

    Carriage Directorate

    Drawing No. AC/DC/EMU/C2-1-

    1-201 is 3660 mm wide EMU Stock and may not be suitable

    for 3250 mm wide stock.

    Therefore Drawing No. may be deleted.

    BEML

    The Under Frame to ICF Drawing

    No. AC/DC/EMU/C2-1-1-201 pertains to EMU which has a width

    of 3658 mm. The same is not

    suitable for OHE with width of 3250 mm.

    The under frame shall be

    made as per SOD

    requirement and got approved from RDSO.

  • alteration. They shall

    be assembled in jigs and fabricated by

    welding. Trough floor

    of 2.0 mm thick of

    steel to IRS: M 41 steel shall be

    provided in covered

    area.

    21. 3.2.4 Air Space

    The air space

    between the outer

    and inner sheeting of the roof shall be

    suitably ventilated as

    also the air space inside walls and end

    walls. Attachments

    may pass through the

    air space as required, but must be

    designed, so that

    they do not cause sections to form

    sealed chambers or

    lodgements for condensed moisture.

    BHEL

    Details of methods of air

    ventilation is required.

    It shall be finalised at Design

    approval stage

    22. 3.3

    Page

    22

    Windows

    Lift type window

    made of powder coated Aluminium to

    ICF drawing No

    EMU/4C/ASR-5-4-402

    Carriage Directorate

    Drawing may be finalized at

    Design stage. The Drawing No. may be deleted.

    “Body Side Double sealed

    glass windows for the air

    Windows to be provided as

    per ICF Design.

  • with latest alteration

    with fixed type poly OHE carbonate louver

    on top and movable

    glass window at the

    bottom.

    conditioned officers/staff cabin

    and inspection Dome” to be added in the clause

    “polyOHE carbonate” to be

    replaced by “Polycarbonate

    Polycarbonate is acceptable

    23. 3.4.2 Hinged doors

    provided on the side

    walls for entry of drivers from outside

    of the OHE car shall

    be of inward opening

    type and will give an opening of 750 mm

    approximately.

    BEML

    Door hinged or sliding optional

    may be specified.

    Doors shall be hinged type.

    24. 3.5 Lavatories The OHE car shall

    have one Indian style

    lavatory, which shall

    be provided with fittings of Stainless

    Steel as being used

    on passenger train and approved by the

    RDSO.

    BHEL we presume one Indian style

    lavatories

    Details given at para 2.3.4.4 above

  • 25. 3.7.2

    Page 33

    Bogies

    Bogie suspension design shall be coil

    steel suspension in

    primary and air

    suspension in secondary stage. The

    bogie design shall be

    as per ICF Drawing No AC//EMU/M/ASR-

    0-0-001 with latest

    alteration.

    Carriage Directorate

    Earlier 8 wheeler OHE are running at max. operating speed

    of 105 kmph, whereas recently a

    Speed Certificate No.

    SV.EMU.RAS dt.12.10.2011 for 8 wheeler DETC (with air

    suspension) has been issued for

    max. operational speed of 95 kmph. Therefore significance of

    using air suspension bogie may

    be reviewed and accordingly the

    Bogie Drawing may be changed

    BEML

    Bogie to ICF Drawing No.AC/DC/M/ASR-0-0-001 may be

    EMU Bogie which will not suit the

    OHE application.

    Bogie shall be as per ICF

    Drawing No.DMU/DPC-0-0001 with Latest Revision.

    26. 3.8.4

    Page

    24

    Wheel Axles and Axle

    Box

    Carriage Directorate

    “of Appendix 1 and width of

    wheel shall be 127 mm minimum” may be deleted

    Acceptable.

    27. 3.8.5

    Page

    24

    Wheel Axles and

    Axles Box

    The rim thickness of the wheel will be

    adequate to provide

    for specified wheel wear.

    Carriage Directorate

    Clause 3.8.5 may be deleted

    Acceptable

    28. 3.8.16

    (iv)

    Side wall and pillars:

    The material of body

    pillar shall be IRS M-41. Pillars shall be

    continuous from sole

    bar to cant-rail, except below window

    openings, and shall

    be braced by

    BEML

    Side Wall Pillars shall be of

    Stainless Material.

    Not acceptable

  • longitudinal members

    between adjacent pillars. Bracing being

    designed to act as

    integral part of the

    exterior sheeting.

    29. 3.9

    Page

    25

    Brake System Carriage Directorate

    Clause No.3.9.1 and 3.9.2 are

    repeating these may be re-numbered.

    Acceptable

    30. 3.9.1

    Page

    25

    Panel mounted air

    brake system to

    RDSO Spec: MP-0.01.00.19 (Rev-01),

    June 2010

    Carriage Directorate

    Repeated

    “110 kmph” to be changed to “105 kmph”

    BHEL

    Air brake system will be provided

    with Fabricated Console without provision of MU in place of Panel

    mounted Air Brake system to

    RDSO Specification MP-0.01.00.19 MU operation is not required for

    DETC application.

    BHEL comments are

    acceptable.

    31. 3.9.2

    Page 25

    The composition „K‟

    type non-asbestos Brake Blocks to RDSO

    Specification No. C-

    9508 with latest revision/amendment

    shall be used. Brake

    Rigging shall be as

    per ICF Drawing No. EMU/M-3-2-064 with

    latest alteration shall

    be provided to prevent the Brake

    Blocks riding down

    the Wheel tapers. The

    Carriage Directorate

    The last line of the para mentioning the BC pressure of

    1.6 kg/cm2 to be deleted.

    Repeated

    “Wagon weight 120t” may be

    replaced by “Two wagons

    weighing 60t each in gross load condition.”

    Phooltas

    Please clarify whether wagon weight is 120 t or both together.

    Each Wagon weight is 60t

  • Brake Cylinder

    pressure for 20.32 t Axle load Bogies shall

    be 1.6 kg/cm2.

    32. 3.9.3

    (i)

    Provision of

    Emergency Brake Valve.

    An Emergency Brake

    in case valve in each Driving Cab on

    extreme right hand

    side.

    BHEL

    D-1 Emergency Brake Valve will be provided in both CAB for

    Emergency Brake application.

    BHEL‟s comments are

    acceptable.

    33. 3.9.3 (ii)

    Provision of Stand-by -Brake, in case of

    failure of Distributer

    Valve or any component in the

    main Brake system.

    BHEL We will provide Air Brake System

    having an additional C2W Relay

    Valve exclusively for Braking from SA-9 Independent Brake.

    It shall be decided at the time of design approval

    34. 3.9.3

    (iii)

    Parking Brake to

    RDSO Specification No. CK 408 (latest

    revision) capable of

    holding fully loaded OHE Car with 120 t

    trailing load of two

    loaded Bogie Flat

    Wagons in un-braked state on 1 in 33 down

    gradient under wet

    condition.

    Carriage Directorate

    “120t trailing load of two loaded bogie flat wagons” may be

    replaced by “two trailing wagons

    weighing 60t each in gross load condition”.

    Phooltas

    Please clarify whether wagon weight is 120 t or both together.

    Each Wagon weight is 60t

    two trailing wagons weighing

    60t each in gross load condition---is acceptable

    Total trailing load is 120t.

    35. 3.9.5 Brake Rigging Carriage Directorate When Drawing of Brake rigging is mentioned in para 3.9.2 then para 3.9.5 may be deleted

    Provisions of Specification

    shall remain.

  • 36. 3.10.3 Compreg to RDSO

    Spec. No. C-9407 – type –II shall be used

    for clamp.

    BHEL

    We will provide polypropylene clamps.

    RDSO‟s Specification shall

    prevail.

    37. 3.10.4 Colour identification

    scheme of pipes. Pipes, ducts and

    conduits shall

    conform to an identification colour

    scheme. This shall be

    approved by RDSO.

    BHEL

    We will provide colour stickers instead of paint because painting

    on Stainless Steel pipe is not

    possible.

    Poly urethane Paint scheme

    as per RDSO‟s Specification shall be followed.

    38. 3.11 Page

    27 &

    28

    Interior furnishing Carriage Directorate “LP sheet conforming to STR

    No.C-K514 (Latest Revision)

    may be used for thermosetting resin bonded laminated sheet for

    the OHE car” to be added after

    “IS: 2046”. And last sentence of

    the para to be deleted.

    Acceptable.

    39. 3.12

    Page

    28

    Ceiling and panelling Carriage Directorate

    “may be used for the OHE

    car.” To be added after “C-K601 (Latest Revision)”

    “or Non-asbestos limpet Sheet

    to RDSO Specification No. C-

    K601 (Latest Revision)” to be deleted

    Acceptable.

    40. 3.13

    Page 28

    Flooring

    Floor of the vehicle shall be as per ICF

    Drawing No.

    EMU/MASR-41-001

    Carriage Directorate

    Drawing may be finalised at Design stage.

    Therefore, Drawing No. may be

    deleted.

    ICF Drawing to be followed

  • with latest alteration.

    The opening in the flooring for passage

    of Pipes and Cables

    through the floor shall

    be so constructed as to prevent any

    seepage of oil.

    In addition to give effective protection

    against the spread of

    fire originating

    beneath the Body.

    41. 3.15

    page

    28

    Cattle Guard

    Detachable type

    cattle guards shall be provided under each

    buffer beam. The

    cattle guard shall be

    fitted with adjustable rail guards so as to

    maintain the

    minimum free space above the rails under

    all conditions (see

    item 7 of clause 2.0). i) Cattle guard and

    RCF Drawing No.

    EM26108 with latest

    Amendment. Or Cattle Guard and

    ICF Drawing. No.

    EMU-2-6-046 with

    Carriage Directorate

    Sub Para i) may be deleted.

    The Drawing may be finalised at design stage

    Cattle guard as per RCF

    Drawing. No. EM26108 with

    latest amendment.

  • latest alteration.

    42. 3.22

    Page 31

    Parking Brakes

    In case Parking Brakes are proposed

    the features of the

    Brake Actuator, its type and the

    schematics of its

    operation shall be furnished.

    Carriage Directorate

    Sub Para (8) may be written as “Feature of the proposed parking

    Brake Actuators, its type and the

    schematics shall be furnished.”

    Acceptable.

    43. 4.0 Illumination

    Driving Cabs, Staff

    Cabins, Workshop & Storage space shall

    be provided with

    level of illumination of at least 30 lux at the

    Working Plane level

    (1 m above the floor

    level). OHE Car lighting shall be

    provided with 18 W,

    600 mm x 26 mm double capped

    Fluorescent Tube

    lights along with its

    fittings and Electronic Lamp Ballast as per

    RDSO Specification

    No. RDSO/PE/SPEC/TL/00

    11-2000 (Rev.1) with

    the latest revision

    PS & EMU Directorate

    Fluorescent tube light fittings

    “with wire mesh guard” may be added.

    BHEL

    Speed should be 105 km/h in

    Acceptable.

    Wire mesh guard shall

    provide protection to the fitting.

  • shall be used.

    44. 4.3.2 Battery Charger for

    charging Batteries of 110 V of 120 Ah

    capacity Lead acid

    maintenance free storage Batteries of

    capacity as

    mentioned at Clause No.5.3.2.20. The

    Battery Charger shall

    comply with ICF

    Specification No. ICF/Elect/067 (Rev.1)

    and Battery charger

    for 24 Volts

    ICF Specification No.

    ICF/Elect/067 (Rev.1) mentioned in clause is for the

    Battery Chargers provided in

    EMU/MEMU motor coaches suitable for 100 V, 95 Ah

    batteries.

    BHEL

    Para not complete. However, Battery Charger for 24 V Batteries

    shall be Engine mounted charging

    Alternator.

    1. Battery Charger for 24 V

    Batteries shall be Engine mounted charging alternator.

    2. Battery Charger for

    charging Batteries of 110 V of 120 Ah capacity. Battery

    Charger shall be from RDSO‟s

    approved Vendor as per Specification No.

    RDSO/PE/SPEC/AC/0008

    (Rev.2).

    45. 4.3.4 A skid mounted

    portable Diesel

    Generator similar to

    „Honda‟ make (petrol start Kerosene run or

    Petrol start, Petrol

    run) of 3 kVA (minimum), 240V, 50

    Hz along with

    transformer shall be

    provided to meet 150 Amps light weight

    IGBT welding

    machine load and other Auxiliary load of

    search lights (2x250

    Watts), Emergency

    BHEL

    Details of Transformer may be

    furnished. Also the scope of

    supply welding machine may be clarified.

    It shall be decided at the

    time of design approval stage

  • light and for other

    such purposes.

    46. 4.5.2 Twin Beam Head light Twin Beam head

    lights shall be

    provided at both ends. The head light

    shall confirm to

    RDSO‟s Specification No

    ELRS/SPEC/PR/0024

    (Rev-1) Oct. 2004.

    The operating voltage of Head Light shall be

    110 V DC.

    PS & EMU Directorate Twin Beam head lights in

    EMU/MEMUs are provided as per

    RDSO‟s Specification ELRS/SPEC/PR/0024 (Rev-1)

    Oct. 2004; which is with DC-DC

    convertor. The operating voltage of EMU/MEMUs Head Light is 24

    Volts.

    BHEL Head Light as per RDSO‟s

    Specification No.

    ELRS/SPEC/PR/0024 (Rev-1) Oct. 2004, the operating voltage of

    Head Light shall be 24 V DC. For

    this purpose 110/24 V DC-Dc as per RDSO Specification No.

    ELRS/SPEC/DC-DC

    Convertor/0021 Rev.1..

    Operating voltage of head light may be accepted as 24

    Volts DC.

    24 Volts DC Supply for twin beam head light shall be

    taken from 110 DC source

    with DC-DC convertor.

    47. 4.5.3 Tail light Two aspect (red and

    white) LED type 24 V

    15 W tail light shall

    be provided at each end to comply with

    General &Subsidiary

    Rules of Indian Railways.

    PS & EMU Directorate

    In EMU & MEMUs LED based

    flashing type tail lamp having

    one aspect (RED) is provided.

    BHEL Specification of Tail Light may be

    furnished.

    May be accepted as PS & EMU Directorate‟s comments. Para

    shall contain RED aspect Tail

    Lamp. The Tail Lamp shall as

    per RDSO‟s Specification No. RDSO/PE/SPEC/TL/0119-

    2000 Rev. “0”.

    48. 4.5.5 Marker light

    Marker light of LED type as per RDSO‟s Specification No ELRS/SPEC/PR/0022 (Rev-1) Oct. 2004 shall be provided on either end of the OHE Car.

    PS & EMU Directorate

    Provision of marker light needs

    to be checked with respect to provision of two aspect (Red &

    White) LED type tail lights as per

    Clause No. 4.5.3 of the above Specification.

    Comments of PS & EMU

    Directorate are not acceptable

    Marker light of LED type as

    per RDSO‟s Specification No

    ELRS/SPEC/PR/0022 (Rev-1) Oct. 2004 shall be provided

    on either end of the OHE car.

    49. 4.5.6 Search light BHEL It shall be decided at the time

  • OHE car shall be

    provided with two 250 W searchlights

    with Metal Halide

    lamps, one on each

    end, for inspection of the OHE while on the

    run. Searchlights

    shall provide a high intensity illuminating

    beam and capable of

    swivelling on

    universal joint type supports.

    Specification of search light may

    be furnished.

    of design approval stage

    50. 4.5.12 Flood light

    Four flood lights giving diffused light of

    75 watts shall be

    provided with each

    OHE Car.

    BHEL

    Specification of the flood lights may be furnished.

    It shall be decided at the time

    of design approval stage

    51. 5.3.2.1 Diesel Engine

    Two independent

    under-slung naturally aspirated, turbo-

    charged and after

    cooled horizontal

    diesel engines of proven design of

    indigenous make (like

    Cummins NTA 855 R), complete with all

    accessories, suitable

    for traction service

    Motive Power Directorate

    (i) The calculation for horse

    power requirement as 285 hp, for operation in adverse

    conditions referred in clause 2.0

    of chapter –II may be

    submitted. (ii) CRDI type injection system

    in Engine is a special feature.

    Reason for considering the same may be clarified. It has got

    financial angle also. Either we

    should for CRDI Engine or for an

    BHEL

    Horizontal word to be removed.

    This is because vertical Engine can also be suitable for this

    application. Power required for

    lifting Platform may be drawn

    from main power pack.

    Tractors India (P) Limited

    Two independent turbo-charged and after-cooled Diesel Engines of

    proven and established design,

    complete with all required

    Two independent under-slung

    naturally aspirated, turbo-

    charged and after cooled Diesel Engines of proven

    design suitable for 8 Wheeler

    Diesel Electric Tower Car of

    reputed make, complete with all accessories, suitable for

    traction service under the

    climatic and operating conditions obtained in India,

    shall be provided. The engine

    shall be of Common Rail

  • under the climatic

    and operating conditions obtained in

    India, shall be

    provided. The engine

    should be preferable of Common Rail

    Direct Injection

    (CRDI) type. Alternative proposal

    with other

    indigenously

    manufactured, proven designs of horizontal

    diesel engines may be

    offered. The continuous traction

    rating of each engine

    shall not be less than 285 hp or higher at

    1800 rpm after due

    de-rating for

    environmental temperature of 55

    0C. It shall be

    battery started. Specific Fuel

    Consumption (SFC)

    shall be low. Robust construction, low

    maintenance and

    satisfactory record of

    past performance are

    ordinary Engine. accessories, suitable for traction

    services under the climatic and operating conditions in India shall

    be provided.

    The Engine(s) shall be with

    electronically controlled fuel injection and control system of

    latest proven designs to conform

    to emission norms and best of performances under variable load

    conditions as essential for the

    application. The Electronic Fuel

    system should provide low fuel consumption at reference site

    conditions in actual application

    with variable loads. The Diesel Engine, electronically

    controlled, should provide self-

    diagnostic details which on demand should be able to provide

    information on defects / faults,

    Alarm details etc. so that

    maintenance & repair is done within shortest possible time-line.

    Continuous duty Power rating of

    each Engine must not be less than 285 HP @ 1800/2100 RPM or

    higher as required & established

    at reference site conditions of 550C & 1000 Mtrs AMSL as

    mentioned in 1.2.1.3.

    Adequate and sufficient

    allowances shall be incorporated

    Direct Injection (CRDI) type.

    Alternative proposal with other indigenously

    manufactured, proven

    designs of horizontal diesel

    engines may be offered. The continuous traction rating of

    each engine shall not be less

    than 340 hp (approximately) or higher at 1800 rpm after

    due de-rating for

    environmental temperature of

    55 0C. It shall be battery started. Specific Fuel

    Consumption (SFC) shall be

    low. Robust construction, low maintenance and satisfactory

    record of past performance

    are of paramount importance. Tenderer shall furnish full

    particulars of the engine with

    the offer. Adequate allowance

    shall be made in the power of the diesel engine for the de-

    rating under most adverse

    climatic conditions stated in Clause-1.2 of Chapter-I of

    this specification. Successful

    tender shall give detailed calculations for engine‟s

    suitability and its rating.

  • of paramount

    importance. Tenderer shall furnish full

    particulars of the

    engine with the offer.

    Adequate allowance shall be made in the

    power of the diesel

    engine for the de-rating under most

    adverse climatic

    conditions stated in

    Clause-1.2 of Chapter-I of this

    specification.

    Successful tender shall give detailed

    calculations for

    engine‟s suitability and its rating.

    while working out on-site power in

    application with derations and Power losses as encountered

    under adverse operating

    conditions.

    The Engine shall be suitable for 24 VDC batteries starting. The Engine

    should be of robust construction

    with low maintenance requirements and satisfactory

    performance levels. Regular

    Engine service & maintenance

    requirements and schedules are to be clearly indicated and confirmed

    by OEM.

    52. 5.4.1

    page

    38

    The cooling

    Equipment shall be

    guaranteed to work efficiently under the

    climatic conditions

    specified in Para-1.2 of Chapter- I of the

    Specification.

    The Radiator and fan

    shall be of adequate capacity with 30%

    choked condition of

    the radiator used. Air

    Phooltas

    As roof mounted radiator has

    been specified, 15 % chocking factor. Kindly be accepted. 30%

    chocking factor radiator can also

    be supplied but will unnecessarily add to the cost hence, we request

    that this clause may please be

    amended.

    Specification Para shall be

    retained.

  • flow required for the

    radiator fan shall be at least 15% more

    than that actually

    required to make up

    for any reduction in air flow due to train

    movement. The

    limiting ambient capability of the

    cooling system shall

    be minimum 55 0 C

    with 30 % chocked condition

    53. 5.4.4 The maximum

    operating water temperature shall

    normally not exceed

    950C.

    Tractors India (P) Limited

    The maximum operating temperature of engine cooling

    system along with alarm

    temperature and shut-down /

    safety shut-off temperature are to be mentioned in submission.

    Comment: All modern engines are

    with pressurised cooling system to accommodate higher

    temperatures and better cooling

    performances. All modern engines operate at about 920 to -980C with

    alarm and shut-off at about 1040C

    & 1100C.

    Specification Para shall be

    retained.

    54. 5.4.8 Cooling Proving trials shall be carried out in

    a test bed at the

    contractor‟s premises

    Phooltas Trial may kindly be carried out on

    the Car in filled during

    commissioning in place of

    Test to be carried out in the firm‟s (OEM) premises

  • to prove the

    adequacy of the cooling system

    comprising of radiator

    and Hydraulic Oil

    Cooler for the prototype in the

    presence of RDSO‟s

    representative. The procedure for such

    testing shall be

    submitted and got

    approved from RDSO.

    manufacturer premises.

    55. 5.4.10 Page 39

    The Tenderer shall

    submit drawing for

    mounting details of Radiator Assembly,

    Fan drive

    arrangement and

    ensure that these fit completely within the

    overall dimensions of

    OHE Car.

    Phooltas

    Compressor capacity of Cummins

    Engine is 5 CFM at low idle speed, hence, Cummins are requested

    that the same may be amended

    accordingly.

    It shall be decided at the time

    of design approval stage

    56. 5.5 The CRDI Engine shall

    be electronically

    controlled using

    suitable and proven ECUs.

    Phooltas

    Cummins are offering a proven

    mechanical Engine for this

    application. The same is already used and performed satisfactorily

    in earlier DETC manufactured by

    ICF. However, please note that they have offered Electric

    Governing system for engine

    control (LCC) as well as man

    Electric Governing system for

    engine control (LCC) as well

    as main Traction Alternator

    excitation control to be provided.

  • traction alternator excitation

    control. Please amend this clause accordingly.

    57. 5.3.2.12 The Exhaust pipe

    shall not leave OHE

    carbon soot on important assemblies

    like Traction Motors,

    axle drive etc. The pipe shall be taken to

    the roof with

    adequate insulation

    to with stand 7000C. The silencer shall be

    provided on the

    dished rooftop.

    Motive Power Directorate

    Describes that the

    Pipes shall be taken to the roof. It is mentioned that the Exhaust

    Pipe alongwith silencer, shall be

    provided on dished roof. The reason for considering this type

    of design may be advised.

    However, in case of under slung

    power pack, the Exhaust pipe is provided horizontally and

    located under floor avoiding the

    position near footsteps of the Vehicle.

    Motive Power Directorate

    Remarks are acceptable

    58. 5.3.2.19 The Exhaust Emission

    shall be below the

    limit laid down in UIC/ORE No.

    B13/RP22/E Clause-4

    of the entire engine range of operation

    from idle to full power

    and shall be

    measured as per UIC/ORE/B13/RP21E.

    The exhaust opacity

    shall not exceed 20 as measured by

    Hartridge smoke

    Meter or equivalent

    BHEL

    The exhaust emission shall be

    below the limit laid down in UIC/ORE No B13/RP22/E

    Tractors India (P) Limited

    Indian Pollution Control Requirements for Heavy Road Vehicles as per circular / Pollution Control Board to mention ........

    Existing Specification shall be

    retained

  • scale under all

    conditions including acceleration of the

    Engine. A suitable

    catalytic converter

    shall be connected in Exhaust Pipe to limit

    the Emission.

    59. 5.3.2.20 The tenderer shall supply the complete

    system including

    Engine starter and

    Battery Chargers. Batteries shall be of

    following ratings:-

    24 V, 290 Ah Battery for Engine

    cranking.110 V,

    120Ah Battery for

    control and auxiliary circuits.

    BEML 24V, 290 Ah Battery RDSO

    standards to be incorporated.

    Battery Charger for 24 V batteries shall be Engine

    mounted charging Alternator

    60. 5.7.7,

    5.8 & 5.9

    Traction Motor, Motor

    suspension & Axle Drive & Bearings

    Tower wagon shall

    be fitted with 4

    traction motors, two on each bogie, The

    motors shall be typed

    4601 BX with pinion and earth return

    brush assembly as

    per BHEL schedule

    PS & EMU Directorate

    All types are Traction Motors including Traction Motors

    provided in EMUs & MEMUs are

    dealt by traction motor group of

    Electric Loco Directorate. The comments on detailed

    design parameters and

    suitability of BHEL make 4601 BX Traction Motor may be

    obtained from traction motor

    group of Electric Loco

    CGL

    Tower Wagon shall be fitted with 4 Traction Motors, two on each

    bogie. The Motors with pinion,

    Earth return brush the motor shall

    be of DC series wound. The motor shall be complete with all its

    accessories and shall include

    pinion, earth return brush, gear wheel and gear case. Field proven

    motor suitable for DETC

    application shall be supplied.

    Tower Wagon shall be fitted

    with 4 Traction Motors, two on each Bogie, the Motors

    shall be type 4601 BX (BHEL

    make) or TM 2141A (CGL

    make) or similar proven design.

    The DC Series Motor shall be

    complete with all its accessories and shall include

    pinion, earth return brush,

    gear wheel and gear case.

  • item No 000501 B

    and gear case as per schedule item No

    000502 B and shall

    be series wound

    working on the pulsating current.

    Directorate. Phooltas

    Please amend to BHEL/CGL in other approved make.

    BEML

    TMS of BHEL make or any other

    equivalent which are used in similar rail application.

    Field proven motor suitable

    for DETC application shall be supplied.

    61. Motor rating

    The one hour rating of Traction Motor

    shall be of 97%

    excitation and

    continuous rating shall be adequate t

    give the required

    performance. The motor will be

    provided with 3%

    permanent ohmic

    field shunting.

    Motor Suspension &

    Axle drive The traction motor

    nose suspended with

    plane sleeve bearing arrangement. Each

    Traction Motor shall

    be drive one axle of

    its motor bogie through a single

    reduction gear drive

    enclosed in a rigid

    5.8.1

    Four Axle hung, Nose

    suspended and self ventilated DC series Traction Motors of

    proven design and approved

    by RDSO two on each Bogie,

    shall be provided on the OHE Car. The Armature coils shall

    be formed of polyimide

    (kapton) covered Copper Conductors and suitably

    impregnated.

    TIG/MIG welding shall be used for the Commutator.

    The technical/ constructional

    requirements as given in

    Annexure – 6 shall be complied with the traction

    motor of similar design and

    construction with proven performance in traction

    application on IR will be

    preferred. Traction motors shall be 4601 BX type of M/s.

    BHEL or TM 2141 A of M/s

    CGL type or similar proven

  • and water tight gear

    case firmly secured to prevent damage by

    movement and

    vibration under the

    most severe operating condition

    but easily removable

    for attention to the gear.

    The armature shall be

    mounted on anti-

    friction bearing of approved make. The

    inner race shall have

    adequate interference for the duty.

    design with Plains Sleeve

    Suspension Bearings. Class of insulation of TM shall be “H

    class” (180 0C Class). Each

    Traction Motor shall have

    minimum output not less than 115 KW (Approximately).

    62. 5.8.1

    (iv)

    Two auxiliary self-

    cooled, Brushless

    Alternators, one with each Engine, shall be

    provided in the

    Inspection OHE Car with suitable

    Regulating Equipment

    and Battery Charger to supply 122 V

    D.C.+ 5% regulated

    voltage from idle

    speed to maximum speed of the engine

    for meeting the

    following loads:-

    BHEL

    Source of Power for search light

    may be clarified. As per Clause No. 5.8.1, it is from Auxiliary

    Alternator, whereas as per clause

    No. 4.3.4 is from skid mounted portable 3 kVA Diesel Generator

    Set.

    One Auxiliary self-cooled,

    Brushless Alternators with

    each Engine shall be provided in the inspection OHE Car

    with suitable Regulating

    Equipment.

  • i. Battery Charging

    (110 volts, 120 Ah Batteries) provided

    on the OHE Car- 10

    Amps.

    ii.Lights and fans load of the OHE

    car-25 amps.

    iii. Flood Lights iv. Search lights

    v.Control System 10

    Amps.

    vi. Twin Beam Head Light of 250

    watts,110 V D.C. as

    specified in Chapter-IV of

    this Specification.

    vii. Power required for forced cooling

    for Rectifier, if

    warranted,

    approximately 1 kW.

    viii. Heater load one

    each of 1 kW in both the Cab.

    ix. The Air

    conditioning & Ventilation load of

    observation Dome

    and Officer‟s

    Cabin.

  • The Alternator shall

    have a rating of minimum 9

    kW.(Electrical load

    requirement shall be

    got approved from RDSO)

    63. 5.8.2.1 Drive Arrangement

    The Auxiliary Alternators shall be

    driven from the main

    Engine by a single

    pulley and V-belt arrangement.

    BHEL

    Drive arrangements for Auxiliary Alternator may be clarified as per

    this clause it is from Engine end,

    whereas as per clause no. 5.7.5.4

    it is through alternator end.

    The Clause 5.7.5.4 shall be

    corrected as “The provisions shall be made for driving the

    Auxiliary alternator and Air

    Compressor through a

    common shaft extension from Engine through V-Belts and

    pulley on the extended shaft

    of the Engine, Pulley of C-section to IS: 3142 shall have

    a suitable PCD to be approved

    during Design approval stage.

    The Pulley shall be push-fit with suitable securing

    arrangement. The material of

    the Pulley shall be steel forged conforming to IS:

    2004 gr.III”

    64. 5.10 Motor contactor

    Motor Contactor of BHEL supply, one

    Contactor for each

    Motor, suitable for operation in

    combination with

    overload Relays, for

    PS & EMU Directorate

    ICF Drawing No. EMU/M2-9-0-503, is applicable for installation

    of under slung equipments in BG

    AC EMU stock only. The installation of control equipment

    in OHE Car may be different, as

    there are other equipment like

    CGL

    Motor Contactor One Contactor for each motor,

    suitable for operation in

    combination with overload Relays, for opening the Traction Motor

    circuit in overload and under fault

    condition shall be provided. These

    RDSO/ICF approved make

    shall be added in place of BHEL.

  • opening the Traction

    Motor circuit in overload and under

    fault conditions shall

    be provided These

    Contactors shall be located in dust-proof

    cubicle mounted on

    the under frame in such a way as to

    prevent all risk and

    damage to other

    apparatus from arcs formed by their

    operation. Mounting

    of the motor switch group No.1 and 2

    shall be as per ICF

    Drawing No. EMU/M2-9-0-503 (latest).

    diesel-alternator set etc., which

    may be required to be mounted under slung.

    Contactors shall be located in

    dust-proof cubical mounted on the under frame in such a way as to

    prevent all risk and damage to

    other apparatus from arcs formed

    by their operation. Remarks of CGL

    We will not able to supply BHEL

    make contactor. They be CEW make which is an approved

    supplier for same application in

    700 & 1400 Hp DEMU.

    BHEL ICF Drawing No. EMU/M2-9-0-503

    (latest) may be provided.

    Phooltas please amend to BHEL/CGL in

    other approved make.

    65. 5.10.7.2 REVERSER

    Electro pneumatically

    operated Reverser of BHEL make for

    changing the

    direction of rotation shall be provided in

    each Motor circuit.

    These shall be

    mounted in cubicle on the under frame and

    shall be of robust

    design, remote

    Phooltas

    Please amend to BHEL/CGL in

    other approved make. CGL

    Electro pneumatically operated

    Reverser for changing the direction of rotation shall be

    provided in each motor circuit.

    These shall be mounted in cubicle

    on the under frame and shall be of robust design, remote operated

    and suitably interlocked to ensure

    that no movement can take place

    RDSO/ICF approved make

    shall be added in place of

    BHEL.

  • controlled and

    suitably interlocked to ensure that no

    movement can take

    place while they carry

    current. Provision shall be made for

    hand operation. In

    emergency, the Reverser Contact

    shall have self wiping

    action.

    while they carry current. Provision

    shall be made for hand operation, the reverser contact shall have

    self-laping action.

    Remark

    We will not be able to supply BHEL make Reverser. The supplier

    will be approved supplier for the

    same application in 700 & 1400 hp DEMU.

    BHEL

    With respective to remote control

    reverser, we understand is that the operation from driver‟s desk.

    BEML

    Reverser of BHEL or any other equivalent which are used in

    similar rail application.

    Operation from Driver Desk is

    to be kept.

    66. 5.10.7.3 Mounting

    arrangement shall be as per ICF drawing

    No. EMU/M2-9-0-503

    (latest alteration)

    PS & EMU Directorate

    The comments against the clause no 5.10 as per para7

    above.

    Mounting shall be under

    slung.

    67. 5.10.7

    .4

    Motor cut out switch

    Two four position

    rotary switches, of

    BHEL make, one for motor 1&2 and other

    for motor 2&3 shall

    be provided. The first switch will have

    position marked as

    „Normal‟ 1 out‟,‟1 & 2‟

    PS & EMU Directorate

    Motor cut out switches given in

    the clause are as per the control

    circuit of AC EMU and MEMUs. Suitability/Requirement of these

    motor cut out switches are to be

    checked as per the requirement of the control circuit of the self-

    propelled OHE car

    Phooltas

    Please amend to BHEL/CGL in

    other approved make.

    CGL Motor cut out switch: Two four

    position rotary switches, one for

    motor 1 & 2 and other for motor 3 &4 shall be provided. The first

    switch will have position marked

    as „normal‟, „1 out‟, „1 & 2 out‟

    RDSO/ICF approved make

    shall be added in place of

    BHEL.

  • out and „2 out‟. The

    second switch shall have markings

    „normal‟, „3 out‟,‟3

    and 4 out‟ and „4 out‟.

    The switches shall have 16 contacts to

    provide various

    facilities for control as required including the

    following.

    and „2 out‟. The second switch

    shall have marking „normal‟, „3 out, „3 and 4 out‟ and „4 out ‟.The

    switches shall have 16 contacts to

    provide various facilities for

    control as required including the following.

    Remark: We will not be able to

    supply BHEL make reverser. They supplier will be approved supplier

    for the same application

    BEML

    Motor cut out switch two, four position rotary switches of BHEL

    make or any other equivalent

    make which are use in similar rail application.

    68. 5.10.7.5 Motor Negative cut

    out switch

    Hand operated motor negative contactor

    switch of BHEL make

    shall be provided on the negative side of

    the motor and it shall

    be possible to isolate defective motors both

    on positive and

    negative side.

    Suitable interlock as required shall be

    provided. The

    contactors shall be of

    PS & EMU Directorate

    Suitability/Requirement of the

    motor negative cut out switches are to be checked as per the

    requirement of the control circuit

    of self-propelled OHE car.

    Phooltas

    Please amend to BHEL/CGL in

    other approved make. CGL

    Negative cut out switch are not

    required for the subject application. Negative Contactor

    shall be provided on the negative

    side of the motor circuit and it shall be possible to isolate

    defective motor both on + ve & -

    ve sides switch interlocks as

    required shall be provided. The Contactors shall be of adequate

    capacity to with stand the short

    circuit current.

    Remarks of CGL are agreed.

    This Para shall be modified

    accordingly.

  • adequate capacity to

    withstand the short circuit.

    BEML

    Motor negative cut out switch hand operated motor negative

    contactor switch of BHEL make

    are any other equivalent make

    used in similar rail application.

    69. 5.11 All motor contractors

    on OHE car shall be

    suitable for a remote operation from any

    driving cap through

    the contractors shall

    be of Elctro pneumatic type of

    BHEL make shall be

    provided with blow out coils and arcing

    horns, etc to brake

    the current without

    deriment to their working parts or

    adjacent equipment.

    All contact trip, interlocks, pins and

    plungers etc. Shall be

    easily accessible for maintenance.

    PS & EMU Directorate

    ICF drawing No. EMU/M7/ASR-7-

    0-706 (latest version) is the schematic diagram for control

    circuit specifically for AC EMUs

    and MEMUs. The same may not

    be applicable for self propelled OHE Car.

    CGL

    All motor contractors on OHE car

    shall be suitable for remote operation from any driving cab

    through traction motor overload

    „reset‟ switch. The motor

    contractor shall be of electro pneumatic type and shall be

    provided with blow out coils and

    arcing horns, etc. To break the current without detriment to their

    working parts or adjacent

    equipment. All contact trip,

    interlocks, pins and plungers etc. Shall be easily accessible for

    maintenance.

    Remark We will not be able to supply

    BHEL make contractor. They be

    CEW make which is an approved supplier for same application in

    700 &1400 hp DEMU.

    Phooltas

    Please amend to BHEL/CGL in other approved make.

    CGL remarks are acceptable.

    70. 5.12 A

    (a&c)

    Connection and

    operation of the

    PS & EMU Directorate

    ICF Drawing No. EMU/M7/ASR-

    Phooltas

    Phase to phase voltage is not

    Successful Tenderer shall

    submit the Drawing for

  • page

    43 to 45

    contractors shall be

    as per ICF Drawing No EMU/M7/ASR-7-0-

    706(Latest Version)

    7-0-706 (latest version) is the

    schematic diagram for control circuit specifically for AC EMUs

    and MEMUs. The same may not

    be applicable for self propelled

    OHE car.

    required, thus the clause may

    kindly be deleted.Control battery is also not required, the same

    may kindly be deleted. This

    amendment has been requested,

    by traction equipment supplier. BHEL

    ICF Drawing No. EMU/M7/ASR-9-

    0-706 (latest may be provided).

    connection and operation of

    contactors at Design approval Stage.

    71. 5.13 The motor contactor

    shall open the circuit

    they protect

    automatically on over load and shall be

    capable of clearing

    the resultant arcs under all conditions of

    overload.

    PS & EMU Directorate

    ICF Drawing No. EMU/M7/ASR-

    7-0-706 (latest version) is the

    schematic diagram for control circuit specifically for AC EMUs

    and MEMUs. The same may not

    be applicable for self propelled OHE car.

    This provision shall be

    covered in Traction Motor

    Portion.

    72. 5.13.1.3

    Suspension Bearings Taper roller suspension bearing shall be grease

    lubricated.

    BHEL As per clause 5.8 bearing mentioned is plane sleeve bearing, where as

    against this clause it mentioned as tapper roller bearing. Same may be Clearfield.

    Plain sleeve Suspension Bearing shall be in place of taper roller

    Bearings

    73. 5.13.1.4 & 5.13.1.5 (Pg 44 of 80)

    PS & EMU Directorate Traction Motors are dealt by traction motor group of Electric loco directorate accordingly. Comments may kindly be obtained from Electric Loco Directorate.

    This Para shall be covered in TM portion

    74. 5.16.2

    (iii &

    iv)

    A suitably designed control panel shall be provided in the OHE car for housing all

    Phooltas

    Cummins does not recommend to

    monitor fuel pressure as well as

    Both the gauges have been

    removed from the

    Spoecification

  • the control accessories. The panel shall be so situated so as to provide easy access to all the components for their maintenance /service.

    the boost pressure, hence gauges

    for this parameter will not be supplied. Please amend the

    clause.

    75. 7.6.1

    P-55

    All steel castings wherever used and welding joints shall be subjected to radiographic testing after manufacture / repair, to a suitable scheme/ standard suggested/approved by RDSO.

    Phooltas

    RDSO has accepted the ultrasonic testing of welding joints. This

    clause may kindly be amended

    accordingly.

    Not Acceptable

    76. 7.7 Page

    55

    One of the power and trailer bogies shall be subjected to exhaustive stationary tests at Contractor’s works in the presence or RDSO representative

    Carriage “Trailer Bogie” to be deleted.

    Phooltas There is no trailor bogies are to

    powered. In case approved bogie

    design is used the test should be waived please amend suitably.

    Acceptable

    77. 7.10

    Page

    56

    Riding Quality The riding quality tests shall be conducted at a speed which is 10% higher than the maximum specified operating speed, i.e. 121 km/h on a section of mainline track over which there are no temporary speed restrictions and which is considered by the railway

    Carriage Directorate “121 km/h to be replaced by

    “115 km/h. Test shall be conducted as per

    RDSO conventional DAS method as mentioned in MT-334

    New Para for EBD test at Maximum operating speed (Arrived by Oscillation trials) to be added in the specification

    BHEL Since the design of Bogie and suspension is of Indian Railways, the prime responsibility of performance is lies with Indian Railways.

    Views of Carriage are acceptable

  • as being in a generally run down condition for main line standards but without speed restrictions. The tests shall be conducted from a reasonably low speed, which is considered safe by the Indian Railways, upwards insteps of 10-15 km/h to establish the performance at the specified speeds.

    78. 7.11 Acceptance criteria The dynamic augment at maximum speed of 110 km/h plus 10% shall preferably be within 50% at rail level. The lateral forces at maximum speed will be within 4-t per axle. The vertical acceleration shall not exceed 0.3 g both in vertical and lateral modes in tare and loaded conditions. The sparling ride index shall not exceed four. The derailment co-efficient shall not exceed one. OR, latest as laid down by RDSO at the time of inspection or oscillation.

    Carriage Directorate “110km/h” to be replaced by

    “105 km/h” “OR” mentioned in 5th line may

    corrected

    BHEL Since the design of bogie and suspension is Indian Railways, the prime responsibility of performance is lies with Indian Raiways. Maximum speed is 105 kmph.

    110 kmph speed shall be kept.

    79. 2.12 (ii)

    Period of continuous running at 110 km/h on

    BHEL Speed should be 105 km/h instead of

  • generally tangent track

    followed by frequent to and fro movement at walking pace for 1-1/2h)

    110 kmph, as max speed of car is

    specified at 105 kmph.

    Annexure 1 80. Sl.

    No.09

    Under Frame Carriage Directorate

    Drawing No. ICF Drawing No.

    AC/EMU/M/ASR-0-0-001 may not be suitable for 3250 mm wide

    stock. Therefore, Drg. No. may

    be deleted.

    The Drawing of Under Frame

    of 8 wheeler Diesel Electric

    Tower Car can be finalised at the stage of Design/Drawing

    approval Stage.

    81. Sl. No.

    11

    Bogie Design Carriage Directorate Comments same as S.N. 11

    above

    Bogie shall be as per ICF Drawing No. DMU/DPC-0-0-

    001 with latest alteration.

    82. Sl. No.12

    Windows Carriage Directorate Comments same as S.N. 10

    above

    83. Sl.

    No.12

    Flooring Carriage Directorate

    Comments same as S.N. 22 above

    Annexure 2

    84. Sl. No.1

    List of Drawings/Calculation

    Carriage Directorate “OHE OHE Car” to be corrected. Layout Drawing Should contain

    end view of the OHE superimposed on Diagram 1 D of BG SOD Revised 2004

    Acceptable

    85. Sl.No.21,31 & 46

    List of Drawing/Calculation

    Carriage Directorate OHE OHE Car to be corrected

    Acceptable

    86. New Clause

    Fire prevention measures:

    PS & EMU Directorate The relevant provision of code of practical for prevention of fire on

    PS & EMU Dte comments are acceptable

  • EMU stock no RDSO/PE/CP

    /EMU/0001 (Rev.0) of August‟2003 and amendment no 1 of July 2006 issued by RDSO shall be included.

    87.

    General

    Carriage Directorate The comments on the equipments such as traction motor, rectifier, cables etc. may be obtained from Electric Loco Directorate. In addition to the above, numbering of the

    clauses of the above specification is required to be corrected. Desired operational speed EBD on level track with two un-braked

    wagons of 60t each on levelled/gradient track should be mentioned in the specification. It is suggested that EBD should be verified from software available in the Motive Power Directorate. It should be checked from GR/SR that whether two un-braked wagons with one power car is permitted as GR/SR or not. However, the operability of the two un-braked Wagon may be checked according to G&SR before finalising the specification.

    Noted

    88. M/s. Titagarh Wagons limited As you may be already aware, M/s Titagarh Wagons Limited is keen to participate in the above tender by virtue

    of having expertise and experience of manufacturing and supplying self-propelled 25kV ac BG EMU rolling stock

    to Indian Railways, which are in operation on IR network for over 2 years now.

    We have studied the revised “draft” Specifications No. TI/SPC/OHE/8WDEIC / 0090(2/09) Rev “1” of August,

    2011 for the tendered item, available at your website and have found that the manufacturer is required to

    design a completely new vehicle with necessary design calculations required to be submitted to RDSO for

    Noted

  • approval as per the clause no.3.22, (a) 1 to 8, page no. 29 of technical specifications.

    In this connection we would like to submit our comments as below:

    1. The tendered quantity is small (55 nos.) and the DETC business is limited to small numbers due to the very nature of the stock. Developments of new platforms can be undertaken for products of recurring demand and in

    good numbers. Detailed design calculations for new platform is a very expensive exercise and would needlessly make the product expensive and make the evaluation more difficult. The calculations needed on a rolling stock are very time-consuming and money- intensive. Reinventing a fresh/new design would make the product unreasonably expensive. The need for transfer of technology (TOT) from a designer / manufacturer cannot be

    ruled out. In the process new design and development costs for such small numbers would make the stock unreasonably expensive for acceptance by the Railway Board.

    2. As DETC is a maintenance-cum-emergency vehicle to be manufactured in small numbers, it is imperative to

    have common designs for IR. New designs would impose new maintenance practices and schedules, which

    would be different from the existing stocks. IR is already facing problems in assimilating various new designs

    of 4-Wheeler DETC. As has been discussed in various fora, maintenance of DETC is causing serious concerns

    all over IR on account of non-standardization of the product. A further proliferation of designs would strain

    the already stressed system.

    3. A new design can take a long time to go through the rigors of final acceptance by IR thereby causing

    considerable loss to the exchequer in the process.

    4. Designing a new rolling stock of this nature would considerably narrow the expanse of competitive bidding,

    restricting the participation to a limited few.

    5. Bogie: The revised draft Specifications of August 2011 specifies that the bogie should conform to existing ICF

    bogie design applicable for EMU Motor coach (drawing no. AC//EMU/M/ASR-0-0-001). EMU Motor coach

    bogies, as you are aware, are tested and approved by RDSO to run at 100 kmph operating speed and a

    maximum test speed of 110 km/hr on IR network. On the contrary, the stipulations for operating speed for

    the tendered DETC has been specified to be 105 kmph (clause No. 2.0, sub-clause 9, Page No.12 of

    Technical Specifications) for which the vehicle needs to clear maximum test speed of 115.5 kmph (+10%).

    However, incase the operating speed of 105 kmph for the DETC is to be achieved, a new bogie would be

    required, which would be a very tall order since bogie approval process is very rigorous and stretch much

  • longer. Further, the bogie and the new design of body will have to be dynamically matched in order to

    achieve the specified speed potential.

    It is hence in the interests of all stakeholders that the 8-Wheeler tower wagons be inducted into IR on

    common design platform. This would eliminate the need of separate designs for a very small stock and also

    eliminate the requirement of detailed design review by IR for all the aspects of design (Detailed FEA,

    Dynamic analysis, Stress analysis, Transmission, Oscillation Trials etc.). Matching of power demand by

    traction motor for different operating conditions and demand on the power pack (para 5.2, page No. 35 of

    the technical specification) and also development of characteristics curves etc will involve detailed designing

    calculations. Moreover standard designs available on IR have proven to be very reliable.

    In the meantime, please recall that ICF already has a proven design of a similar DETC vehicle which are

    plying successfully on the IR network.

    In view of the above we earnestly request you to proliferate this existing ICF design of 8-Wheeler DETC with

    respect to the current tender referred above since it is common wisdom that a common design will make IR

    accommodate a wider participation of capable rolling stock manufacturers and its decision-making more

    simple, transparent and fast, which shall ensure a cheaper and easier-to-maintain product, and avoiding the

    time consuming binding requirements of oscillation trials, speed certification etc.

    In a nutshell, the benefits to MoR will be as follows:

    Substantial savings in procurement cost and time Substantial savings in cost of maintenance Ease of maintenance therefore savings by way of quicker uptime Wider participation of Indian rolling stock manufacturers Ensuring level playing field at the bidding stage Faster and transparent evaluation of bidding process

    We thank you for your kind patronage as always and now look forward to your favorable response.