OSHA Subpart RSteel Erection
![Page 2: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/2.jpg)
Before authorizing the start of steel erection…
• Concrete footings, piers, and walls has attained the necessary strength by testing,
• 75% of the intended min. compressive design strength
or
• sufficient strength to support the loads imposed during steel erection
Commence after written notification is rec’d
![Page 3: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/3.jpg)
Pre-shift visual Crane inspection
• Safety devices, boom angle indicator, boom stops, anti-two block devices, load moment indicators
• Wire rope• Hydraulic fluid levels• Tire inflation• Ground conditions (no water)• Level ground *
![Page 4: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/4.jpg)
No Riding of the Headache Ball
![Page 5: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/5.jpg)
No employees are to work under suspended loads
Except when starting connections, when hooking up, and unhooking
![Page 6: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/6.jpg)
Multiple lift rigging
5 Members (Maximum)
Members to be similar
Rigged at center of gravity and kept level
Rig the top one first
7 ft.
Set the bottom one first
![Page 7: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/7.jpg)
No more than 8 floors from the erection
floor and the permanent floor
Permanent Floor
![Page 8: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/8.jpg)
No more than 4 floors or 48 feet of unfinished
bolting or welding above the uppermost
permanently secured floor
Permanently Secured Floor
Permanent Floor
![Page 9: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/9.jpg)
Fully Planked
2 floors or 30 feet maximum distance to fully planked floor
Hey
![Page 10: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/10.jpg)
Headed steel studs, steel bars and steel lugs, and other shear connectors pose a tripping hazard on the tops of flanges
Attach shear connectors after the metal decking is installed
![Page 11: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/11.jpg)
Covers for Roof and Floor Openings
cover
Covers shall support 2 times the weight of employees, equipment and materials that may be imposed on the cover
Skylights must meet the strength requirements
Covers are to be secured
Covers are to be clearly marked “Hole” or “Cover”
![Page 12: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/12.jpg)
4 Anchor Bolts minimum
18”
300 lbs
![Page 13: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/13.jpg)
Do not release hoist line until at least 2 bolts are connected at each connection.
![Page 14: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/14.jpg)
Perimeter columns to extend at least 4 feet above the finished floor for safety cables
4 feet
Perimeter columns with holes or other devices at 42-45” above finished floor for perimeter safety cables
![Page 15: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/15.jpg)
>15 feet
Workers must be protected by nets, guardrails, positioning devices or harnesses when working more than 15’ when there is an unprotected edge or side.
![Page 16: Draft - Subpart R Steel](https://reader036.vdocuments.net/reader036/viewer/2022083000/556c1fb0d8b42a8d648b4939/html5/thumbnails/16.jpg)
The maximum area of unsecured decking shall not exceed 3,000 sq. ft.