dredging of gold tailings dam (wa) (hdpe lined …...dredging of gold tailings dam (wa) (hdpe lined...
TRANSCRIPT
![Page 1: Dredging of Gold Tailings Dam (WA) (HDPE Lined …...Dredging of Gold Tailings Dam (WA) (HDPE Lined Pond) Material Pumped Gold Tailings Depth Pumped 1-5 m Pump Capacity 4000 L/min](https://reader034.vdocuments.net/reader034/viewer/2022042201/5ea16838b4d01e35c24e9ff0/html5/thumbnails/1.jpg)
DredgingofGoldTailingsDam(WA)(HDPELinedPond)
Material Pumped Gold Tailings
Depth Pumped 1-5 m
Pump Capacity 4000 L/min (clear water)
Slurry Ratio 15%
Slurry Pumping Flow Rate
202 m3/ hr
Average slurry extraction
1617 m3/day*
Average wet solid extraction
242 m3/day*
Pumping Distance 180 m