drive 2017 | 26 october - circular design - circular architecture - hans governed
TRANSCRIPT
Hans Goverde kraaijvanger architects
Architecture for a Circular World
kraaijvanger architectscreating places to exploredesigning the future since 1927
projectnaam, fase, datum
kraaijvanger architects
CHALLENGE US..
projectnaam, fase, datum
kraaijvanger architects
VENLO ASKED FOR A BUILDING WITH A POSITIVE IMPACT..
projectnaam, fase, datum
kraaijvanger architects
NOW THEIR BUILDING PURIFIES THE AIR AND WATER AND ABOVE ALL IT GENERATES ENERGY.
projectnaam, fase, datum
kraaijvanger architects
CITY OFFICIALS IN VENLO NOW WORK IN AN OFFICE 5X HEALTHIER THAN AVERAGE.
projectnaam, fase, datum
kraaijvanger architects
“I WANT TO MAKE MY PRIVATE ART COLLECTION MORE ACCESSIBLE TO THE PEOPLE”
projectnaam, fase, datum
kraaijvanger architects
VOORLINDEN IS NOW HOLLANDS MOST VISITED PRIVATE MUSEUM.
projectnaam, fase, datum
kraaijvanger architects
“WE WANT TECH-STUDENTS TO BROADEN THEIR HORIZON”
projectnaam, fase, datum
kraaijvanger architects
@ THE PLAYGROUND TECH-STUDENTS NOW EXPLORE ARTS, SPORTS, CULTURE AND TECHNOLOGY IN A HYPERFLEXIBLE BUILDING
CIC CHOSE US TO DESIGN THEIR ECOSYSTEM FOR INNOVATION
AFTER ONE YEAR A 100+ START-UPS GATHERED THERE IN ROTTERDAM.
“WE NEED 67.000M² OF OFFICE, BUT OUR PLOT IS WAY TO SMALL”
NOW 5000 PEOPLE WORK ON TOP OF THE BUSSIEST PUBLIC TRANSPORT HUB OF THE NETHERLANDS.
CAN WE WALK ON AIR?
YES WE CAN!
kraaijvanger architects
AFTER MODERNISM COMES CIRCULARITY
kraaijvanger architects
Cradle to cradleThe importance of circular construction
cradle to cradle
cycle dashboard
C2C materi-al specificati-
ons
demolition specification
material passports
energy supplying
facade
natural thermal flows
C2C building
specification
diversity in space
partner network
enery supplying
roofsnatural light optima-
lisation
principle: waste is food
goal:stimulate diversity
tools: sun =
energy
detailing to be taken
apart
kraaijvanger architects
Cradle to cradleThe importance of circular construction
regenerateupcycle
renovate
reuse
biochemical elements
extract elements
parts supplier
product supplier
services
user
maintenance
materials
kraaijvanger architects
Vision on C2C designRethink the way we make architecture
kraaijvanger architects
FIVE THEME’S FOR CIRCULAR DESIGN
1. Process innovation
2. Air purifying buildings
3. Materials and Health
4. Zero energy
5. Closed Water Loop
PROCESS INNOVATION
kraaijvanger architects
Process innovation
kraaijvanger architects
Process innovation
kraaijvanger architects
Process innovationPlanning
kraaijvanger architects
Process innovationWorkshop: client, advisors & “the market”
External
Scheldebouw
Oscomere
Océ
Philips
Scheuten
C2C expolab
Mosterd de winter
Copijn
Mobilane
Kitchenadvisor
Internal
Customer contact centre
Facility workgroup
Technical workgroup
Urban planning workgroup
Maaswaard
Dutch Railway
Fire Department Venlo
AIR PURIFYING BUILDING
kraaijvanger architects
Air purifying building
kraaijvanger architects
Air purifying buildingIf a car can purify the air why can’t a building do the same?
kraaijvanger architects
Air purifying buildingBuilding facade as a green lung
Solar Chimneys for natural air flow.Greenhouse in wintertime air flows through
the greenhouse to the AC, in summertime it
goes directly to the AC, trees purify the air.
North-eastern Green Façade air
purifying, insulating, filters out particulate
matter, NOx and SO
3. Air comes out
cleaner than it goes in
Square with trees to filter the air and
dampen noise and wind.Constructed Wetland Roof
for water filtration.
Parking Garage precools the air in summertime.
kraaijvanger architects
TU/e test results
30 % SO2 decrease
30 % NOx decrease
with lower airspeed:
50 % less?
the green facade
compensates for 3000 m2
road in dust (smog)
(royal haskoning)
Air purifying buildingBuilding facade as a green lung
Results from tests with
the facade at
TU Eindhoven:
30% decrease in SO2
30% decrease in NOx
At lower airspeeds 50% reduction could be possible
The green facade compensates the emission of fine dust particles genereated bij the equivalent of 3000 m² road
kraaijvanger architects
Air purifying buildingLow tech, high impact
kraaijvanger architects
Air purifying buildingLow tech, high impact
kraaijvanger architects
Air purifying buildingLow tech, high impact
MATERIALS AND HEALTH
kraaijvanger architects
Materials & HealthEye catching stairs increases activity during the day
kraaijvanger architects
Materials & HealthThe green facade cleans the air, inside and out.
kraaijvanger architects
Materials & HealthThe Office floors are open and filled with daylight
kraaijvanger architects
Materials & HealthThe Office floors offer a variety of workstations
kraaijvanger architects
Materials & HealthThe Office floors offer a variety of workstations
ZERO ENERGY
kraaijvanger architects
Zero EnergyPV panels, an abundance of daylight, led-lights and overall energy efficiency
kraaijvanger architects
Zero Energy“We want active buildings!” Michel Weijers, City of Venlo
CLOSED WATER LOOP
kraaijvanger architects
Closed Water Loop
Collect rainwater
Water saving taps and toilets
Separate grey water system
Constructed wetland cleans water for nonfood reuse
Solar collectors
Energy efficient kitchen equipment
kraaijvanger architects
Closed Water LoopConstructed Wetland Roof
kraaijvanger architects
Closed Water LoopConstructed Wetland Roof
BUSINESS CASE
kraaijvanger architects
Business caseTotal Cost of Ownership vs. Total Cost of Usage
TCO VS. TCUInitial investments + operational costs
Health + productivity
Residual value:
The building as a deposit for raw materials.
kraaijvanger architects
€ -11.000.000,00
€ -6.000.000,00
€ -1.000.000,00
€ 4.000.000,00
€ 9.000.000,00
€ 14.000.000,00
€ 19.000.000,00
€ 24.000.000,00
€ 29.000.000,00
20
14
20
16
20
18
20
20
20
22
20
24
20
26
20
28
20
30
20
32
20
34
20
36
20
38
20
40
20
42
20
44
20
46
20
48
20
50
20
52
estimated exploitation costwithout zero energyinvestment (energy index at4%)interest + write down ofzero energy investemensts
savings in energy costs
Business case Investing in zero energy
kraaijvanger architects
Business caseExtra investments in sustainability
Initial investment Replacement costs in 40 years
Break even in years
Yield Life-span in years
Cost reductionin 40 years
Savings in 40 years
total € 3.410.050,00 € 1.702.000,00 15 12,50% € 27.285.528,00 € 16.884.008,00
triple glazing € 465.300,00 26 7,00% 40 € 1.847.173,00 € 904.941,00
rain water collection € 27.500,00 9 18,30% 40 € 327.396,00 € 271.708,00
water free urinals € 3.300,00 € 4.000,00 16 7,80% 20 € 20.906,00 € 5.878,00
constructed wetlands filter € 102.000,00 32 5,10% 40 € 302.755,00 € 96.205,00
PV cels € 496.100,00 € 300.000,00 19 8,30% 25 € 2.723.694,00 € 1.126.472,00
solar collectors € 16.500,00 € 20.000,00 8 20,00% 20 € 250.491,00 € 175.350,00
geothermal heating City Hall € 1.066.000,00 € 520.000,00 10 15,30% 20 € 11.801.940,00 € 8.603.867,00
geothermal heating Maaswaard € 861.000,00 € 265.000,00 18 11,40% 20 € 6.250.983,00 € 3.824.732,00
Rc=5,00 € 146.850,00 17 10,80% 40 € 930.300,00 € 632.929,00
HR Heath Recovery € 49.500,00 € 65.000,00 37 12,40% 20 € 473.358,00 € 235.443,00
LED lights € 176.000,00 € 528.000,00 7 22,80% 10 € 2.356.534,00 € 1.006.483,00
total nominal savings € 3.410.050,00 € 1.702.000,00 28 7,60% € 11.039.800,00 € 2.561.211,00
total savings (energy index at 2,5%) € 3.410.050,00 € 1.702.000,00 17 10,30% € 18.815.090,00 € 8.413.570,00
total savings (energy index at 4%) € 3.410.050,00 € 1.702.000,00 15 12,50% € 27.285.528,00 € 16.884.008,00
total saving (energy index at 6%) € 3.410.050,00 € 1.702.000,00 13 15,30% € 45.612.917,00 € 35.211.397,00
kraaijvanger architects
Business case Health + productivity
In a healthy building everybody profits
• 1% drop in sick leave is a € 600.000 saving for the
city of Venlo. Per year!
• Constant monitoring air quality and wellbeing.
• Scientific field research by University of Berkeley,
Maastricht en Aachen.
1% energy
10% building
90% staffCost breakdown for a typical office building TCU
kraaijvanger architects
C2C Base CampFloriade World Fair 2012, Venlo
kraaijvanger architects
C2C Base CampFloriade World Fair 2012, Venlo
projectnaam, fase, datum
kraaijvanger architects
Early Childhood CentreWassenaar, the Netherlands
projectnaam, fase, datum
kraaijvanger architects
Early Childhood CentreWassenaar, the Netherlands
projectnaam, fase, datum
kraaijvanger architects
Early Childhood CentreWassenaar, the Netherlands
LOOKING AHEAD
naam projectopdrachtgever
kraaijvanger architects
naam projectopdrachtgever
kraaijvanger architects