Page 2: DTE Company Profile - May 2011

Introduction

Engineering, design and project management company based in

Constantia, Johannesburg (Established 2005)

Full EPCM services to small maintenance projects

Fully BEE compliant – Level 3 contributor (110%)

Cost effective – low overhead structure

Client focused and flexible

Proven track record

Strengths in crushing, milling, flotation, materials handling, pyromet

systems

Page 3: DTE Company Profile - May 2011

Core CompetenciesWe provide our client with the following services:

Conceptual and feasibility studies

Project and construction management

Process engineering and design ensuring the application of appropriate technologies

Mechanical, Civil, Structural, Platework, Piping, Electrical and Instrumentation engineering design (Prokon)

Detailed design / draughting services (Autocad)

Structural steel and platework shopdetailing for fabrication (Tekla structures)

Project planning, cost control and procurement management

Expediting and quality control

Pre and post-contract quantity surveying and enquiry assistance

Hot and cold commissioning

Plant process efficiency and optimisation studies

Clerk of works services

Page 4: DTE Company Profile - May 2011

Completed ProjectsClient Project Description Project Basis Value Project Status

Impala Platinum Smelter expansion - No. 7 Pierce

Smith Converter and

Secondary Hood Installation

Full EPCM R 95 million Completed March 2009

Tharisa Minerals Early Revenue Plant - Greenfields

Chrome concentrator

Full EPCM R 60 million Completed April 2009

Lonmin Platinum Installation of Larox pressure filter

and ancilliaries at the Lonmin

Western Platinum Smelter

Full EPCM R 53 million In progress

Lonmin Platinum Slag Plant expansion - New Slag

Ball Mill, Filter cake receiving

station and other modifications

Full EPCM R 52 million Completed January 2007

Lonmin Platinum Optiamal usage of Smelter Filters. Feasibility Study R 55 million Completed July 2009

New Concept Projects Metorex Ruashi ROM Crushing

Stockpile & mill feed circuit.

Detailed design R 50 million Completed September 2008

Platinum Mile Resources Flotation concentrate & tailings

(Deswik) re-grind circuit

expansion.

Full EPCM R 40 million Completed February 2009

Impala Platinum Toll off loading, sampling and re-

pulping facility.

Full EPCM R 25 million Completed February 2006

Platinum Mile Resources Concentrate thickening and re-grind

(SMD) circuit.

Full EPCM R 12 million Completed August 2007

Impala Platinum R10 Hammer sampler installation. Full EPCM R 13 million Completed July 2008

Lonmin Platinum Engineering and Design Services

Agreement 2009 and 2010.

Design R 5 million Ongoing

Page 5: DTE Company Profile - May 2011

Completed Projects

Client Project Description Project Basis Value Project Status

Holcim Rooikraal Secondary crushing

circuit upgrade.

Detailed design R 10 million Completed November 2008

Lonmin Platinum Upgrade of reagent plant. Lump sum turnkey R 1 million Completed September 2005

Platinum Mile

Resources

Cleaner tails re-grind feasibility

testwork and CBE

Feasibility Study N/A Completed January 2007

Debswana Diamond

Company

Class III feasibility study (CBE) for

400 tph re-crush reloading facility.

Feasibility Study N/A Completed September 2006

Impala Platinum Third party review of Hatch

furnance design.

Review N/A Completed February 2006.

Impala Platinum Pre-Feasibility study and testwork

for re-processing of tailings dams.

Pre-feasibility N/A Completed April 2006

Platinum Mile

Resources

Order of magnitude study for 250

000 tpm tailings re-treatment plant.

Pre-feasibility N/A Completed October 2006.

Impala Platinum Pre-Feasibility study for the

recovery of metallurgical grade

chromite from the Impala MF2 plant

tailings

Pre-feasibility N/A Completed November 2007

Assmang Pre-Feasibility study for the

recovery of metallurgical grade

chromite and PGE's from the

Assmang Dwarsrivier tailings

Pre-feasibility N/A Completed November 2007

Page 6: DTE Company Profile - May 2011

Project photos

Page 7: DTE Company Profile - May 2011

Project photos

Page 8: DTE Company Profile - May 2011

Project photos

Page 9: DTE Company Profile - May 2011

Project photos

Page 10: DTE Company Profile - May 2011

Project photos

Page 11: DTE Company Profile - May 2011

Project photos

Page 12: DTE Company Profile - May 2011

Project photos

Page 13: DTE Company Profile - May 2011

Project photos

Page 14: DTE Company Profile - May 2011

Project photos

Page 15: DTE Company Profile - May 2011

Project photos

Page 16: DTE Company Profile - May 2011

Project photos

Page 17: DTE Company Profile - May 2011

Quality Management System

Based on templates of an ISO accredited system

Targeted ISO accreditation – Mid 2011

Encompasses all business aspects of our business

Page 18: DTE Company Profile - May 2011

Quality Management System

Corporate Procedures

Quality Management Procedures

Project Management Procedures

Drawing Office Procedures

Site Procedures

Procurement Procedures

Human Recourse Procedures

IT Procedures

Page 19: DTE Company Profile - May 2011