Pit¢@R'N E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY GENERATING AUTHORITY OF THAILAND REPORT NO. 21200-3809 SYSTEM PIANNING DEPARTMENT MARCH1995 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 09-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Pit¢@R'N

E-235 VOL. 29

TRANSMISSION SYSTEM

EXPANSION PROJECT NO.9

( 41994 - 1998 )

VOLUME I DETAILED ECONOMIC ANALYSIS

ELECTRICITY GENERATING AUTHORITY OF THAILAND

REPORT NO. 21200-3809 SYSTEM PIANNING DEPARTMENT

MARCH 1995

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TRANSMISSION SYSTEM EXPANSION PROJECT NO.9

(1994-1998)

VOLUME II DETAILED ECONOMIC ANALYSIS

REPORT NO. 21200-3809

MARCH 1995

Prepared By Concurred By

Transmission System Planning DivisionemPlanino_(Prakob Dhienhirunya)

Assistant Director, System

Planning Department-Transmission

Submitted By: Approved By:

(Prutichai Chonglertvanichkul) (Siridat Glankwahmdee)

Chief, Transmission System Director, System Planning Department

Planning Division

Page 3: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

ABBREVIATIONS

ACSR - Aluminum Conductor Steel Reinforced

cct-klm - Circuit-Kilometer

DC/ST - Double Circuit/Steel Tower

DEDP - Department of Energy Development and Promotion

DR. - Discount Rate

EDR. - Equalized Discount Rate

EGAT - Electricity Generating Authority of Thailand

FBC - Fluidized Bed Combustion

F.C. - Foreign Currency

IDC - Interest During Construction

L.C. - Local Currency

MTHB - Million Baht

MEA - Metropolitan Electricity Authority

MCM - Thousand Circular Mils

MVA - Megavolt-ampare

MVAr - Megavolt-ampere Reactive

MW - Megawatt

NEPC - National Energy Policy Council

NEPO - National Energy Policy Office

NESDB - National Economic and Social Development Board

NESDP - National Economic and Social Development Plan

NIDA - National Institute of Development Administration

PDP - Power Development Plan

PEA - Provincial Electricity Authority

P.V. - Present Value

TDRI - Thailand Development Research Institute

THB - Baht

USD - US Dollar

VAT - Value Added Tax

W/O - Without

Page 4: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TABLE OF CONTENTS

Page

1. INTRODUCTION I

2. SUMMARY AND RECOMMENDATION 2

3. CRITERIA AND ASSUMPTIONS FOR ECONOMIC ANALYSIS

OF SUBPROJECTS 7

4. DETAILED ECONOMIC ANALYSIS OF EACH SUBPROJECT 11

5T FNANCTAT. TJTIFICATION OF TS-9 PROJECT BASED ON

TIME SLICE APPROACH 139

APPENDIXES

1. Load Flow Diagrams of the Proposed Plan of each Subproject 147

2. Full Name and Abbreviation ot Substation 217

Page 5: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

tKOGRIVEn

21

I S NV- E ENIR.L-OflEN TI jI

SN/-EER91S EEIALNITEN II LINE

at Exstn Subsotiost lU *** I +o a{ @s§*vt f @

Eqrmn inttO~n INO OCAT_IOn HA ^; *¢gP

a 9 ftY \N b*<~~~~~~~~~RGIN

MicioeosSse Epnin ;- .- @ --

X~~ ~ ~~~ 6 W .E\

REGIN 2M

....... .T I h1CN ...... ... . io , W. .El-N

N ~ ~ ~ ~~ N N Ir II ^ t MYCZT

A^ W)L l tl * O O ~~~~~~~~~~~~~~~-. ~~ tl-s

--- MM v _- z_ra

i3 ~ ~ ~ ~ ~ ~ ~ ~~~~~GL Addi joTfHAILAND t t1l r> 'EEYlc ElRAICATHlll O FII

at Eislig Sbstoionst~ep\\\x t ra"l rwcTxctorEz sclenOF NAI

i)~~~ ~~~ Recie oe orpn. to t< > 6

I' EqlprTenl nstolatios ,_ £ , \ LtOC^IOW.

(H)Misellneos yslm Epanion 0m;r i . a_

at Exstn Subs ,q : tt~Iw' '- ir

Page 6: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

i. INTRODUCT

Report Volume II (Detailed Economic Analysis) presents details of the

economic and financial justifications of the Transmission System Expansion ProjectNo.9 (TS.9). The project comprises 24 subprojects for transmission line and substationexpansion and reinforcement, addition of new transformers, reactive power supply andmiscellaneous equipments including related communication system. The scope and

purpose of each subproject are described in Volume I (Main Report).

The economic justification of each subproject is performed based on theleast cost solution. Each proposed subproject is the least cost alternative among other

alternatives which serve the same objectives.

Since TS.9 Project is an integral part of EGAT's overall development

program, the economic justification of the whole project package in terms of economicand financial internal rate of return (EIRR and FIRR) has been therefore evaluated based

on the time-slice study of EGAT'is overall llower Development Plan (PDP) for the

period covered by the Project.

-1-

Page 7: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

2. SUMMARY AND RECOMMENDATION

2.1 Economic Analysis of each subproject is evaluated based on the least cost

solution. The proposed subproject is selected from at least three other possible

altematives which can satisfy the same objiectives. The -resent value of te t0o Cost

of each possible alternative which include investment cost, operation and maintenance

cost and the cost of system losses of each alternative, is calculated and compared.

System losses of each subproject and its alternatives are obtained from the power flow

studies of the whole EGAT's power system. The economic viability of each subproject

is presented in terms of the Net Present Value (NPV) and benefit/cost ratio (B/C ratio)

at 10 % discount rate and equalized discount Rate (EDR).

2.2 Results of economic analysis w\hich has indicated that all proposedsu'bprojects in TS.9 Project are the least cost alternative, are summarized in Table 2.1.

2.3 The four years time slice study oflGA(iT'l's overall Power Development Plan

(PDP) 1995-1998 is performed to represent the economic and financial rate of return

(EIRR and FIRR) of the whole package of TS.9 project. The result ol the study shows

the EIRR and FIRR of the Project is 11 .77 and 4.51 percent respectively.

2.4 It can be concluded from the analyses that the TS.9 Project is the least cost

solution for EGAT's power system reinforcement and expansion in each subproject area

and the whole package of TS.9 project for the period of 1995-1998 is also economically

viable.

-2-

Page 8: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 2.1 Summary Result of Economic Analysis in TS. 9

No. Fiscal Description Net P.V. R/r EquelizedYear @10 %DR.1 Ratio Discount

__(MTHB) Rate

CENTRAL REGION

1. 230/115 KV BAN PONG 2 - BAN PONG I - NAKHON CHAISI - SAM PHRAN 2 LINES AND SUBSTATIONSa. 1998 - Reconstruction ot115kV Ban Pong 2-Ban Pong 1-Nakhon Chalsl-Samn Phran 2to

2301115 kV DC/ST 2x1.272 MCM ACSR, 43 km2006 - Installation o0 230/115 kV 1x200 MVA Transtormer at Ban Pong 2 Suostation

- Construction of 230 kV Ban Pong 2-Sal Noi DC/ST 1,272 MCM ACSR, 53.6 km- Reconstruction ot 230 kV Ratchaburi 2-Ban Pon 2 to DC/ST 2x1272 MCM ACSR, 41.7 km - --- Base Ca se

b. 1998 -Reconstructionot115kVBanPong2-(BanPongl)-NakhonCharsito 230kVDC/ST

2xi ,272 MCM ACSR, 38 km-FReconstruction oll 15kV Nakhon Chaisi-Sam Phran 2to 115/230 kVDC/ST 2x1,272 MOM ACSR, Skm- Installaton of 230/115 kV 3x200 MVA Transtormer at Nakhon Chaisi Sur.station

2006 - Construction of 230 kV Ban Pong 2 - Sai Noi DC/ST 1.272 MCM ACSR. 53.6 km- Reconstruction o 230 kV Ratchaburi 2-Ban Pon 2 to DC/ST 2xt 272 MCM ACSR, 41.7 km 88.56 1.0026 N.A.

C. 1998 - Construction of 230 kV Sai Noi-Nakhon Chaisi DC/ST 2x1.272 MCM ACSR. 35 km and-Reconstnjctlono 115kV NakhonChaisi-Samphran2 to 1151230 kV DC/ST 2x1.272 MOM ACSR. Skm-Installation of 230/115 kV 2x200 MVA Transformer at Nakhon Chaisi Suostation

1999 - Construction of 230kV Ban Pong 2-Sal Nol DC/ST 1,272 MCM ACSR, 53.6 km2006 - Reconstruction ot 230 kV Ratchaburi 2 -Ban Pong 2 to DC/ST 2x2 272 MCM ACSR, 41.7 km

Installation ot 230/115 kV 1x200 MVA Transto rmer at Nakhon Chaisi Sibstation 501.16 1.0146 > 150.0 S62. 1S5 KVSBOWIN -BAN BUNG LUNEAND SUBSTATIONS

a. 1997 - Construction ot tISkV Bo Win-Ban Bung DC/ST 2x795 MOM ACSR. 27 kmn2001 - Installation ot230/115 kV 1x200 MVA Transformer at Bo Win Substation -Bae Case

b. 1997 - Reconstruction of 11 SkV Ao Phai-Si Racha-Ban Bung to Ao Phal-Ban Bung DC/ST 2x795 MCM ACSR,

38 km with detour line Si Racha-Ban Bung 33 km2004 - Installation ot 230/115kV 1 x200 MVA Transtormer at Bo Win Substation

-Installatbon ot 230/115 kV 1 x200 MVA Transtormer at Ao Phai Substation 90.02 1.0036 > 150.0c, 1997 - Construction of 230 kV Bo Win-Ban Bung DC/ST 1,272 MCM ACSR, 27 km

- lnstallaton of 230/115 kV 2x200 MVA transtormer at Ban BtSng Substation___ 2004 - Installation of 230/1 1 5 kV i x200 MVA Transtormer at Bo Win Substation 243.37 1.0096 >150.0%

3. 115 KVTHAWUNG SUBSTATION AND LINES CONNECTIONa. 1898 -Construction ot The Wung Switching Substation at intersection point of 11SkV

Lop Buril -Sing Burl and Ang Thong 2-Lop Bun 2 line.- Installation of 1 x200 MVA Transformer at Ang Thong I Substation

2002 - Construction of 115 kV Tha Wung-Lop Burl 1 SC on DC/ST. 795 MCM ACSR, 13 kmBase Case …b. 1998 -Reconstruction ot115 kV Ang Thong 1-Sing Burto be DC/ST 2x795 MOM ACS, 234km

- Installation of 1 x200 MVA Transformer at Ang Thong I Substation- Installation o0 44.08 and 22.04 MVAr Capacitor Bank at Sing Burn and Lop Buri I Substation respectrtely.

2002 -Construction ot15WkV Sing Burl-Lop Buri 1 SC on DC/ST, 795 MCM ACSR, 27 km 20.76 1.0001 N.A.c. 1 998 - Tenmination of one cctot 230 kV Tha Tako-Ang Thong 1 to Sing Buri

-Installation of 1x200 MVA Transtormer at Sing Buri Substation2002 -Construction o115kV Sing Buri-Lop Buri SCon DC/ST. 795 MCM ACSR, 27 km2006 -Installation ot 1x200 MVA Transformer atAng Thong 1 Substation 3_ 32.30 1.0016 | N.A.

d. 1998 -TerminationofonecCtof23okVThaTako-Thalan3anc tl5kV SngBuri- LopBur 1 toThaWung- Installation of 1x200 MVA Transformer at Tha Wung

2002 - Construction of 115 kV Tha Wung - Lop Burn I SC on DC/ST. 795 MCM ACSR. 13 km2003 -Installation o12x200 MvATranstormer at AnRThong)l Srstato-__-| 44.866 1.0022 N.A.

4. 115 KV THALAN 3 - SARABURI 1 LINE AND SUBSTATIONSa. t998 -Reconstruction of I 15 kV Thalan 1 -Saraburi I to Thalan 3-Saraburi I DC/ST 795 MCM ACSR.

I1t5 km (with detour line) and 115 kV Thalan I-Thalan 3 SC on DC/ST79S5 MCM ACSR, 5 km … - -_--Base Case-----b. t998 -Reconstruction ot I1 t kV Thalan 1 -Saraburi I to DC/ST 795 MCM ACSR.t8 km (with detour line) I

- Reconstruction oft Is kV Thalan 1 -Thalan 3 to DC/ST 795 MCM ACSR. 5km 10.03 1.0004| 31.36 %c. 1998 - ConStrUctionof IIskVThalan3-Saraouri I SConDC/ST795MCMACSR. 14kmank d an

- Terminaton of 115 kV Thalan I -Saraburi I to Thalan 3 and- Reconstruction of I 15 kV Thalan 1 -Thalan 3 to SC on DC/ST 795 MCM ACSR,5 krn

__ 2003 --Strlnging2rtdcctof115kVThalan3-Saraburi t 795MCMACSR, 14km 10.97 1.0004 | 25.28 %5. 115:kV RATCHASURI 2 - PHETCHABURI UNE AND SUBSATIONS

a. 1998 - Reconstruction of 115 kV Ratchaburi 2-Phetchaburl to DC/ST ix795 MCM ACSR, 53 km| - Installation of 6.04 and 12.08 MVAr Capecitor Bank at Cha-Am and Phetchaburi Substation respectively. … Base Case …

b. 1998 - Teminiation of 2nd Cet ot 230 kV Ratchaburl 2-Prachuap Khiri Khan line to Hua Hin 1,272 MCM ACSR. 10 kl2006 - Construction of 115 kV Ratchaburi 2-Phetchaburi SC on DC/ST 2x795 MCM ACSR, 53 km 12.09 1.0005 12.77 %

_ c. 1998 - COnstnrction o0115 IkV Ratchaburi 2-Phetchaburi SCon DC/ST 2_795 MCM ACSR. 53k | 29.12 1.0012 >150.0 %21 -Ma,-9S

04:19 PM

-3-

Page 9: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 2.1 Summary Result of Economic Analysis in TS. 9_ _LCPN~T1NUED) ________

No. Fiscal |Description Net P.V. B/C EquaiizedYear @10 %DR. Ratio Discount

(MTHB) Rate

CENTRAL REGION (CONTINUED)

S. 115 KV PRACHINBUFRi 2- WATTHANA NAKHON LINE AND SUBSTATIONS

a. 1998 - Construction of I 15 kV Prachin Burl 2-Watthana Nakhon SC on DC/ST 2k795 MBCM ACSR, i7 kn - … Base Case …-. *ooe Co,-trtio.. 9. 230;11S kVP,,;ri Bu,, 2r-rrN_ihana Nagirron Sr_ on jCisi 1.272 MOM AcSR. 87 km _lUtt.UU 1 .UU3U >1150. *! c. 1998 -Construction ot 230 kV Prachi/ni Bu 2-WatthaniaNakghonl SC on DCIST 1.272 MCM ACSR. 07 km

--Instailaton o/230/115 kV1Ix209MVA Trsnslormer at WattiaNathon Substation. 322.14 1.0173 >150.0%NORTHEASTERN REGION

7. 230/115 KV MUKDAHAN 2 SUBSTATION AND 115 KV MUKDAHAN 2 - THAT PHANOM - NAKHON PHANOM

UNES. AND SLEBsTATONS

a. 1998 - Construction of Mukdahan 2 Substation and

- Temirnation oa one cct of 230 kV Savannakhet - Rol Et to Mukdahan 2 SubstatiOn

- tnstailation of 230/115 kV 2x200 MVA Transformers at Mukdahan 2 Substation

- Constnuction of 115 KV Mukdahan 2 - That Phanom DC/ST 795 MCM ACSR S8 km

- Construction of 115 kV That Phanon - Nakhon Phanom SC on DCIST 795 MCM ACSR 59 km

2003 -IInstailaton ot 230/115 kV 1x200 MVA Transformer at Rog Et Substation

2005 - Stringin 2nd cct of t t5 kV That Phanom - Nakrion Phanom 795 MCM ACSR 59 km _ Base Ca se …b. 1 998 - Construction ot NaLkhon Phanom 2 Sutstation and

- Terninaton of onre ct of 230 kV Thakhek - Sakon Nakhon 2 to Nakhon Phanom 2 Substation

- instailalton ot 230/115 kV 2x200 MVA Transformers at Nakhon Phanom 2 Sutbstation

- Constrijetlonf 1115kV Nakhon Phanom 1 -Nakhon Phanom 2 DC/ST 2x795 MCM ACSRl, 13km

- Construct/on of 115 kV Nakhon Phanom I -That Phanom DC/ST 795 MCM ACSR. 59 km

- Constructionof 1i5kVThatPhanom-Mukdalian SC on DC/ST 795 MCM ACSR., 45km

2001 -InstallatIon of 230/115 kV 1 x200 MVA Transformer at Roi El Substation

2004 -Stringing 2nd cct of 115 kV That Phanom - Mukdahan 795 MCM ACSR 45 km 367.72 1.0230>1c. 1998 - Construction alt I 5 kV Sakon Nakhon - That Phanom DC/ST 795 MCM ACSR 70 km

- Construction of 115 kV That Phanom - Nakhon Phanom SC on DC/ST 795 MCM ACSR 59 km

- Consttnction of 115 kV That Phanom - Mukdahan SC on DC/ST 795 MCM ACSR, 45 km

2001 - Installaton of 230/115 kV 1 x200 MVA Transformer at Roi Et Substation

2004 - Stringing 2nd cct 01115 kV That Phanom - Mukdahan 795 MCM ACSR. 45 km

2005 - Stnnging 2nd cct of I I5 kV That Phanom - Nakhon Phanom 795 MGM A9SR. 59 km 263.81 1.0165 31.53%d. 1998 - Construction o t115 kV Sakon Nakhon - Tnat Phanom DC/ST 795 MCM ACSR 70 km

- Construction of 115 kV That Phanom - Nakhon Phanom SC on DC/ST 795 MCM ACSR 59 km

- ConstrUction o0 115 kV Phon Thong - Mukdanlan SC on DC/ST 795 MCM ACSR, 90 km

-Stringing 2nd cct ot115kV Rol Et-Pion Thong 795 MOM ACSR. 45km

2001 - Installation or230/115kV 1x200 MVA Transformer at Rog Et Substation

2004 -Stringing2ndcotofll5kVPhonrThong - Mukdahan 795MCMACSR 90km

2005 -Stringing2ndoctotl115kVThatPhanom-NakhorinPnamm 795MOM.ACSR, 59km 281.971 1.0177 145.89% 18. t t15iV UDON 2 - NONG BUA LAM PHU UNE AND SUBSTATIONS

a. 1998 - Construction of 115kV Udon Thani 2 - Nong Bua Lam Phu SC on DC/ST 795 MCM ACSR, G1 km

2001 - Construction ot 115 kV Nong Bua Lam Phu - Loeg SC on DC/ST 795 MCM ACSR, 79 km

2005 - Stringing 2nd cct of115 kV Udon Thani 2 - NongBua Lam Phu 795 MCMACSR, 81 km ------…Base Case--…--b. 1 8 - Construction of 11 SkV Udon Than 2 - Nong Bua Lam Phu DC/ST 795 MCM AC SR. 61 km

2001 - ConstructionofIl5kVNongBuaLamPhu- Leai SConDCIST 79sMCMACSR, 79kmrn 6.04 1.0004| N.A. c. 1998 - Construction ot 230/115 kV Udon Than, 2 - Nong Bua Lam Phu DC/ST 1,272 MCM ACSR, 8I km

2001 -Construction of 115 kV Nong Bua Lam Phu- Loei SO on DC/ST 795 MCM ACSR, 79 km 63.02 1.0040 >150.0%19. 15 KV ROI ET- PHAYAKKHAPHUM PHISAI - SURIN UNES AND SLBSTATIONS

a. 1998 -Stringing 2nd ot 115 kVRoi Et-Phayakkhaphum Phisai 795 MCM ACSR, 84km and

- ConstructIon of 1115 kV Phayakkhaphum Phisai - Surin SC on DC/ST 795 MCM ACSR 80 km i

2003 - Stringing 2nd cot 0/1115 kV Phayakkhaphum Phisai - Surin 795 MCM ACSR 80 km ------ Base Case … =_--b. 1998 - Construction o0 115 kV Si Sa Ket - Surin SC on DC/ST 795 MCM ACSR 951km k -

- Stringing 2nd of 115 kV Roi Et - Phayakkhaphum Phisai 795 MCM AC SR 84 km

2003 - Stringing 2nd cct o 115kV Si Sa Ket - Surin 75 MCM ACSR 95km _ 67.15 [ 1.0041 58.57 %c. 1998 - Construction of 115 kV Burram - Surin SC on DC/ST 795 MCM ACSR 47 km

-Coonstructionolll5kVPhayakkhphumPhisa,- Suriri SConDC/ST 795MCMACSR. 80km

|-Reconstnction ot115kV Nakhon Ratchasima I - Buriram tobe DC/ST 795 MCM ACSR. 110.4km

2003 - Stringing 2nd cot of115 kV Buriram - Surin 795 MCM ACSR. 47km

2006 |-Reconstruction ot115kV Nakhon Ratchasima I - Nakhon Ratchasima 2100 te

DCIST 2x795 MCM ACSR 11.7 km

_- String 2nd cot 0/115 kV Phayakkhiaphum Phisa,-Surin 795 MOM ACSR. 90km 287.38| 1.0176 50 0 IO. t1SKV CHAIYAPHUM- BAMNET NARONG UNE AND SUBSTATIONS

a. 1998 -ConstructIon of 115 kV Chaeyaphum - Bamnet Narong SC on DC/ST 795 MCM ACSR 58 km

- Installaeono/ 115-22-11 kV2xS0MVA Transformer at Bamnet Narong Substatlon. B------Base Case-----b. 1998 -Constructionotf 15kVNakhonFRatchasgma2 - Bamnet Narong SC on DC/ST 795 MCM ACSR 85km K

| |_______ - Installation of 115-22-11 kV 2xS0 MVA Transformer at Bamnet Naron Substatlon 1 65.38| 1.00901 >150.0%||c. 1998 i-Installation o0 Gas Turbine Powa Plants at Bamnet Narong 1_ 1,009.561 1.0458 62.81 %;I

21-Mar-9504109 PM

-4-

Page 10: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 2.1 Summary Result of Economic Analysis in TS. 9

N. Fiscal DeIr jin Iin Not P.V /RC I EaualizedYear , @10 -DR.I Ratio Discount

(MTHB) Rate

NORTHEASTERN REGION (CONTINUED) I

11. 115 KY UBON RATCHATHANI 2 - KANTHARALAK LINE AND SUBSTATIONS

a. 1998 -Construction of 11 SkV Ubon Ratchathani 2 - Kantharalak SC on DC/ST 795 MCM ACSR 55 km

-Installaton of 115-22-11 kV2x50 MVA Transformer at KamtharalakSubstation_. Base Case …-----b. 1998 -Construction of 11 5kV SI Sa Ket - Kantharalak SC on DC/ST 795 MCM ACSR 65 km

_ -Installaton ot1 15-22-11 kV 2xs0 MVA Transformerat Kantharalak Substation. 27.22 1.0018 >150.0 %_ c. 1998 _ Installaton ot Gas Turbine Power Plants at Kantharelak 449.55 1.02941 83.90 _

12. 115 KV SURIN - SANGKHA LINE AND SUBSTATIONSa. 1998 - Construction of 1 15 kV Surin - Sangkha SC on DC/ST 795 MCM ACSR 49 km

- Installationo '115-22-11 kV2xs5oMVATransrormeratSangqha uLbstation. -_____- Base Cas e …--__b. 1998 -Construction o1 115 kV Si Sa Ket - Sangkha SC on DC/ST 795 MCM ACSR 74 km

- Installatton o 115-22-11 kV 2x5oMVA Transo as n. 92.40 1.0061 >150.0 %c. 1998 -Constrnction of22 kV Surin - Sangkha 2xDC with AVR 185 sq.mm. AAC 66 km and

- Installabon of 115-22-11 kV 2xS oMVA Transformer at Sangkha Substation._ 2000 -Construction f 115 kV Surin-Sha _SC_ojn DC/ST 795 MCM ACSR 49 km 42.95 1.0028 30.63 S

SOUTHERN REGION13. 230:KV NAKHON Si THAMARAT - THUNG SONG - SURAT THANI LINES AND SUBSTATIONS

a. 1998 - Reconstruction of 115 kV Nakhon Si Thammarat - Thung Song to230/1 15 kV DC/ST 1272 MCM ACSR, 54 km

- Reconstruction of 15s kV Surat Thani-Thung Song to 230 kV DC/ST 2xr1272 MCM ACSR. 122 km- Installation of 2x200 MVA Transformers at Thung Song Substation.

2003 - Conversion o1 115/230 kV Nakhon Si Thammarat - Thung Bon ire to energized at 230 kV B-----Base Case-b. 1995 - Reconstruction of 115 kV Nakhon Si Thammarat - Thung Song to 230 kV DC/ST 1,272 MCM ACSR. 54 m

- Construction of 230 kV Surat Thani - Nakhon Si Thammara DC/ST 2x1272 MCM ACSR 145 km- Installabon of 2x200 MVA Transformers at Thung Song Substation.

2006 --insfallationof xlooMvATransformerat suraf Than; Substation ___ 569.14 1.0172 107.18 %c. 1998 - Reconstruction of 115kV Nakhon Si Thammarat - Thung Song to 230kV DC/ST 1,272 MCM ACSR, 54km

- Construction or230kV Khanom - Nakihon Si Thammarat DC/ST 2x1272 MCM ACSR 98 km- Installatonof2x200MVA Transformers at Thu.o Sonm Sibrgati.n

2006 - Installatonof1x100MVATransformer-atSurat Thani-substatior _ 64.73 1.0020 32.62 jd. 1998 - Reconsttwetion of 115 kV Surat Thani-Thung Song to 230kV DC/ST 2x .272 MCM ACSR, 122 km

- Installabon of 2x200 MVA Transtormers at Thung So ng Substation.- Construction of new 230 kV Phattalung Substation and Termination of 230 kV

___________ Nakhon Si Thammarat-Fkhattalung and 230hV Thung Song-Khong Njae to Pnattlung Substation 91.47 > 150.0 94. 230 KV KHLONG NGAE - YALA LINES AND SUBSTATIONS

a. 1998 -Construction of 230kV Khlong Ngae-Yala DC/ST 1272 MCM ACSR. 120 km I I_-(using existing Hat Yai 2-Ye a PW)and installation of 2x0OOMVA Transformer at Yala Substation.… Base Case…-----

b. 1998 -Construction of 230/115 kV Khlong Ngae-Yala DC/ST 1272 MCM ACSR, 120 km(using existing HY2-YL ROW) and installation of t x200 MVA Transformer at Khlong Ngae

2006 - Conversion o1230/115 kV Khlong Ngae-YalaOC/ST 1272 MCM ACSR to be energiZed at 230kV __k _ 108.78 1.0053 41.25 %c. 1998 -Construction01230kVKflongNgae-Yala DC/ST 1272MCMACSR, 120km

(using new ROW) and Installaton of 2x200 MVA Transformer at Yala Substation. 251.45 1.0122 > 150.0 %5. 230/1 15 KV PHANGNGA - PHUKET JUNCTION - PHUKET 2 LINES AND SUBSTATIONS

a. 1998 -Construction of 230/t11 kVPhangnga-PhuketJunction (Future Phuket 3 Substation)DC/ST 1.272 MCM ACSR, 76 km Initially energized at 115 kV(using ROW of existing 115 kV Phangnga-Phuket Junction 150 sqmm AAAC line) and

- Construction of 1 15 kV Phuket Junction-Phuket 2 SC compact line, 2x795 MCM ACSR 12 km |and connect with one cot of new 230/115 kV Pnangnga-Phuket Junction line and

- Connection of existing 1 15 kV Phuket Junction-Phuket 2 with another cot Ofnew 230/1i5kV Phangnga-Phuket Junction line and

- Replacement of 2x1tOD MVA Transformer at R_atjp1a_ha Substation with 2x200 MVA B - -=-Base Case--…---b. 1995 - Sameas*a.-but use2x795MCMACSR conductor for ll5kVPhangnga-PhuketJunctionline 1

2002 - Construction of 115 kV Phuket 3 Substation at Phuket Junction and Terminate 2 cots of new 115kV I IPhangrnga-Phuket Junction and existing 1 15 kV Phangnga-Phuket t to Phuket 3 Substation andreconstruction of the existing 115 kV Phangnga -Phuket 1 from Phangnga to Phuket 3 to DC/ST2x795 MCM ACSR, 70km _ _ 108.56| 1 .0047 > 150.0 %S

c. 1998 - Construction o1230 kVPhuket 3 Substation at Phuket Junction and reconstrucson of existing 11 5kV iIFRailaprabha-Phangnga and Phangnga-Phuket Junction to 230kV Rallaprabha-Phuket 3 DC/ST I1,272 MCM ACSR, i49kmaniterminate2 cots of existing IlskVPhangnga-Phuktt I toPhuyket3

- Installation of 2x200 MVA transformer at Phuket 3 Substation2004 -Construction of 115 kV Phuket 2-Phuket Junction SC CoTpact line, 2x795 MCM ACSR 121km 1160.74 1.0069 N.A.

1:15 KV YALA -NARATHIWAT LINE AND SUBSTATIONSa. 1998 - Constructlon of 1 15 kV Yala - Narathiwat SC on DC/ST 795 MCM ACSR, 61 km B- - ase Case- - -- …b. 1998 |-Constructionof lskvPattani - Narathlwat SC onDC/ST 795 MCM ACSR, 80km 137.031.0081 _50.0_

C. 1998 -ConstrLctionofII5kVYala-Narathiwat DC/ST 795MCMACSR 61km 23.77 1.00141 >150.0 %I21-Mar-95

04:19 PM

Page 11: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 2.1 Summary Result of Economic Analysis in TS. 9________ ________ ________(C9NTNUED) _ __ _ _ _ _ _ _ _ _

No. Fiscal Description Net P.V. B/C EqualizecYear @10 %DR. Ratio Discount

(MTHB) RateSOUTHERN REGION (CONTINUED) I

17. 115 KV SURAT THANI - BAN DON UNE AND SUBSTATIONSa. 1998 |-Stringing 2ndcctOtI15kVSuratThani-BanDon477MCMACSR. 13.4km

2001 -Constructionoft 5kVPbunphin-Banon SC onDC/ST 795MCM 10okm 7ae 1.se-b. 1998 - ConstrLctionof ttSkVPhunphin-BanDon SConDC/ST795MCM ACSR. I0kmand I

- Reconstruction of 115 kV Surat Thnrs-Phunprhin to be SC on DC/ST 795 MCM ACSR, 6.2 km2003 - Stringing 2nod cot of 1 I5 kV Surat thani-Phunphin795 MCM ACSR 22.20 1.0012 >150.0 9

c . 1998 - Irstallabon ot Gas Turbine Power Plants at Ban Don Substation 5164.1 1 1.2760 >150.0 9NORTHERN REGION

18. CONVERSION OF MAE MOH 3- CHAING RAI FROM 115 KV TO 230 KVa. 1998 - Conversion of 230/115 kV Mae Moh 3-Chang Ral DC/ST 1.272 MCM ACSR,200 km

to energized at 230 kV-Instaliation of 2x200 MVA Transformer at Chiang Ral Substation

2006 - Installabon of 1 x200 MVA Transformer at Mae Moh 3 Substation ------ Base Case- - - - -b. 1998 - 115 kV Phayao - Chiang Rai SC on DC/ST 795 MCM ACSR,80 km

-Installabon of 1 x200 MVA Transtormer at Mae Moh3 Substation1999 - Addition of Capaotor Bank2001 - Conversion of 230/115 kV Mae Moh 3-Chiang Rai DC/ST 1.272 MCM ACSR,200 km to be energized at 230 26.1

-Installaton of 2x200 MVA Transformer at Chiang Ral Substation ___ _ 226.96 1.0130 >_150.0___C. 1998 - Tenmination oft I s kV Mae Moh 3 - Chiang Rai to Phayao 1,272 MCM ACSR. I km

-Installabon of 11 x200 MVA Transformer at Mae Moh 3 Substation1999 - Addition of Capackor Bank2001 - Conversion o' 230/11 5kV Mae Moh 3-Cheang Rai DC/ST 1.272 MCM ACSR.200 km to be energmed at 230k

- Installabon of 2x200 MVA Transformer at Chiang Rai Substation _ 61.591 1.0035 22.63 %19. 115 KV LAN KRABU - KAMPHAENG PHET LINE AND SUBSTATIONS

a. 1998 -Construction of 115kV Lan Krabu - Kamphaengphet DC/ST 795 MCM ACSR, 47 km2006 - Construction o I 15kV Bhumibol - Tak I SC on DC/ST 785 MCM ACSR, 47 km ------ Base Case- - - - -

b. 1998 - Terminaton o115 kV Tak 1 - Kamphaengphet to Tak 2 SC/ST 477 MCM ACSR, 3 km-Installaton of 2x200 MVA Transformer at Tak 2 Substation-Construction of I 15kV Bhumibol - Tak 1 SC on DC/ST 795 MCM ACSR, 47 km- Conrstruction of 11S kV Tak 2- Kamphaengphet SC on DC/ST 795 MCM ACSR. 53 km. 246.07! 1.0140 > 150.0 9W

c. 1998 - Terminarton of one cot of 230 kV Shumibol - Nakhorn Sawan lime to Kamphaengphet, 2 km- Installabon of 2x200 MVA Transformer at Kamphaengphet Substatlon

2006 - Terminatbon of 2nd cot of 230 kV Bhumibol - Nakhon Swan lIme to Kamphaengphat. 2 km 163.04 1.0093 >150.0920. 116 KV MAE MOH 3- LAMPANG 2 UNE AND SUBSTATIONS

a. 1998 - Construction of 115 kV Mae Moh 3- Lampang 2 DC/ST 2x795 MCM ACSR. 27 km (New R-O-W)- Termination of two cot of 115 kV Lamphun 2 - Mae Moh 2 line to Lampang 2

1999 - Installaton of 1x200 MVA Transformer at Chiang Mai 3 Substation2000 -Reconstructionof 115kV MaeMoh2-Lampang 1-Lamphun 1 tobe230kV Mae,Molh3-Saraphi

DC/ST 2x1,272 MCM ACSR. 124.4 km and 1 15 kV Mae Moh 3- Lampang 1 DC/ST 795 MCM ACSR. 41.4 knand 115 kV Lampang 2-Lamphun I DC/ST 785 MCM ACSR 16 1 km

-Terrninabon of 115 kV Lamphun 2 -Chiang Ma 2 line to Saraphl Substation DC/ST andReconstruebon of0115kV Lamphun 2-Saraphiltobe DC/ST 2x795 MCM ACSR. 10km

-installaton o121200 MVA Transformer at Saraphi Substation ------…Base Case- - - - -b. 1998 - Reconstnrction of 115kV Mae Moh 2-Lampang I-Lamphun ' tobe 230kV Mae Moh 3-Saraphi i

DC/ST 2x1,272 MCM ACSR, 124.4 km and 115 kV Mae Moh 3- Lampang I DC/ST 795 MCM ACSR,41.4 krand 115 kV Lamphun 2-Lamphun 1 DC/ST 795 MCM ACSR 16 1 km

- Terminaton of 1115 kV Lamphun 2-Chiang Mal 2 line to Saraphi Substation DC/ST andReconstnrction of 115 kV Lamphun 2 - Saraphi to be DC/ST 2x795 MCM ACSR. 10 km I

-rInstallation of 2x200 MVA Transformer at Saraphi Substation .2000 - Constnrction of 115 kV Mae Moh 3- Lampang 2 DC/ST 2x795 MCM ACSR. 27 km (New ROW) I I2006 - Installaton of 1 x200 MVA Transformer at Chiang Mal 3 Substation 53.20 1.00331 N.A

c. I1998 - Termtnabon of230 kV Mae Moh 3 - Chiang Mai 3 line and 115 kV Lampang 2- Lamphun 2 line to Hang Ch 0N- Installaton of 2x200 MVA Transformer at Hang Chat Substation

2000 - Reconstruction of 115 kV Mae Moh 2-Lampang I -I.amphun I to be 230 kV Mae Moh 3-SaraphiDC/ST 2x1.272 MCM ACSR, 124.4 km and 115 kV Mae Moh 3- Lampang I DC/ST 795 MCM ACSR.41 .4kando 115 kV Lamphun 2-Lamphun I DC/ST 795 MCM ACSR 1 6. 1 km I

- Termination o1115 kV Lamphun 2 -Chiang Ma 2 ine to Saraph1 Substation DC/ST andReconstruction o1 115 kV Lamphun 2 - Sarapht to be DC/ST 2x795 MCM ACSR, 10 km

- Installabon of 21200 MVA Transformer at Saraph, Substation2006 -Reconstruction of 115 kV Saraphi - Chiang Mai 2 line to be DC/ST 2x795 MCM ACSR, 16.1 km 267.08|1. >150.0 s

21. t115 KV CHIANG MAI 2- MAE TAENG LINE AND SUBSTATIONa. 1998 - Construction of 115 kV Chiang Mai 2- Mae Taeng SC on DC/ST 795 MCM ACSR. 42 km

- Installation of 2x50 MVA Transforner at Mae Taeng sustation. _ _ __ |------EBase Case- - - - -b. 1998 - Installation of Diesel Power Plants at Mae Taeng _ 573.501 1.03871 52.37%C. 1998 |-Installabon of Gas Turbine Power Plants at Ma.Taeng _T __ 612.56 1.0413l 110.56X

21 -M--604: 19 PI

-6-

Page 12: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

3. i...t tLIiA ArN v A SSUP ivirTIONS r n r tJ1VIIC A'NALYSIS OF

SUBPROJECTS

3.1 Methodology of Analysis The economic analysis is made to find out the

least-cost program to serve the electricity demand in each project area. The

transmission system expansion program which includes the proposed subproject is

compared with the other two or three possible alternatives. The benefit/cost ratio (B/C

ratio), net present value (NPV) and equalized discount rate (EDR) are calculated to

indicate that the proposed subproject is included into the least-cost program. The

discount rate of 10 % is used to determine the least cost solution.

3.2 Alternative Transmission System Expansion Program Details of three or

four possible transmission system expansion alternatives to each subproject are

described in Section 4.

3.3 Capital Cost of Alternatives All capital costs are estimated based on 1994

price level. The cost without import duties and taxes, interest during construction

(IDC), and escalation are used in the study.

3.3.1 Transmission System The details of cost estimate of each proposed

subproject is shown in Volume I (Main Report). The cost estimate of transmission

system included in each alternative plan are based on 1994 constant price including

engineering, supervision and physical contingencies using the same unit price for each

subproject.

-7-

Page 13: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

3.3.2 Distribution System 'lhe capital cost of the distribution system is

estimated based on the following unit price: -

22 kV 33 kV

a) Construction of distribution line

185 sq.mm.AAC conductor (MTHB/km)

- Single Circuit Structure 0.395 0.433

- Double Circuit Structure 0.777 0.859

- Single Circuit on D)ouble

Circuit Structure 0.424 0.469

- Stringing 2nd Circuit 0.394 0.436

b) Aerial Cable (MTHB/km/cct) 0.924 1.271

c) Automatic Voltage Regulator (AVR)

(MTHB/Set) 5.500 7.500

d) Switchgear (for I feeder) 2.000 2.000

e) Installation of one bank of

50 MVA Transformer at the

Terminal Substation 30.300 30.300

3.3.3 Diesel Power Plant The capital cost of 2.5 MW diesel power plant

used in the study is 20,600 THB/kW (USD. 792/kW).

3.3.4 Gas Turbine Power Plant The capital cost of 25 MW gas turbine

unit is estimated at 15,120 THB/kW (USSD. 582/kW).

-8-

Page 14: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

3 4 Economic Life The economic lives of various project elements used in the

study are

Years

Transmission and Distribution Line 40

Substation and Equipment 25

Diesel Power Plant 15

Gas Turbine Power Plant 15

3.5 Operation and Maintenance Cost (O&M Cost) The O&M cost for various

types of project is assumed to be a fixed percentage of capital cost as follows

% of Capital Cost

Transmission Line 1.0

Distribution Line 1.0

Substation and Equipment 2.0

Diesel Power Plant 3.0

Gas Turbine Power lPlant 3.0

3.6 Capacity and Energy Cost of the 'T'ransmission and Distribution

Alternatives

Since the transmission and distribution system alternative do not produce

any generating capacity to the power system so when these alternatives are compared

with the installation of diesel or gas turbine power plant alternative, the cost of

producing power and energy to the system must be included in the cost of transmission

and distribution system alternative.

The Long Run Marginal Cost (LRMC) of EGAT's overall power

development plan is used to represent the cost of producing power and energy to the

system. The LRMC of capacity cost is calculated by using Average Incremental Cost

(AIC) concept, which is the ratio of discounted investment cost corresponding to

-9

Page 15: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

EGAT's Power Development Plan during 1995-2004 to the discounted value of

incremental power of the same period. The LRMC of energy is calculated as a

weighted average, with the weights depending on the share of future energy generation

by the different types of power plant during the same period.

The capacity and energy cost based on EGAT's Power Development Plan

(PDP 95-01), at 1994 price level are:

Capacity Cost = 28,255.90 THB/kW (USD. 1,108.1/kW)

Energy Cost = 0.7117 THB/kW (US.d 2.791/kW)

3.7 Losses in Transmission and Distribution System

Besides the difference in investment cost and O&M cost between each

alternative, the difference in EGAT's power system losses is also taken into account in

the least cost solution study. The capacity loss (MW) is adopted from power flow study

of the respective alternative. The energy loss (GWh) is calculated from the capacity

loss and loss factor using these equations as lollows:

Energy Loss (GWh) = Capacity Loss (MW) x 8.76 x Loss Factor

Loss Factor = 0.1 (Load Factor) + 0.9 (Load Factor)2

The cost of losses used in the study are also adopted from EGAT's LRMC

as follows

Cost of Capacity Loss = 2,997.40 THB/kW-yr

Cost os Energy Loss = 0.7117 THB/kWh

3.8 Heat Rate and Fuel Cost of Alternative Power Plant

2.5 MW Diesel Plant = 2,508.7 kcalUkWh

2V T.V'7 G Turbiae Piatit = 3,i90.0 kcailkWh

Diesel Oil Price (Without Taxes) = 4.6224 THB/Litre

Heating Value of Diesel Oil = 8,959.6 kcal/Litre

-10-

Page 16: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

4. DETAILED ECONOMIC ANALYSIS OF EACH SUBPROJECT

-11-

Page 17: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.1230/115 KV BAN PONG 2 - BAN PONG 1 - NAKHON CHAISI -

SAM PRAN 2 LINE AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.1.

b) Alternative Plans The three possible alternative plans to serve the same technicalobjectives of this subproject as described in Volume I (Main Report) are

Alternative A

Year 19

- Reconstruction of the existing Ban Pong 2 - Ban Pong I - Nakhon Chaisi

- Sam Phran 2 from 115 kV double circuit line to 230 kV double circuit line, using2x1272 MCM ACSR conductor, a distance of approximately 43 km, initially energizedat 115 kV.

The economic cost is 583.2 MTIIB.

Year 2006

- Construction of 230 kV Ban Pong 2 - Sai Noi, double circuit line, using

1272 MCM ACSR conductor, a distance of approximately 53.6 km.

- Reconstruction of the existing 230 kV Ratchaburi 2 - Ban Pong 2 from

double circuit line using 1272 MCM ACSR conductor to double circuit line using2x1272 MCM ACSR conductor, a distance of approximately 42 km.

- Installation of lx200 MVA 230/115 kV transformer at Ban Pong 2

Substation.

The economic cost is 946.8 MTHB.

-12-

Page 18: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Alternative B:

Year 1998

- Reconstruction of the existing Ban Pong 2 - Ban Pong 1 - Nakhon Chaisi

- Sam Phran 2 from 115 kV double circuit line to 230 kV double circuit line using

2x1272 MCM ACSR conductor, a distance of approximately 43 km, the Nakhon Chaisi

- Sam Phran 2 line section will be initially energized at 115 kV.

- Installation of 3x200 MVA 230/115 kV transforners at Nakhon Chaisi

Substation.

The economic cost is 1,046.6 MTHB.

Year 2006

- Construction of 230 kV Ban Pong 2 - Sai Noi line, double circuit steel

tower, using lx1272 MCM ACSR conductor, a distance of approximately 54 km.

- Reconstruction of the existing 230 kV Ratchaburi 2 - Ban Pong 2 from

230 kV double circuit line using 1272 MCM ACSR conductor to double circuit line

using 2x1272 MCM ACSR conductor, a distance of approximately 42 km.

The economic cost is 852.4 MTHB.

Alternative C

Year 1998

- Construction of 230 kV Sai Noi - Nakhon Chaisi - Sam Phran 2 line,

double circuit steel tower, using 2x 1272 MCM ACSR conductor, a distance of

approximately 40 km, the Nakhon Chaisi - Sam Phran 2 line section will be initially

energized at 115 kV.

-13-

Page 19: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

- Installation of 2x200 MVA 230/115 kV transformer at Nakhon ChaisiSubtation.

The econnom.ic cost is 9186 MAATHB

Year 1999

- Construction of 230 kV Ban Pong 2 - Sai Noi line, double circuit steeltower, using 1x1272 MCM ACSR conductor, a distance of approximately 54 km.

The economic cost is 463.9 MTHB.

Year 2006

* Reconstruction of the existing 230 kV Ratchaburi 2 - Ban Pong 2 from

double circuit line using 1272 MCM ACSR conductor to double circuit line using2x1272 MCM ACSR conductor, a distance of approximately 42 km.

- Installation of 1x200 MVA 230/115 kV transformers at Nakhon ChaisiSubstation.

The economic cost is 388.5 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are givenin Appendix 1.

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 34,440.95

Alternative B 34,529.51

Alternative C 34,942.10

-14-

Page 20: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB) (%_

Alternative A VS. Alternative B 88.56 1.0026 N.A.

Alternative A VS. Alternative C 501.16 1.0146 >150.00

Results of the analysis have led to the conclusion that the construction of

230/115 kV Ban Pong 2 - Ban Pong I - Nakhon Chaisi - Sampran 2 transmission

system project is the least cost alternative.

-15-

Page 21: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.1

Load Forecast for Ban Pong 1, Nakhon Chaisiand Sam Pran 2 Substations

_________________________________________ Subproact No.1

Fiscal Peak Demand Energy Demand Load Factor

Year MW % Increase GWh % Increase (%)

1994 304.18 - 1876.92 - 70.44

1995 205.22 a/ -32.53 1004.72 -46.47 al 55.89

1996 223.73 9.02 1085.25 8.02 55.371997 243.23 8.72 1214.36 11.90 56.99

1998 263.80 8.46 1336.80 10.08 57.851999 285.48 8.22 1498.58 12.10 59.922000 308.36 8.01 1682.78 12.29 62.30

2001 332.54 7.84 1880.99 11.78 64.57

2002 358.11 7.69 2083.89 10.79 66.43

2003 385.24 7.58 2293.73 10.07 67.972004 414.08 7.49 2517.70 9.76 69.41

2005 444.86 7.43 2760.59 9.65 70.84

2006 477.72 7.39 3023.78 9.53 72.26

Note: al Some loads are transfered to the PEA's 115kV systems which receive power from 230/115 kV

Sam Phran 1 and Ban Pong 2 Substaton.

-16-

Page 22: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.2Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 1; Subproject No.1

Cost Stream Alternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 81054.63 81155.40 0.9988 -100.776.00 59830.04 59840.40 0.9998 -10.368.00 45038.37 44989.05 1.0011 49.32

10.00 34529.61 34440.95 1.0026 88.5612.00 26924.79 26810.77 1.0043 114.0214.00 21324.71 21194.62 1.0061 130.0916.00 17132.33 16992.63 1.0082 139.7018.00 13944.90 13800.07 1.0105 144.8320.00 11486.26 11339.41 1.0130 146.8522.00 9564.14 9417.43 1.0156 146.7124.00 8042.59 7897.51 1.0184 145.0826Q00 6824.14 6681.72 1.0213 142.42

Equalized Discount Rate is Not Applicable

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit - - Cost Net Benefit

4.00 81843.98 81155.40 1.0085 688.586.00 60448.42 59840.40 1.0102 608.028.00 45537.13 44989.05 1.0122 548.08

10.00 34942.10 34440.95 1.0146 501.1612.00 27273.50 26810.77 1.0173 462.7414.00 21624.72 21194.62 1.0203 430.1116.00 17394.24 16992.63 1.0236 401.6018.00 14176.26 13800.07 1.0273 376.1920.00 11692.62 11339.41 1.0311 353.2122.00 9749.64 9417.43 1.0353 332.2124.00 8210.40 7897.51 1.0396 312.8926.00 6976.76 6681.72 1.0442 295.04

Equalized Discount Rate is Greater Than 150%

Transmission System Planning Division21 -Mar-95

11:05AM

-17-

Page 23: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.2

115 KV BO WIN - BAN BUNG LINE AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.3.

b) Alternative Plans The three possible alternative plans to serve the same technical

objectives of this subproject as described in Volume I (Main Report) are

Alternative A:

Year 1997

- Construction of 115 kV Bo Win - Ban Bung line, double circuit steel

tower, using 2x795 MCM ACSR conductor. a distance of approximately 27 km.

The economic cost of the project is 206.8 MTHB.

Year 2001

- Installation of lx200 MVA 230/115 kV transformer at Bo Win

Substation.

The economic cost is 81.6 MTHB.

Alternative B

Year 1997

- Rolo the existing Ao Phai - Si Racha - Ban Bung iine from

115 kV single circuit line to 115 kV Ao Phai - Ban Bung double circuit line, using

2x795 MCM ACSR conductor, a distance of approximately 38 km.

-18-

Page 24: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

The economic cost of the project is 277.6 MTHB.

Year 2004

- Installation of 1 x200 MVA 230/115 kV transformer at Bo Win

Substation.

- Installation of l x200 MVA 230/115 kV transformer at Ao Phai

Substation.

The economic cost is 189.0 MTHB.

Alternative C

Year 1997

- Construction of 230 kV Bo Win - Ban Bung line, double circuit steel

tower, using 1,272 MCM ACSR conductor, a distance of approximately 27 km.

- Installation of 2x200 MVA 230/115 kV transformer at Ban Bung

Substation.

The economic cost of the project is 531.7 MTHB.

Year 2004

- Installation of Ix200 MVA 230/115 kV transformer at Bo Win

Substation.

The economic cost is 81.9 MTHB.

-19-

Page 25: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix 1.

d) Results of Econom..ic A.a;ivsis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 25,346.84

Alternative B 25,436.86

Alternative C 25,590.21

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB) (%)

Alternative A VS. Alternative B 90.02 1.0036 >150.00

Alternative A VS. Alternative C 243.3.7 1.0096 >150.00

Results of the analysis have led to the conclusion that the construction of115 kV Bo Win - Ban Bung transmission system project is the least cost alternative.

-20-

Page 26: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.3Load Forecast for Ban Bung Substation

Subprojee No.v

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%)

1994 49.62 - 281.32 - 64.721995 57.67 16.22 318.10 13.07 62.971996 68.22 18.29 373.98 17.57 62.581997 79.88 17.09 437.59 17.01 62.541998 93.05 16.49 506.65 15.78 62.161999 102.39 10.04 572.74 13.04 63.862000 110.33 7.75 620.77 8.39 64.232001 118.81 7.69 672.26 8.29 64.592002 127.84 7.60 727.29 8.19 64.942003 137.44 7.51 786.01 8.07 65.282004 147.63 7.41 848.57 7.96 65.622005 158.42 7.31 895.06 5.48 64.502006 169.85 7.21 985.76 10.13 66.25

. \~~~~~~~~~~~-1

Page 27: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4 .4Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 1; Subproject No.2

Cost Stream A!ternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 57805.75 57667.75 1.0024 138.006.00 43079.88 42959.86 1.0028 120.028.00 32783.09 32679.12 1.0032 103.97

10.00 25436.86 25346.84 1.0036 90.0212.00 20093.56 20015.47 1.0039 78.1014.00 16135.04 16067.08 1.0042 67.9616.00 13151.03 13091.65 1.0045 59.37i 8.00 10864.6.3 10812.54 1.0048 52.1020.00 9085.87 9039.96 1.0051 45.9222.00 7682.31 7641.66 1.0053 40,6524.00 6560.18 6524.03 1.0055 36.1526.00 5652.14 5619.85 1.0057 32.29

Equalized Discount Rate is Greater Than 150%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B!C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 57982.92 57667.75 1.0055 315.176.00 43247.37 42959.86 1.0067 287.518.00 32942.97 32679.12 1.0081 263.84

10.00 25590.21 25346.84 1.0096 243.3712.00 20240.94 20015.47 1.0113 225.4714.00 16276.76 16067.08 1.0131 209.6916.00 13287.31 13091.65 1.0149 195.6618.00 10995.63 10812.54 1.0169 183.1020.00 9211.74 9039.96 1.0190 171.7822.00 7803.19 7641.66 1.0211 161.5324.00 6676.23 6524.03 1.0233 152.2026.00 5763.53 5619.85 1.0256 143.68

Equalized Discount Rate is Greater Than 150%

Transmission System Planning Division21 -Mar-95

11.07 AM

-22-

Page 28: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.3115 KV THA WUNG SUBSTATIONS AND LINE CONNECTION

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.5.

b) Alternative Plans The four possible alternative plans to serve the same technical

objectives of this subproject as described in Volume I (Main Report) are

Alternative A:

Year 1998

- Construction of I 15 kV Tha Wung Substation at the intersection between

115 kV Lop Buri 1 - Sing Buri and 115 kV Ang Thong 2 - Lop Buri 2 lines and

terminate these two 115 kV lines to Tha Wung Substation.

- Installation of lx200 MVA 230/115 kV transformer at Ang Thong ISubstation.

The economic cost is 271.5 MTHB.

Year 2002

- Construction of 115 kV Tha Wung - Lop Buri 1 line, single circuit on

double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 13 km.

The economic cost is 71.8 MTHB.

-23-

Page 29: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Alternative B:

Year 1998

- Reconstruction of the existing Ang Thong 1 - Sing Buri line from 115

kV single circuit line to double circuit line, using 2x795 MCM ACSR conductor, a

distance of approximately 34 km.

- Installation of lx200 MVA 230/115 kV transformer at Ang Thong I

Substation.

The economic cost is 345.7 MTHB.

Year 2002

- Construction of 115 kV Sing Buri - Lop Buri line, single circuit on

double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 27 km.

The economic cost is 172.6 MTHB.

Altemative C:

Year 1998

- Termination of one circuit of the existing Tha Tako - Ang Thong I line

to Sing Buri Substation.

- Installation of lx200 MVA 230/115 kV transformer at Sing Buri

Substation.

The economic cost is 363.1 MTHB.

-24-

Page 30: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Year 2002

- Construction of 115 kV Sing Buri - Lop Buri line, single circuit on

double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 27 km.

The economic cost is 172.6 MTHB.

Year 2006

- Installation of lx200 MVA 230/115 kV transformer at Ang Thong 1

Substation.

The economic cost is 94.6 MTHB.

AlterinaUve D

Year 1998

- Construction of 230/115 kV Tha Wung Substation and terminate oine

circuit of 230 kV Tha Tako - Thalan 3 and 115 kV Sing Buri - Lop Buri I to Tha

Wung Substation.

- Installation of 1 x200 MVA 230/115 kV transformer at Tha Wung

Substation.

The economic cost is 350.1 MTHB.

Year 2002

- Construction of 115 kV Tha Wung - Lop Buri I line, single circuit on

double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 13 km.

-25 -

Page 31: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

The economic cost is 71.8 MTHB.

Year 2003

- Installation of lx200 MVA 230/115 kV transformer at Ang Thong 1

Substation.

The economic cost is 94.6 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix 1.

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 20,395.40

Alternative B 20,416.16

Alternative C 20,427.70

Alternative D 20,440.28

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB) (%)

Alternative A VS. Alternative B 20.76 1.0001 N.A.

Alternative A VS. Alternative C 32.30 1.0016 N.A.

Alternative A VS. Alternative D 44.88 1.0022 N.A.

Results of the analysis have led to the conclusion that the construction of

115 kV Tha Wung Substation project is the least cost alternative.

-26-

Page 32: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.5

Load Forecast for Singburiand Lop Buri 1 Substations

.. _______________________________________ ,_____...______._ _.___ . -Subproect No.3

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%)

1994 70.20 - 318.82 - 51.841995 80.29 14.37 374.04 17.32 53.181996 75.15 a/ -6.40 340.55 a/ -8.95 51.731997 79.75 6.12 369.17 8.40 52.841998 84.40 5.83 392.53 6.33 53.091999 89.17 5.65 416.99 6.23 53.382000 94.03 5.45 442.68 6.16 53.742001 98.99 5.27 469.57 6.07 54.152002 104.10 5.16 495.90 5.61 54.382003 109.40 5.09 523.96 5.66 54.672004 114.91 5.04 553.61 5.66 55.002005 120.67 5.01 585.41 5.74 55.382006 126.70 5.00 619.49 5.82 55.82

Note: a/ Some loads are transfered to PEA's 115 kV Systems which receive power from 115 kV

Lop Buri 2 Substation.

-27-

Page 33: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.6Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 1; Subproject No.3

Cost Stream Altarnative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost __ Net Benefit

4.00 47704.59 47760.13 0.9988 -55.546.00 35254.07 35270.41 0.9995 -16.348.00 26579.42 26572.37 1.0003 7.05

10.00 20416.16 20395.40 1.0010 20.7612.00 15954.47 15925.99 1.0018 28.4814.00 12666.58 12634.10 1.0026 32.4716.00 10202.61 10168.47 1.0034 34.1418.00 8326.74 8292.37 1.0041 34.3720.00 6877.39 6843.69 1.0049 33.7022.00 5742.14 5709.65 1.0057 32.5024.00 4841.55 4810.56 1.0064 30.9926.00 4118.69 4089.36 1.0072 29.33

Equalized Discount Rate is Not Applicable

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 47710.32 47760.13 0.9990 -49.816.00 35263.45 35270.41 0.9998 -6.968.00 26590.43 26572.37 1.0007 18.06

10.00 20427.70 20395.40 1.0016 32.3012.00 15965.96 15925.99 1.0025 39.9714.00 12677.73 12634.10 1.0035 43.6216.00 10213.30 10168.47 1.0044 44.8318.00 8336.94 8292.37 1.0054 44.5620.00 6887.12 6843.69 1.0063 43.4222.00 5751.43 5709.65 1.0073 41.7924.00 4850.46 4810.56 1.0083 39.8926.00 4127.26 4089.36 1.0093 37.89

Equalized Discount Rate is Not Applicable

Transmission System Planning Division21 - Mar-95

11:08AM

-28-

Page 34: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.6Summary Result of Economic Analysis

(continued)I

Project Transmission System Expansion Project No. 9Region 1; Subproject No.3

Cost Stream Alternative A

Benefit Stream Alternative D

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit _ Cost _ Net Benefit4.00 47786.05 47760.13 1.0005 25.926.00 35307.69 35270.41 1.0011 37.298.00 26615.17 26572.37 1.0016 42.81

10.00 20440.28 20395.40 1.0022 44.8812.00 15970.92 15925.99 1.0028 44.9314.00 12677.93 12634.10 1.0035 43.8216.00 10210.55 10168.47 1.0041 42.0818.00 8332.39 8292.37 1.0048 40.0220.00 6881.53 6843.69 1.0055 37.8322.00 5745.28 5709.65 1.0062 35.6324.00 4844.06 4810.56 1.0070 33.5026.0u 4120.6, 4089.36 1.0077 31.45

Equalized Discount Rate is Not Applicable

Transmission System Planning Division21 -Mar-95

11:12AM

-29-

Page 35: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBpROJECT NO.4115 KV THALAN 3 - SARABURI 1 LINE AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.7.

b) Alternative Plans The three possible alternative plans to serve the same technical

objectives of this subproject as described in Volume I (Main Report) are

Alternative A:

Year 1998

- Construction of 115 kV lhalan 3 - Saraburi I line, double circuit steel

tower, using 795 MCM ACSR conductor, a distance of approximately 15 km. This

transmission line will be constructed on the right-of-way of the existing 115 kV Thalan

1 - Saraburi 1 line.

- Construction of 115 kV 'Ihalan I - Thalan 3 line, single circuit on double

circuit steel tower, using 795 MCM AC'SR conductor, a distance of approximately 5 km.

This transmission line will be constructed on1 the right-of-way of the existing 115 kY

Thalan 1 - Saraburi 1 line.

The economic cost is 161.8 MTIIB.

Alternative B

Year 1998

- Reconstruction of the existing Thalan 1 - Saraburi I from 115 kV single

circui linie 'o LI . xV doubie circuit iine, using 795 MCM ACSR conductor, a distance

of approximately 18 km.

-30-

Page 36: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

- Reconstruction of the existing 115 kV Thalan 1 - Thalan 3 from double

circuit line using 477 MCM ACSR conductor to double circuit line using 795 MCM

ACSR conductor, a distance of approximately 5 km.

The economic cost is 169.3 MTIIB.

Alternative C

Year 1998

- Construction of 115 kV Thalan 3 - Saraburi I line, single circuit on

double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 14 km.

- Termination of 115 kV Thalan I - Saraburi I at Thalan 3 substation and

reconstruction of the existing 115 kV Thalan I - Thalan 3 from single circuit line to

single circuit on double circuit line, using 795 MCM ACSR conductor, a distance of

approximately 5 km.

The economic cost is 153.9 MTIIB.

Year 2003

- Stringing 2nd circuit of the 115 kV Thalan 3 - Saraburi I line, using 795

MCM ACSR conductor, a distance of approximately 14 km.

The economic cost is 38.6 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix 1.

-31-

Page 37: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

d) Results of Economic Analysis

1. Comparison of Present Value

P.AV. i 10 % DR. (MT!5B

Alternative A 25,500.61

Alternative B 25,510.64

Alternative C 25,511.58

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB) (%)

Alternative A VS. Alternative B 10.03 1.0004 31.36

Alternative A VS. Alternative C 10.97 1.0004 25.28

Results of the analysis have led to the conclusion that the reconstruction

of 115 kV Thalan 1 - Saraburi I to 115 kV Thalan 3 - Saraburi I transmission system

project is the least cost alternative.

-32-

Page 38: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.7

Load Forecast for Saraburi 1 Substation

Subp,ropct No.4

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%)

1994 44.40 - 246.24 - 63.31

1995 62.48 40.72 369.43 50.03 67.501996 68.78 10.08 413.67 11.98 68.661997 52.57 a/ -23.57 256.82 a/ -37.92 55.771998 57.15 8.71 278.71 8.52 55.671999 61.96 8.42 308.07 10.53 56.762000 67.07 8.25 341.46 10.84 58.122001 72.51 8.11 380.31 11.38 59.872002 78.33 8.03 416.76 9.58 60.742003 84.54 7.93 457.78 9.84 61.812004 91.18 7.85 505.60 10.45 63.302005 98.27 7.78 557.60 10.28 64.772006 105.86 7.72 614.18 10.15 66.23

Note a/ Some loads are transfered to PEA's 115 kV systems which receive power from 230/115 kV

Saraburi 2 Substation.

-33-

Page 39: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4 . 8Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 1; Subproject No.4

Cost Stream Alternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost _ __ Net Benefit

4.00 61301.64 61281.13 1.0003 20.516.00 44903.78 44887.66 1.0004 16.128.00 33538.75 33526.05 1.0004 12.71

10.00 25510.64 25500.61 1.0004 10.0312.00 19735.39 19727.47 1.0004 7.9214.00 15508.08 15501.86 1.0004 6.2316.00 12362.60 12357.73 1.0004 4.87i8.00 9985.61 9981.84 1.0004 '3.7620.00 8163.14 81S0.28 1.0004 2.8622.00 6746.81 6744.70 1.0003 2.1124.00 5632.17 5630.67 1.0003 1.5026.00 4744.65 4743.66 1.0002 0.99

Equalized Discount Rate = 31.36%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value. Present Value B/C Present ValueRate of of Ratio of(°/9) Benefit Cost ___ _ Net Benefit

4.00 61301.92 61281.13 1.0003 20.796.00 44904.75 44887.66 1.0004 17.098.00 33539.85 33526.05 1.0004 13.81

10.00 25511.58 25500.61 1.0004 10.9712.00 19736.04 19727.47 1.0004 8.5614.00 15508.39 15501.86 1.0004 6.5316.00 12362.56 12357.73 1.0004 4.8318.00 9985.25 9981.84 1.0003 3.4120.00 8162.51 8160.28 1.0003 2.2322.00 6745.95 6744.70 1.0002 1.2524.00 5631.11 5630.67 1.0001 0.4426.00 4743.43 4743.66 1.0000 -0.22

Equalized Discount Rate 25.28%

Transmission System Planning Division21 - Mar-95

11:13AM

-34-

Page 40: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.5115 KV RATCHABURI 2 - PHETCHABURI LINE AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.9.

b) Alternative Plans The three possible alternative plans to serve the same technical

objectives of this subproject as described in Volume I (Main Report) are

Alternative A

Year 1998

- Reconstruction of the existing 115 kV Ratchaburi 2 - Phetchaburi from

single circuit line to double circuit line, using 2x795 MCM ACSR conductor, a distance

of approximately 53 km.

The economic cost is 287.9 MTHB.

Alternative B

Year 1998

- Termination of the 2nd circuit of 230 kV Ratchaburi 2 -Prachuap Khiri

Khan line at Hua Hin Substation, using 1,272 MCM ACSR conductor, a distance of

approximately 10 km.

The economic cost is 156.3 MTHB.

-35-

Page 41: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Year 2006

- Construction of 115 kV Ratchaburi 2 - Phetchaburi line, single circuit

on double circuit steel tower, using 2x795 MCM ACSR conductor, a distance of

approximately 53 km.

The economic cost is 278.1 MTHB.

Alternative C

Year 1998

- Construction of 115 kV Ratchaburi 2 - Phetchaburi line, single circuit

on double circuit steel tower, using 2x795 MCM ACSR conductor, a distance of

approximately 53 km.

The economic cost is 306.0 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix 1.

d) Results of Economic Analysis

1. Comparison of Present. Value

P.V. at 10 % DR. (MTHB)

Alternative A 24,266.75

Alternative B 24,278.83

Alternative C 24,295.87

-36-

Page 42: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

2. Net Present Value and B/C, Ratio

Net Present Value B/C Ratio EDR.

(MTHB) (%)

Alternative A VS. Alternative B 12.09 1.0005 12.77

Alternative A VS. Alternative C 29.12 1.0012 >150.00

Results of the analysis have led to the conclusion that the reconstruction

of 115 kV Ratchaburi 2 - Phetchaburi transmission system project is the least cost

alternative.

-37-

Page 43: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.9

Load Forecast for Phetchaburi, Cha Amand Hua Hin Substations

Subproyct No.5

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%)

1994 71.60 - 401.85 - 64.071995 91.25 27.44 460.59 14.62 57.621996 99.57 9.12 504.38 9.51 57.831997 108.08 8.55 546.72 8.39 57.751998 116.77 8.04 584.31 6.88 57.121999 125.58 7.54 625.97 7.13 56.902000 134.58 7.17 670.21 7.07 56.852001 143.85 6.89 718.42 7.19 57.012002 153.18 6.49 762.81 6.18 56.852003 162.77 6.26 809.60 6.13 56.782004 172.64 6.06 859.76 6.20 56.852005 182.74 5.85 912.00 6.08 56.972006 193.12 5.68 966.32 5.96 57.12

-38-

Page 44: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.10Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 1; Subproject No. 5

Cost Stream Alternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 57338.42 57288.57 1.0009 49.856.00 42236.38 42200.32 1.0009 36.068.00 31730.24 31707.07 1.0007 23.18

10.00 24278.83 24266.75 1.0005 12.0912.00 18895.39 18892.40 1.0002 2.9914.00 14937.06 14941.29 0.9997 -4.2316.00 11977.92 11987.72 0.9992 -9.8018.00 9730.99 9744.99 0.9986 -13.9920.00 7999.85 8016.91 0.9979 -17.0622.00 6647.90 6667.11 0.9971 -19.2124.00 -55787S3 5599.37 0.9963 -20.6426.00 4723.30 4744.81 0.9955 -21.51

Equalized Discount Rate = 12.77%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 57326.17 57288.57 1.0007 37.606.00 42234.25 42200.32 1.0008 33.938.00 31738.26 31707.07 1.0010 31.20

10.00 24295.87 24266.75 1.0012 29.1212.00 18919.91 18892.40 1.0015 27.5114.00 14967.53 14941.29 1.0018 26.2316.00 12012.91 11987.72 1.0021 25.1918.00 9769.30 9744.99 1.0025 24.3120.00 8040.46 8016.91 1.0029 23.5522.00 6689.98 6667.11 1.0034 22.8724.00 5621.64 5599.37 1.0040 22.2626.00 4766.51 4744.81 1.0046 21.70

Equalized Discount Rate is Greater Than 150%

Transmission System Planning Division21 - Mar-95

11:16AM

-39-

Page 45: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.6

115 KV PRACHIN BURI 2 - WATTHANA NAKHON LINE

AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.11.

b) Alternative Plans The three possible alternative plans to serve the same technical

objectives of this subproject as described in Volume I (Main Report) are

Alternative Ii.

Year 1998

- Construction of 115 kV Prachin Buri 2 - Watthana Nakhon line, single

circuit on double circuit steel tower, using 2X795 MCM ACSR conductor, a distance of

approximately 67 km.

The economic cost is 345.1 MTHB.

Alternative B

Year 1998

- Construction of 230 kV Prachin Buri 2 - Watthana Nakhon line, single

circuit on double circuit steel tower, using 1,272 MCM ACSR conductor, a distance of

approximately 67 km, initially energized at 115 kV.

The economic cost is 476.2 MTHB.

-40-

Page 46: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Alternative C:

Year 1998

- Construction of 230 kV Prachin Buri 2 - Watthana Nakhon line, single

circuit on double circuit steel tower, using 1,272 MCM ACSR conductor, a distance of

approximately 67 km.

- Installation of 1 x200 MVA 23 0/115 kV transformer at Watthana Nakhon

Substation.

The economic cost is 779.9 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix 1.

UI) AXResu'Ls ol ucor.omr.c fnaluz

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 18,571.47

Alternative B 18,679.47

Alternative C 18,893.61

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB) (%)

Alternative A VS. Alternative B 108.00 1.0058 >150.00

Alternative A VS. Alternative C 322.14 1.0173 >150.00

-41-

Page 47: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Results of the analysis have led to the conclusion that the construction of

115 kV Prachin Buri 2 - Watthana Nakhon transmission system project is the least cost

alternative.

-42-

Page 48: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.11

Load Forecast for Watthana Nakhon Substation

Subprojct No.6

Fiscal Peak Demand Energy Demand Load Factor

Year MW % Increase GWh % Increase (%)

1994 29.66 - 123.39 - -

1995 34.15 15.14 149.92 21.50 50.111996 37.29 9.19 165.70 10.53 50.731997 40.52 8.66 138.03 -16.70 38.89

1998 43.89 8.32 155.45 12.62 40.431999 47.42 8.04 173.74 11.77 41.82

2000 51.18 7.93 194.66 12.04 43.42

2001 55.15 7.76 217.11 11.53 44.94

2002 59.36 7.63 243.57 12.19 46.84

2003 63.82 7.51 274.89 12.86 49.17

2004 68.57 7.44 304.88 10.91 50.76

2005 73.61 7.35 337.41 10.67 52.33

2006 78.96 7.27 372.66 10.45 53.88

-43-

Page 49: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.12Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 1; Subproject No.6

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit _ Cost ___ Net Benefit

4.00 44063.65 43926.65 1.0031 136.996.00 32461.79 32335.35 1.0039 126.448.00 24396.18 24279.43 1.0048 116.75

10.00 18679.47 18571.47 1.0058 108.0012.00 14551.81 144S1.63 1.0069 100.1714.00 11518.41 11425.25 1.0082 93.1716.00 9251.64 9164.76 1.0095 86.8818.00 7530.91 7449.68 1.0109 81.2320.00 6205.32 6129.20 1.0124 76.1222.00 5170.01 5098.52 1.0140 71.4924.00 4351.03 4283.76 1.0157 67.2726.00 3695.46 3632.06 1.0175 63.41

Equalized Discount Rate is Greater Than 150%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 44337.90 43926.65 1.0094 411.256.00 32714.02 32335.35 1.0117 378.678.00 24628.41 24279.43 1.0144 348.98

10.00 18893.61 18571.47 1.0173 322.1412.00 14749.57 14451.63 1.0206 297.9414.00 11701.35 11425.25 1.0242 276.1116.00 9421.15 9164.76 1.0280 256.3918.00 7688.22 7449.68 1.0320 238.5320.00 6351.53 6129.20 1.0363 222.3322.00 5306.10 5098.52 1.0407 207.5824.00 4477.89 4283.76 1.0453 194.1326.00 3813.88 3632.06 1.0501 181.82

Equalized Discount Rate is Greater Than 150%

Transmission System Planning Division21 -Mar-95

11:17AM

-44-

Page 50: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.7

230/115 KV MUKDAHAN 2 SUBSTATIONS AND 115 KV MUKDAHAN 2

- THAT PHANOM - NAKHON PHANOM LINES AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.13.

b) Alternative Plans The four possible alternative plans to serve the same technical

objectives of this subproject as described in Volume I (Main Report) are

Alternative A

Year 1998QI Lai-I i1~

- Termination of one circuit ot 230 kV Savannakhet - Roi Et at Mukdahan

2 Substation.

- Installation of 2x200 MVA 230/115 kV transformers at Mukdahan 2

Substation.

- Construction of 115 kV Mukdahan 2 - That Phanom line, double circuit

steel tower, using 795 MCM ACSR, a distance of approximately 36 km.

- Construction of 115 kV That Phanom - Nakhon Phanom line, single

circuit on double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 59 km.

The economic cost is 755.5 MTHB.

-45-

Page 51: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Year 2003

- Installation of lx20( MVA 230/115 kV transformer at Roi Et Substation.

The economic cost is 114.2 MTHB.

Year 2005

- Stringing second circuit of 115 kV That Phanom - Nakhon Phanom line,

using 795 MCM ACSR conductor, a distance of approximately 59 km.

The economic cost is 6237 MTHB.

Alternative B

Year 1998

- Termination of one circuit of 230 kV Thakhek - Sakon Nakhon 2 at

Nakhon Phanom 2 Substation.

- Installation of 2x200 MVA 230/115 kV transformers at Nakhon Phanomn

2 Substation.

- Construction of 115 kV Nakhon Phanom 2 - Nakhon Phanom 1 line,

double circuit steel tower, using 2x795 MCM ACSR conductor, a distance of

approximately 13 km.

- Construction of 115 kV Nakhon Phanom 1 - That Phanom line, double

circuit steel toWer, using 795 MCM ACSR conductor, a distance of approximately 59

km.

- Construction of 115 kV That Phanom - Mukdahan line, single circuit on

double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 45 km.

The economic cost is 865.5 MTHB.

-46 -

Page 52: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Year 2001

- Installation of lx200 MVA 230/115 kV transformer at Roi Et Substation.

The economic cost is 114.2 MTHB.

Year 2005

- Stringing second circuit of 115 kV That Phanom - Mukdahan line, using

795 MCM ACSR conductor, a distance of approximately 45 km.

The economic cost is 45.0 MTHB.

Alternative C

X.TA..A._ 1 AA OIL lai 17:70

- Construction of 115 kV Sakon Nakhon - That Phanom line, double

circuit line, using 795 MCM ACSR conductor, a distance of approximately 70 km.

- Construction of I 15 kV That Phanom - Nakhon Phanom line, single

circuit on double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 59 km.

- Construction of 115 kV That Phanom - Mukdahan line, single circuit on

double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 45 km.

The economic cost is 625.0 MTHB.

Year 2001

- Installation of I x200 MVA 230/115 kV transformer at Roi Et Substation.

The economic cost is 114.2 MTHB.

-47-

Page 53: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Year 2004

- Stringing second circuit of 115 kV That Phanom - Mukdahan line. usine

795 MCM ACSR conductor, a distance of approximately 45 km.

The economic cost is 45.0 MTHB.

Year 2005

- Stringing second circuit of 115 kV That Phanom - Nakhon Phanom line,

using 795 MCM ACSR conductor, a distance of approximately 59 km.

The economic cost is 62.7 MTHB.

Alternative D

Year 1998

- Construction of 115 kV Sakon Nakhon - That Phanom line, double

circuit steel tower, using 795 MCM ACSR conductor, a distance of approximately 70

km.

- Construction of 115 kV That Phanom - Nakhon Phanom line, single

circuit on double circuit steel tower, using 795 MCM ACSR conductor, a distancc of

approximately 59 km.

- Construction of 115 kV Phon Thong - Mukdahan line, single circuit on

double circuit steel tower, using 795 MCM ACSR conductor, a distance ol

approximately 90 km.

- Stringing second circuit of 115 kV Roi Et - Phon Thong line, using 795

MCM ACSR conductor, a distance of approximately 45 km.

-48-

Page 54: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

The economic cost is 847.7 MTHB.

Year 2001

- Installation of lx200 MVA 230/115 kV transformer at Roi Et Substation.

The economic cost is 114.2 MTHB.

Year 2004

- Stringing second circuit of 115 kV Phon Thong - Mukdahan line, using

795 MCM ACSR conductor, a distance of approximately 90 km.

The economic cost is 71.2 MTHB.

wy.. ~nr.nr

- Stringing second circuit of 115 kV That Phanom - Nakhon Phanom line,

using 795 MCM ACSR conductor, a distance of approximately 59 km.

The economic cost is 62.7 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix l.

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 15,955.30

Alternative B 16,323.02

Alternative C 16,219.11

Alternative D 16,237.27

-49-

Page 55: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB) (%)

Alternative A VS. Alternative B 367.72 1.0230 >150.00

Alternative A VS. Alternative C 263.81 1.0165 31.53

Alternative A VS. Alternative D 281.97 1.0177 145.89

Results of the analysis have led to the conclusion that the constructionof 230/115 kV Mukdahan 2 Substation and line termination together with construction

of 115 kV Mukdahan 2 - That Phanom - Nakhon Phanom transmission system project

is the least cost alternative.

-sn-.

Page 56: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Tabie 4.13Load Forecast for Nakhon Phanom, That Phanom

and Mukdahan Substations__ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ _ Subprojccl No.7

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%/0)

1994 55.74 - 216.28 - 44.291995 60.96 9.36 233.36 7.90 43.701996 63.62 4.36 248.33 6.41 44.561997 68.87 8.25 268.61 8.17 44.521998 74.12 7.62 289.06 7.61 44.521999 79.55 7.33 311.88 7.89 44.762000 85.18 7.08 336.07 7.76 45.042001 90.99 6.82 361.81 7.66 45.392002 97.04 6.65 386.94 6.95 45.522003 103.12 6.27 413.48 6.86 45.772004 109.90 6.57 441.43 6.76 45.852005 116.77 6.25 471.18 6.74 46.062006 123.96 6.16 503.09 6.77 46.33

-51-

Page 57: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.14Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 2; Subproject No. 7

Cost Sirearn Alternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 36337.10 35529.68 1.0227 807.416.00 27273.21 26666.22 1.0228 606.998.00 20898.87 20431.63 1.0229 467.24

10.00 16323.02 15955.30 1.0230 367.7212.00 12973.19 12677.83 1.0233 295.3714.00 10474.96 10233.26 1.0236 241.7016.00 8579.05 8377.94 1.0240 201.1218.00 7116.67 6946.81 1.0245 169.8620.00 5971.56 5826.19 1.0250 145.3722.00 5062.34 4936.48 1.0255 125.8524.00 4331.15 4221.07 1.0261 110.0826.00 3736.21 3639.08 1.0267 97.14

Equalized Discount Rate is Greater Than 150%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost _ _ Net Benefit

4.00 36250.36 35529.68 1.0203 720.686.00 27176.64 26666.22 1.0191 510.428.00 20797.03 20431.63 1.0179 365.40

10.00 16219.11 15955.30 1.0165 263.8112.00 12869.41 12677.83 1.0151 191.5814.00 10372.78 10233.26 1.0136 139.5216.00 8479.47 8377.94 1.0121 101.5318.00 7020.29 6946.81 1.0106 73.4820.00 5878.75 5826.19 1.0090 52.5622.00 4973.29 4936.48 1.0075 36.8124.00 4245.92 4221.07 1.0059 24.8526.00 3654.80 3639.08 1.0043 15.72

EnaJi7orizedr- Discount Rate = 31r.a

Transmission System Planning Division21-Mar-95

11:20AM

-52-

Page 58: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.14Summary Result of Economic Analysis

(Continued)

Project Transmission System Expansion Project No. 9Region 2; Subproject No.7

Cost Stream Alternative A

Benefit Stream Alternative D

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 36075.87 35529.68 1.0154 546.196.00 27096.99 26666.22 1.0162 430.778.00 20777.34 20431.63 1.0169 345.71

10.00 16237.27 15955.30 1.0177 281.9712.00 12911.24 12677.83 1.0184 233.4114.00 10429.07 10233.26 1.0191 195.8116.00 8544.17 8377.94 1.0198 166.2418.00 7089.44 6946.81 1.0205 142.6320.00 5949.72 5826.19 1.0212 123.5322.00 5044.35 4936.48 1.0219 107.8724.00 4315.95 4221.07 1.0225 94.8826.00 3723.05 3639.08 1.0231 83.98

Equalized Discount Rate = 145.89%

Transmission System Planning Division21 -Mar-95

11:22AM

-53-

Page 59: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.8115 KV UDON THANI 2 - NONG BUA LAM PHU LINE AND

SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.15.

b) Alternative Plans The three possible alternative plans to serve the same technical

objectives of this subproject as described in Volume I (Main Report) are

Alternative A:

Year 1998

- Construction of 1 15 kV Udon T hani 2 - Nong Bua Lam Phu line, single

circuit on double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 61 km.

The economic cost is 176.7 MTHB.

Year 2001

- Construction of 115 kV Nong Bua Lam Phu - Loei line, single circuit

on double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 79 km.

The economic cost is 212.7 MTHB.

-54-

Page 60: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Year 2005

- Stringing 2nd circuit of 115 kV Udon Thani 2 - Nong Bua Lam Phu line,

using 795 MCM ACSR conductor, a distance of approximately 61 km.

The economic cost is 56.0 MTHB.

Alternative B

Year 1998

- Construction of 15 kV Udon Thani 2 - Nong Bua Lam Phu line, double

circuit steel tower, using 795 MCM ACSR conductor, a distance of approximately 61

km.

The economic cost is 226.4 MTiHB.

Year 2001

- Construction of I1 5 kV Nong Bua Lam Phu - Loei line, single circuit

on double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 79 km.

The economic cost is 212.7 MTHB.

Alternative C

Year 1998

- Construction of 230 kV Udon Thani 2 - Nong Bua Lam Phu line, double

circuit steel tower, using 1,272 MCM ACSR conductor, a distance of approximately 61

km, initially energized at 115 kV.

The economic cost is 319.7 MTHB.

-55 -

Page 61: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Year 2001

- Construction of 115 kV Nong Bua Lam Phu - Loei line, single circuit

on double circuit steel tower, using 795 MCM ACSK conductor, a distance of

approximately 79 km.

The economic cost is 212.7 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix 1.

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 15,748.44

Alternative B 15,754.48

Alternative C 15,811.46

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB) !(%

Alternative A VS. Alternative BI 6.04 1.0004 N.A.

Alternative A VS. Alternative C 63.02 1.0040 >150.00

Results of the analysis have led to the conclusion that the construction of

115 kV Udon Thani 2 - Nong Bua Lam Phu single circuit on double circuit line is the

least cost alternative.

-56-

Page 62: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.15

Load Forecast for Nong Bua Lam Phuand Loei Substations

Subpro*ct No.S

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%)

1994 33.44 - 114.64 - 39.141995 55.97 a/ 67.37 196.94 a/ 71.79 40.171996 57.73 3.14 208.46 5.85 41.221997 62.20 7.74 225.51 8.18 41.391998 66.81 7.41 243.41 7.94 41.591999 71.50 7.02 263.50 8.25 42.072000 76.23 6.62 284.53 7.98 42.612001 81.05 6.32 306.84 7.84 43.222002 86.00 6.11 328.15 6.94 43.562003 91.11 5.94 350.70 6.87 43.942004 96.42 5.83 374.42 6.76 44.332005 101.98 5.77 399.88 6.80 44.762006 107.67 5.58 426.85 6.74 45.26

Note: a/ Highly demand increase due to transfered load from Udon Thani I Substation

to newly constructed Nong Bua Lam Phu Substation.

-57-

Page 63: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.16Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 2; Subproject No. 8

Cost A;trem Aiternati-ve A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(O) Benefit Cost Net Benefit

4.00 36256.30 36257.81 1.0000 -1.516.00 26928.60 26926.99 1.0001 1.608.00 20406.41 20402.29 1.0002 4.12

10.00 15754.48 15748.44 1.0004 6.0412.00 12372.95 12365.50 1.0006 7.4514.00 9870.27 9861.84 1.0009 8.4316.00 7986.36 7977.30 1.0011 9.06i8.00 6545.58 6536.15 1.0014 9.4220.00 5427.30 5417.74 1.0018 9.5722.00 4547.41 4537.85 1.0021 9.5524.00 3846.28 3836.86 1.0025 9.4226.00 3281.08 3271.88 1.0028 9.20

Equalized Discount Rate is Not Applicable

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 36316.69 36257.81 1.0016 58.886.00 26989.66 26926.99 1.0023 62.678.00 . 20465.98 20402.29 1.0031 63.68

10.00 15811.46 15748.44 1.0040 63.0212.00 12426.86 12365.50 1.0050 61.3614.00 9920.94 9861.84 1.0060 59.1016.00 8033.82 7977.30 1.0071 56.5218.00 6589.94 6536.15 1.0082 53.7820.00 5468.74 5417.74 1.0094 51.0022.00 4586.10 4537.85 1.0106 48.2524.00 3882.42 3836.86 1.0119 45.5626.00 3314.85 3271.88 1.0131 42.97

Equalized Discount Rate is Greater Than 150%

Transmission System Planning Division21 -Mar-95

11:24AM

-58-

Page 64: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.9115 KV ROI ET - PHAYAKKIAPHUM PHISAI - SURIN LINES

AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.17.

b) Alternative Plans The three possible alternative plans to serve the same technical

objectives of this subproject as described in Volume I (Main Report) are

Alternative A

Year 1998

- Stringing 2nd circuit of 115 kV Roi Et - Phayakkhaphum Phisai line,

using 795 MCM ACSR conductor, a distance of approximately 84 km.

- Construction of 115 kV Phayakkhaphum Phisai - Surin line, single

circuit on double circuit steel tower using 795 MCM ACSR conductor, a distance of

approximately 80 km.

The economic cost is 302.2 MTHB.

Year 2003

- Stringing 2nd circuit of 115 kV Phayakkhaphum Phisai - Surin line,

using 795 MCM ACSR conductor,. a distance of approximately 80 km.

The economic cost is 66.0 MTHB.

-59-

Page 65: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Alternative B:

Year 1998

- Construction of 115 kV Si Sa Ket - Surin line, single circuit on double

circuit steel tower, using 795 MCM ACSR conductor, a distance of approximately 95

km.

- Stringing 2nd circuit of 115 kV Roi Et - PhayakkhaphniWfiPhisai line,

using 795 MCM ACSR conductor, a distance of approximately 84km.

The economic cost is 335.6 MTHB.

Year 2003

* Stringing 2nd circuit of 115 kV Si Sa Ket - Surin line, using 795 MCM

ACSR conductor, a distance of approximately 95 km.

The economic cost is 74.1 MTHB.

Altenative C

Year 1998

- Construction of 115 kV Buri Ram - Surin line, single circuit on double

circuit steel tower, using 795 MCM ACSR conductor, a distance of approximately 47

km.

- Construction of 115 kV Phayakkhaphum Phisai - Surin line, single

circuit on double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 80 km.

-60-

Page 66: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

- Reconstruction of the existing 115 kV Nakhon Ratchasima 1 - Buri Ram

from single circuit line to double circuit line, using 795 MCM ACSR conductor, a

distance of approximately 111 km.

The economic cost is 633.4 MTHB.

Year 2003

- Stringing 2nd circuit of 115 kV Buri Ram - Surin line, using 795 MCM

ACSR conductor, a distance of approximately 47 km.

The economic cost is 49.3 MTHB.

Year 2006

- Reconstruction of the existing 115 kV Nakhon Ratchasima I - Nakhon

Ratchasima 2 from single circuit line to double circuit line, using 2x795 MCM ACSR

conductor, a distance of approximately 12 km.

- Stringing 2nd circuit of 115 kV Phayakkhaphum Phisai - Surin line,

using 795 MCM ACSR conductor, a distance ofapproximately 80 km.

The economic cost is 125.3 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix 1.

-61-

Page 67: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 16,341.97

Alternative B 16,409.12

Alternative C 16,629.36

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(M iITB) (%)

Alternative A VS. Alternative B 67.15 1.0041 58.57

Alternative A VS. Altemative C 287.38 1.0176 >150.00

Results of the analysis have led to the conclusion that the line stringing

of 2nd circuit of Roi Et - Phayakkhaphum Phisai and construction of 115 kV

Phayakkhaphum Phisai - Surin transmission system project is the least cost alternative.

-62-

Page 68: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.17

Load Forecast for Phayakkhaphum Phisaiand Surin Substations

Subpropet NoS

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%)

1994 52.80 - 215.83 - 46.661995 77.05 a/ 45.93 291.53 g 35.07 43.191996 83.28 8.09 321.81 10.39 44.111997 89.17 7.07 345.36 7.32 44.211998 95.11 6.66 369.52 7.00 44.351999 101.13 6.33 396.73 7.36 44.782000 107.15 5.95 425.02 7.13 45.282001 113.28 5.72 455.02 7.06 45.852002 119.47 5.46 482.85 6.12 46.142003 125.89 5.37 512.47 6.13 46.472004 132.57 5.31 543.62 6.08 46.812005 139.52 5.24 576.84 6.11 47.202006 146.76 5.19 612.64 6.21 47.65

Note: e/ Highly demand increase due to transfered load from Maha Sarekham and Roi Et Substation

to newly constructed Phayakkhaphum Phisai Substation.

-63-

Page 69: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.18Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 2; Subproject No. 9

Cost Stream Alternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 37417.47 37300.41 1.0031 117.076.00 27873.88 27777.58 1.0035 96.318.00 21187.93 21107.87 1.0038 80.07

10.00 16409.12 16341.97 1.0041 67.1512.00 12927.44 12870.72 1.0044 56.7214.00 10344.40 10296.21 1.0047 48.1916.00 8395.10 8353.98 1.0049 41.1318.00 6900.46 6865.24 1.0051 35.2220.00 5737.35 5707.11 1.0053 30.2522.00 4819.79 4793.77 1.0054 26.0224.00 4086.75 4064.36 1.0055 22.4026.00 3494.33 3475.05 1.0055 19.28

Equalized Discount Rate = 58.57%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 37664.77 37300.41 1.0098 364.366.00 28116.56 27777.58 1.0122 338.988.00 21420.51 21107.87 1.0148 312.64

10.00 16629.36 16341.97 1.0176 287.3812.00 13134.76 12870.72 1.0205 264.0414.00 10539.06 10296.21 1.0236 242.8516.00 8577.77 8353.98 1.0268 223.7918.00 7071.93 6865.24 1.0301 206.7020.00 5898.49 5707.11 1.0335 191.3822.00 4971.40 4793.77 1.0371 177.6324.00 4229.61 4064.36 1.0407 165.2526.00 3629.13 3475.05 1.0443 154.08

Equalized Discount naie is Greater Than 150%

Transmission System Planning Division21 -Mar-95

11:26 AM

-64-

Page 70: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.10115 KV CHAIYAPHUM - BAMNET NARONG LINE AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.19.

b) Alternative Plans The three possible alternative plans to serve the same technicalobjectives of this subproject as described in Volume I (Main Report) are

Alternative A

Year 1998

* Construction of 115 I-V Chai-aphum - Bim. net NTrong line, siLng circui

on double circuit steel tower, using 795 MCM ACSR conductor, a distance ofapproximately 58 km.

The economic cost is 251.7 MTHB.

Alternative B

Year 1998

- Construction of 115 kV Nakhon Ratchasima 2 - Bamnet Narong line,

single circuit on double circuit steel tower, using 795 MCM ACSR conductor, a distance

of approximately 65 km.

The economic cost is 264.1 MTHB.

-65-

Page 71: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Alternative C:

Year 1998

- Installation of three units 25 MW gas turbine power plant at Bamnet

Narong Substation.

The economic cost is 1,134.0 MTHB.

The installation schedules of Alternative A, B and C are shown in Figures

4.1 to 4.3.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are givenin Appendix 1.

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 22,059.14

Alternative B 22,124.52

Alternative C 23,068.70

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB) (%_

Alternative A VS. Alternative B 65.38 1.0030 >150.00

Alternative A VS. Alternative C 1,009.56 1.0458 62.81

Results of the analysis have led to the conclusion that the construction ofthe proposed 115 kV Chaiyaphum - Bamnet Narong transmission system project is the

least cost alternative.

-66-

Page 72: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.19

Load Forecast for Bamnet Narong Substation

Subprojec No.10

Fiscal Peak Demand Energy Demand Load Factor

Year MW % Increase GWh % Increase (%)

1994 14.00 - 61.40 - 50.07

1995 18.00 28.57 a 70.20 14.33 at 44.52

1996 19.20 6.67 79.20 12.82 47.09

1997 35.50 84.90 a/ 116.50 47.10 a/ 37.46

1998 36.80 3.66 189.00 62.23 58.63

1999 38.10 3.53 222.30 17.62 66.61

2000 39.40 3.41 253.10 13.86 73.33

2001 40.80 3.55 260.50 2.92 72.89

2002 42.20 3.43 268.10 2.92 72.52

2003 43.60 3.32 276.00 2.95 72.26

2004 45.00 3.21 284.10 2.93 72.07

2005 46.40 3.11 292.60 2.99 71.99

2006 47.79 3.00 301.30 2.97 71.97

Note: _l Highly demand increase due to demand of Asean Potash Mine Project.

-67-

Page 73: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.20Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9

Region 2; Subproject No. 10

Cost Stream : AterMftve A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 50673.11 50555.92 1.0023 117.196.00 37685.21 37590.60 1.0025 94.618.00 28603.47 28525.52 1.0027 77.95

10.00 22124.52 22059.14 1.0030 65.3812.00 17412.91 17357.23 1.0032 55.6814.00 13923.60 13875.55 1.0035 48.0616.00 11294.79 11252.85 1.0037 41.9418.00 9282.21 9245.25 1.0040 36.9720.00 7718.22 7685.37 1.0043 32.8522.00 6485.87 6456.47 1.0046 29.4024.00 5502.38 5475.90 1.0048 26.4826.00 4708.20 4684.23 1.0051 23.98

Equalized Discount Rate is Greater Than 150%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 52970.30 50555.92 1.0478 2414.386.00 39366.42 37590.60 1.0472 1775.818.00 29853.89 28525.52 1.0466 1328.37

10.00 23068.70 22059.14 1.0458 1009.5612.00 18135.85 17357.23 1.0449 778.6214.00 14484.16 13875.55 1.0439 608.6116.00 11734.33 11252.85 1.0428 481.4818.00 9630.25 9245.25 1.0416 385.0020.00 7996.09 7685.37 1.0404 310.7322.00 6709.27 6456.47 1.0392 252.8024.00 5682.96 5475.90 1.0378 207.0626.00 4854.78 4684.23 1.0364 170.55

Equalized Discount Rate = 62.81%

Transmission System Planning Division21-Mar-95

11:28AM

-68-

Page 74: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Capacity (MW)120 -

110 - 115 kV Chaiyaphum - Bamnet NarongSC on DC/ST 795 MCM ACSR

100 -E

90 - Installed Capac¢vU,

80 - o80~~~70 - 0

60-

50 - U3

40 0. ~~~~~~~~~Peak Demand

30 -

20-

10

0 1993 1 1994 1 1995 1 1996 1 1997 1 1998 1 1999 1 2000 2 2001 I 2002 I 2003 1 2004 1 2005 1 2006 1 2007

Fiscal Yeair

Figure 4.1 Installation Schedule for Subproject No. 10(Bamnet Narong Substation) Alternative A

Page 75: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

(Capacity (MW)120 -

110 - 115 kV Nakhon Ratchasima 2 - Barnnet NarongSC on DC/ST 795 MCM ACSR

100 -

E 90 - E t K Installed Capacity

U)80 u

70 -0

60-

50 - U.0

40 -.......Peak Demand

30-

20 -

10__________

0 - 1993 1 1994 1 1995 1 1996 1 1997 1 1998 1 1999 1 2000 1 2001 1 2002 1 2003 1 2004 r 2005

Fiscal Year

Figure 4.2 Installation Schedule for Subproject No. 10(Bamnet NarongSubstation) Altemative B

4 4

Page 76: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Capacity (MW)120 -

110 -Gas Turbine 3x25 MW

100 -

90- 0 IInstalled Crapacity80

70 -

60-- *. Firm Capacily

50 -

40 - 3_ Peak Dernand0.30-

20-

10

0 1993 1 1994 1 1995 1996 1 1997 1 1998 1 1999 1 2000 1 2001 2002 1 2003 1 2004 1 2005 1 2006 7 2007

Fiscal Year

Figure 4.3 Installation Schedule for Subproject No. 10(Bamnet Narong Substation) Alternative C

Page 77: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.11115 KV UBON RATCHATHIANI 2 - KANTHARALAK LINE

AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.21.

b) Alternative Plans The three possible alternative plans to serve the same technical

objectives of this subproject as described in Volume I (Main Report) are

Alternative A:

Year 1998

- Construction of 115 kV Ubon Ratchathani 2 - Kantharalak line, single

circuit on double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 55 km.

The economic cost is 247.0 MTHB.

Alternative B

Year 1998

- Construction of 115 kV Si Sa Ket - Kantharalak line, single circuit on

double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 65 km.

The economic cost is 267.2 MTHB.

-72-

Page 78: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Alternative C

Year 1998

- Installation of two units 25 MW gas turbine power plant at Kantharalak

Substation.

The economic cost is 756.0 MTHB.

Year 2001

- Installation of one unit 25 MW gas turbine power plant at Kantharalak

Substation.

The economic cost is 378.0 MTHB.

The installation schedules of Alternative A, B and C are shown in Figures

4.4 to 4.6.

c) Power Flow Diagrams The power flow diagrams fQr the proposed plan are given

in Appendix 1.

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 15,305.51

Alternative B 15,332.73

Alternative C 15,755.06

-73-

Page 79: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.(MHB ______ s o

Altemative A VS. Alternative B 27.22 1.0018 >150.00

Alternative A VS. Alternative C 449.55 1.0294 83.90

Results of the analysis have led to the conclusion that the construction of

the proposed 115 kV Ubon Ratchathani 2 - Kantharalak transmission system project is

the least cost alternative.

-74-

Page 80: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.21

Load Forecast for Kantharalak Substation

Subpro*ct No.l I

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%)

1994 13.50 - 48.60 - 41.101995 15.00 11.11 54.70 12.55 41.631996 16.60 10.67 61.10 11.70 42.021997 18.20 9.64 67.30 10.15 42.211998 19.90 9.34 74.70 11.00 42.851999 21.70 9.05 82.00 9.77 43.142000 23.50 8.29 89.60 9.27 43.522001 25.30 7.66 97.60 8.93 44.042002 27.30 7.91 103.10 5.64 43.112003 29.80 9.16 114.60 11.15 43.902004 31.20 4.70 123.70 7.94 45.262005 33.40 7.05 133.30 7.76 45.562006 35.60 6.59 143.40 7.58 45.98

-75-

Page 81: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4 .22Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 2; Subproject No. 11

r(riqt Stream : Altema` A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit __- Cost Net Benefit

4.00 35190.32 35144.81 1.0013 45.526.00 26152.80 26115.06 1.0014 37.748.00 19836.45 19804.63 1.0016 31.82

10.00 15332.73 15305.51 1.0018 27.2212.00 12059.40 12035.80 1.0020 23.6014.00 9636.66 9615.97 1.0022 20.6916.00 7812.47 7794.15 1.0024 18.3218.00 6416.71 6400.35 1.0026 16.3620.00 5332.66 5317.95 1.0028 14.7122.00 4478.95 4465.63 1.0030 13.3224.00 3797.97 3785.85 1.0032 12.1226.00 3248.34 3237.25 1.0034 11.08

Equalized Discount Rate is Greater Than 150%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit -- Cost Net Benefit

4.00 36183.06 35144.81 1.0295 1038.256.00 26886.55 26115.06 1.0295 771.498.00 20388.41 19804.63 1.0295 583.78

10.00 15755.06 15305.51 1.0294 M9.5512.00 12387.75 12035.80 1.0292 351.9414.00 9895.73 9615.97 1.0291 279.7616.00 8019.62 7794.15 1.0289 225.4718.00 6584.31 6400.35 1.0287 183.9620.00 5469.68 5317.95 1.0285 151.7322.00 4591.96 4465.63 1.0283 126.3324.00 3891.89 3785.85 1.0280 106.0426.00 3326.89 3237.25 1.0277 89.63

Equalized Discount Rate 83.90%

Transmission System Planning Division21 -Mar-95

11:29 AM

-76-

Page 82: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Capacity (MW)150 -

140 -

130 -

120 - 115 kV Ubol Ratchathani 2 - Kantharalak

110 - 1SC on DC/ST 795 MCM ACSR

100 - o

90 - 4 Installed Capacity

80 _

70-

60 - .

50 - 'O

40 -

30-

20 -Peak Demand

1 0

0-° 1993 1994 1995 1996 1997 1998 1999 2000 1 2001 1 2002 1 2003 1 2004 1 2005 1 2006 I 2)07

Fiscal Year

Figure 4.4 Installation Schedule For Subproject No. 11(Kantharalak Substation) Alternative A

Page 83: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Capacity (MW)150 -

140 -

130 -

120 - E 115 kV Si Sa Ket - Kantharalak

110 - I SC on DC/ST 795 MOM ACSR

100 Cl)_

90 - Installed Capacity

80 -

co 70 -

60 -

50-40-30-

20 -- ~ekDmn

1 0

0 - l1993 1 1994 1 1995 1 1996 1 1997 ! 1998 1 19991 2000 1 2001 1 2002 1 2003 1 20047 12005l12006 1 2007

Fiscal Year

Figure 4.5 Installation Schedule for Subproject No. 11(Kantharalak Substation) Alternative B

Page 84: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Capacity (MW)100 -

90 - GasTurbine 1x25MW

80 - Installed CapacityE Gas Turbine70 - ,l 2x25 MW

70 - >CD

60 s n l 260~~~~.

t5- .a Firm Capacity

30 A!

20 - T _ mand20

10 l

0 1993 1 1994 1 1995 1 1996 1 1997 1 1998 1 1999 2000 1 2001 1 2002 2003 1 2004 1 2005 1 2006 1 2007

Fiscal Year

Figure 4.6 Installation Schedule for Subproject No.11(Kantharalak Substation) Alternative C

Page 85: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.12115 KV SURIN - SANGKIIA LINE AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted asshown in Table 4.23.

b) Alternative Plans The three possible alternative plans to serve the same technicalobjectives of this subproject as described in Volume I (Main Report) are

Alternative A:

Year 1998

- Construction of 115 kV Surin - Sangkha line, single circuit on doublecircuit steel tower, using 795 MCM ACSR conductor, a distance of approximately 49km.

The economic cost is 230.7 MTHB.

Alternative B

xYear 1998

- Construction of 115 kV Si Sa Ket - Sangkha line, single circuit on

double circuit steel tower, using 795 MCM ACSR conductor, a distance ofapproximately 74 km.

The economic cost is 291.6 MTHB.

-80 -

Page 86: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Alternative C

Year 1998

- Construction of 22 kV Surin - Sangkha distribution line with automatic

voltage regulators (AVR), using 185 sq.mm AAC conductor, a distance of

approximately 66 km.

The economic cost is 111.58 MTHB.

Year 2000

- Construction of 115 kV Surin - Sangkha line, single circuit on double

circuit steel tower, using 795 MCM ACSR conductor, a distance of approximately 49km.

The economic cost is 230.7 MTIHB.

The installation schedules of Alternative A, B and C are shown in Figure4.7 to 4.9.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are givenin Appendix 1.

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 15,138.38

Alternative B 15,230.78

Altemative C 15,181.33

-81-

Page 87: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTIHB! _ _ _

Alternative A VS. Alternative B 92.40 1.0061 >150.00

Alternative A VS. Alternative C 42.95 1.0028 30.63

Results of the analysis have led to the conclusion that the construction ofthe proposed 115 kV Surin - Sangkha transmission system project is the least cost

alternative.

-82-

Page 88: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Tabie 4.23

Load Forecast for Sangkha Substation

Subvqfd tNo.12

Fiscal Peak Demand Energy Demand Load Factor

Year MW % Increase GWh % Increase (%)

1994 9.80 - 35.20 - 41.00

1995 11.10 13.27 40.10 13.92 41.24

1996 12.40 11.71 45.40 13.22 41.80

1997 13.80 11.29 51.00 12.33 42.19

1998 15.30 10.87 56.90 11.57 42.45

1999 16.80 9.80 63.10 10.90 42.88

2000 18.40 9.52 69.50 10.14 43.12

2001 20.00 8.70 76.20 9.64 43.49

2002 21.70 8.50 83.20 9.19 43.77

2003 23.40 7.83 90.60 8.89 44.20

2004 25.10 7.26 98.10 8.28 44.62

2005 26.90 7.17 106.00 8.05 44.98

2006 28.80 7.06 114.10 7.64 45.23

-83-

Page 89: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4 .24Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 2; Subproject No. 12

Cost Stream Alternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 35053.84 34870.91 1.0052 182.946.00 26028.19 25885.72 1.0055 142.478.00 19723.51 19609.98 1.0058 113.53

10.00 15230.78 15138.38 1.0061 92.4012.00 11967.54 11890.88 1.0064 76.6614.00 9553.93 9489.22 1.0068 64.7016.00 7737.92 7682.47 1.0072 55A518.00 6349.47 6301.32 1.0076 48.1620.00 5271.94 5229.62 1.0081 42.3122.00 4424.02 4386.47 1.0086 37.5524.00 3748.20 3714.58 1.0091 33.6326.00 3203.16 3172.83 1.0096 30.34

Equalized Discount Rate is Greater Than 150%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 34938.77 34870.91 1.0019 67.866.00 25945.46 25885.72 1.0023 59.738.00 19661.13 19609.98 1.0026 51.15

10.00 15181.33 15138.38 1.0028 42.9512.00 11926.37 11890.88 1.0030 35.4914.00 9518.12 9489.22 1.0030 28.8916.00 7705.62 7682.47 1.0030 23.1418.00 6319.50 6301.32 1.0029 18.1920.00 5243.56 5229.62 1.0027 13.9322.00 4396.77 4386.47 1.0023 10.3124.00 3721.80 3714.58 1.0019 7.2226.00 3177.43 3172.83 1.0015 4.61

Equalized Discount Rate 30.63%

Transmission System Planning Division21-Mar-95

11.31 AM

-84-

Page 90: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Capacit (MW)ISO

140130

120

10 E .9115kv

Sunn - Sangkha

100 C1

SC on DCIST 795 MCM ACSR

90 1l

00 80 Q0

7060 dl

s0

40 -a.

302010

I Peak Demand

°~~~~~~~9 5997 999i

Fiscal Ye Noar

FigUre 4. Installation Schedule for Subprojlect No. 12

(Sangqkha Substation) Afternative A

Page 91: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

CaPaCitY (I\mwl)150 -

130 -;

t100 d EV 115kV S'SaKet - Sangkha

l c c SC On DC/ST 795 MCM ACSR

90- ,.9

, 80 -1 XE lA lIstalledCa ac

I

1 701 9 1 I 9 9 8 1 0

60s a e f o o

n0 b a B

20-i1 I

10-l

0 d

0

Fl9lr 4-8 angkhallttn Schedule for -Subproiect No. 12

(SankhaSubstation) AlternativeB

Page 92: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Capacity (MW)150 -

140 -

130 -

120 -E 115 kV Surin -Sangkha

110 - SC on DC/ST 795 MCM ACSR

100 - .0. X

90 - OInstalled Capacity

80 - CD

CD)70 , CD

60 UlFca50 -c40 -C

30~~~~~~:

20 PeakDemand

1 0

0 993 1 1994 1995 1 1996 I1997 I1998 I1999 I2000 12001 12002 1 2003 12004 12005 12006 I7 2007

Fiscal Year

Figure 4.9 Installation Schedule for Subproject No. 12(Sangkha Substation) Alterrative C

Page 93: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.13

230 KV NAKHON SI THAMMARAT - THUNG SONG - SURAT THANI

LINES AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.25.

b) Alternative Plans The four possible alternative plans to serve the same technical

objectives of this subproject as described in Volume 1 (Main Report) are

Alternative A:

Year 1998

- Reconstruction of the existing Nakhon Si Thammarat -Thung Song from

115 kV single circuit line to 230 kV double circuit line, using 1,272 MCM ACSR

conductor, a distance of approximately 54 km, initially energized at 115 kV.

- Reconstruction of the existing Surat Thani - Thung Song from 115 kV

double circuit line to 230 kV double circuit line. using 2x1,272 MCM ACSR conductor,

a distance of approximately 122 km.

- Installation of 2x200 MVA 230/115 kV transformer at Thung Song

Substation.

The economic cost is 1,561.2 MTHB.

Year 2003

- Conversion of 230/115 kV Nakhon Si Thammarat - Thung Song line to

energized at 230 kV.

-88-

Page 94: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

The economic cost is 95.8 MTHB.

Alternative B

Year 1998

- Reconstruction of the existing Nakhon Si Thammarat - Thung Song from

115 kV single circuit line to 230 kV double circuit line, using 1,272 MCM ACSRconductor, a distance of approximately 54 km.

- Construction of 230 kV Surat Thani - Nakhon Si Thammarat line, double

circuit steel tower, using 2x1,272 MCM ACSR conductor, a distance of approximately145 km.

- Installation of 2x200 MVA 230/115 kV transformer at Thung SongSubstation.

The economic cost is 2,291.9 MTHB.

Year 2006

- Installation of xlO0 MVA 230/115 kV transformer at Surat ThaniSubstation.

The economic cost is 67.8 MTHB.

Alternative C

Year 1998

- Reconstruction of the existing Nakhon Si Thammarat - Thung Song from

115 kV single circuit line to 230 kV double circuit line, using 1,272 MCM ACSR

conductor, a distance of approximately 54 km.

-89-

Page 95: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

- Construction of 230 kV Khanom - Nakhon Si Thammnarat line, double

circuit line, using 2x1,272 MCM ACSR conductor, a distance of approximately 98 km.

- Installation of 2x200 MVA 230/115 kV tmnsformer at Thung Song

Substation.

The economic cost is 1,815.3 MTHB.

Year 2006

- Installation of lxlOO MVA 230/115 kV transformer at Surat Thani

Substation.

The economic cost is 72.1 MTHB.

Alternative D

Year 1998

- Reconstruction of the existing Surat Thani - Thung Song from 115 kV

double circuit line to 230 kV double circuit line, using 2x1272 MCM ACSR conductor,

a distance of approximately 122 km.

- Installation of 2x200 MVA 230/115 kV transformers at Thung Song

Substation.

- Termination of 230 kV Nakhon Si Thammarat - Phatthalung and 230 kV

Thung Song - Khlong Ngae lines at Phatthalung 2 Substation.

The economic cost is 1,696.8 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix 1.

-90-

Page 96: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 33,050.00

Alternative B 33,619.14

Alternative C 33,114.72

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB) _ _ _

Alternative A VS. Alternative B 569.14 1.0172 107.18

Alternative A VS. Alternative C 64.73 1.0020 32.62

Results of the analysis have led to the conclusion that the construction of

230 kV Nakhon Si Thammarat - Thung Song - Surat Thani transmission system project

is the least cost alternative.

-91-

Page 97: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.25

Load Forecast for Lower Southern Region

SubproFct No.13

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%)

1994 489.79 - 2738.64 - 63.83

1995 556.30 13.58 2985.10 9.00 61.26

1996 644.99 15.94 3441.59 15.29 60.91

1997 711.87 10.37 3801.86 10.47 60.97

1998 771.42 8.37 4089.85 7.57 60.52

1999 828.65 7.42 4384.66 7.21 60.40

2000 888.19 7.19 4687.14 6.90 60.24

2001 946.69 6.59 5000.04 6.68 60.29

2002 1008.55 6.53 5283.50 5.67 59.80

2003 1068.39 5.93 5575.11 5.52 59.57

2004 1130.51 5.81 5883.77 5.54 59.41

2005 1192.03 5.44 6198.27 5.35 59.36

2006 1255.76 5.35 6527.41 5.31 59.34

-92-

Page 98: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4 . 2 6Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 3; Subproject No.13

Cost Stream Alternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 72755.72 71923.23 1.0116 832.496.00 55162.17 54431.47 1.0134 730.708.00 42671.54 42027.94 1.0153 643.60

1 0.'' '00 0 l00033619.14, '33050.00 :1.017 569.1412.00 26929.38 26424.08 1.0191 505.3014.00 21894.41 21444.09 1.0210 450.3216.00 18039.86 17637.17 1.0228 402.6918.00 15042.21 14681.02 1.0246 361.2020.00 12677.03 12352.18 1.0263 324.8522.00 10786.00 10493.15 1.0279 292.8524.00 9255.70 8991.15 1.0294 264.5426.00 8003.59 7764.20 1.0308 28903

Equalized Discount Rate = 107.18%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 71986.19 71923.23 1.0009 62.966.00 54501.02 54431.47 1.0013 69.558.00 42096.97 42027.94 1.0016 69.03

it00000010.0S,-0 3314.2 33050.00 1-0020: 04.7312.00 26482.61 26424.08 1.0022 58.5314.00 21495.64 21444.09 1.0024 51.5416.00 17681.55 17637.17 1.0025 44.3818.00 14718.42 14681.02 1.0025 37.4020.00 12382.97 12352.18 1.0025 30.7922.00 10517.78 10493.15 1.0023 24.6324.00 9010.12 8991.15 1.0021 18.9726.00 7778.00 7764.20 1.0018 13.81

Equalized Discount Rate = 32.62%

Transmission System Planning Division21-Mar-95

11:34 AM

-93-

Page 99: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.26Summary Result of Economic Analysis

(Continued)

Project Transmission System Expansion Project No. 9Region 3; Subproject No.13

Cost Stre;am : A;te,nFa,,v6e A

Benefit Stream Alternative D

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 72086.62 71923.23 1.0023 163.396.00 54562.08 54431.47 1.0024 130.618.00 42135.81 42027.94 1.0026 107.87

10.00 33141.47 33050.00 1.0028 91.4712.00 26503.27 26424.08 1.0030 79.1914.00 21513.76 21444.09 1.0032 69.6716.00 17699.22 17637.17 1.0035 62.0518.00 14736.80 14681.02 1.0038 55.7820.00 12402.70 12352.18 1.0041 50.5222.00 10539.16 10493.15 1.0044 46.0124.00 9033.25 8991.15 1.0047 42.1026.00 7802.85 7764.20 1.0050 38.66

Equalized Discount Rate is Greater Than 150%

Transmission System Planning Division21 - Mar-95

11:36 AM

-94-

Page 100: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.14230 KV KHLONG NGAE - YALA LINE AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.27.

b) Alternative Plans The three possible alternative plans to serve the same technicalobjectives of this subproject as described in Volume I (Main Report) are

Alternative A:

Year 1998

- Construction of 230 kV Khlong Ngae - Yala line, double circuit steeltower, ising 1 j272 MCM ACSR rnuictor, a itanc osf a 120 km. (usicn

existing right-of-way of existing 115 kV Hat Yai 2 - Yala line).

- Construction of 230 kV Yala Substation with 2x200 MVA 230/115 kVtransforners.

The economic cost is 934.4 MTHB.

Alternative B

Year 1998

- Construction of 230 kV Khlong Ngae - Yala line, double circuit steel

tower, using 1,272 MCM ACSR conductor, a distance of approximately 120 km (usingexisting right-of-way of 115 kV Hat Yai 2 - Yala line), initially energized at 115 kV.

- Installation of 2x200 MVA 230/115 kV transformer at Khlong NgaeSubstation.

The economic cost is 896.6 MTHB.

-95-

Page 101: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Year 2006

- Installation of 1 x200 MVA 230/115 kV transformer at Hat Yai 2a-abstationl.

The economic cost is 89.4 MTHB.

Alternative C:

Year 1998

- Construction of 230 kV Khlong Ngae - Yala line, double circuit steel

tower, using 1,272 MCM ACSR conductor, a distance of approximately 120 km.

- Construction of 230 kV Yala Substation with 2x200 MVA 230/115 kVtransformer.

The economic cost is 1,258.0 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are givenin Appendix 1.

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 20,548.56Alternative B 20,657.35Alternative C 20,891.41

Alternative D 20,800.02

-96-

Page 102: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.-

(MTHB)

Alternative A VS. Alternative B 108.78 1.0053 41.25

Alternative A VS. Alternative C 251.45 1.0122 >150.00

Results of the analysis have led to the conclusion that the construction of

230 kV Khlong Ngae - Yala transmission system project is the least cost alternative.

-97-

Page 103: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.27

Load Forecast for Yala, Pattani, Narathiwat,and Sugai Kolok Substations

Subprojc No.14

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%)

1994 98.82 - 533.05 - 61.581995 119.84 21.27 600.50 12.65 57.201996 129.29 7.89 645.69 7.53 57.011997 139.02 7.53 692.00 7.17 56.821998 149.11 7.26 732.94 5.92 56.111999 159.58 7.02 779.98 6.42 55.802000 170.43 6.80 830.36 6.46 55.622001 181.63 6.57 885.99 6.70 55.682002 193.33 6.44 938.56 5.93 55.422003 205.46 6.27 994.43 5.95 55.252004 218.30 6.25 1054.69 6.06 55.152005 231.44 6.02 1118.38 6.04 55.162006 245.03 5.87 1184.97 5.95 55.21

-98-

Page 104: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.28Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 3; Subproject No.14

Cost Stream Alternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 45971.56 45701.70 1.0059 269.856.00 34513.39 34316.49 1.0057 196.898.00 26449.60 26304.06 1.0055 145.54

10.00 20657.35 20548.56 1.0053 108.7812.00 16414.78 16332.73 1.0050 82.0514.00 13249.43 13187.09 1.0047 62.3416.00 10846.56 10798.94 1.0044 47.6218.00 8992.85 8956.36 1.0041 36.4920.00 7541.29 7513.28 1.0037 28.0122.00 6388.87 6367.40 1.0034 21.4724.00 5462.33 5445.93 1.0030 16.4026.00 4708.71 4696.27 1.0026 12.44

Equalized Discount Rate = 41.25%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(M) Benefit Cost Net Benefit

4.00 45983.12 45701.70 1.0062 281.426.00 34590.93 34316.49 1.0080 274.448.00 26567.75 26304.06 1.0100 263.69

10.00 20800.02 20548.56 1.0122 251.4512.00 16571.62 16332.73 1.0146 238.9014.00 13413.70 13187.09 1.0172 226.6116.00 11013.82 10798.94 1.0199 214.6818.00 9160.16 8956.36 1.0228 203.8020.00 7706.70 7513.28 1.0257 193.4222.00 6551.12 6367.40 1.0289 183.7224.00 5620.58 5445.93 1.0321 174.6626.00 4862.46 4696.27 1.0354 166.19

Equalized Discount Rate is Greater Than 150%

Transmission System Planning Division21 -Mar-95

11:42 AM

-99-

Page 105: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.15230/115 KV PHANGNGA - PHUKET JUNCTION - PHUKET 2

LINES AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.29.

b) Alternative Plans The three possible alternative plans to serve the same technical

objectives of this subproject as described in Volume I (Main Report) are

Alternative A

Year 1998

- Reconstruction of the existing Phangnga - Phuket Junction (Proposed Site

of future Phuket 3 Substation) from 115 kV single circuit line to 230 kV double circuit

line, using 1,272 MCM ACSR conductor a distance of approximately 76 km, initially

energized at 115 kV.

- Construction of 115 kV Phuket Junction - Phuket 2 line, single circuit

compact line, using 2x795 MCM ACSR conductor, a distance of approximately 12 km.

- Connecting of the Phangnga - Phuket Junction line with the existing 1 15

kV Phuket Junction - Phuket 2 and the new 115 kV compact line.

- Replace the existing 2x100 MVA 230/115 kV transforrners with 2x200

MVA transformers at Rajjaprabha Substation.

The economic cost is 652.0 MTHB.

-100-

Page 106: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Alternative B

Year 1998

- Reconstruction of the existing 115 kV Phangnga - Phuket Junction from

single circuit line to double circuit line, using 2x795 MCM ACSR conductor, a distance

of approximately 76 km.

- Construction of 115 kV Phuket Junction - Phuket 2 line, single circuit

compact line, using 2x795 MCM ACSR conductor, a distance of approximately 12 km.

- Connecting of the Phangnga - Phuket Junction line with the existing 115kV Phuket Junction - Phuket 2 and the new 115 kV compact line.

- Replace the existing 2xlO0 MVA 230/115 kV transformers with 2x200MVA transformers at Rajjaprapha Substation.

The economic cost is 628.4 MTHB.

Year 2002

- Construction of 115 kV Phuket 3 Substation at Phuket Junction andterminate 230/115 kV Phangnga - Phuket Junction lines to Phuket 3 Substation.

- Termination of 115 kV Phangnga - Phuket 1 line to Phuket 3 Substation

and reconstruction of the line section from Phangnga to Phuket 3 from double circuit

line using 477 MCM ACSR to double circuit line using 2x795 MCM ACSR conductor,

a distance of approximately 70 km.

The economic cost is 429.2 MTHB.

-101-

Page 107: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Alternative C

Year 1998

- Reconstruction of the existing Phangnga - Phuket Junction from 115 kV

single circuit line to 230 kV double circuit line, using 1,272 MCM ACSR conductor,

a distance of approximately 76 km.

- Construction of 230 kV Phuket 3 Substation with 2x200 MVA 230/115

kV transformers.

- Construction of 230 kV Rajjaprabha - Phangnga line, double circuit steel

tower, using 1,272 MCM ACSR conductor, a distance of approximately 73 km and

connected with the 230 kV Phangnga - Phuket 3 line.

The economic cost is 1,381.1 MTHB.

Year 2004

- Construction of 115 kV Phuket 3 - Phuket 2 line, single circuit compact

line, using 2x795 MCM ACSR conductor, a distance of approximately 12 km.

The economic cost is 60.1 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix 1.

-102-

Page 108: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 23,235.26

Alternative B 23,343.82

Alternative C 23,396.00

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB) 0(°')

Alternative A VS. Aiternative B i08.56 1.0047 >15D.0 V%/

Alternative A VS. Alternative C 160.74 1.0069 N.A.

Results of the analysis have led to the conclusion that the construction of

230 kV Phangnga - Phuket Junction initially energized at 115 kV and 115 kV Phuket

2 - Phuket Junction transmission system project is the least cost alternative.

-103-

Page 109: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.29

Load Forecast for Phuket Province

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%)

1994 86.74 - 514.20 - 67.671995 100.48 15.84 603.91 17.45 68.611996 109.56 9.04 650.42 7.70 67.771997 119.07 8.68 713.32 9.67 68.391998 128.94 8.29 762.42 6.88 67.501999 139.27 8.01 818.47 7.35 67.092000 150.09 7.77 878.84 7.38 66.842001 161.30 7.47 945.14 7.54 66.892002 173.14 7.34 1009.06 6.76 66.532003 185.61 7.20 1077.95 6.83 66.302004 198.97 7.20 1152.89 6.95 66.142005 212.88 6.99 1232.99 6.95 66.122006 227.54 6.89 1318.09 6.90 66.13

-104-

Page 110: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4 .3 0Summary Result of Economic Analysis

Project : Transmission System Expansion Project No. 9Region 3; Subproject No.15

Cost Stream Alternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 52369.38 52303.71 1.0013 65.676.00 39220.44 39124.41 1.0025 96.048.00 29976.16 29868.67 1.0036 107.49

10.00 23343.82 23235.26 1.0047 108.5612.00 18492.51 18388.39 1.0057 104.1214.00 14878.48 14781.52 1.0066 96.9616.00 12139.62 12050.93 1.0074 88.6918.00 10030.57 9950.37 1.0081 80.2020.00 8382.30 8310.32 1.0087 71.9922.00 7076.46 7012.17 1.0092 64.2924.00 6n28.R7 5971.64 1.0096 57,2326.00 5178.76 5127.92 1.0099 50.84

Equalized Discount Rate is Greater Than 150%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Vaiue Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 52029.59 52303.71 0.9948 -274.116.00 39063.83 39124.41 0.9985 -60.588.00 29943.58 29868.67 1.0025 74.91

10.00i 23396.00 23235.26 1.0069 160.7412.00 18602.89 18388.39 1.0117 214.5014.00 15028.81 14781.52 1.0167 247.2916.00 12317.14 12050.93 1.0221 266.2218.00 10226.25 9950.37 1.0277 275.8820.00 8589.67 8310.32 1.0336 279.3522.00 7290.82 7012.17 1.0397 278.6524.00 6246.79 5971.64 1.0461 275.1626.00 5397.74 5127.92 1.0526 269.82

Equalized Discount Rate is Not Applicable

Transmission System Planning Division21 -Mar-95

01:05 PM

-105-

Page 111: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.16

115 KV YALA - NARATHIWAT LINE AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.31.

b) Alternative Plans The three possible alternative plans to serve the same technical

objectives of this subproject as described in Volume I (Main Report) are

Alternative A:

Year 1998

- Construction of 115 kV Yala - Narathiwat line, single circuit on double

circuit steel tower, using 795 MCM ACSR conductor, a distance of approximately 61

km.

The economic cost is 383.1 MTHB.

Alternative B

Year 1998

- Construction of 115 kV Pattani - Narathiwat line, single circuit on

double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 80 km.

The economic cost is 495.3 MTHB.

-106-

Page 112: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Alternative C

Year 1998

- Construction of 115 kV Yala - Narathiwat line, double circuit steel

tower, using 795 MCM ACSR conductor, a distance of approximately 61 km.

The economic cost is 435.7 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix 1.

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 16,882.43

Alternative B 17,019.45

Alternative C 16,906.19

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB) (%_

Alternative A VS. Alternative B 137.03 1.0081 >150.00

Altemative A VS. Alternative C 23.77 1.0014 >150.00

Results of the analysis have led to the conclusion that the construction of

115 kV single circuit on double circuit Yala - Narathiwat transmission system project

is the least cost alternative.

-107-

Page 113: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.31

Load Forecast for Narathiwat andSungai Kolok Substations

Subprotecl Nol16

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%)

1994 31.80 - 146.21 - 52.49

1995 37.55 18.08 165.76 13.37 50.391996 40.68 8.34 177.15 6.87 49.711997 43.90 7.92 191.10 7.87 49.691998 47.23 7.59 203.61 6.55 49.211999 50.70 7.35 217.95 7.04 49.072000 54.27 7.04 232.69 6.76 48.952001 57.96 6.80 248.94 6.98 49.032002 61.80 6.63 264.34 6.19 48.832003 65.78 6.44 280.67 6.18 48.712004 69.93 6.31 297.97 6.16 48.642005 74.15 6.03 316.16 6.10 48.672006 78.45 5.80 334.89 5.92 48.73

-108-

Page 114: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.32Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 3; Subproject No.16

Cost Stream Alternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 38302.46 38085.97 1.0057 216.496.00 28646.20 28463.45 1.0064 182.758.00 21870.90 21713.87 1.0072 157.03

10.00 17019.45 16882.43 1.0081 137.0312.00 13477.46 13356.29 1.0091 121.1614.00 10843.42 10735.09 1.0101 108.3416.00 8850.39 8752.60 1.0112 97.7918.00 7317.76 7228.78 1.0123 88.9820.00 6121.34 6039.83 1.0135 81.5122.00 5174.31 5099.22 1.0147 75.0924.00 4415.05 4345.53 1.0160 69.5126.00 3799.14 3734.52 1.0173 64.62

Equalized Discount Rate is Greater Than i50%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 38100.47 38085.97 1.0004 14.506.00 28483.25 28463.45 1.0007 19.808.00 21736.43 21713.87 1.0010 22.56

10.00 16906.19 16882.43 1.0014 23.7712.00 13380.33 13356.29 1.0018 24.0414.00 10758.82 10735.09 1.0022 23.7416.00 8775.70 8752.60 1.0026 23.1018.00 7251.06 7228.78 1.0031 22.2820.00 6061.18 6039.83 1.0035 21.3522.00 5119.60 5099.22 1.0040 20.3824.00 4364.94 4345.53 1.0045 19.4126.00 3752.97 3734.52 1.0049 18.44

Equalized Discount Rate is Greater Than 150%

Transmission System Planning Division21 - Mar-95

01:07 PM

-1oo-

Page 115: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.17115 KV SURAT TIANI - BAN DON LINE AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.33.

b) Alternative Plans The three possible alternative plans to serve the same techllical

objectives of this subproject as described in Volume I (Main Report) are

Alternative A:

Year 1998

- Stringing 2nd circuit of 115 kV Surat Thani - Ban Don lin,c using 477

MCM ACSR conductor, a distance of approximately 13 km.

The economic cost is 30.6 MTHB.

Year 2001

- Construction of 115 kV Phun Phin - Ban Don line, single circuit on

double circuit steel tower, using 795 MCM ACSR conductor, a distancc oI

approximately 10 km.

The economic cost is 140.5 MTHB.

Alternative B

Year 1998

- Construction of 115 kV Phunphin - Ban Don line, singie circuit on

double circuit steel tower, using 795 MCM ACSR conductor. a distance of

approximately 10 km.

-110-

Page 116: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

- Reconstruction of the existing 115 kV Surat Thani - Phunphin from

single circuit line using 150 sq.mm AAAC conductor to single circuit on double circuitline using 795 MCM ACSR conductor, a distance of approximately 6.2 km.

The economic cost is 170.3 MTHB.

Year 2003

- Stringing of the 2nd circuit of 115 kV Surat Thani - Phun Phin line,

using 795 MCM ACSR conductor, a distance of approximately 6.2 km.

The economic cost is 22.1 MTHB.

Alternative C

Year 1998

I nstallation of three units of 25 MW gas turbine power plant at Ban DonSubstation.

The economic cost is 1,134.0 MTHB.

Year 2000

- Installation of one unit of 25 MW gas turbine power plant at Ban DonSubstation.

The economic cost is 378.0 MTHB.

Year 2004

- Installation of one unit of 25 MW gas turbine power plant at Ban lDonSubstation.

-111-

Page 117: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

The economic cost is 378.0 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix 1.

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 18,710.26

Alternative B 18,732.46

Alternative C 23,874.37

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB) (%)

Alternative A VS. Alternative B 22.20 1.0012 >150.00

Alternative A VS. Alternative C 5,164.11 1.2760 >150.00

Results of the analysis have led to the conclusion that the 115 kV Surat

Thani - Ban Don Line Stringing project is the least cost alternative.

-112-

Page 118: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.33

Load Forecast for Ban Don Substation

Subprojel No. 7

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%)

1994 52.36 - 298.04 - 64.981995 53.37 1.93 305.97 2.66 65.451996 57.37 7.49 328.88 7.49 65.441997 42.12 a -26.58 240.25 J -26.95 65.111998 45.34 7.64 254.91 6.10 64.181999 48.61 7.21 271.27 6.42 63.702000 51.98 6.93 289.06 6.56 63.482001 55.45 6.68 308.62 6.77 63.542002 59.00 6.40 326.71 5.86 63.212003 62.68 6.24 345.87 5.86 62.992004 66.53 6.14 366.33 5.92 62.862005 70.42 5.85 387.66 5.82 62.842006 74.39 5.64 409.63 5.67 62.86

Note p/ Some loads are transfered to the PEA's 115 kV systems which receive power from

230/115 kV Thung Song Substabon.

-113-

Page 119: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4 .34Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 3; Subproject No.17

Cost Stream Alternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 43270.21 43253.55 1.0004 16.656.00 32097.62 32078.30 1.0006 19.328.00 24293.26 24272.17 1.0009 21.09

10.00 18732.46 18710.26 1.0012 22.2012.00 14694.39 14671.56 1.0016 22.8314.00 11708.82 11685.73 1.0020 23.1016.00 9463.70 9440.60 1.0024 23.1018O.00 7748.37 7725.47 1.0030 22.9120.00 6418.32 6395.75 1.0035 22.5722.00 5372.80 5350.67 1.0041 22.1324.00 4540.47 4518.86 1.0048 21.6126.00 3870.11 3849.07 1.0055 21.05

Equalized Discount Rate is Greater Than 150%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost ___ Net Benefit

4.00 54277.49 43253.55 1.2549 11023.946.00 40466.54 32078.30 1.2615 8388.248.00 30790.61 24272.17 1.2686 6518.44

10.00 23874.37 18710.26 1.2760 5164.1112.00 18834.87 14671.56 1.2838 4163.3114.00 15095.24 11685.73 1.2918 3409.5216.00 12272.08 9440.60 1.2999 2831.4818.00 10106.19 7725.47 1.3082 2380.7220.00 8419.49 6395.75 1.3164 2023.7322.00 7087.63 5350.67 1.3246 1736.9624.00 6022.44 4518.86 1.3327 1503.5926.00 5160.49 3849.07 1.3407 1311.42

Equalized Discount Rate is Greater Than 150%

Transmission System Planning Division21 - Mar-95

01 08 PM

-114-

Page 120: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.18CONVERSION OF MAE MOH 3 - CHIANG RAI LINE FROM 115 KV TO

230 KV

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.35.

b) Alternative Plans The three possible alternative plans to serve the same technicalobjectives of this subproject as described in Volume I (Main Report) are

Alternative A

Year 1998

- Conversion of Mae Moh 3 - Chiang Rai line from 115 kV to 230 kV and

installation of 2x200 MVA transformer at Chiang Rai Substation.

The economic cost is 397.7 MTHB.

Alternative B

Year 1998

- Construction of 115 kV Phayao - Chiang Rai line, single circuit on

double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 80 km.

- Installation of lx200 MVA 230/115 kV transformer at Mae Moh 3Substation.

The economic cost is 344.9 MTHB.

-115-

Page 121: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Year 2001

- Conversion of Mae Moh 3 - Chiang Rai line from 115 kV to at 230 kVariA -- n-in ' '.1A 1.ffx r 11')AI1 I IAT r - ,f PI- ID.;and installatuion of4vU LVI V 3A 2,0./11 kxV trans1U1%.Ae atL Chiar.g, RA i "uWs-o.

The economic cost is 341.7 MTHB.

Alternative C:

Year 1998

- Termination of the existing 115 kV Mae Moh 3 - Chiang Rai line at

Phayao Substation, using 1,272 MCM ACSR conductor, a distance of approximately I

km.

- Installation of lx200 MVA 230/115 kV transformer at Mae Moh 3Substation.

The economic cost is 134.1 MTHB.

Year 2001

- Conversion of Mae Moh 3 - Chiang Rai line from 115 kV to 230 kV and

installation of 2x200 MVA 230/115 kV transformers at Chiang Rai Substation.

The economic cost is 341.7 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix 1.

-116-

Page 122: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 17,425.56

Alternative B 17,652.52

Alternative C 17,487.15

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB) _ _ _

Alternative A VS. Alternative B 226.96 1.0130 >150.00

Alternative A VS. Alternative C 61.59 1.0035 22.63

Results of the analysis have led to the conclusion that the conversion ofMae Moh 3 - Chiang Rai line from 115 kV to 230 kV pfoject is the least costalternative.

-117-

Page 123: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.35

Load Forecast for Chiangrai, Mae Chan andThoeng Substations

Subpro.cl No.18

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%)

1994 81.78 - 319.35 - 44.581995 99.80 22.03 391.84 22.70 44.821996 114.94 15.17 464.46 18.53 46.131997 123.20 7.19 495.49 6.68 45.911998 131.88 7.05 532.81 7.53 46.121999 140.92 6.85 573.01 7.54 46.422000 150.33 6.68 616.93 7.66 46.852001 160.10 6.50 664.32 7.68 47.372002 170.22 6.32 708.46 6.64 47.512003 180.77 6.20 756.58 6.79 47782004 191.76 6.08 808.11 6.81 48.112005 203.13 5.93 863.88 6.90 48.552006 214.93 5.81 924.19 6.98 49.09

-118-

Page 124: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.36Summary Result of Economic Analysis

Project : Transmission System Expansion Project No. 9Region 4; Subproject No.18

Cost Stream Alternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit4.00 39811.53 39507.44 1.0077 304.096.00 29764.71 29486.98 1.0094 277.728.00 22'08.87 22457.30 1.0112 251.56

10,00 17652.52 17425.56 1.0130 226.9612.00 13958.65 13754.21 1.0149 204.4314.00 11210.56 11026.44 1.0167 184.1216.00 9130.88 8964.94 1.0185 165.9418.00 7531.79 7382.04 1.0203 149.7520.00 6283.94 6148.61 1.0220 135.3322.00 5296.83 5174.32 1.0237 122.5124.00 4506.14 439E5.04 1.0253 111.1126.00 3865.47 3754.53 1.0268 100.95

Equalized Discount Rate is Greater Than 150%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost __ Net Benefit

4.00 39626.33 39507.44 1.0030 118.896.00 29584.12 29486.98 1.0033 97.138.00 22535.39 22457.30 1.0035 78.09

10.00 17487.15 17425.56 1.0035 61.5912.00 13801.58 13754.21 1.0034 47.3714.00 11061.60 11026.44 1.0032 35.1616.00 8989.66 8964.94 1.0028 24.7318.00 7397.86 7382.04 1.0021 15.8220.00 6156.85 6148.61 1.0013 8.2422.00 5176.12 5174.32 1.0003 1.8024.00 4391.39 4395.04 0.9992 -3.6426.00 3756.29 3764.53 0.9978 -8.24

Equalized Discount Rate - 22.63%

Transmission System Planning Division21 - Mar-95

01:11 PM

-119-

Page 125: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.19115 KV LAN KRABU - KAMPHAENGPHET LINE AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.37.

b) Alternative Plans The three possible alternative plans to serve the same technical

objectives of this subproject as described in Volume I (Main Report) are

Alternative A

Year 1998

- Construction of 115 kV Lan Krabu - Kamphaengphet line, double circuit

steel tower, using 795 MCM ACSR conductor, a distance of approximately 47 km.

The economic cost is 238.5 MTHIB.

Year 2006

- Construction of 115 kV Bhumibol - Tak 1 line, single circuit on double

circuit steel tower, using 795 MCM ACSR conductor, a distance of approximately 47

km.

The economic cost is 157.2 MTHB.

Alternative B

Year 1998

- Te..rn-fion of thei txisting 1 !s V Taik I - T-(-amnh enonhet line at Tak

2 Substation, using 477 MCM ACSR conductor, a distance of approximately 3 km.

-120-

Page 126: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

- Installation of 2x200 MVA 230/115 transformers at Tak 2 Substation.

- Construction of 115 kV Bhumibol - Tak 1 line, single circuit on doublecircuit steel tower, using 795 MCM ACSR conductor, a distance' of approximately 47km.

- Construction of 115 kV Tak 2 - Kamphaengphet line, single circuit ondouble circuit steel tower, u'sing 795 MCM ACSR conductor, a distance ofapproximately 53 km.,

The economic cost is 642.8 MTHB.

Alternative C

Year 1998

- Termination 'of the existing 230 kV Bhumibol - Nakhon Sawan line atKamphaengphet Substation, using 1,272 MCM ACSR conductor, a distance ofapproximately 2 km.

- Construction of 230 kV Kamphaengphet Substation with 2x200 MVA230/115 kV transformers.

The economic cost is 404.0 MTHB.

Year 2006

- Termination of the second circuit of 230 kV Bhumibol - Nakhon Sawanline at Kamphaengphet Substation, using 1272 MCM ACSR conductor, a distance ofapproximately 2 km.

The economic cost is 123.5 MTHB.

-121 -

Page 127: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix 1.

d) Results of Econo...ic A ;

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 17,599.85

Alternative B 17,845.92

Alternative C 17,762.88

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB) (__ __

Alternative A VS. Alternative B 246.07 1.0140 >150.00

Alternative A VS. Alternative C 163.04 1.0093 >150.00

Results of the analysis have led to the conclusion that the construction of

115 kV Lan Krabu - Kamphaengphet transmission system project is the least cost

alternative.

-122-

Page 128: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.37

Load Forecast for Tak 1, Mae Sot andKamphangphet Substations

Subproect No.1 9

Fiscal Peak Demand Energy Demand Load Factor

Year MW % Increase GWh % Increase (%)

1994 55.85 - 262.35 - 53.62

1995 65.31 16.94 305.36 16.39 53.37

1996 72.02 10.27 332.84 9.00 52.76

1997 78.99 9.68 370.09 11.19 53.48

1998 86.28 9.23 404.09 9.19 53.46

1999 93.85 8.77 440.27 8.95 53.55

2000 101.80 8.47 479.76 8.97 53.80

2001 110.18 8.23 522.63 8.94 54.15

2002 119.03 8.03 563.79 7.88 54.07

2003 127.95 7.49 606.89 7.64 54.15

2004 138.46 8.21 658.32 8.47 54.28

2005 149.14 7.71 712.59 8.24 54.54

2006 160.53 7.64 772.33 8.38 54.92

-123-

Page 129: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4 . 3 8Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 4; Subproject No.19

Cros+ Q+r: rnt A - AtS WLutIAu - fl ttA. u....- w

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 40449.61 40174.40 1.0069 275.226.00 30183.46 29917.40 1.0089 266.068.00 22989.57 22733.28 1.0113 256.29

10.00 17845.92 17599.85 1.0140 246.0712.00 14096.67 13861.06 1.0170 235.6114.00 11313.44 11088.34 1.0203 225.1016.00 9211.48 8996.80 1.0239 214.6818.00 7598.31 7393.82 1.0277 204.4920.00 6341.62 6147.01 1.0317 194.6022.00 5348.97 5163.89 1.0358 185.0824.00 4554.84 4378.88 1.0402 175.9626.00 3912.00 3744.75 1.0447 167.26

Equalized Discount Rate is Greater Than 150%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value BIC Present ValueRate of of Ratio of

) Benefit Cost ___ Net Benefit

4.00 40426.93 40174.40 1.0063 252.536.00 30130.92 29917.40 1.0071 213.538.00 22918.17 22733.28 1.0081 184.89

10.00 17762.88 17599.85 1.0093 163.0412.00 14006.83 13861.06 1.0105 145.7714.00 11220.05 11088.34 1.0119 131.7116.00 9116.77 8996.80 1.0133 119.9718.00 7503.78 7393.82 1.0149 109.9620.00 6248.30 6147.01 1.0165 101.2922.00 5257.57 5163.89 1.0181 93.6824.00 4465.81 4378.88 1.0199 86.9326.00 3825.64 3744.75 1.0216 80.89

Equalized Discount Rate is Greater Than 150%

Transmission System Planning Division21-Mar-95

01:12 PM

-124-

Page 130: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.20115 KV MAE MOH 3 - LAMPANG 2 LINE AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.39.

b) Alternative Plans The three possible alternative plans to serve the same technical

objectives of this subproject as described in Volume I (Main Report) are

Alternative A

Year 1998

- Construction of 115 kV Mae Moh 3 - Lampang 2 line, double circuit

steel tower, using 2x795 MCM ACSR conductor. a distance of approximately 27 km.

The economic cost is 274.6 MTHB.

Year 1999

- Installation of 1x200 MVA 230/115 kV transformer at Chiang Mai 3

Substation.

The economic cost is 129.7 MTHB.

Year 2000

- Reconstruction of the existing Mae Moh 2 - Lampang 1 - Lamphun 1from 115 kV single circuit line to 230 kV Mae Moh 3 - Saraphi double circuit line.

using 2x1,272 MCM ACSR conductor, a distance of approximately 124 km.

- Construction of 115 kV Mae Mob 3 - Lampang I line, double circuit

steel tower, using 795 MCM ACSR conductor, a distance of approximately 41 km.

-125-

Page 131: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

- Construction of 115 kV Lamphun 2 - Lamphun 1 line, double circuitsteel tower, using 795 MCM ACSR conductor, a distance of approximately 16 km.

- Construction of 230 kV Sarapni Substation wi'uh 2-00 MVIA 230/115kV transformers.

The economic cost is 1,943.5 MTHB.

Alternative B

Year 1998

- Reconstruction of the existing Mae Moh 2 - Lampang 1 - Lamphun Ifrom 115 kV single circuit line to 230 kV Mae Moh 3 - Saraphi double circuit line,using 2x1,272 MCM ACSR conductor, a distance of approximately 124 km.

- Construction of 115 kV Mae Moh 3 - Lampang 1 line, double circuitsteel tower, using 795 MCM ACSR conductor, a distance of approximately 41 km.

- Construction of 115 kV Lamphun 2 - Lamphun 1 line, double circuitsteel tower, using 795 MCM ACSR conductor, a distance of approximately 16 km.

- Construction of 230 kV Saraphi Substation with 2x200 MVA 230/115kV transformers.

The economic cost is 1,975.7 MTHB.

Year 2000

- Construction of 115 kV Mae Moh 3 - Lampang 2 line, double circuitsteel tower, using 2x795 MCM ACSR conductor, a distance of approximately 27 km.

Te economic CU0L iS 3O. IVI2 IMTH.

-126-

Page 132: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Year 2006

- Installation of lx200 MVA 230/115 kV transformer at Chiang Mai 3

Substation.

The economic cost is 129.7 MTHB.

Alternative C

Year 1998

- Termnination of the existing 230 kV Mae Moh 3 - Chiang Mai 3 and 115kV Lampang 2 - Lamphun 2 at Hang Chat Substation and installation of 2x200 MVA

230/115 kV transformers at Hang Chat Substation.

The economic cost is 519.3 MTHB.

Year 2000

- Reconstruction of the existing Mae Moh 2 - Lampang 1 - Lamphun Ifrom 115 kV single circuit line to 230 kV Mae Moh 3 - Saraphi double circuit line,

using 2x1,272 MCM ACSR conductor, a distance of approximately 124 km.

- Construction of 115 kV Mae Moh 3 - Lampang 1 line, double circuit

steel tower, using 795 MCM ACSR conductor, a distance of approximately 41 km.

- Construction of 115 kV Lamphun 2 - Lamphun 1 line, double circuit

steel tower, using 795 MCM ACSR conductor, a distance of approximately 16 km.

- Construction of 230 kV Saraphi Substation with 2x200 MVA 230/115kV transformers.

The economic cost is 1,975.7 MTHB.

-127-

Page 133: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Year 2006

- Reconstruction of 115 kV Saraphi - Chiang Mai 2 from double circuitline using 477 MCM ACSR conductor to doublc circuit line usinLg 2Lx179151 ACSR

conductor, a distance of approximately 16 km.

The economic cost is 193.7 MTHB.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are given

in Appendix 1.

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 15,908.04

Alternative B 15,961.24

Alternative C 16,175.12

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.

(MTHB! -_ _ _

Alternative A VS. Altemative B 53.20 1.0033 N.A.

Alternative A VS. Alternative C 267.08 1.0168 > 150.00

Results of the analysis have led to the conclusion that the construction the

proposed construction of 115 kV Mae Moh 3 - Lampang 2 transmission system project

is the least cost alternative.

-128-

Page 134: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.39

Load Forecast for Lampang 2 Substation

Subpro*ct No.20

Fiscal Peak Demand Energy Demand Load FactorYear MW % Increase GWh % Increase (%)

1994 25.20 - 108.31 - 49.061995 25.65 1.79 109.02 0.66 48.521996 67.30 aX 162.38 267.82 a/ 145.66 45.431997 69.05 2.60 334.34 24.84 55.271998 70.89 2.66 342.36 2.40 55.131999 72.84 2.75 351.12 2.56 55.032000 114.89 a/ 57.73 510.81 a/ 45.48 50.752001 117.05 1.88 521.39 2.07 50.852002 119.33 1.95 531.28 1.90 50.822003 121.73 2.01 542.16 2.05 50.842004 124.26 2.08 553.92 2.17 50.892005 126.92 2.14 566.80 2.33 50.982006 129.72 2.21 580.90 2.49 51.12

Note a/ Highly demand increase due to demand of Siam Cement Factory.

-129-

Page 135: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4 .4 0Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9

Region 4; Subproject No. 20

Cost Stream Alternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 34608.37 34559.70 1.0014 48.676.00 26198.18 26150.55 1.0018 47.638.00 20252.76 20203.01 1.0025 49.74

10.00 15961.24 15908.04 1.0033 53.2012.00 12801.26 12744.25 1.0045 57.0114.00 10430.21 1036956 1.0058 60.6516.00 8619.41 8555.54 1.0075 63.8718.00 7213.53 7146.97 1.0093 66.5620.00 6105.28 6036.59 1.0114 68.6922.00 5219.34 5149.05 1.0137 70.3024.00 4501.99 4430.59 1.0161 71.4026.00 3914.31 3842.24 1.0188 72.07

Equalized Discount Rate is Not Applicable

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost . Net Benefit

4.00 35007.84 34559.70 1.0130 448.146.00 26521.32 26150.55 1.0142 370.778.00 20515.21 20203.01 1.0155 312.20

10.00 16175.12 15908.04 1.0168 267.0812.00 12976.02 12744.25 1.0182 231.7714.00 10573.25 10369.56 1.0196 203.6916.00 8736.59 8555.54 1.0212 181.0518.00 7309.50 7146.97 1.0227 162.5420.00 6183.80 6036.59 1.0244 147.2122.00 5283.43 5149.05 1.0261 134.3824.00 4554.10 4430.59 1.0279 123.5126.00 3956.45 3842.24 1.0297 114.21

Equalized Discount Rate is Greater Than 150%

Transmission System Planning Division21 - Mar-95

0114 PM

-130-

Page 136: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

SUBPROJECT NO.21115 KV CHIANG MAI 2 - MAE TAENG LINE AND SUBSTATIONS

a) Load Forecast The electricity demand in this subproject area is forecasted as

shown in Table 4.41.

b) Alternative Plans The three possible alternative plans to serve the same technical

objectives of this subproject as described in Volume I (Main Report) are

Alternative A:

Year 1998

- Construction of 115 kV Chiang Mai 2 - Mae Taeng line, single circuit

on double circuit steel tower, using 795 MCM ACSR conductor, a distance of

approximately 42 km.

The economic cost is 259.6 MTHB.

Alternative B

Year 1998

- Installation of eighteen units of 2.5 MW diesel power plant at Mae

Taeng Substation.

The economic cost is 927.0 MTHB.

Year 2001

- Installation of six units of 2.5 MW diesel power plant at Mae Taeng

Substation.

-131 -

Page 137: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

The economic cost is 309.0 MTHB.

Year 2005

- Installation of three units of 2.5 MW diesel power plant at Mae Taeng

Substation.

The economic cost is 154.5 MTHB.

Alternative C

Year 1998

- Installation of three units of 25 MW gas tturbine power plant at MaeTaeng Substation.

The economic cost is 1,134.0 MTHB.

The installation schedules of Alternative A, B and C are shown in Figures

4.10 to 4.12.

c) Power Flow Diagrams The power flow diagrams for the proposed plan are givenin Appendix 1.

d) Results of Economic Analysis

1. Comparison of Present Value

P.V. at 10 % DR. (MTHB)

Alternative A 14,818.93

Alternative B 15,392.43

Alternative C 15,431.49

-132-

Page 138: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

2. Net Present Value and B/C Ratio

Net Present Value B/C Ratio EDR.(MTHB! (%)

Altemative A VS. Alternative B 573.50 1.0387 52.37

Alternative A VS. Alternative C 612.56 1.0413 110.56

Results of the analysis have led to the conclusion that the construction ofthe proposed 115 kV Chiang Mai 2 - Mae Taeng transmission system project is the leastcost alternative.

-133-

Page 139: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Table 4.41

Load Forecast for Mae Taeng Substation

Subprojwct Noll

Fiscal Peak Demand Energy Demanu Load FactorYear MW % Increase GWh % Increase (%)

1994 23.50 - 75.00 - 36.431995 26.10 11.06 84.60 12.80 37.001996 28.80 10.34 94.70 11.94 37.541997 31.60 9.72 105.20 11.09 38.001998 34.40 8.86 116.00 10.27 38.491999 37.20 8.14 126.90 9.40 38.942000 39.90 7.26 138.10 8.83 39.512001 42.60 6.77 149.30 8.11 40.012002 45.30 6.34 160.70 7.64 40.502003 47.90 5.74 172.10 7.09 41.012004 50.50 5.43 183.70 6.74 41.532005 53.10 5.15 195.50 6.42 42.032006 55.70 4.90 207.40 6.09 42.51

-134-

Page 140: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Tabl e 4.42Summary Result of Economic Analysis

Project Transmission System Expansion Project No. 9Region 4; Subproject No. 21

Cost Stream Alternative A

Benefit Stream Alternative B

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 35139.63 33638.85 1.0446 1500.796.00 26162.84 25088.44 1.0428 1074.398.00 19879.27 19099.46 1.0408 779.81

10.00 15392.43 14818.93 1.0387 573.5012.00 12126.83 11699.78 1.0365 427.0514.00 9706.56 9384.85 1.0343 321.7216.00 7881.81 7636.85 1.0321 244.9618.00 6483.78 6295.46 1.0299 188.3220.00 5396.54 5250.52 1.0278 146.0222.00 4539.17 4425.12 1.0258 114.0424.00 3854.35 3764.74 1.0238 89.6026.00 3300.86 3230.14 i.02i9 70.72

Equalized Discount Rate = 52.37%

Cost Stream Alternative A

Benefit Stream Alternative C

Discount Present Value Present Value B/C Present ValueRate of of Ratio of(%) Benefit Cost Net Benefit

4.00 35176.84 33638.85 1.0457 1537.996.00 26201.78 25088.44 1.0444 1113.348.00 19918.55 19099.46 1.0429 819.09

A10.00 15431.49 14818.93 1.0413 612.5612.00 12165.47 11699.78 1.0398 465.6814.00 9744.67 9384.85 1.0383 359.8216.00 7919.31 7636.85 1.0370 282.4618.00 6520.60 6295.46 1.0358 225.1320.00 5432.58 5250.52 1.0347 182.0622.00 4574.35 4425.12 1.0337 149.2324.00 3888.60 3764.74 1.0329 123.8626.00 3334.11 3230.14 1.0322 103.98

Equalized Discount Rate = 110.56%

Transmission System Planning Division21-Mar-95

O1:16 PM

-135-

Page 141: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Capacity (MW)150 -.. _

140 -130 -120 - E 115 kV Chiang Mai 2 - Mae Taeng

Val SC on DC/ST 795 MCM ACSR110 - c

100 - ,o90 B0

90 - _.c K Installed Capacity -

IL .80

70

60-

50 - |40-30 - PeakDemand

20-

10 -

0 - 1993 1 1994 1 1995 1 1996 1 1997 1 1998 1 1999 1 2000 2001 1 2002 1 2003 2004 1 2005 l 2006 1 2007

Fiscal Year

Figure 4.10 Installation Schedule for Subproject No.21(Mae Taeng Substation) Alternative A

Page 142: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Capacity (MW)150 -_

140 -130 -t

120- E 'xi

> 8~~~~0 -. IntleCa ai

7 0 -) A)|ptyC~~~~~~~ ~OCd)

110 i ]F lCwt

100 -

90-

70iguI Installed Capaly a

60 __Sti) eni.0 _________ ~~~~~~~~~~~~Firm Capacity

50- 5a.

40PekDmn30

20

1 0

1993 1994 11995 11996 1997 1998 1 i999 2000 2001 2002 2003 1 2004 2005 2006 2007-

Fiscal Year

Figure 4.11 installation Schedule for Subproject No.21(Mae Taeng Substation) Alternative B

Page 143: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

Capacity (MW)

140 -130 -

120 - E Gas Turbine 3x25 MW

110 - XC100 _ _______________________

90 - Installed Capacity

80 0)00

70 -.

60 - Firm Capacity

40

30

20

10

0 - 1993 1994 1 1995 1 i996 1 1997 1 1998 1 1999 1 2000 ! 2001 1 2002 1 2003 1 2004 1 2005 1 2006 1 2007

Fiscal Year

Figure 4.12 Installation Schedule for Subproject No.21(Mae Taeng Substation) Alternative C

Page 144: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

5. FINANCIAL JUSTIFICATION OF TS.9 PROJECT BASED ONTIME SLICE APPROACH

-139-

Page 145: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

5. FINANCIAL JUSTIFICATION OF TS.9 PROJECT BASED ON TIME SLICE

APPROACH

5.1 Methodology of Analysis

First part of this report is the studies to prove that each proposed

subproject is the least cost among all of the technical viable alternatives to meet the

system requirements in each subproject area. The financial justification of the whole

package of the TS.9 Project is the second part of the economic viability study of the

project. The purpose of this study is to evaluate the economic and financial internal rate

of return (EIRR and FIRR) of the whole package of TS.9 project. However the benefit

accrued from the transmission system project cannot be directly calculated as the power

generation project, the technique of time slice analysis of the EGAT's overall PDP has

been therefore applied to calculate the EIRR and FIRR of the project. Although the

feasibility study of TS.9 project was started from 1994 and the construction of the

project will be completed in 1998, the period of 1995-1998 is selected for the time slice

study since the disbursement of the project started from 1995 and the study period

should be extended to cover the effect of implementing various types of power plantinto the PDP.

The EIRR or FIRR is the discount rate which equalizes the present value

of the economic or financial costs estimated for the EGAT's PDP to the benefit

expected from implementing this PDP over the period of 1995 to 1998.

The incremental revenue, incremental capital, fuel and O&M cost used for

the analysis are based on the PDP 95-01. All costs and benefits in terms of money

value are based on 1994 price level. Costs without taxes, IDC and escalation are used

for the EIRR study while the current cost with IDC and escalation are used for the FIIUt

study.

-140-

Page 146: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

5.2 Capital Investment Costs

The capital costs are the investment costs of the power generation and

transmission projects which are involved in the EGAT least-cost Power Development

Plan during the study period (1995-1998).

5.3 Operation and Maintenance Costs (O&M Costs)

The O&M costs are assumed to be a fixed percentage of capital

investment costs as follows

% of Capital Cost

Oil/Gas-Fired Plant 2.5

Lignite-Fired Plant 3.0

Hydro Power Plant 1.0

Transmission System 1.5

5.4 Fuel Cost

Fuel prices, in real term at 1997 price, used in the EIRR study are the

same as used in the optimization of the latest EGAT's PDP (PDP 95-01); and the fuel

prices in current term used in the FIRR study are taken from the EGAT's financial

projection corresponding to PDP 95-01. Details of the prices for various types of fuel

are shown in Tables 5.1 to 5.2.

5.5 Revenues

The benefit of TS.9 project is obtained from the incremental energy sale

from the base year (1994). The EGAT average selling prices resulted from EGAl's

financial analysis to meet the financial covenant are used to calculate the incremental

revenues during the study period.

-141-

Page 147: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

5.6 Results of the Studies

The results of eronomic and financial internal rate of return can be

summarized as follows

EIRR Stud FIRR Study

Internal Rate of Return (%) 11.77 4.51

-14,-

Page 148: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TABLE 5.1FUEL PRICE FOR OPTIMIZATION OF EGAT'S PDP 95-01

(CONSTANT 1994 PRICE)_ a/ _ b/ c/ c/ pi

Fiscal | Lignite (Mae Moh) Imported Coal Heavy Oil Diesel Oil Natural Gas Natural GasYear (0.5 % Sul hur (Myanmar

USD/MBtu USD/Ton % Inc. USD/MBtu USD/Ton % Inc. USD/MBtu THB/Litre % Inc. USD/MBtu THB/Utre % Inc. USDIMBtu THB/MBtu % Inc. USD/MBtu THB/MBtu % Inc.

1994 1.12 12.56 - 1.89 50.00 - 2.96 2.92 - 3.86 3.50 - 2.40 61.09 - - - -

1995 1.12 12.63 0.56 1.94 51.10 2.20 3.04 3.00 2.74 4.00 3.63 3.71 2.35 59.82 -2.08 - - -1996 1.13 12.68 0.40 1.97 52.10 1.96 3.07 3.03 1.00 4.09 3.71 2.20 2.36 60.26 0.74 - - -1997 1.14 12.75 0.55 1.99 52.60 0.96 3.15 3.11 2.64 4.24 3.84 3.50 2.38 60.74 0.80 - - -

1998i 1 14 12.82 0.55 2.02 53.20 1.14 3.23 3. 181 2.25 4.39 3.98 3.65 2.44 62.25 2.49 3.28 83.54 -

19991 1 15 12.89 0.55 2.03 53.70 0.94 3.21 3.261 2.52 4.56 4.13 3.77 2.50 63.66 2.27 3.28 83.54 0.002000 1 15 12.97 0.62 2.05 54.20 0.93 3.40 3.35 2.76 4.72 4.28 3.63 2.54 64.77 1.741 3.28 83.61 0.082001 1 16 13.01 0.31 2.06 54.40 0.37 3.37, 3.321 -0.90 4.69 4.25 -0.70 2.54 64.65 -0.19 ! 3.35, 85.43 2.182002 1.16 13.06 0.38 2.07 54.60 0.37 3.341 3.29. -0.90 1 4.65 4.22 -0.71 2.51 63.92! -1.13 3.37 86.05 0.732003 1.17 13.11 0.38 2.08 54.80 0.37 3.31 3 26 -0.91 4.62 4.19 -0.71 2.51 63.941 0.03! 3.39 8657 0.602004 1 17 13.16 0.38 2.09 55.10 0.55 3.28 3.23 -0.92 4.59 4.16 -072, 2.51 63.881 -0.09 3.421 87.10 0.612005 1.18 13.22 0.46 2.09 55.30 0.36 3.24 3.191 -1 24 4.56 4.13 -0.72 2.50 63.84 -0.06! 3.441 87.631 0.612006 1 18 13.30 0.61 2.09 55.30 0.00 3.24 3.19 0.00 4.56 4.13 0.00 2.51 63.94 0.161 3.45 88.10 0.542007 1,19 13.38 0.60 2.09 55.30 0.00 3.24 3.19 0.00 4.56 4.13 0.00 2.51 64.06 0.19 3.45 88.10 0.002008 1.20 13.48 0.75 2.09 55.30 0.00 3.24 3.19 0.00 4.56 4.13 0.00 2.51 64.07 0.02 3.45 88.10 0.002009 1.21 13.58 0.74 2.09 55.30 0.00 3.24 3.19 0.00 4.56 4.13 0.00 2.51 64.07 0.00 3.45 88.10 0.002010 1.22 13.69 0.81 2.09 55.30 0.00 3.24 3.19 0.00 4.56 4.13 0.00 2.51 64.07 0.00 3.45 88.10 0.002011 1 23 13.81 0.88 2.09 55.30 0.00 3.24 3.19 0.00 4.56 4.13 0.00 2.51 64.07 0.00 3.45 88.10 0.00

Notes: I Based on producion costotUSD1 2.3/ton (estmated by Mine Engineering Departmnenton May 3,1994) January 11,19952j Based on FOB price estimated by IBRD (June 1994) and included treight and insurance cost of USD 7.0/ton and inland transportation cost of USD 6.0/ton.

c/ Estimated by PTT on Novenber 15,1994.

Souroe: EGAT's Power Developmnent Plan 95-01 (Volume I : Main Report).

Page 149: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TABLE 5.2FUEL PRICE FOR OPTIMIZATION OF EGAT'S PDP 95-01

(CURRENT PRICE)

Fiscal Lignite (Mae Moh) Imported Coal Heavy Oil Diesel Oil Natural Gas Natural GasYear (0.5 %Sul ( Manmart

USD/MBtu USD/Ton % Inc. USD/MBtu USD/Ton % Inc. USD/MBtu |THB/Litre % Inc. USD/MBtu TIHB/Lilre % Inc. USD/MBtu THB/MBtu % Inc. USD/MBtu THB/MBtu % Inc.

1994 1.98 19.67 - 1.91 50.44 - 3.62 3.57 - 6.43 5.83 - 2.71 69.12 - - - -1995 1.75 17.39 -11.59 2.00 52.84 4.76 3.77 3.72 4.20 6.66 6.04 3.60 2.68 68.29 -1.20 - - -1996 1.84 18.27 5.06 2.09 55.29 4.64 3.92 3.87 4.03 6.89 6.24 3.31 2.78 70.77 3.63 - - -1997 1.93 19.22 5.20 2.18 57.46 3.92 4.12 4.07 5.17 7.16 6.50 4.17 2.88 73.45 3.79 - - -1998 2.03 20.20 5.10 2.26 59.65 3.81 4.33 4.27 4.91 7.46 6.77 4.15 3.02 77.12 5.00 3.77 96.17 -1999 2.14 21.25 5.20 2.34 61.85 3.69 4.55 4.49 5.15 7.77 7.05 4.14 3.16 80.56 4.46 3.77 96.24 0.0712000, 2.25 22.34 5.13 2.43 64.27 3.91 4.80 4.73 5.35 8.12 7.36 4.40 3.27 83.50 3.65 3.97 101.11 5.062001 2.37 23.50 5.19 2.50 66.08 2.82| 4 .86l 4.79 1.27 8.23 7.46 1.36 3.33 85.01 1.81 4.11 104.81 3.6612002 2.49 24.71 5.15 2.58 68.01 2.92 4.92 4.85 1.25 8.33 7.55 1.21 3.37 85.86 1.00 4.18 106.71 1.81j2003 2.61 25.98 5.14 2.65 69.96 2.87 4.98 4.92 1.441 8.44 7.65 1.32 3.43 87.51 1.92 4.25 108.47 1.652004 2.75 27.33 5.20 2.72 71.92 2.80 5.06 4.99 1.421 8.56 7.76 1.44 3.49 89.10 1.82| 4.33 110.31 1.702005 2.89 28.75 5.20 2.80 74.01 2.91 5.13 5.06 1.40 8.67 7.86 1.29 3.56 90.81 1.92 4.40 112.14; 1.662006 3.04 30.24 5.18 2.831 74.601 0.80 5.14 5.07 0.20 8.70 7.89 0.38 3.63 92.60 1,97 4.46 113.85 1.5212007 3.20 31.81 5.19 2.85 75.20 0.80 5.141 5.07 0.00 8.74 7.93 0.51 3.75 95.58 3.22 4.51 115.02 1.032008 3.37 33.47 5.22 2.87 75.83 0.84 5.15| 5.07 0.00 8.77 7.95 0.25 3.80 96.84 1.32 4.56 116.19 1.022009 3.54 35.21 5.20 2.90 76.48 0.86 5.15 5.07 0.00 8.81 7.99 0.50 3.84 97.60 0.78 4.62 117.88 1.452010 3.73 37.04 5.20 2.92 77.15 0.88 5.16 5.08 0.20 8.85 8.02 0.38 3.96 100.96 3.44 4.65 118.59 0.602011 3.92 38.98 5.24 2.95 77.85 0.911 5.16 5.09 0.20 8.89 8.06 0.50 4.08 104.01 3.02 4.70 119.85 1.06Notes a/ Transfer price of lignite estimated by Account Department. January 1 i,t995

b/ Based on FOB price estimated by IBRD (June 1994) and included freight end insurance cost of USD 7.0/ton, import duty of 1% of FOB price and inland transportation cost of USD 6.0/ton.c/ Estimated by PTT on November 15,1994.

Source: EGAT's Powar Development Plan 95-01 (Volume li: Financial Analysis).

Page 150: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TABLE 5.3CALCULATION OF EIRR OF EGAT'S PDP 95-01 (1995-1998)

TRANSMISSION SYSTEM EXPANSION PROJECT NO.9

Fiscal Cost Stream Benefit Stream NetYear Capital O&M Incremental Total Total Incremental Average Selling Price Sale Benefit

Cost Cost Energy Cost Energy Energy Sale THE/kWh) Revenue (MTHB)Cost Sale (GWh) (GWh) Current Price 1994 Price (MTHB)

1991 387.98 387.98 -387.981992 1403.43 1403.43 -- 1403.431993 5911.93 5911.93 -5911.93

-1994 15628.98 15628.98 63643.3 -15628.981995 23521.00 632.77 8604.67 32758.44 71577.1 7933.81 1.3603 1.3080 10377.27 -22381.171996 18629.71 1461.53 16559•36 36650.59 78786.4 15143.04 1.4363 1.3279 20109.05 -16541.541997 9831.66 1771.95 22386.74 33990.34 85524.8 21881.42 1.5334 1.3632 29828.47 -4161.881998 5611.30 1978.09 24873.59 32462.98 92472.8 28829.45 1.5556 1.3297 38335.48 5872.511999 1978.09 24873.59 26851.68 92472.8| 28829.45 1.5556 1.3297 38335.48 11483.811 2000 1978.09 1 24873.59 26851.68 92472.8 ! 28829.45 1.5556 1.3297 38335.48 11483.812001 1978.09 1 24873.59 26851.68 92472.8 28829.45 1.5556 1.3297 38335.48 11483.8120021 1978.09 24873.591 26851 68 92472.8 28829.45 1.55561 1.3297 38335.48) 11483.812003 1978.091 24873.59 26851.68 92472.81 28829.45 1.5556 1.3297 38335.48 11483.812004 | 1978.09 24873.59 26851.68 92472.8 28829.45 | .55S6 1.3297 38335.48 11453.812005 1 1978.091 24873.591 26851.68 92472.08 28829.451 1.5556 1.3297 38335.48! 11483.812006 1978.091 24873.59 26851.68 92472.8 28829.45) 1.5556 1.3297 38335.48 11483.812007 1978.09| 24873.59 26851.68 92472.8 28829.45 1.5556 1.3297 3833548! 11483.812008 1978.09 24873.59 26851.68 92472.8 28829.45 1.5556 1.3297 38335.48 11483.812009 1978.09 24873.59 26851.68 92472.8 28829.45 1.5556 1.3297 38335.48 11483.812010 1978.09 24873.59 26851.68 92472.8 28829.45 1.5556 1.3297 38335.48 11483.812011 1978.09 24873.59 26851.68 92472.5) 28829.45 1.5556 1.3297 38335.48 11483.812012 1978.09 24873.59 26851.68 92472.8 28829.45 1.5556 1.3297 38335.48 11483.812013 1978.09 24873.59 26851.68 92472.8 28829.45 1.5556 1.3297 38335.48 11483.812014 1978.09 24873.59 26851.68 92472.E; 28829.45 1.5556 1.3297 38335.48 11483.812015 1978.09 24873.59 26851.68 92472.8 28829.45 1.5556 1.3297 38335.48 11483.812016 1978.09 24873.59 26851.68 92472,1 28829.45 1.5556 1.3297 38335.48 11483.812017 1978.09 24873.59 26851.68 92472.8| 28829.45 1.5556 1.3297 38335.48 11483.812018 1978.09 24873.59 ! 26851.68 92472.8 28829.45 1.5556 1.3297 38335.48 11483.812019| -8264.69 1978.09 24373.591 18586.99 92472,8 | 28829.45 1.5556 1 1.3297 38335.48 19748.50

Total 72661.30 47384.18 594769.71 714815.19 - - - - 903695.40 188880.22P.V.

5o%OR s37808e4 1 _12134.02 151952.64 217867.50 _ j - _ - 226222.04 8354.54

Economic Internal Rate of Return - 11.77%30-Mar-95

Page 151: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TABLE 5.4CALCULATION OF FIRR OF EGAT'S PDP 95-01 (1995-1998)

TRANSMISSION SYSTEM EXPANSION PROJECT NO. 9

Fiscal Cost Stream Benefit Stream NetYear Capital O&M Incremental Total Total Incremental Average Selling Price Sale Benefit

Cost Cost Energy Cost Energy Energy Sale (TH /kWh Revenue (MTHB)1991 397.58 Cost Sale (GWh) (GWh) Current Prce 1994 Prce (MTHB) _ 9.1991 397.58 397.58 -397.58

1992 1439.83 1439.83 -1439.831993 6499.23 6499.23 -6499.231994 17332.00 17332.00 63643.3 -17332.001995 27553.26 726.57 9335.67 37615.50 71577.1 7933.81 1.3603 1.3080 10792.36 -26823.141996 24292.65 1743.33 20515.44 46551.42 78786.4 15143.04 1.4363 1.3279 21749.95 -24801.471997 13028.85 2118.87 31305.83 46453.55 85524.8 21881.42 1.5334 1.3632 33552.97 -12900.581 998 7423.70 2381.37 35121.17 44926.25 92472.8 28829.45 1.5556 1.3297 44847.09 -79.151999 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552000 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552001 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552002 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552003 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552004 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.55

4o- 2005 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552006 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552007 2381.37 35121.17 37502.55 92472.8 28829 45 1.5556 1.3297 44847.09 7344.552008 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552009 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552010 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552011 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552012 2381.37 35121.17 37502.55 92472 8 28829.45 1.5556 1.3297 44847.09 7344.552013 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552014 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552015 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552016 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552017 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552018 2381.37 35121.17 37502.55 92472.8 28829.45 1.5556 1.3297 44847.09 7344.552019 - 10319.98 _ 2381.37 35121.17 _ 27182.57 92472.8 _ 28829.45 1.5556 1.3297 44847.09 17664.53

Total 87647.12 56978.96 833822.74 978448.82 - - - - 1052731.31 74282.49P.V.

@00%Drt 64451.00 14565.67 210681.85 289698.53 _ _ _ - 261867.78 -27830.74

Financial Internal Rate of Return 4.51%26- May-95

Page 152: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

APPENDIX 1

LOAD FLOW DIAGRAMS

OF THE PROPOSED PLAN OF EACH SUBPROJECT

-147-

Page 153: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY
Page 154: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO SAI NOI14 -140

204 -199-25 1541 39014.3 2 40 0 39 0

_IZ2 5 -40.0~~~~~~~~~~~~~Al0.9

202~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~4

) H 1.0) 1)4.0 I 251 1 l

772 8 6vovl l .i 7804 2 _ 102 5 1953 2

3xl9+X3 MN N '_ 706701 0 1MW -23 11.2

KSi 14 -t _$11 If2 1 _ 7702 5 r sr Xrr 789 SOUTH THON BURI

I CDOO 0 528. 25~~~~~~~~~~~~~~~~~~~~uprjetNo

TO~~ ~ lXANG SAAN O CHAMHN o2v raCl

01A7-T59 DR CAS NCS-98P-1O |r ll

L.~ ~ ~~~~~~~7 -4 XC-| 235C1 1T9 1.0_ S21 124 |1. .- 7°'1 |13 1 1421o

RHB3 6. ;2 i. 026X . Vu 102} 031.

1~~ ~ ~~~~ ~ ~~~~~~~~~~~~~~ 1 .031 X|13 j 77 8 7lV lV R 1

7. I 77 0 .I . 'I . .2. 771 . -23.0

3X(X20 .20)M 7. 2 3E t' -4.8172

THAOAN SAPHAN NA SRINAGARND_

g~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~7 0_ 7 DIA7 9ZDW| 19

Page 155: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO SAI NOI205 -20i = . -19811.7 0 .3 9 5. .8 . i

2 - 2 0 'IO -29011.7 -39.3 45.8203 _199

Y,HL 1.046 ~~~~~~~11.5

KHA LJ-i I1 .1 77Sl|t5 "I) - - MTI HI

KS.0191

o7

oo_ ,4l0 3,,9

THA THJNG NA_ . SRINAGARIND ° 5f 13 _ 5 . 52 5L _9.7053 SNR 106045

lX(2X200+2001132 ' l 1 tW 1 1 115189 -726 11j j

.THA THUNii NA SRINAGARIND~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~~~~~~71 SOT TONBU~

TO BANG S APNAN KTOCHAMHN aupoec o 2X|9-X30 W R2 7 82 6 1 -19.8 7705 -2. 7704 -26 5 7703 - 7730 -26.0

p?6 1.00~~~-8.48 P81 DP .009 3

3X 4-20 .2 00 0 M

TO BANG SAPHAN TO CHIJMPNON~~~~~~~~~~~~ SI 099

K~~~' I [JiA7.1S9 DRW I 1998 -7!4115k-

Page 156: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO SAI NOI204 -200 14: -14713 . 7 -1.9 -39. 39. 3

204 -200 149 -1473. -19 -39.V5 3 9.3 202 -199

2X19elX35 MW 7713 l t 1. 046 3Sx327o+2xlso MW 94 >13.4 -2.0

(4;) i) 3436-2 426 71 vS ~ ~ ~~229a 2 -1 8BP7 ! -f i

77127724 . v 1jO3 -19.8 10 29 _ 0 1 ra k -9 8 H3.4-2.0

1- 9r s -137 6 _ 77411 | -i7.7 1.99

-KHAO ~ ~ ~ ~ KEN KRACHA B3P2^~iU

3XI00 HW ~~~~~~~~~~~~~~7801 * 1.

3001.05 141.9 1.19 6 -191 S_R 7; r 0 0 7 0 _5 .5RS380 1 1.025 plll rm . 1.0227804 16043

|I| 7720 M ralX -i°s 63 7t7798 -14.032

3X12X2' 00 02C 2M 4 5 e4er °

THA THUNG NA I CHUAGHONI | I 101 %

2X19a 1230 I 4W 004S ! 1E46 L3 I29.2X180 MW BA 'I 1 T | C

2.7 -27:0 770 17.9~~~~~~~~~~~~~~~~~~~~Al0.9

77 -19.0 17.2~~~~~~~~~~~~~~~~~~~~~~~~~~~~71 173T4-. 59.9~~~~~~~~~~~~1.9Sl

.9-17.B 1.018~~~~~~~~~~~~~~~~~~~~~~I 6r7l'4 -17.9 7816 -17.3 =11TO

-3.6 SAl~~~~~~~~~~CS097 0.2977 SOUTH THON BURl -24

7716~~~~~~ ~7062. - 302

KB 1.015 TM 1.012 -1601.30 . .. ~ . 9 - 395 9.

7711 -14 3 77 - 4. CP7 .5 37 9SM .93 5420.94 04 0.64 504 0960~~0~ ~ ~ 0 .r ~~0 ~~0 7 ~~ 2 05 -23.2 7704 -20.66 . 7703-249 730-2.

-T- TOBA SPHN TOCUMHNSOUTHpTojet No.R11 4 2 -2~EM PLN6N DETLA AN 3PP3 3 5 7 P2 EA LOAD 771.OIA? ~S9 DRWI ~ 15kV BA PONG -BAN ONG2 INE TRPPED ASE NC-98R7

Page 157: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO SAI NOI203 -19 147 -1061772 -5.6 -42.6 38.6

233 -MW 107 -17_17.2 -5.6 -42.6 38.6

201 - 97(;) L 1.(p6 q) ! 1 _ O 25 75q ~ 16.91-5.7

4 146201 -97724 045 16.9 -5.7

_K__A_O~ olEN n c _ n r eBP2r 1.01500AO IIW 70 -11.7(T ) -51.4 _-6 6 30. -82 9 - 3 5 0 3.2 Pioa

m K S 0o997770 °174123 cJ l . = n I-;i 1 _ 77i4 15 | -i7 9 S 1. 200]. 25

A1 oir 22.7 41 9 -41.4OL1 I050 I0NR 1.045 26. -25.6

o ~ ~~~ ~ ~ 04 -33 6.2 -6 - 26. 25

12 124 0.023

0 0~~~~~~~~~~~~~~~~~~~70

713 6 6 3 -35.0

LOWE(R2 C29ENw2L 15.

~~ 53I529 I _ _ _ _ _ _ _ _1.31_

712 92 1

O9 SA__ _ SP00A

-17.1 16.2~~~oo2 101 - 1 .0 04 0 o 0519931 OUT TI-ONrn R6~~~~~~~~~92 02

I k(S 0 AA7-TS9DSW | 1qX 1 MM PN2 I70: 1 3.2

08 ,., 10067a59 7 0164 %Cp1I ITO

-2' sAl 1 001 SOUTH THON BURI~~~~~SA122 7 22 i1x 3.

KAENG KRACHM

1.ti.L. -~~~~~~~~1.8 3.0SA2 2.

903 1025 PillS 1022 1.000 002 0.09727004215 69272 122 7903 -. .. 242 eqm 1 02 1220 -6)1.

711~~~~~~~~~~~~~.~4. -. 4. 4. Lzz9. -9.0' J]~~~~-9 27 5 224 774 24170. 22

B30 (30223PK3SN30099

fIT9A7.T~~~9 DR 7t3 4.2SAM 1PHRAN2 099

i2.2~~~~ ~~ 020 SN

Page 158: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO SAI NOI205 -2 -S 53. 617.0 -48 561 4.

205 - 0 53.317.0 -4.B -56.1 49.32 0 3 -19_16.7 -4.9 g

K7lL o .023 203 -3197724z -31l.8 7 0_7301 1 i IOD _11.0 16.7 -4.9

K21AO LAEM 7801

(F)o (5) 43.7. 770 _ . -27.539g07'r |l92

352e100>1 Mi° -3 _§

0. 28. 28. 25 38.

MH eoeo .00 10045

7eO6..I XP -1. 78I00 M 1040 -G. - . .0 ;70 O2w m t tt3 AGO O

I0 .0 1- _" P .3% 2 _ - 2 548 _ 3-i4 275.1 11 03 ' SAI 0.999 TO-11.8 2 I 5THA THONG NA SRINAGARIND

2X19.1X30 9*9 014 1.049 SA -W12~~~~~~~~71

7-4S 1 040

4 ________________30 781

w T O6

(p9 . 22.

-4.8 15.6~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-5

581.3 S040I-O BR

i 4 i S-STEM7 P 0EP LAP

| b DIGS9DR | 997 l BA POGIoNKHO CHISi-AMPRSN DEOU UNE 5 BANGKO NCS97-1

-28.5~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~-162.21 - 5 -27.51~~~~~~~~~~~~~~~~~~~~~~~~~~

-.

1.010 TM 1,010 ~~~~~~~~119 o 12. 1TO 9210601 .. 105 04 .17 11 5. 7 7t ~ ~ ~ ~ ~ ~ ~~ ~729 ~ .. ~ 700-2 0542 . 703I 3. 0 7730 UT-THONBUR

-7 . 7 4... 527 2.

7 Su715ojec77No. TO BANG SAPHAN TOFN CHUMPHN

S'~~1EMS PLMJMNG DEPT. LOAD JUN93, POP 94-01 NTS9-P 3 PEAK 2OD P7 7N ON2 7 -A OG OCT WIH3 1DIA4-S9 DW 197 BA PONG - NKHONCHA~I - SMPI-RAN~DETOR UNECASENCS-7P-1

Page 159: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO NONG CHOK 20I4

-26.9 6702 -17 5 6703

3

2 9 a 36 0 36'S 2 I _ 329

0. 9-

-6.. 679

-667 TO ON NUCH 7634. -

BMIG PAKONG 60 1. 70S . -~~~~~~~~~~~~~~~~~~~~449 _ ( 2X55G).2X(2X6g .P2AKONG SP _W _ _ 06

--66334 _ _ _ TO BANG PHLI .; | - T

-63. B 1 1 v - 1

6134 1.046 9°1 -14it

690 - 0~~~~~~~~~.4 680T -' * 6905-4 -

>~~~~~I 30 1-t 0 07 rQ

(I I 2J-. - '

,134 ,. 132 1 -

4740 ~ ~ ~ ~ _,O ,!Og -22. -4ts . 40. -2^

'910 q° - i2 |.1 033 S C I 1 3i3i li°i4,

0.19rsoo 0~~~~4.0

-49.3^ 40.0| 2 t_- 3 1

U.'~~~~~~~~~~~~~~~~~~~~~~~~~~~~~5.

I COS W- 1.009 l l 1 . 23 ' -2Z 10

-14S 6 1 -t.3 6.1. M W31.1 -22.7~~~~~~~~~~~~~~~~~~~~~73 . 2.

09h2 005 ,l 1.001 6013 R1.l9 271 5i637 61 | 1.040 Cl . 1 09 0.9i5

41so9 61 P .nr do I k 4d TTm X1 xx1,el ,

tt 4 [30351 0 ;t -2731 .9 73.9 '9 ¢t 29.932§os -29.713! tS 117325 _ __ , __;_ __ 3 -43Fiq] erti lol,t;_261N

33 ILl -l2~~~~~~~~~~~~~~ 064 3~~~~0 0 -D .D . 4.

S-° 0. -FSLSubproject No. 2

|SYSTEMS PLANNiNG OE>-T V OAD JL.N 33 .O FCF C- ' 9P11BSG |PEAK LOAD| ALCs|CSEBG9P1.I I OIAs- DRW 1 1997 NORMAL CASE CASE .BG-11 . I

Page 160: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

26. TO NONG CHOK

TO RS . .66.6 72.=-64 3663.

62. 67

-667 _ _ _ 7TO ON NUCH 76.6.4 679

BANG PAKONG 670 S 16 673 -71 6.634 4412XSSOh.2XIM0O.120) Kw6

TO BANG PHLI 66 .

I K b , i M I 0 1 1 0D Sj - i t t

6U a I _.066 6622

r6 .6 -- 9S 690555 00 7. .2.6 61B B 2

|* S " 1. 1. -C 3 -6.56740 I, 2. .45.

000 ~ ~ ~ ~ ~ 0 00 0 R -6.5 1 1 1

.4.~~~~~~~~~~~~~~~~~~~~~~~7

-0,6.5 3 4

-6, .0 ~~~~~~~~~~~~~~~~~~~10937.1ID3

i737 sYo | |'% s e t ~~~~~~~ol w 1- - '. 4 2 -72 261F

665 0.226~~~~~~~~~~~~~~~~~~~~~~~~-3

1 Ir t t too to661 -262 CS <0 2.03

I- =ui__ 3-.-1, - * ,0 01

-23J ~ ~ ~ ~~~LJ 6734 -77.7 -27.627

|6 .2 | O I A S T S D P W 1 9 9 7 1 -0 I. 2 ,-0 7 0 0..~~~~~~~~~~~~~607.

0. 21-~~~~0.6

670 -is.0~~~1 660003 601.3

6707 -26.1 6706 -16.6~~~~~~~~~X6. M66 0 030 . -I--~~~~~~~~~~~~~~~~~~~.. 09 o 9~60 365 70.9 -00.2 302~~~is T5

O -11 6 -12.0~~~~~, 1 63

0. `360.700.9 00 6.7 -6.

22.6 -22.0~~~~~~~~~~~~~~~~~~~~~~~~2.

60 - ~~~~~~~~.1.7 -7.2 0.066709 -36.0 6904 2 -129

I ,.,000 0 0 00 *'0~~~~~~~~~~~~~7. 6 .10216195

SH21 lic 6 SH'i 'J", 'RY3 1 0. 50. 50.9209 52. 503 E .4 C .1 .9

67i 5 2 ~~6710 1. 6713 , ,, ,7 - 5 401322.20 ?16 9354 673 71o 0 22.1679 2.

26.4 27 9 -1, 2

0 -7.3 61~~~~~~3. 3. ub rje tNo

1962 2.206NG EPT LODJU662 PP 4 0.16 P973 1PE 42 LOAD3 6. 6 C 2200 623

J I - I I i~~~~~~~~~~~~~~~~~~~~7 .. __-.

Page 161: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO THA TABO TO TAXHLI 2 TO THA TAXO

LB1 0.9755710O -29.4

C3D 1.0045704 ~~~-31.5

TO NAXH AWAN0R3 1 042

TO NR2 -7=771792 1.021PC TOSI502 m-9.5 TO PCH T- 2.I

9 79 70 1 021

57709 w > -27 .9 1*] -31.32 6 5 r

S 0.99o

23.0 -24.3s F W 805 1 1 .r _ t | -i7 3 l 7v8 il3

141 - 4-

Nf . ,r 23. :o 1.1 || 0136o 6--

-29.6 _ 5716 ri r i~~~~~Ti ; 07401 -0' - -2. _ T<1.3 039

1 ; _w t 720 _r2 03 -730

141 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 4

570 rd -32 9 5704 -32 2 5 700 -3.2

517fl l co c iiS. o.';! QZ-

1 04 ~ ~ ~ ~ ~ ~~0 1 2

5sM7 57 1 5 - -33.6

Ul 1.014 1.047 1 57-~~~~~~~~~~~~~~~~~~~~~~~~~~~~1.4

I 2I01 20s2x2002001 99I

T209 S0 TO RS N____ ____________ ________________________________________________________ SubprojecSubpoject No..33

- r SYSlEMS PLANNING DEPT . LO 93 PP 9-01 PTS9 PEAK LOAD NORMAL CASE | CASE A97P-tO

W w DIA7-TS9CRW 1 t997 1 1 3

,S1 .2. 571 -28.7

Page 162: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO THA TARO TO TAKHLI 2 TO THk TARO

. .L91 D.904I 5105 -35.0

CBD 1.003 5714 93. V_

TO NAKH NAWAN 1 040

LB3 2. 020I 45712 e -209.9 I I TO PCH TO SKI

5033 -009

ST 'I1 0.93 15709 r ' -33.4 SR2 1 042

1159~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~50- _i3 .a ttr __s_,

4' 4_ 41'=;_i 5713 l124.0 1.022 019 1.010~~~~~~~~~~~~~~~~:12

:!t~~~ ~ ~ ~~~~~~~~~~ ~ ~ ~ ~~~~~~~~~~~ ... .so 3 l

2. a u 57^$ -

|-I I I WANG I

~~J1T TOO RS 0 >to 4'. -. 053

TL~~TL4

ATI ~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~ 1upoec Io 3 03|

Ln ATI 570 3 -32.2~~~~~~~~~~~~~~~~~~~~~~573 '-3.

z | SYSEM6 PLANING DET.LOAD lNci3.PP94 01 7P11SI PEAK LAI:-332

§ 4;} 8 DIA5TS9.ORW | 1997 1 115kV TAKHU2-SING BUsAI LINE04 TRIPP0EO139 TI.C;ASE66000-97P.01

DBN 1.013 1.046 5601~~~~~~~~~~~~~~~~~~1025715 -29.9 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~~~~~~52 S7130 2

-29.6 3 J2 1 WAJ1G02OI

7 .6 57 9.1~~~~~~~~~~~~~~~~~~~~~0220 0094

SP, Oil~59 TO6

DIAS-1S9 DRW I 1997 I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~09 1

Page 163: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO THA TAKO TO TAIKHLI 2 TO THA TARO

Le8 o. a985710 -25.9

CBD 0.983 0j 5714 -;27.6TO NAINHN ;AWAN

081 1.03o

4|PE ~ ~~~~~~ ~ ~ ~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 3393 1 .. 2

-29.4 29.5 5706 -8.3 3

2-14.1 19.5 TO .R2LA2 . . __r0 1.010 i5712 .52 -2 I2l TO PCH8 TO SoI_

0 - 0C.9000 r m i r ; S 1 1.007

33.9 3 -33.4 13 9 - _ w

25. 3 -25.135.3 -23.1s 2o 10 0 0.00.1

0IO 1.009 I. .3

575717 -24.0 Ii. 0 o 025

090 . 57 27 0.0;w|; T fflt ffl: ffl 3 5805 . T 5713 200IT .0o . 2.4

100 -'9' 0720 . . 20

5715~ ~~~ -25N 4l 5711wN Sw S .t. -2. .. 2

00I0 -33.5 34.I I~I I _ _009 _ I_ I__ 571 -S

-32.1 33.0 . 0 50. 5061 011 ., 1 030

801 .. _____ 0 00 - 0.2 ___ _ _

| B 1|0Y 0 AT2 D 00 09 5719 -25. 5711 O I -23.2 9 577. __ 6____ -29- 1 5704B -2 35087 27.

90 1 044 - . - ______________66-1 ~ -6 .

o~~~~~~ooooo 02 0~~~~~~~~~~~~~~~~10 50 F 8 13.9~~~~~~~~~~~~~~~~~~ 8. 9

SP 1,~~~107 Ay90 'I~ 044 99100.00

~~~2 5~~~~~~~ j 000~~~~~~~~255

5727 . J J 22 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~505 - 6.7 ~ ~ ~ ~ ~ ~ ~ - -7 .....

- .12 lj~~~~~~~~~~~22202 0295

TO2 so 10 TO1.RS

D'A3-1S9 ~~ PEAK LOAD -ISYSTMS LANINGDEP LOD JN~3PD727O 22.3O 0698 INRALCS IH11k H UG USAINCAET-8

9 S~~~~~~~~~~~

1,11" -A-4~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 164: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO THiA TAKO TO TAKHLI 2 TO THA 1AXO

L B1 0.992S710 -27.1

CAD 0.9765714 ~~~-28.

TO NA0HA N AWAN -0 1034

-29.4 29.55706 .-14.1 W321e ri 6 S _ _ -iS T0 NR2:4.0 TO ERR T1-5 129.4 129.1

97. -1. 1 4-'S 0mt

LE 1 004 T C T SD r5712 -72 -- -26.3 r r 7

SKI

i00 _ I oe o 10 3 _ < r 9 4 w0__ * $ 17.3 6 .

25.3 3 47.3

5.3 -. 1 D 00 0!30

Si 0 95

5709 6.1 1 036

11 9611"'"'.'""* 2

993

-i34371 59.

00 T0 SDRS- SD0 . S 75

ATI - 3.3 IrL I I . 03 3~~~~~~570

| .n D V9EM PIANNiN DEAT2 LA J9,D9-19'1S 1 KLOD 15kV TAHI2 - SIG UIL7TIPDCS 1 r

| 5715 DIA;-259 5711DRW3 - 6 _ 6710

04 919 * 1.040~~~~.4 1 226 -~~~~~~~~~L- -91 .

13. 02 -20.~~~~~2290000M

~~ DIAS.TS9 DRW I 1998~~~~-103 .07 RI02

Page 165: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO THA TAKO TO TAXHLI 2 TO THA TAKO

LEI 0.3338|

CBD 1. 0035714 -31.8

TO NAltHA N AWAN -O r 032 N 5706 -335

LB2 1.017 To PCH TO SKI

00 r.r 1 0 .. 030 5

_ r S000 . ! o 0CD .i0 0

5708 - -33.1~~~~~~~~~~~~~~5 0 -9

O _ 07.9 3 r er r O 133 ~ 0.;629.; 2SL _ o X s rv N rs

AT2~8. 631

-37~ ~~~~~2 2 _177 ro8o 4 lo 5 il sr l i3

94 ~ ~ ]H] DEN 0. ,,,9 .i2 5601 _:K1 1 ;n I°1

000 All 5701 u7 25 7 _ _ r 6 rl lo9I 5716 1.011 -707l _-28.6r -ii 7 Wi23i3 < Ojo ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~. 00io 0007

000 -2778.0 ° 29.0 o,. 0

-18.1 17.8~~~~~~~~~~~~~~~~~A1 7 1a T-BN 7.21 AT21 1.0 -5 1.L 31.

-17.1 17.7 Al T0 -3.

Op.0.4 3 2 8 _ s i7 0 3

5715 -30.0 S71 . -29.1

0 ~~~~~~~~~~~~~0 000 ~ ~ ~ ~~~~~~~~~~~~~~. r.J41.04%- 1 1 .2 ~ 0 0 0 0 5.9 _2 _ _ _ 2 _ _ _ _ _ _ _ _T__ _ _ _ _ _ _ _ _3 2__ _

1.145720 39.

SP,_ 0.9 A I I io" 104I57 9 -~-30. 00 11

512 024 884 1.030~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~IO3 L 100SR 3-

J 20 2020 200 984

WANG NOI

roSO 890T RS

Subproject No. 4SYSTEW PLANNING DEPT LCAD JUN993 PDP94-0o 96PO PEAK LOAD |NORMAL CASE rACF QD)1 Orn -inDIA5-TS9 DRW .^^-A

Page 166: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO THOK TAJCO TO TAKHLI 2 TO THJO TAKO

LBI 0.9975710 .26.0

050 0. 982 *5714 -27.7 r

TO NAKH N AWANA0-29.4 _ 9-5 5 9. r 81 3-14.1 14.0 TO A 23-29.4 ___ 2.

e 1+ ~~~~~~~~~~-14. 1.004 WL4*_ 1.

1~~~~~~~~~~~~~~9 OaXb' S7 1" t'I ,, : '4 'jt i:'^

5712 -25. 7 2 TO PC _ Ski

. _ ' , l'4.1 _____ 33.

~~5j ~ 20.1 X

20.3 -25.1

ro ,~ - . _1. 00_

509 2 |4. 1 s 1.036-97.9

SI P09 1.0il

=1 3 ik~~~~~~~~~~T . 140.01. OIL 751

DRN 1.01a AT2 1.045~~~~~~~~AT 5701157 J

- ~~~~~~~~ rn ___ ____~~~~~~~~~~~~~~~--7 41-II~~~~~~4-20.4 20.9 j~~~~~~~~~~~~01 660I.2

ATI.10 270ATI -0.~~ 08 0 997ISp 1.007 AYl , .4 _ __ _ _ _ _ _ _ _ __ _ _ _ _ _ _

S7t -23.S~~~~~~~~~~~~~~~~~~~1 -2

S719 6 .040 I'v~~~~~~~1 439~ 00 4;2S.2 1 126~~~~~~~~~2 46

TO 1000 Y08S Subproject No. 4~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~02 L20.8

S"~~1EMS PLAMIING DEPT ,LQAD JJN~~~~3.POP94-O1 ~~~P11SRI ~ ~ LOAD NORMAL CASE CASE SRI-98.P-12O.D~~~AS-1~~~~~BCRW I 1998~ ~ ~ ~ ~ ~ ~~4

Page 167: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO THA TAXO TO TAOI 2 TO TfA TARO

1B8 0.9985780 -21.5

5714 -. 3

TO NA S S'AWAN I. 8

-14.1 _4.8 T_ 900 n '52_ w T r ^ 2, g j-29.4 ___ .

-14.1 0 T i '; : - C,52, TO PCH TO SI-,:

- a aC 82 1.00*77~~~4. r ' _ 104.3 e 3.

_t *e > r tt~~~~~S l Oil

249 24.424.9 -24.6

0.,f57;88 920. 53.'889 . a

570$ 7 r0. 7.2

.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~9 *-7 I IS 3

tO > ) 10 5 Subproject No. 4~~~~~~~~~~~~~~~~10

AT2 1.809 8 998 8571 8.54

4.5~~~~~~~~~~~~~T AT 5'7 3 -44DM | .011 AT21 . 1.04| 5601 ' -2_7

571 5 21.0 5781 ,-89.5 27.2 -27-

oo-3.5 34.8 CC a 1 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ .*- ~~~~~~.6.6 -2 -20.9 289 1*7 274 o0 5 0 58 0 54 m

21 - .030

-28.7 57 4 a -~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~T .-- - 7.4 - 4~~~~~~~~~~~Tit. 5 i13 -1.~ ~ ~ ~ ~~~~-0. 131

7 _;.2 0.7 S71, ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~S -- -1273.2 098 2

4717 -6 .102

.12~~~~2

382.... ~~~~~~~~~~1 044 8W ~~~~~~~1.048

TO RS ~~~~~~~~~~~~~~~~Subproject No. 4

~' SYSTEMS PLANNiING DEPT. LOAD JN3. POP 94-01 a6io PEA LOAD NORMAL CASE, WITH I115kV LrNE THALAN3 - SARABUP11 CASE SRI-98P-20

DIAS-TS9 ORW 1998~~~9

Page 168: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO SAI NOT2703 7032 - -1-9 56 106 -105

17.2 -5. -~~~~~~42.5 38.47 2 4 1 0 46 203 -199 116 0105

2 8 063: -5t . n 0 6 7804 _ _ _ 1 025 38 4

2X19 | lX30 MS 'nR SR~~~~~~~ ~~~ ~~IlAAIN .19(T 5 3HL 7-67 3 8 1.4 *. -35 1 , 7[P1 av,r i

0.4 201 N l-li 1 _ 77iO 15 1 1 1i7 8 9 SA1 I. TO

So f S; llissi l oRt 1~~~~~~1< of at ffi X C 4 0T liisi m T O 17~O -5

BP2 ~~~~~~~~~~12 8

KHAO~~~~~~~ LAE 7BO | - 2_1. |77 r

2;L _ 3 7.903 ^ q- o NW3 -- T7 4 1 019 > 1 K°°° SW2 0. 991 i |-7-i2. 7709 -17.5

28a 25 IIi.5

7.0 1. (2 4 5

LOWER 6 T-; n-a 7RnA .4 4 C5. BPS -I13 1 - 71- 613

132,6 6 . 1 001

|1. W7. I 2I77S V (a 41i 1 1

THA THUNG NA SRINAGARIND ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~BAGKK O

7713 4 %~~~~~~~~~~~~~~~~~~~~~~~~~~~~6. 732

.7 30.7 -85 7728 3.1 22 4 1 70412.63 73 2.

7712 -13.1~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ -40 8

TO 102 BANGKSPA OCOPO upOKec N0 .

bYSThMSPLANNNG DEPT LOAD JJN~3 P0P94-O1 gePiGA 1998 NORMAL CASE CASE250 P25.982P-iO62

Page 169: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO SAI NOI

19.6 -7.9 -41.1 33 7

19. 6 -7.9 -41.1 33 7

21 -17KHL 2.046 ~~~~~~~19 .3 -7.90 4 046 20 -7_9

_RAO LAM 19.3 B2724 - -7 - 79 033X100 MW . ;19_00O~~~~~~~~~~~~~~~~~~1 '0 ~~~~~~~~~~~~~~~~~~~~~KS 0.996

123 ~~~~~~~~~~~~~~~~~~~~~~~~T .0 5 57709 -24.6

o a a 1 00~1 0.29s9.278KL a"110 94jaX^19TlHX30 SINRl 1.045 41 M 1 406 -4~~" ..20............In. 6el2

I ~~~~~~~~~~~7-34-119 ~ ~ 7 0 0 " ~ 7799 * 10221

7.0 21- SRINAGARIND

2Xl9.lX30 KW SNR ~1.047 ff 0.2XI80 KW

3.. 2 - ^7713 -13.9 30.3 -30.8): -51.4 52-,1 r, O I"43 _314B 1.01S

7712 6. -17.7 - -7 1 1a 9~~~~~~~: -9 _ _ _ _ _ _ _ _ _ _ _ _ _ __- , 02 lse9 _15 3 6 TO

XB 1.001 n! RB2 _ _ o * q a _ 21.017 770______8__________GKOK NOI

-21~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1

50 ., 1.101 TM4 1 03 a . 04 -05 TO17711 r -23.2 77 2 0. 5. 17 =. TO

X 2.5S -2 8 _ 1 . 000 SOUTH THON BURI

IKAE3N KEACHAN 2a 0 27

IR2 1(0) _B 0. 9;1|! S27r4 r%7 1-26,1 1711 - . 9~~~~~~~~~~~~~~~6

gKXXC .o | 0.990 CA. | .t 0.972

10 9 1 -47~~~~~~4 - ; 1 73t 12 1 ~~~~~~~~~0.198g -1. o99 -182 ~7,-801

-196 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~0-23.8.1 -7 9I .8 I 00 2.9 -0 7

953 1025 P0 1 000 - 17922 25 Z-io s 7803 r Hr- 1-020 10 lsn *1 0 974 SY | C.996 SN42 0.99s0 t;NI 0.994, °N3 0.995

205 6N0. 974 77 -30 0 7704 : : -31.0 7703 -2929.

l 1 ~~~~~~~~~~~7720, | e. 54 77l l- .8II | ,~ 22.7 -22. ,.2 4° 56.7 75 50 , 0 0 C4^7-TS9.F0.6 -1.1 -0.3 0.9

1- .5 56.-0.3 0.

PKEa109 OB , 0.9907720 29

LOWER CENTRAL CC. I3x12x201,200499TOBANGTO CANU PHON Subproject No. 5

S14F ES LANIG DEPT LOAD iN 93 PDP 94-O01 96P I RB2 PEAK LOAD 230kV RATCHABURI2 - HUA HIN LINE TRIPPED LCASE PB' -98P-1 I[MA7-TW.DRW ~ ~ ~ ~ ~ I 1.998

Page 170: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

V

TO SAI NOI203 -19 107 -10617.2 -0 .6 -42. 6 38.6

2 -199 1807

201 -19 78.

_HL 1.046 2016.9 -5.77724 0.5 ~~~ ~~~~~201 -1916.9 -5.71

X3HxAlO0O LAEM 74:B 1. 015 3X100 MN~ ~ ~ ~ ~ ~~~~~~761 -11. 7,-.-) (- ) Oj)J s 7 _ _ _ r r _ XS 0. 997~~~~JO 0 ~~~~~~~~~~~~~7709 -17.4

2Xl9+1X30 Mll 0 713 11 _ 5 6 382290+2 10 5 41 41 00 r

X)(HL | 53 i °3-29-- -,2 17.0 00 SNs 1c4 41.9 l-41.4

7712 21^ _1_ -S.72 -; 8 .1 _ 15 6N N N0

2638256r *Tx T. N -4 9; 9Rn _2 ;5 6 79.A61 1T

| - -3 90-13 7 2 |. 7 G _023o.oo.o 730}~, -m 5 >7 L t t | i z 1t 5 17016.2

52| I8. PX .' s . 3B PRS ,U 1101

LOWER7CENTRAL.0C. | 1 7720 <fl< '! ' , 3 .6 717.64.1 -3.6 1 30.5 -357707 0 --I7 6

.a . . .1 . 1 5 . ,.6,_. ..

15.6 -6.9 1 001

0~~~~~~~' ~'KB ~~1.006 7"I 1.004 -. 10.2 -10.1

1.00 SOUTH THON BURI

37.1 -3 6. 9 1 5 7 1 7.3RB' ~ ~ ~ 1. 023 PB12

7715 5 77720716 21 7375-2 70241732.3 70

13.0 -13 7 1. Cloe00200

.k 1-2.6 1~ ~ ~ ~ ~~~~~~16 0551xx CIL 1030 112.5 -12. 51~~~~~~~~~~~~1

1.036 -6 o 10 -63i 125-25

319 12192 00.2 00 1604~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~3-.TO BANG SAPHAN TO CHUMPHON~~~~~~ SUbpiO7E3Ct17a.3

S~W~/6 Pt*JNIN DEPT WAi~ ~DP4-O1 S6PiO PEK LOAD NC~F'SML CASE ,Wrni 15W RATCKABURI- PHETCHABLIRICASE PB-98P-2

Page 171: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO SAI NOI203 -198 -10618 0 -6.4 44 40.1

201 -~~~~1979-1198.0 -6949 446. 40.16

MIL 1.046 170 r 6.5

q ) 2) (3) y V | 0. 525.4 525.1 ;25 70; 1 -17.8~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1 19

772 0.2 1° 7 7 4-

KcAO LAE BP23X10 MW 70

13 2- -131 1. KS 0 .99N7 __ O u.

3~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~70 _ 6.15 | 1 18w

c~~~~~~~~ oco oco 39l- | W 62 | i2 86 i.8T

11 6 0~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~5.

|~~~~~~~~~~~0.5 +_; X^7 41. T .6f

?a .9 -4 T- 176 Ia -i -1 A |5; 6. . 6 1 9

19~~~~~~~~~~~~~~~~~~~~~~P

-/X0+011. S 7 .0

I THTG MA SRTIONAARIND

lx 9 XII 1994 01019 ~~~~~~~~~~~~' 1. 5479 B7PO

TON ~ 0353 0 __________________________ _ _ _ _ _ _ _ 2__ _ _ _

lo.- .- 5 .9

4.7 6 9 311~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~71

| 3. | SYS-2S .9NG DEPT,L>D SN.PDP - Ot WPt1+ | P L° | ZSV RATCHABUR!Z -HUA HIN UNE TRIPPED | CASE B980-0|712 j.5 W181 - 19.1 _.-6.373 -0 0~~~~~~~~~~~~~ii 1. -g0 4 04 BA TO O

IKAENGKRA 020 7. 0~1

1, . .- 0012.4 62 7 S61. ..- i. 1. - .B 1 . 004 -~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1.0-93

2.2 -2.5 - 6-2.9-0.409R 425 b -19.0232

0 0 772 , ~ 7709 -23.0 7704-24.6 7303 -23.6 7710 -23.

LOWER CENTRAL CC.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1 -1.02.6.71.

9 0 9 0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~60-.

Page 172: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO ShI NOI205 -200 -S47 55.016.8 -20 -55.6 4B 8205 -200 -54.7 55.0

03 _1 191tH L ;2 ' '| ' L2 ' e 1i0 5 0 26N R 3l li O 4 5 - ^ 1 6 . 4 - 48 8

" p ~ ~ ~ ~ 1.6I

BP2 r 1.015MO 790 `1 -~~~~~~~~~~~~~~~~~~~~~~~~~~~23 3

- I32 -1311 °27n6

1n7N13 l14 ., 0 1 125

XHL 790

-2m

68 54 .3 A6_T

~~~~~~~~-1~~~~~~~~-3 .

n1 1 8 7.u 3 SU O BURT

13~~~~~~~~~10

-~~~~~~~ 2 -102 F Subrojct5o.0

TO BTUG SAPNSAN TO CHUIPNON SD-p,o*e,t_ No._

W SYSTEMS PLANNING DEPT. LOAD JUN9~3 VP 94-01 97P11RB2 | PEAK LOQAD| OPEN LINE 1I15kV RATcHABuRl2 - PHETCHABuRI | CASE PB-97P-1Og ss a7-1s9DRw 1997 1

0

Page 173: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

24I

TO- NONG CHOK 3 6704-2 t -. 7D 37' : ?72

_ 3

TotRs :;776 3 2 9 io

-? TOBS 7~~~~~~~~~OONNCH.

TO ON NUCH BANG PAKONG -16.5 3 -2p 67--51.0 - - '-I ~~~~~~~~~~ 22Q550).2XI23O0120 K6W

- - . 16 74-i2 41 r |1 i DDs7 1 .029

6802

-50 2 L _0

.. 60 1.0 01 1.3 001 1 a _ . .. 3

1~~~~~~~~~~1

6749 3.030o;16 - 336740 -1. - l

'aml I I I

I 7I3

I

-52.1 4

I 11 61.llI

-66, 61.2-

ugo 1.014 lo

-36.0

|' '3 09ES337ET 0 N3PP03ft E O^ OA AE AEK9P1

a 6734, , 39 4 -4516

{~~~~~~~~~~~~~~~~~~~~~~~~~- .5 '- 14 1tT9S 9

-6 - . ~ - 1 634 1.029-1 .6 ~~~~~~~~6707 03663 2.

0 1.016.

JLP 1 90~~~~~~3.6 165 -1660

6709~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~~-. KIRIDHARN

36 6~~~~~02 0. 020i009i

_ __ 3-03-03-0C3C-3 D - 12BL n I i ~~~~ ~ ~~~~~~~046. RAYONG 2 iso 0 2RY' ~~~~~~ ~67 4X1(2X03103121 KW5 6i31 - 25

57 A

30.6~~~~~~~~~~~~~~3.

-5.7~~~~~~~~~~~~~~~~~~.

Subproiect No. 6SYTEMS PLANNING DEPT, LOAD JUN 93 PDP 94- 01 96P11 WVNK PEAKALCAE LOADK-8P1

DtA&-TSG ORW 19 OMLCS AEWK9P1

Page 174: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

TO NONG CHOK 1i3

I Dil Ir 1 1 F 1 F j~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.07 A103 .4TO RS 31 81.2 3~ 31 ~~~~~~~~~~~~~~81.2

TO ON NUCH 27.3

_1i. = _ _ _ TO ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~BA1GPL 42 250 22i G P2A0)ONG 7 o _ 1.058PA0I- (2X550)2 N 67S0 - -12. 673 -6.7

-51.46TO BAN; PHLI 4 83.9

7144 lam45 80 1.053 8002 OH 0. 0 0

-. 3 8- _ . 35 1.021

1.''~~0-~- c o -DO3I. 80

1.33 1. 33 1.00 39 _.

4_ 10330

6 09ng ~~521 61 3i3 r 2

6D. a ~ ~ ~ ~ m. 5

6710 51>51' 1i616 667Y2 1 7 |e- mm 1i.01 1.032+12 lr- i

0'1~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1

q t~~~~~~~~~~~~~~~~~~~~~~0 9 ic'5Si 25 o -3-°3

8.0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~70_

. rii6 1 z 1 1 13037-5t -30,.7lo4~~~~~~~~~~~~~~~~~~~~~~07 .

3927 4810 130

882 1333 1841 1.812 4453 ~~~~~~~~~~~~~~~~~~ 1.060 801 ~~~~~~~1.838 N 1.02 8 C

6712 -17.1 6311 7 a L-856 6f713 .,-iP.s 6711 -15.1 671, -16.8 L717 -. -3 6718 627966

T_ tt 12~~~. 2 03i QS I i10 0.5 9 o-71. 3. 4.80 0- . 82 1. 1.0 012 2. 3.

DIA6-T89 DRw I 1998 I6709 NAK0 O00. 2X. MW 5 u prjc o | t | SEEMS P -NiNG DET.L -D PDP>01PtC | PE LOX | ORMAL VS,WITH 11kV UNE MCHIN BU2'WA5HA | CASE :-9OD-2

Page 175: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

VIENTIANE

. 0* 7 I 0.,. *.S

-. 3~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~m

MNIU PHNOIG _ :S_o2X(2XI212113)MW

SYTM _LrNN DEP ,LOAD JUN 93.i PDP 940 T9 9 PA ODI NRMLOEAINCAEM29P

D UR, _ _ ; _t.lil. d 1iW lia ''w

, FE ' T , T .

-T rLlI: i

is°t-i°ai I 1 -"Xol,ol | sLoo -Ilszl i ] g14* sX I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~4

SR~~'',_qtg"H1lcil 758. . 7 ' 2 ^°

PC SKISbrjetN.7 ^[

-PI SYSTEMS PLANNING DEPT, LOAD JUN 93, PDP 94- 01, NTS8-Q097 Supojc No.4 LOD|7 N | DIA 2.TS 9 | 97 OML OPIERATiON |CASE MD2 -97P - 10|

Page 176: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

VIENTIANE

.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~0 075 00 S c0. o 00

NAN' NG :.,:'-

1'~~~~~~~~~~~~~~~~~~~~~~0 00 "~

1~*~ 0

-- °' -"Ioo

LS _

I-.~~~~~~~~~~~~~~f

r~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~0 . _ c.

1 -s _0 - - - -- I

_ _ _ i o:,.,,_ i' ,° +'-,': .:

_________________________________________________Subproject No. 7 0

| '., SYSTEMS PLANNING DEPT,LOAD JUN 93. PDP 94-01 .MD2 -97(0-11 I PEAK LOAD I i~ ,?~ 'r I1A TI 197t15KV. YASOTHON -AMNAT CHAROEN TRIPPED I CASE MD2 - 97P -11

q W 1 0tA2.T9 1 1997 1 1 R *

,

Page 177: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

VIENTIANE THEUN HINBOUN

tW . -s-' 1- ' - ~~~~~~~~~~~~~~~~~~~Z5'tJ t _ 11415 X,. E~~~~~~~~~~~~~~~~~ 5-t

{ I dL'. :11 11 1.1 'S - - 9 I e - = w w I I I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~S5 t

I # tsgtogs tIN Isl ;- .I

55 005+C4> Ut to s F -og

-. 4~~~~~~~~~~~~~~~~~~~~~~~~~T

4- 18 Ill - S _ . 14.l i== it 1 -~

il n - it - _ 05 3 _, 93 1 t | wAfS

|~~~~~~~~~~~~~~~~~~ * i - tos 55- .. ~ tt.. - ~ ss tos ., to, r: ti

SYSTEMS PLANMING DEPT.L1OAD JUN 93. POP9-01 NTS9-- 09 PEAK LOAD | WITH ,15I MUKDA4AN 2- THT PHANOM DC/ST AND I

.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~i f

2X NAN PHONG T

IS 2~~~~S 0

Page 178: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

VIEN.TIANE THEUN HINB HO1iN

, l -iooloz >5 173e -77 i ( ~~~~~~~~~~~~~~~~~~~~~~~~~~~~THtAKHEK

. 8 >'i'7] .t.t.' £'+t, ". e ;' t 'i~~~~~~~~~~~~~~4" 'S

2X (2X121+m .1 7 3) | W

>1 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ W 7 7_1:o|.| J1NFTHEN

l 7l :l1 s _ 001|l I III77n1|77JI7 - ':l'#ll~~~~~~~~~~~~~~~~~-6 LSi ;i3 g77i*71l 71 a1 j a lt

J | | t o t X X | o c f | l E~~~~~~~~! NN TM m { { ,",L !1 ' M: ioRo ,0, ' i 'ii': | | 7'm. ? °,? *, . i i | I ni 7>7Z7j 1~~~~~~~~~~~~AVANN"ET

'' '' 1_ - 4 SiE - W -1-fE w i1 1 ,!,^-iE 7H

SR3 + 4-.in io . f .IIN HUAI HOR

PCN ilCl ~~~~~~~~~~Subproject No. 8 -s'

SYSTEMS PLANNING DEPT,L-OAD JUN93.PDP94-01,NBL-gQ- 10 PIEAK LOAD NOMA OPRAIO

| ,&I DIA2. TS | 1998 ,OM OEAIN CS N8.9P

Page 179: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

VIENTIANE iTHUHEKO)

I A,'' [<1'''' V r + ;Wz I~~~~~~~~~~~~~~~~~~~~' -

2X(2X12I.113)MW 5~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.1~:001

F~~~~~~~~~~~~U I;^_r ; - ...

C iol ,>,'i' si:',, -'5' S t _ _ ,.b .o It No. ~Y~PL~JIN -i:T, LODJN., POP................ i40 .NS . |9 J......... PEAK LOA I o

1|11' t:St'~~~~~ ~~~~ 199 WIT 115' 'i'N THN 2- NO ALMPUSOND/T CS B -_9"' -20S

I 1- 1 #= -- I I I I liM CLg <8= 1et _ D " F-1 E E -1g° i t _i il t _ A ns e n« | nm . x oig~~~~~~~~~~~~~~~~~~~~~~~~~~~~~NM HEIN

~~~~~~TT ,|| 7,___ _ i__ r 10 1 2

I I ~~~ t- ii"i # * siS 80 o 1z 1z s l~~~~~~~VWWrt o . 1l ,,:i't Xi6

SR2 HUA DI2.T9| 19HOIH 1 VU(NTAI2- OGBAIMUSO C/Te S D 8-2

* , # .~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~R

Page 180: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

VIENTrIANE THEUN HINBO3UN

{4~~~ ~ ~ ~~~~~~~~~~~~~ 330 s fl -. -

-30.*-

2X(2XI21t113XHl N e

-t~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-

I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~S - -' I '0 20 o: m

-*-NAM THEUJN 2

~ T * @ 01 rSAVAWMAET

U, .llJ.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Ji1,i

rr-7 0 ! Ai A 7 t.kt 11 .3 W .. HV 7r~i' I .

~~I SI b rojec: No. 9 034.......5-i:

I~~~.i~ ~ SYTM P1NNN DETLA JUN 93 POP 940 .SU - - 980$ - ,10 | | 1&J -LOAD71 l0a % Xi

D2IAA2 HO R

I 199 NOMA T 'i:' SU-98P-1O

FC O Subproject No. 9 PM7,-

SYSTEMS PLANNING DEPT, LOAD JUN 99,PDP 94-O0tSU-90Q- 10 PEA LOAD tiRA PRTO CS U-9P-1| }|DIA 2. TS 9 1998 1 EOMLOEAIN|CS U-9P-1

Page 181: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

VIENrIANE THEUN NIHBOUIN

TRAKHEK~~~~~~~~~~10 NNTHU

NAM PHONG~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~SVINXE

0..) -41~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~4___________________________________________________ __________________________________

LS~~~~~~~~~~~~~~~~~~~** .0 S 00 0 1.l 40 1U 04 00 - 00

4~~~upojc o [J~iEMS~T~I~NIN DEPT. LOAD JUN93. PDP 94.01 ,TS9 - 098 PEAK OADT WITH 115 K ROI ET - PHAYAKHAPHUM PHISAI NE STRINGING CAE SU - 98P -A 24,! +1

SAVANNA99 AD 1 K PAYKHAHU PIAI- URNSCONDCS

I 0~~~~~~~~~~HA O

Page 182: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

VlENTIsbNE ~~~~~~~~~~~~~~~~~~~THEtIN HINBOUN

re"l si 4s1 &1 I_ IH

171 PRO -i- r-NtP 2r W J s ~ e i wr-!4r i

2X ,: 3 S |2Xl*2l5 -l t !,o ; 1;73 1 _rM i

UR7 1 ;lj i

1-5- i:' . . _sOi

| a E L i 3; F . [,:: I I | .:t 1: f _ m :. . ; r I I 1 i sAVAKKH=:~~~~~~~~~~~~~~~~~~I SVANMHE9 _ 75 _ 16 | \ 15*i ~ ~ ~ ~ ~ -Sl.StI

;7l _ . _1:111 | | § { 1:iS571 _ _{iZ~~~~

T M'SXS .,_iia i7ttili||j L

~~~~~~~~~~~~~~~~~~~~~~~'1 VA~L -

I r<N~~~~~~~~~~~~~i Subproject No. 10 > 'fi|SYSTEMS PLANNING DEPT, LOAD JUN 93, PDP 94- 01,NTS9 - °98t PEAK LOAOCAS BN| 4 | DU2 TSg | 1998 | VlyT~~~~~~~~~MfH 1 15 KV CFHAIYAPHUM -BAMNeT NARONG SC ON pC/sT |CS NI9P

Page 183: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

VIENTIANE THEL'N HINBOUN

. W S9ll I > > t g°3' j * e.§*o~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~*0.1

105 __________j______________ ________________________ I

°' nIl Li --2_NAM PHONG _ ° i r r _1

101

_b CPA N o 11 -

__ _ _ _ _ _ _ _ _ _ _ _

LS LYES L G T 1 - 08 E1A L A T 1 7 - T S - 8

00 NAY- i=|. THEUI 2

I -i~/ -IA.TS 1998- . . I I fE Nole v I I T;E5lT I I

| 0zn P.

| FCH iXI ~~~~~~~~~~~~~~~~~~~Subproject No. IIss e | t|SYSTEMS PLANNING DEPT, LOAD JUN 93, PDP 94-Ot,.NTS9 - 098 PEAK LOAD WIT 11 5 VUO ACAHN ATHRLKS ND/T9l-

| |DIA 2.TS 9 | 1998 |WT 1 VUO ACAMI-ATA>SODMT|CS l9P1

Page 184: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

VIENTIANE THEK H

_ r .1 i 1 -l | - 1 - ^ i +1 * .10.0 _ -LO.

- 041.3. _ Ik 02 -0.2^ 0t°-- Ii

THAKHEK~~~~~~~~~~~~SVNNXE

S - . ,, .S T r _ bjc :^' l H~~T 7

" _ 7 | j .. i _ 71^__ __ - _ 7 0 0.

u9l S)C e-FX0tNMM)

S nXil i Xjl- ;; 4 t f D _ _ | 4 ___ -- 11

(2xj N~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~P0SN3

| TTU | nTs i| i1. *i9.iT z" , aicsz | | a?ss 4. 4b _ _ 1.00 II 1.00 00 . 0 ............ 100 -i 00* -1

l t|.|- -§ | 0 se i .s \ +7 J e X e - -. 0 2 +|x .p1 113510 i 5 ; ) | | ; _ X i " S o.s j ; | | 1 -0-- $ NDR0|

} EtH I ~~~~~~~~~~~~~~~~~~~~~~~~~~~Subproject No. 12 o{o

| L SYSTEMS PLANNING DEPT,LOAD JUN 93.,PDP 94-01, NTSg- Q98 PEAK LOAD |Xsf | DIA2.TS9 | 1998 { ~~~~~~~WITH 115 Ky SURIN-SANGKH-A SCON DC/ST |CASE SKfl-98PR T

Page 185: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

95P PKK

5WJAFiABIA . .._0i

;;J L L 71S ' o n _ -i7 1 -005 I_10

i71-7¢t %,14Q Q i;; _ X1 ;t ~3>

000 _ 0 _1 101 0101 * _ *1* 0 -°

004 1

II~~ ~ ~ S; 114 0 ; r ;s3

0 00~~~~~~~~~~~~~~~~~

r | 1.|13 _lo. lo 7 }%.4 J~~~~~~~~~~~~~~~~~~~~~~~RW LN

Subproject No. 13agi | SYSTEMS PLANNING DEPT, LOAD JUN 93. PDP 94- 01 TS- 960-10 I PEAK LOAD NORMAL OPERATION CASE TS - 96P -10DIA 3. TS9 1996 i

Page 186: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP P1K

KHANOM

(27109 4L226 6

93 s :.09 IS 11T T70A,AU .1 1 702' .26. - - 4..

miK t. ,2 lt . ; - - letiX N~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~"

i F~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~o 6

00~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~10

UL~~~~~~~~~~~~~~~~~~~~~~~~~~~~~"

l~~~~~~29 I 11 -, i _P s:,2 r

1 =AWS- . 1

|1SYSTEMS PLANNING DEPT, LoAD JUN93, PDP 94- 01,T5-9 11 .PEAK LOAD630A KHNOM-AKNSITHMMART 1CGT TRIPPED - 96P -11|DIA 3. TS9 1971 -2

Page 187: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP PXX

010 rr-20 000200

KRHANOM(000 ioiooozo*, no 16

RAJJAPRi7BHA KA _

000

_ 0 b7 _ L . - - -01i

0101 ._0.0 0101l- .'-. -002 000 ....- .N C

0 _ - 9

D-A 3O TS 2 1999

ow -r; ,z .- ozo

o 0 010 . ..-.

S ,i707'20='

no - loot - - - 0.020 000 * 0000 002 * .0 .0.000 010 0000~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~BXGIPNG7t ; i

Subproject No. 13,|SYSTEMS PLANNING DEPTLOAD JUN 93.,PDP94-01,.TS- 99Q -10 |PEAK LOAD WITH 115KV SURAT THANI-.THUNG SONG DCIST CASE TS -99P - 10| f|DIA 3 . TS 9 1999 NORMAL OPERATION

-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 188: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

. b f ~ ~ ~ ~~~~~~~~~~~~~~~~~~~~~~~~~ 1 .- 00

07 - o.5.1 070 ~~~~~~~~~~~~~~~~~-70.02rV

RAJJAPRABHA I

0o _

vT1' i7 v * XG377ss, T" ;70 i _(tt3~ ~ ~ ~ ~ ~ ~ ~~5. 005 .5 .00.1____ __ _ 06 _ __ _ 0,3 0r00

1. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~o oo° ". Oso 51 -- OT o is _

to _. .1 Il ^.-.~ -, - - -° -I - - -

00~~~~~~~~~~~ i - 7o ofll 0.000 i7 II 1* | __.0___ 1 _______ r r*04

|70 010 70 *5 .00 170 Ii iL - Xss 4 1 70 i01 '-H I 'tE 3 r t t 2 i770 i s'k?

- .- - L 0 - - - - -- - -11 - -0

L, d . 0.02

Subproject No. 13 I ..|SYSTEMIS PLANNING DEPT, LOAD JUN 93, POP 94- ol,TS-9Q 11KV PHTHLN-A PPEAK TRIPPE -9p l t f|DIA 3.TS 9 1991Kt9HATAUGLM -O ATIPE A E TS- g -1

Page 189: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP PUX

. ~~~~~~~~~~~~~W

(2770)OU12102.2261

RAJJ7,PRAEHh ~L

4, " ,tT'MrX - 710 MI * I s@7

0 A F -5 - - - - - - - - - *- - -

571~~~0 __ .223 X:i.: -I t2FF

lANG LANG fl;

1>- Y TMS U(NNNG DPT OAD UN93PDP401.S9-9Q-3| PEK LOD | OPEN 115KV. NAKHON SI THAMMAPAT -THUNG SONG UNE |CASE TS - gP -2@ | DIA 3 .TS 9 | 1996 _ _L

Page 190: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP PK-

I'M~ ~ ~ ~ i 2;L

RAJJAPRASHA~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~XA3A

32375). 14336332.0351

77P 7 r3 7 3. -3.

r loo 3.303- :2 __ l 3 I I.._a|

l~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~36 i i- 33513i7

00 *$>351 z,

137 -3 5j, 1i:e jj

t h H A~~~ ~~~t' n' 4 .. A±.AJH'4],1 31

3 313 ;33 iT i 13fl 251 33 . _a |e n,3

~~~~~~~~~~~~l:~-31. 3 7 -i

BOG LG t 5 o

|Subproject No. 13| .3 SYSTEMS PANNING-DEPT, LOAD JUN93, PDP901, NTS9 - 97 PEAK LOAD | WITH 115K. NAKHONSITHAMMARAT-THUNGSONG DCtST3737 -63.0 3DIA .3 TS9 1997 333 -ND OPEN 115KV. THUNGSO3NA OPEN 1 CASE TS-97P-10

Cr, 3 I73 73397 URT HNI2cT

Page 191: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP PKK

,too w~~~~~~~~~~~~~~~~~oo-a f4g Z

(2170001Z41(00taat

0D 1 40 . .5,2

1& >_.07 oni 1.000

0~~~~0 02 0.047 I 000~~~~~~~~~~~~~~~~~~~~~~4

n tit 7 s< _;7i 3 w 1bMM. r o.5. ZO1 7. °l a. Ii744 9 o _ _ I -s7 113l s Z~1. VT 0

' W; I - l' * o -4LDy_oc .' 9, 0

- ; 20 .4.]35l55 t7s4 <S

p7

.00. 0i7 0 . ik5S .*z§z b - 0i7

loo7jt 0 00: _ 9. ., ' § 5 s-°s lalT73t _ tign4$ 13Tl0 tZ 9^ t o.o P 7j

I _7- 70 0-§;- y $1b 1.00

S T S L N tG DE7 P T , L O A D 7 J U N00 9 3 , P .0.0 1 0 1.0 .5 0 -5.7~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~3,6 v;;-5tzLX°t

. ,. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Subproject No. 13

|SYSTEMS PLANNMNG DEPT, LOAD JUN 93, PDP 94-01.NTS9- 09 | PEAK LOAD| WITH 230KV. THUNG SONG - SURAT THANI DCIST CASE TS - 98P - 10| DIA3. TS9 _ 1998 _ _ ___ _

Page 192: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP PKK

IF W |~~~~~~~~~~~~~~~~~~~~~~KAORP-JAPPA~~~~~~~~~~~ A2:f(X1226 b

X § X B7t2 ' ¢. L5,1,2 @ tl:$;qlS25~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~4 41,

I ;42-o!ts j --- }05/2]'r4f3l{~~~~~~~~~~~~~~~~~~~~~~~~~~~~2

; 2 ~~~~~~~~T J4;I4.'tgj?}:........._

a) V c, I X S _ _, f m X, _ X ,,

' I ~~r12 ---2

@, ,,,212 L _ . o lo |~~~~~~~~~~~~~~~~7TT,

I aX ,,2 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~u p oecl7t N .. 1ti 13

'-|SYSTEMS PLANNING DEPT, LOAD JUN 93, PDP 94- 01, TS -980 -11 PEAK LOAD rS b rjc

. |DIA3S.TS9 |298 30V. KI KNOM -NAKHON ITHAMAPAT IlCCT TRIPPED |CASE TS -98P - I11

Page 193: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP PKK

Rl07JAP.7ABAa - , 0 ..

260. -20 lORAN ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~AN LN

.0 1 1'1 .''t _ _ _ +',' .j.SY000 EMS P4A0 2005,, EPT, LOAD JU0N 93, PDP 94- ol.NE - 000 .A LO 0D .

0IA .; 2001

r ,1 ;zz5 2:.r; | .1~~ ~ ~ ~~~~~~~~~~ ~ ~ ~~~~~~~~~~~~~~~~~~~022 1O0 0; -2

BANG IJANG iig

________________________________ Subproject No. 14

'wJ|SYSTEMS PLANNING DEPT, LOAD JUN93, PDPS4-01,KNE-01Q- 10l PEAI LOAD TNORMAL OPERATION | CASE KNE-0P-1

f t | DIA 3. TS9 | 2001 1 . _ A

Page 194: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

(21051)*.CX12.2.0) M

00 I ,, M-g too

R7WJAPRALHA -, = _- _i. 7.3XP t; : lz -* f ze r t

D 0 # i _ _ ? _ ;75 0i$ i 0, G, t}6 g r d0,0 0 . 0

t~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~0 | .0 .0 002 .> xt , * :SO _ 00 - 40.

Subproject No. 144 SYSTEMS PLANNING DEP, LOAD JUN 93, PDP 94-01 KNE-Qa1- ii PK LOD | 115KV. PATTANI -YALA TRPPED CASE KNE - 01P- 1DIA 3. TS9 I 011

Page 195: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP P5K

.U

0 e~~~~~~~~~~~~~~~~~~~e

708 5 o . o I 0.000

040. -00 4000S1

SL0 _ E O5.9 300P 9 O -N 40 - Io

r 7 _ i r _ _ T i t _ w r * r 1.050~~~~~~~~~~~000 ... j 0

215~~~~~~~~~~~~~~~~~~~~~~~~i _0 _ 00 100

Fz i _ 4 s X r ir __ l3 4 _ _ _0 7 .teaJ1070

l lss lzjDIA70 *1i 3., T-S 19992

700. -°o 0;7 l _ .00]7 4 080 - 0.0001

| ?70 A wjw78 %? - w_ T* ! * |~~~~ X10 0 9 0- ~ 0040

sz 1;l -4 X ' HVDC s.s *~~ | | ______ 302 .200 -

- ~ ~~~~~~~~~~~~~~~~~ 4'j' 0 007.0 i0 70

ft~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Sbrjc No. 014 0.-o

! Wf I DIA S TSg | 1 999 1 . _ l~~~~~~~~~~~~~ ~~00

Page 196: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

asp PKK

a 2i..

I * a [ 7,. .... -l-.4s .F., 4- X _ _] .

*~~.4V

7 + 1 T M: 4I

. o o l | ua ' Lj W i 17 v - _lb e tt~juL -t .0 .|

77vb _ _ -i5 l -94.0 - 99 n *- - -- - t-O

t ',-. ,j., HVDC 1z^Zfi ,. 1 1 ' g 116.0 X S 09

BANG LANW

Subproject No. 14SYSTEMS PLANNING DEPT, LOAD JUN 93, PDP 94-01,KNE- 990-1 PEAK LOAD 1 1 KV. HAT YAI 2 - PATTANI I CCT TRIPPED CASE KNEi- 99P -

iL < DIA 3 TS13 1999 11K.HTA2PlAN1CTRPE| C SE N :-9 1

Page 197: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP PKK

12X75) . (4X012.26)

'I 1.051 702 I 7 l. 0 .000

- 7 _ _________, -L.tW;KBS~~~ 00 f o _ _ __ _ _ __ _ _ __ _ _ _ .7 '. . 5.

_ On - - - -100 . 11° ~ ~ 15 w1 5o1!

i it 1 iz **~~~- 0'01 1066 O- 0.0 0_ *2

t~~~~~~ ~ ~ ~~~~~~~~~~~~~~ 0 0 S 0 5 0 _5 03 0 .10.

tO 101 US 1s _000 _1 10_0 oL IT

tv~~~~~~ Io I I .-"' "- tsHsq q 6° " 030 10s

- ~ l I I 0 .1o0.3rr issXs

7 7 i _> _ r t si5 : | 05 -fl- +5O :o

,* |j. < 7 7 ° A L °. ___ ___ __ °5 s 0 0S040.5 q

foJ ~ ;1 75 77.71 0 00 DC |, 1 1 010|nl.u

7no ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ S u p oj c N o.j 14. l..

SYSTEMS PLANNING DEPT LOAD JUN 93 PDP 94-01 ,I'ffS 9098 PEAK- L>OAD WIH2a|KHOGNA - YAL DCS 127 MC AEKE-9P 10 BANG LANG X T-

Subproject No. 14

. |SYSTEMS PLANNING DEPT. LOAD JUN 93, PDP 9- 01NTS 9- 098 |PEAK LOAD | IH 2S0O6' KHLONG NGAE -YALA DC/ST 1272 MCM. |CASE KNE - 98P -1 0|,f|DIA S .TS 9 i 998 11

Page 198: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

PKK

.40.-O 20 MT

(2VS5).(4Z111,20422W3.60 m~AX61

10,~~~~ '. T

"~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~A o .(75rr

- ~~ ~ ~ t@ _1..404 10lt

l ;14.1 _ . . _ L--l0140 4

l , i, 3 u ol _ r LjO38 r; _ *_ * Lo3e~~~~~~~~~~~~~~~~~~22 Q

3~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~7' 1 010 = 010* _ _l o. 100 4 _* 1.0203 z

Subproject No. 15

SYSTEMS PLANNING DEPT. LOAD JUN 93. PDP 94-01 PK -970- 10 PEAK LOAD -1\A'f" DIAs. Ts 9 1999 NOMA OERTINCAE K-9P 1

Page 199: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP p1K

CF .4 1.0 2A

(2X15).(IX112.226) NW6

RAJJAPAIFt A BHA

I 021 ~ ~ ~ ~ 0

Ct 0.224 0 1.001~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~10

A. o'~~~~' OPI 2 HVD u. - C

2 2. 3 0 2X 0 2r 2 l.s 25 1.0 -12.01.n

_3 0As 1.026 _ o b R ( 1 ~ 2 i *SnorN

-sY TE.S -P LA -1 -N 1DK 0-I i1 26KV _G - .K IP-A0 DIAS TS . 11 . .07.

,,,o,~~~ -. -. - 2.02... 0,0 2°it.000 .. 0.00 ,:_ 50

SYSTEM PL NNN DET LOA JU 9, P| |40 ,PK ,,-1 I PE K OA 15KV 'jN N APF K T lOOnXsT' TRIPE CAS PK-99 7, 1010

,:AJ DIAS TS9 | 100 IVC|12;

E ejzoei L j -43i-43z39 aolwoO I

Page 200: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

n s.Zz0 _ " XjaX(ansB-Xal^z. 4

BSP P1K

'25 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 2

to ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ W

_.06 P6.0 _ -i _065 .,

7 -7 -1 0 2 0 . 0 7-|

.t _ ._ __________________________________ _ Suprjet No. 15

ELOADJUN ,D 94.01 .P - 0. 11ANRMAL PERAIONSE1.i 3;; .. ._ gL=: n- e w~~~~~~~~~~~~ i

*.1-@1 -1. 111 217 _a^d1 n . io1H

I;"'~~~W -22 lIIHVC-.7 , .,j

Gloi, Wi ~~~~~~~~~~~~~~~~~~~~~~~~~~~1 '. - 4. - '>!e -vD2I

Subproject No. 15

|SYSTEMS PLANNNG DEPT.,LOAD JUN 93, PDP 94- 01,PK - 0O- 101 PEAK LOAD |NORMAL OPERATION |CASE PK-03P-1DIA 3 . TS 921D03 -101

Page 201: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP P1K

IM

.000-20 r0

0 .- 5 .- 0 - zS.II.Z 1|

KA;SN 1KUNO .|1lla30, H

;'1~~~~~~~~~~2 0 a ,H ''- 0 A 00 0 00, t,,

T ~ ~ ~ ~ ~ ~ ~ M A? A H 11, 00 3l __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ . _ . _ _ __ _

01040 ~ ~ ~ ~ ~ ~ ~~]| IO7ito . a4i7 Il 0, '0057

709~ ~ ~ ~~~~~~~,~ .0~ , o. a . 5 ._ 0 _O__.

On 0.00 ST ,1 0.00 -_ 0.00 9_ S _

106 0 -t r D _ . _ _ _ t¢ * | _ r s 0007

I tF T;Tn f W a S'I 12- E t~~~~~- 0.0 .00| f .5 jo l | l }{VDC .i,§ 3 9 | 000 *0.o Olo

-~ ~~~~~~ ~~~~~~~ ~~o 3-3 . . ;j - 0ua = ; iii07 -iiio.0 rrr^9 |7 n -i

00.0 00 1 CC-

LkENG ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 7 KRUNGt& ;;

00 "0 DI T 20

I 0~~~~~mW

106 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~3

t 1-~~~~upo,c N.1SYSTEMS PLANNING DEPT. LOAD JUN 93. PDP 94-01 .PK - o3a -11 PEAK LOAD 115KV. PHANGNGA - PHUKET 1 1CCT TRIPPED CASE PK - 03P -11~~~~~- F-7

DJA 3. TS 9 2003 I~~~HV

Page 202: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

L.0~~~~~~~~~~~~~~~~~~~~~~~~~.0-O0.0

31.0~~~~~~~~~~~~~~~~~~~~I

- 111k 'L'~~- On ..

4 3 -47 0

rS 70

s

4A

-70~~~:1: _.0 --

0 - - -10. .11' 3

. .011.0

0* z1Zl 470 -1. 0000 0.._ _14- 370 r

-o 0 > . ... . 0471 5 .. 0 _T 0-7

l r > ..... ll ..... ~~~~~~~~~~~~~~~~~~ I C _ 135 4 -4077 476rt Ei2

1l ii - -- i l3'-B41 .,

I

to io -70 3

S Subproject No. 15|SYSTEMS PLANNING DEPT LOAD JUN 93, PDP 94-01, NTSQ -097 PEAK LOAD OPEN115KV. PHANGN(A-PHUKET2 LINE CASE PK-97P-10'sf DIA 3 TS9 1997 .

Page 203: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP PKK

1C75 54401 -

- 0 00 .00.0 '('1' 'N

|~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~0 0000 .J

3090~ ~ ~ ~ 77 _ .LI .22W 70 -00-

RIJJAPR!BIA I _.!r-

-0 0; 6.c *77' 100 *00 - _00 0

7-~~~~~~~~~~~~~~~~~~~~ opT- _e8 3 I-

}702~~~ ~~ 00 00 0 -=0 000 0 73i 50 -04 - _0 0

_ -0 _ _ _ ii -1 _ -1 SI o I 0t o~ 0 i

I IX _ ' Ti~~~~~~~~~~~~~~~%l I, 4' 2r 'i"' MMs

00_i§Ni . . 0 0 0 .0S6

i , SYSTEMS PLANNING DEPT, LOAD JDN PDP 94- 01 PK - 970 - 11 p LOA5 i IUIQ0. 0 0 007 009 ' ' 07 CASE PK-97P-11

MAqwq

Page 204: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP PSK

.60,-2 i7W

KHA1NO

I..., _..\ @Xl

IMJAPaARn __ i

-j 100 _ .

I-I I -F11: ; w I

int '1 t HYDC I "4 . h tir l~HVD

to~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-

Subproject No. 15 ISYSTEMS PLANNING DEPT. AD JUN 95, PDPP 9401,NTSQ - 096 PEAK LOAD VTH NEW 115KV. PHANGNGA - PHUKET 2 DCST CASE PK.. 98P-10|DIA3. TSO 1998 1

Page 205: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP PK

r? 1.000{

360.-20 MR

(32X0) (.40X112221) M

RAJJAPtABHA3I:) 0 3. 1 0 A

k A: 3 _ __

- - ,-~~~~t. I Ill2.

e < nco 1.l b I;o.i ~~~~~~~~~~~~~~~~~~-Ao h J ..I, o

o2 M 1 ; .Subproject No. 16

SYSTEOAS PLANINING D.EPT, LOAD JUN 93, PDP 94- 01, NW - 980 -1 0 1998LO NORMAL OPERATION LCASE NW - 98P - 10\f/ DIA 3. TS 9198 0 4

Page 206: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP PKK

.600-20 WAR

(217S1 ,(Mfl2.226)

RMJJAPRA-HA

On . 0.4 a 3t

0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~~-

aw1w7 " _,Cc4 317"5 _ _ ¢s3to 3X7RT] ^ w * to 1 _ | | I0.043 04 1.014 0007... .. o 00_ oW 1.0(

M. -7 - _ _ 27,

i,71} r _ 7 )|* W 5 Bo X oNu~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~7

_________________________________ ^ | :L; _________________ _ _ W1Subproject No. 16I ~ SYSTEMS PLANNING DEPT, tOAD JUN 93. POP 94- 0Qi TS Cos PEAK LOAD WITH Ii 1 KV. Y(ALA - NARATHIWAT 2ND CCT CASE NWV - 98P -20It ILDA 3. TS g 1998 =

Page 207: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP PKR

Tf X T 1230722 120112.232s)Sl

I.OtZ IJ I.ele @ Q 0 ( >~~~~~~~~~~~~~~~~~~~~ I

-, L X 175 o.0075 ' r 1 7 ~ 2 l.a 3.00 0 " H T9~~~~~~~~0 -. X 1a5 _2 _1 1.020 - -2

s7Cs a ^ r oVrDoCI _ _ Xn I I 2 - -I X -- ITt m;[k =ll q t CT~~~I 0 -5

selt~~~~~~~ lU 2 01 S v .| 550.2'0 1W

I 0. 31 .Subproject No. 17

| SYSTEMS PLANNING DEPT, LOAD JUN93,PDP94- 01.BDN -980 - PEAK LOAD | NORMAL OPERATION CASE BDN 98P-10r v TC 0 1

Page 208: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

BSP PKK

KHAONO

RAJJAPR.BRA

0707 000, T.- 0 0 i -I

-1 00 -

Jg~~~ ~ ~ 7r _- F" 'To b~i <1 a_5

_~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ ;117 _- 3 1_ .'.NC 0

______________________________________________________________________u Subproject No. 17

SYSTEMS PLANNING DEPT, LOAD JUN 93. PDP 94- 01 ,NTS 9 - 098 PEAK LOAD WIH1 KISRTTAI-A O N C AEB\ 70I I DIA 3. TS 9 1998 W 5 S A - D 2N T C

Page 209: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

22.0 -2109

.52.0 -51!3 29.6 -29.6 -n.5- 26 -2 6 ' 1 6 12 li °~ -'' i oc_

- -S 29.6 9. 5 I~~~~~~~~~~~~~~~~~~~ 0. .7

00 .033 06 0.08 02 034

4722 -06.3 4734 -073 4723 47.3

3. 00 1. 00 _iiI~ 637.0501 ;] S

083 3.023 _ .°|r _ 357 M,^s5)K3H 3 , r . 333 _-52.4~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-

47220 -A < te)30 11 __1420 2005 22 4

6 , 4

]3HU!11BOL se_:L 53 - 1ioo34 |~~~~~~~~47 .4 471 -19.n

a 2, 07 .

0~~~~~~~~~~~~~1

T T~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~0

LPI 0 1-10 1021 -41~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~2 5 00

4 Z~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 7~~~~~~~~057 .~%) (4) ) t) (g) (§3 _ t 26 2 26 61 l l TO KHON NAE:N 3 6~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~TOKHN AE

> _ 4 > 701 r w 3jo S S L~ ~~ ~~~~~~~~~~~~~~~~~~~~~~3.S; 2.0 i t

0 7 Lev 9~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~, '.2.0po 0. s.o o. as .n -7j 7s ; -9 36 r_.11 n -i6ll o ,5o$7

.. 4 -r4 0 99X oso n .- . 2 2 o 0 2ol olr M qo s t~~~~~~~~~~~~~~~~~~~A I -2 2 47D0S tc 12 .3 P 471-24.0 is.2

0 0 -2-43i2 1 X -i 2 1 ;W8o in 17 9 - - . 0 00.0 -P 0

TO N7210N00 gSAWOd TO NAJHOJ40 SVAO4 TO TNOA 'rAO

Subproject No. 18

,~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~40 , .1

J8 ;: | s.'r_T0M PLASIMNG DEPT LOAD 1!N9., PDP 9-0' 97020 | PEAK LOAD | I._. 1 2 27007 NORMAL CASE CASE CR-97P-10

3 4~~~~~~~~~~~~~~~~~~~~~~~~~~~IA a

Page 210: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

22.1 -21. 9

9.13 -9.5 111l1lN9c72 11.C-17_3

_ 07.6 -00.3 _._ 124718 -T5. -C6.81

|2C M ;9 C i ov 7 , . : w . C46 !:6 3.9?7 5 ! 2 i * I.OS0~~~~~~~~~~~~~~~~~~~~~14 S. -

-S3.1~~~~~~~~~~~~~~~~~~~~~~~~~~ .7. aS 356 75 3.

-3.i o rr r? 3 . SO.2

B03MIOOL - El 31.6 -1. 2 |r

0(3) 3.2 t5()71 -6Z

41222 |7 171 2*|L7NMAEMOH 3

t |_ |~~~~~~~~~~~~~~~~~~~~ 0 D C- | 499

)0,~~~ as

1.22~~~~~~~~~~~~~~~~~~~~~~~~~~41 -2748

.5

_________________ 6 ~~~~~~~~MAEO30.~

1Z¢5 | SIL\SIS CIANNING OEPT ~~~LOAM UD _ )4 ii.1J7Jt | E K L A HH VrœEMF1 .I AIL RPE I CA E R97-1

SIRIKIT94X02586

W. 0~~~~~~~~~9 .7

Os I S

00 17

U,~ T

32 001~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~L .4

3, 9 3X I W~~~~~~~~~~~~~~~~~~~~~~~~~~. 5 .7

~ ~~~4 g 4~~ ~ ~~~ - 4 0 1-

471 -;3,a~~~~~~~~~~~~~0 -0

TC j.3. 26.1~~~~~~~~~~~~~~~~~~~~~~~C0.1

-, 10.0 -9.9~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~L1 4

0.9 so 0. so 0. 4 4 0.99~~~~~~~~~~~~~~~~100 - . .

DAd. -~~~~~~~~~~~~~~~9 ~~~~~~~R,VJ7- 41

Page 211: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

3 1 01 23 7 -2346

-16~~~~~~~~~~~~~40 1.

I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~0 l;n I 2. Oil ii .;0 17-, -' _ - Q4701 .'. 4 6 4726 -71 o I I nu 15; 6 _ 7322 , O. 36 _ _ 7-O 9)9@

0 50 0. -50 . FY ^ 04 363 3 2 - 9

,71*.7 -07 'ii22Q 7 1 =in - .. i§1 jliL a 1

C 9 !iM7 _ . . _3

4722 4720_ _MAE_' 1 _ -__ 15 _v -o

*74 -16 1 ,0_ -3 6 _ , _ o ;1 _ .4T: 17 ~ -.

4703 7BOL 1191 IiII4 -. 6 . o

-15, - 479 154

O jSO <>.so90 -5. (1(32 Tl 1 .0)CT 'i3~ 35 10 1 '~s° n3 ||L

FF J~~~~~~~~~~~42 4_ T-= GoT_; I; Tm io _o_S _ i i

I TTTTTo~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ III

r r L -I .- 47 3-4 -. - .. , .D' l. .l ,-1,

| 2 ffTO NAXHON ZAN .1 1 2 TO NA}IO01 3AWIN TO TIIA TAKO

_________ ____ ___ ___________ ___________________________ I. Subproject Na. 181

| SYST_MS PLANJNClII DEPT . LOAO JUJN937 FPO94-Ct 93Q1 C | FEAK LOAD |NOjRMAL CASE .WITH 230kV MAE MOH3 - CHIANG RAI |C S R9P101Z §DA4^-TS9 DRW , I 998

_. .

Page 212: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

* . .. 9 0. 0.91

3.22 _ t 7 F,34

_ | | liC42 Q12 1 > _ -i7 *_ 4818 iZ ^1i5°76 MI8E MOH-3

>~~~~~~. S3. -S. 37. 12t36,,.9S Si>1'

(313~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1. 1.

47722_ e -i7 34 4soMAE 9000* 3

7if .44~~~~~~~~~~~~~~03 01.52027 ~~~~~~~~~~~~~~~~~~~~~~901 - 5.2

________________ OO~~~~~~~~~AENOH 340150 w 0. is

io 4 T S 7 | >. > T Z _ - ^ ~ ~~~~~~~~~~~~~S,IR2IKIT_- ~ 4X125 M0W

Mc 1-22 s 4 i-2O.2 :7is, e nw> f i 0a46 997,: i7 6004721 -3620i8 _ s .! _ s n T r o n i

~~~}1;0 j-767jjll|o w oi 0 0 4.4 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~00 01.

:Nl D!3 11.1 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1 4 --6

-46~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~. 4

l ~ ~~~~~~ ~~~~~~~ ~~ ~ _72 4l Li sW }i 76f-l-lt F<n i F 0S= 34

41 L732 -12_j 5 Fe 6 R0 ( 9 6 \ | Lj D < St #9) kI 0

-4 - 0

79. ° 1 1 | 2i~~~~~~~~~~~~~AE MOHi 2 ^1 F ,147

3X75 m OU~~~~~~~~~~~~~~~~~~~~~~~~~~00'50900.6~~ _0 09 i0 2 . 0 6|1.75 -01. .. I 2 1 044 li6

( iX 7 0 1 + 1 1 X 1 1 5 ).(1 X 1 72 . 0 9 0 0 9 9 4 0 0 9 _ _ _ _ -_.N

n 1.034 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~41 - .3BHUXIBOL 471 -8.4~~~~~~~~~~~~~~~~~~~~I4.*l ~ *

I4 .4 - | I

I -15]9190S0L

0. a M2~~~~~~~~~~~~~~~~~~~~~~0. .11 Pa112.3 4 - .4~~~~~~~~~~~~~~~~~0 - 0

I ti 2 0 S | | 4704 i= lioso (3X1Sl. x2s) * I 01; _ i 5 4 1 3;~~~~~~~~~~~~~~~~~. 99 "4

T~~~~l I- 019 470 -11.2~~~~~~~~~~~~~~~~~~~~~~73 .5

4, -- . 1.5

| ~ ~ ~ ~ ~ ~ ~ ~ T ro A0>iCN SAWAN _TO NAKHIUON SAWANO To rHIA TAXO

Subproject No. 18 | &23 | SYSTEMS PLANNING DEPT . LOAD JUN933. PDP94- 01 980 11 MAM2 PEAK LOAD | 230KU MAE MiOH 7- CHIANG RAI UNE TRIPPED CASE CR - 9P - 11| DIA4-TS O3DRW | 1998 I . I M

Page 213: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

2202 0 - -2

: .. 25.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.2

2C7 - 2 9.10 eIO o <6 o I 1o$ on q 2

522 7 S2.0 19 7 7 -29 5 _ _ _ _7

52 .2 -Si 10 ,f . 2 -0 7.Z ___ __

i 2.? _ _~~~~~~1 -7 50 M211 07175ex

-2 ? ~~ -- ~ of --1 : l50 1. O (o) Tio1

4722 -io el MM MO_ 3

4 50 _2

2 1. ., 4 .5 . 26

103 9~~~~~~~~~~~~~~~~~~~~~~53~714

0< *00 3.5-1 SX7Y0 S 't

I E 012 -17-

| G (0) 0

I 0 1 i1 -2.2 1 v T :;° 4 .Ll 1>511 + 704|

2 0 No.

105019'1.1.. -7

99 000 6 I .241 700~~~~~~~T IT

7 ' S|

,0 r |7 7.7

HTJMTBOL 473 0-~~~~~~~~~~~~~~~~~~~~~~~~~~I02 026X002' u).lX70. K-

TO 0HON0K.EN 7

j00~~~~51 ~~~~Tit__________ ____~~~~~~~~~1P4.1 -S. 6~~~~~l1 ~ 00001 .4~~~~~~~~~~~~~~~~~~~~~~~Ii.3'~~ sY0- TEMS PLANNING cEPT 93 POP 94- ~~~~~~.3I PEKLAPOL2JN .NRA AS AEK 9PlI ~~~~~~~~~~~~~~~ 01 97010~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1

0 / D2A4-TS9DRW 1997 . -- _____________ ____~~~~~~~~~~~~~~~~~~, - -- ::7 -. q -,

Page 214: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

22.0 -2.9

C113~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~C 1.3 -l r 1.0 01 m 1.0.023OO

4719 -25 4 4754 -29 -12.4

.~~~~~~~~~~2 2o 4! _iit ^2. o wi 1wi .S

6 .6 -S1.0 -3.I 4 P_ _ 01 1. 1.02 w

-2.5 . 12,,2 |4i w 4 i3 4 -i

4722 17|0 _711 O' %3 s717 - 303i 4H7, r.Hl- 3.00

-3 ~ _ __ _ _ _ __ _ _ ___ F 1;___5 7__7 _ _ 4 9(Ae |E- wO6 I3

O 479 3 15. 0 50 9100 | 6&) 4 Oil 2 w o. -

py .~~0992 ' I0000

10 i - C 71 X i-29 7 r_ IRIKIBHU7HIBot, ~ ~~~~~~~~~~~~~~~~~~~~

40025 1940I _

+2 1 ln Xn G i 2 t | 0 -33 4 - .74500 50 4 2150- 3 |

755

-2 -1 6 .l l | 1.0-9 _92 0 3 L4723_ | 44 | | } r7 ;2 0.505 LAN KltABU [ rs -- 2:. 94 T.; 0.

0.0 S'~~~~~~~~~~2.

34.2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~2 24

13 0 1. 0395

2.2 7 2202 l, ,6 s | | 4?°A < _ 72 -6. 907 20.4

00 115.l X 7 -14.1 n ; l l I ItsW_ o6i<s_07

0.9roec 750. 195

1.019 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~~~~~.7 ~-4133 -18.a ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~~~~~~~. -29~

1050 16 112% ! '4 K __1__ I33.5 34 7 ~ ~ ~ ~ ~ ~ ~ ~ -0. 4. J.15

| |6\S712 PANIN DPT.LOD UN7 DP4-1 7o1B7| EA L0A |11kVBHMIOL-TA1 'RPPD CSEKP99-'pl_

_1.0 _ _9I

-1.9 0.4 .~~~~~~~~~~~~~ 13~0.

39. 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~1. T, :29. 1~~~~~~~~~~~~~~~~~~u prjc N .1

t0IA4.SaDRW 997 15kVHUMMIBOL.- TA1

Page 215: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

. j m (5-.9~~~~~~~ -~~~~~ l Si} 9 t t ' ; -;liii i 7trliri iLil S~~~~~~~~~~~2.7 33.

14.7~~~~~~~

.. 1. 07 1 2 0 a o5 po1

4737 . -1 0 .. 4 . -i. _,5SO 104 o

6 ~ ~~~ -2 3 7.3 -36 2 s l12_ < txeutt2 2" s

T?. X - Ej 111 0

S2.6 -5 36.3 -36.2~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~097 097Iu3Slicl63 Ij033246J j:5]1st .A = X * W w D. N

o12 42' S. ol a 11 .2.......

ii."'. M17 1 27 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~jj' . ~ ~ ~ ~ 0 -

IIBVMIBOL -47 6 7,. 4i0 .0 . S

£6X7D1+(1,[15)+X1X1Ii HW__ =300(00M oc ol o -O ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~T NAOHO SAOO TO) Th - AO37j(7OIIN UE

t~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Sbrjc Na. 19St j

Is I~~~~~~~~~~~~

rm r 2 NM7z

4.4~~~~~~~~~~~~~~~~~~~~~~~ AUpojc No. 19 1

# w / | ei A.'.rYr i5PW 1 998;21

Page 216: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

23i7 -23 .518.1~ ~~-1.

7.7 .7.1 | 3 61.03 7 1.01 oi 1.01)'Iff"3-1 -19.2 ~~~~~4716 5. 4754 -15.9 71 -. 3

Si r -16.$ -S1.734 oe 4 ! ~sf 35.6 -723 1 _ w o 1,31.0 00 1 0 00

~~~~~~~~~~-. _ o oor_ t_=aa()()9

4122 -26.0 4334-6.473-.409 o03 A9063

z 1. 043~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~00 6?50 py~~~~~~~~~~~~~~~~~~~~~~

a 1! 4717 _-4.8 02.10-6

40I2 *

1- .A 3

S ELi; 1 . ., 1 2esa41~~~~~~~~~~~~~~~~~~~~~~~61 1.0501

SIR IKIT

4721 aj71 .3 3i0i. l _ _ 53001 0 |

|~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~- BHUIIBO - 6 i a.9 Sr

I cl 2 CS CP 3) 3) 6|- } l-it.5 ;0 21 l |I *P07 1IS i1 -i114 M

| . 0};2 0.i5D 3d t ,, X f | FL2

_ qxqo } | T .

4133 -26 6 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 190-

| TO NAXHCN SAWAN T7z NAKNON SAWAN TO TNA TAKO~~~~~~~~~~~~~~~~~~~~~~~~~~~TO SOONKAN

'04, MU,~~~~~~~~~~~~~~~~~~~~~~~O .4472 7 .1 0!4~~~~~~~~~00 -.

-0.5~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~. 5797

0.1 0. 50 0._______________

|pi I | 0.9|1 I 0

4732 -11.9 -0.s~~~~~~~~~~~~~L ~ 5l3 PO0.2

TE 1 033~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~6 2

4L0 . .1.04

TO OIP.2(26003 SAWA3O TO 00AX34010 SAWA3O TO ~~~~~~~10.2TA12Oljon 0.911~ ~ ~ ~ ~ ~ ~~~~~~~~~Supojc N.1S'SMSPLNNIG EP. LADJU 93 PP 4-C 901 SE PEK OAD 11kVBHUIBL TAi RIPEDI AS KP9e-1D~4-59RW198 _________________________

__s___

Page 217: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

- 19.7

, ' ' ' ' X=~~~~~~~~~~~~~~~737 199 47f18 !iv 4,34 isI 7S IS

'~~~~~~~~S1 .54 3ia - 37.0 .- 7* - S O >>L CH3 CIS~ ~ ~ ~ ~ ~~~~~~WH

1 loG0 1 i F°S y _ii i S 49s . 1. D4S , 4 I r d r d -31 15ic7x7 0981 l l i12 ne _ t _ a0 0 rj

2 TI X5W 7 L 9 o 6

MOE9003 j

(6X701.1l111;51.(1X17S) ~ ~ ~ ~ ~ 1.71 999 1.5 79 007L79l o

9-.~~~~~~~.

12.C~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.

ii~~~~~~~~~~N no4 liej ac

ceS7 9il 21}| 1 '

o - 2i3 21 1 +--e - rLl 1,, * l i, SS52it l~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~L 109

4722 -20.9 0. 0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~0979097

R5 3 OO3 2- LAN P- X7ABU I 17 S _ -G.7 oi l i i~~~~~~~~~~~~~ 0. - .00

|4.9 A.r, 4,71r | |-ls. | r _ _ 1

0 N . 2 0|0

4708

4730 -. - 0 99 if'.... j~ ...KAE MOH 2~ ~ ~~~~~~~~~Supojc N.2

01A4-TS9.DRW PEAK ~~~~~~~~~~~~~~~~~~3LOASYSTEMS PLANNING DEPT. LOAD] JUN ~~~~~~~~~~3 POP 94- 01 98O1CkJ 1998 NORMAL CASE CASE LP2-96P-10~~~~~~~~~~~~~2

42 7 3-6..

Page 218: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

23.7 -23.5

1. 039 71 1.011 n.019

031 21.3 47113 4. 4734 4 t ^1

45.6- 473 -|5.1

H ~~~ 3 3 ^5O

-l7~~~~~~~~~~~~~~~~~~~~~~~~~~~~~. 00 __ 3 1. o II)()g

V63 4.00 063 2.0 2 1.03 C _1.l 94722 -07.3 34 . 2 -D _ .( 3

LV l i l | i8 1 CR 4 °(D

412 473] |MO 3iD9

tSE~____2 A H2rrtc _ rBHUM3'BOB~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~010

6.6..i311] r N

Ct) 4xl 0 NW 0 75

192033ig.SIj No T. 1x...~~~~~~~~.

X |S\7EtuS LA~tG uF LE t<g790t+1 t.| EA LAD | ic AEMC2- PH N2LIE1RiP'D 1C SELP-9P-1a|~~~~~~~~~~~~4 3s;, |2 D0A t29DR 49 -2.6

1-20. 2~~~~~~~~~~~~~~~~~~~~~~~~~~~400 13 .7

-19.0 19.0

4721 -23.1 31.3 33 0 SO 12 4~~~~~ 2 1 34 Ml . 12

-5.31 0115 -.~~~~~~~~~~lp i3e l -H1 471114 19. 311 0* 5

LPI 1,~~~~121 L: 114 - - - - - - 437 - 2.

- 13 - s in I 133 MAE32OH 2 0 . 706. -.

ill 1.020 L12 1

- - __ __T _ 119

(6X70).(2)[1151.11XI781 W 20.9 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~TO KH00N KAEN 3-1.3 1.3~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.6

41 ~ O .907-4.7 472 0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~73

503131., 50 D 0. 0 . 50

42-0.

2.1- 1A ST I 0~ ~ ~ ~ ~ ~~~~~~~~Sbpojc No. 203SYSTES PLMNCi L~T LAD W ~. ~'J~- i gai'~ PAK LAD iikV MA MOH - LA PHUN LINETR1P0 CAS 2P2-83-4lk z:~~~~# J DiA4 1~~~~~~~9OR W 1998 I _________________~~~~~~1, Oa. w

Page 219: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

237 235

0.001 08 III 1 .- II 1is1 -19.1 4714 ! 4i 1870 1 1 1 013

Q f -5i°.i - 3 i . 3 e 8 i l . 2i 7M

o O

-7.4~ ~~~~4

7,/ 1i -1, T 5<o -g M0.20~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~45

0. r1.02 47S5 1i°6-5 1

__ .7 n ~ | l S ffi (4) $11 )- S.. ,l4

W-E ,3I

N ! I

4722 11 1.2 ~~~~~~~~~~~~~~71 46 480 3 1.5O0

't. ~~~~~~~~~~~~~~~~~~~~~~0 -L.I 111.

T- -T. ~ -g -

__________ ___________ 09E MOH Mrr 1-

BH13MIBOB 4731 1 ~9 5 _1 6

MI~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~C

wn!!

<D']'12 4- X5Dl52 2 t ' fTTTTT? e42 004201000 .00 I:S

472 ||r

TO NARHC N 57AWAN 7 -D TO NASHON SAWAN TO THA TARO~~~~~~~~~~T SOON SEN

411215KMIWT~ ~ ~ ~~~407.1 m 0 W~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~097

2t. S 0.2

-36 4 16.5 77--,~~~~~~~~~~~~~~~~~~~~51 .4

2 2,~~~~~~~~0. 6 3 1. .2

| 5 l:t * | OIA4-TS9 DRW | 1998 1 _ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~475-1

MAE MCH 2~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~Supojc 4o 2

4 1~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~4

Page 220: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

.1~ ~ ~ ~ ~ ~ ~ ~~~~~~.stt~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

475 ;S. 4

N _ I :D1 s7l ;t E | I i X~I A M-T.

I.,~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~0. -23.S2.6 -S2A 36.3 -36.2~~~~~~~~~~~~~~~~~~1.6-1.

l [K; n 1 - cm 042 2. lSO022 -is",471 4-13 4754, 215.6

475 -15.1M

>3 0. 00 1.0 044

on ;,. IJF I. T.:R I I 02I

all 1.047 |(1 1.;73 |0 1.0230 2 o

472 - 5. 734 7 -1. 173 4. -17.24;8t I4 8l 3~ .s 6.7t w X -2a __

is ~~~~~~~~~~~~~~~~~~~~~~~~MM V064 3 . TI

07

LM 0 I .. 0 f 15 0 607

I ",- ia 4 UliOiD L i ! O 1oli 1-,,i's40 111 5bl.'jrjlS"' l~~~~~~~~~~~~~~~~~~~~~~~~~~~1010011KAZO

{ t t t 2 3 L2 ule; mlsi " 1ii°35 ii37 -ii 8~037

| Tr 0.996 039

8so l l 23 251 ¢]- 3 1 _ -6 9 l09074>4 ml UTE0aID1N Lz. 9l> .

-10.5 471, -11.4 a~~~~~~~~~~~~~~~~~~~~~~~~~~-1. -.

LAI TO6.4 NAiCHOW SA1SA 0 TO NI S7-3

Ul 1.021 S p j 1.. 03

401.0 32 -1:5 .47I *. 47045 , -25.8

| W | SSTES LANtNGDEP LA0 INtPGi 9-01310 | K K OAD| NRML CSE,WIT 15kVM3 AEN SBSTTIO | AS MlM98 1

3 1 1 1 . .2

80 -5.1 ~ ~ ~ ~ ~ -5.0 4703 01 98C~~iO 4708 -1S.4 - 1.0

-3.9 2.,~ ~ ~ ~ ~ ~ ~ ~ ~~~~~uprjc N.2

_ I I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1 1 .J~4T9 s LAD NOML.AS ,9H 15V A TEN SBTAIO CS MGsoP1

Page 221: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY
Page 222: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

*

APPENDIX 2

FULL NAME AND ABBREVIATION OF SUBSTATION

-217-

Page 223: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

.. I ' -

Page 224: E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO · E-235 VOL. 29 TRANSMISSION SYSTEM EXPANSION PROJECT NO.9 ( 41994 - 1998 ) VOLUME I DETAILED ECONOMIC ANALYSIS ELECTRICITY

FUIL NAM[ AND ABB3REVIATION OF SUBSTATION

4O. SUBSTATIONS ABBR. NO. SUBSTATIONS ABBR. N. SUBSTATIONS ABBR.

_. AnlNAT CHAROEN AN SS. TA- D0 RA LR 169. PHUKET 112 PKI12

2. ANG THONG 162 ATlb2 86. LAn TAKHONG _LK 17O. PHUNPHIN PP

3. AO PHAI 162 _ApI2 8 7. LAMPANC 1/2 L.PlP2 I& . PONG BON PBO

4.- AO UDOII AU BO8 1AMPHUN 11.2 LNI&2 172. IPRACHII4 BURl 142 PAI1.2

5.ARANYAPRATHET AR 89- LAN RABU 1KB 173. IPRACHUAP KHIRI KHAN PKK

6. AYuTTHAYA 1t2 ATII2 I 0- LAT PHRAO LPR 174. PRAXHON CHAI PrKAC

7. fAnWFT NARn. OA7 RUN IJ I UI 7% DPRA RI

B- BAN BUNG _BHG 92- ... I_ _ t . PfRAN BUfll PO?WER STAT IUN PflT

9. BAN COK CHAN2 BCC 99. _ O SONAJJAPRABHA .CHIEE LARN) RPB

T. VET UOOM 00 136. NA~~~~~~~~~~~LOI LUEN 1722. JAR12TAl

. WANR DON ABDN 94. Lon SAK LS2 IN. TRANCSIT RS

_. RAN DUNGC _ 8G _9. LOP BURI 162 81_6_2 2379. TRANONG RN

12H.BAN KHA N KLAN2 HBK_ 146- NLOAER MAE PING LMP N 80. HRANOT- RA

HO. BAN NA SAN NS 197. nAE CHAET Mc a N 25. RATCHABURI 1.2NG RBI.26J

14. BAN PHAI HH 14 9N- InAE CHAN LAN Pa2U RATCHANVR6 224. THAKA 2BP21

HS. BAN PONG HH2 8P1 .2 nAE HONG SON nH 283. RATCHADAPHISEK RPS

16.BAN SANTI HST 100. nAE KHAn NHr 2248 RAroNG TY2&3 RYl.2&3

Ir. BAN YANG___r Brc IOI. InAE KOK nKK 185. ROI ET RE

HU. BANG KAI HN 102- InAE KUH LUANG (NEA) nKL 186. SAHA HoN S

9g BANG LAnUNG BL IOJ. MAE K IANG MKC 187~ SADA0 SOO

20-0ANC LANG BLG 104M AE LAMA LUANGC nLL fg8A SAI NOI SNO

21 8BANG MAU NAK BMN 160. MAE nOH 1.2PJ 244.2& . UPPESAI BURI SBR

?2. BANG PA-IN 1 BNlE2 106. HAE HAO MINE n- 190- TSAKON GAKHON 192 Soit2

3. BANG PAKONC - PK 107. PAE NCAI N P I194. SALoKTAR SLB

BANG SAPHAN BS N 109. MAE SARIANC _2SR 932. sAnuT SAKHON 1.26J SNI K2

*KRIDA-RNIHUAK SAHA H R SN 14. MAHO SO Hs 194. SAEUT HAENGKC MS

?7. BEToNc 8A I IPOnAE TAENG POT 195. SAN KAPI SKP

K8R. KHuABOL Be 112-. nHA sARAKHAA MK 19r5 SANT KHA ALA

VIO WIN OW -N29 AN- AR 19 SARABIJRI 162 SRI

iO. 9VUSi KA. Soi 4. TA P;;uT NTP F 98. SA-Ah iR j &, SRJ3&4. IUNC sAn PHAN BGS I Is. lnuKoAHAN 162 ME) 62 W 19 s S AI 162 |si

iJ. URI RAM -- UR 116 I|NA KAE (OUT'OF SERVICE) H E 1l200 |SATUN |sTu

Zi. lCHA-An CA 1 17. |NAKHON CHAISI |NCS 1l201. 1SAWANKHALOK SC _1

5,_ |CAEG WATTMANA - _ _W 120 |NAKHON PAHAOM NT 12 120.S RAlKHA --- SC- -

9 |CHiANG KAN -CKT 12J. [AKHON Si THAMnARAT | NST | 207r |SINC POURI SlU

O. IC"IANC MAI 1 .243 cHI . 24 124. lNAM CHOEN _ NCE 1 20a. ISIRIKI I SKI . CH IANG RA I CR 125. NAM CHON |NCN 209 I S IR INDHORN SRD

2v .CHUPON CHICP 12lJ. INAM HAENi NSNHA 1 iUI Su

D.COEnBUNG NACB- 1276 [NAii SUH-E* NAKI S|2) rK | rLe

. HONC THON CTG 12| INAM L3UA NA§E 2PHU SOT DLAN KU so6I H

. IHUAI NCAEO _ H~~~~~CNC 129. NM KHAN NM 21122. SOUTHA THUNC HAR ISTB

C1 HUNKHVI HPK 146. INAMT NGACOK NNA 214. SRTHATARINOH NR

CHONG KLAK CHSK I131. |NUCLEARU NNC _11 2JI UIHA THUNC ST?

3.KCHNG; EKRUC -KB| 132 9A |PAK r CUN 21 SH=|2. |THVN-HNKOLUK S TPTIAENC UATEN PS S PKHUNG I& NPO& 1217 2J4 UIHAHNC I STK

CHUKPAEN CPAN 1I4 NAM PVNT NlHn|PH 1|2;8 SUA TRANC _ _ | SRT

CH. PO CP?TNGK 135. NPANC KHON T PHK 1240. SUORITNA S- I R

5. DOEMANG ALK UAT KBN I115R. NPAMTrHAEUNs | NpN 221.-,,O TAK .CHAHAN 182 I KIfH&2

|KHLNC FAAI_ | LTl NAMO HT KHEUHN 2 HSj NTH2 ||245. TAPER AE PI, | IU_

i.L4 GETRBNGKOK _B|KK Ilag. N6? CAM UAII[ NPB 1226. IUTARADOIT TMO

KIIHATN YHAI SAP H A HYIN)IRD1140 MA5-HN NA PO2249 T IECHAKENC I I H

IKLANC _S KA HA 11416. IHNARtHONCT NW PD 21250 IXESE MAN HKUAYI HO HHA 11425. NIPHRA Af PHUTTAA NTB .1226 THALAN 1I4. TL I2

IKUAI NGE HNO 11456. IPHRAN _ |A NK 12529: THASTHUN NA TNHUAI PHUKNI HPK 146. INORTH BANKOK No 2.30. THTR PS1 ANSOIISSE P^KN TIIN

KABIDN IJR K-B11)- nARC NUHON 2295EPAA