A World of Solutions
E-GasTM Technology
2013 Outlook
Phil Amick, Director Gasification Business Development October 14, 2013
Colorado Springs, Colorado
A World of Solutions
1
Overview
CB&I wins the 8 month sale process to acquire the E- Gas Technology from the newly formed Phillips 66 Company.
CB&I (NYSE: CBI) is the most complete energy infrastructure focused company in the world and a major provider of government services.
One of the most complete providers of services including design, engineering, construction, fabrication, maintenance and environmental services
E-Gas is a part of the Lummus Technology group within CB&I
Safe Harbor Statement
This presentation contains forward-looking statements regarding CB&I and represents
our expectations and beliefs concerning future events. These forward-looking
statements are intended to be covered by the safe harbor for forward-looking
statements provided by the Private Securities Litigation Reform Act of 1995. Forward-
looking statements involve known and unknown risks and uncertainties. When
considering any statements that are predictive in nature, depend upon or refer to future
events or conditions, or use or contain words, terms, phrases, or expressions such as
“achieve”, “forecast”, “plan”, “propose”, “strategy”, “envision”, “hope”, “will”, “continue”,
“potential”, “expect”, “believe”, “anticipate”, “project”, “estimate”, “predict”, “intend”,
“should”, “could”, “may”, “might”, or similar forward-looking statements, we refer you to
the cautionary statements concerning risk factors and “Forward-Looking Statements”
described under “Risk Factors” in Item 1A of our Annual Report filed on Form 10-K filed
with the SEC for the year ended December 31, 2012, and any updates to those risk
factors or “Forward-Looking Statements” included in our subsequent Quarterly Reports
on Form 10-Q filed with the SEC, which cautionary statements are incorporated herein
by reference.
A World of Solutions
4
Overview
Focus on safety: 0.01 LTI in 2012
50,000 employees worldwide
Nearly 125 years of experience and expertise in reliable solutions
Market Cap $5 Billion (Feb. 2013)
$26 Billion Backlog*
50% / 50% U.S. versus international
Approximately 50% / 50% Lump Sum versus Reimbursable
*Includes CB&I 3Q 2012 and SHAW 1FQ 2013 backlog results
CB&I Operating Structure
Technology
• Licensed technology
• Engineering / technical services
• Proprietary catalysts
• Specialty equipment
• Consulting services
Engineering, Construction and
Maintenance Fabrication
Services
Government Solutions
• Engineering
• Procurement
• Module fabrication
• Construction
• Commissioning
• Modularization
• Fabrication
• Erection
• Engineering
• Program and project management
• EPC
• Environmental engineering and consulting
• Emergency response and disaster recovery
• Environmental remediation
6 A World of Solutions
Refining
• Alkylation
• Ethers
• Fluid catalytic cracking
• Gasoline desulfurization
• Delayed coking
• Gasification
• Hydrocracking
• Hydrotreating
• Lube dewaxing/finishing
• Resid upgrading
• Visbreaking
Markets Served
Petrochemical
• Ethylene
• Propylene
• Methanol to olefins
• Ethylbenzene
• Styrene
• Butadiene extraction
• C4 processing
• p-Xylene
• Cumene
• Phenol
• Dimethyl carbonate
• Diphenyl carbonate
• Maleic anhydride
• Polypropylene
Gas Processing
• Cryogenic gas processing
• NGL fractionation
• CO2/N2 recovery
• LNG
• H2 recovery
• Sulfur recovery
7 A World of Solutions
Worldwide Technology Awards 2002-2012
Technology Awards
Refining 256
Petrochemicals 170
Gas Processing 34
Polymers 20
Total 480
(as of 12/2012)
A World of Solutions
9
Refining Portfolio
MTBE
ETBE
ISOMPLUS®
TAME
TAEE
Ethylene Plant C4s
Sat. Gas
Plant
Delayed Coking (fuel, anode, needle)
Visbreaking &
Deep Thermal
Conversion
LC-FINING®
Hydrocracking
(R)FCC
Butane Dehydrogenation
Naphtha
Middle Distillates
Diesel Vacuum
Unit
Jet Naphtha
Butane
Isomerization
FCC Gasoline
HDS
Methanol
Ethanol
Methanol
Ethanol
Ethylene
Plant Feed
Crude
Unit
Thermal Gasoil
Conversion
RDS
Unsat
Gas Plant Hydrogenation
VRDS*
Dewaxing Hydrofinishing
Hydrotreating
Hydrogen
Plant
Alkylation Alkylate
*with OCR and UFR technologies
Hydrogen
Recovery
Sulfur
Recovery
H2S
NH3
H2 Rich
Gas
SynGas Gasification PetCoke
Coal
A World of Solutions
10
Petrochemicals Portfolio
Methanol
Butadiene
Butylene
Cumene
Styrene Ethylbenzene
Butadiene
Extraction
Maleic
Anhydride
Naphtha
AGO/VGO
Steam
Cracking
Ethane
LPG
Propane Dehydrogenation
Butanes
Propane
Propylene
Ethylene
Hydro-
dealkylation
C6-C8s
Benzene Aromatics
Saturation
C4s
Propylene
Polypropylene
Phenol
Dimethyl
Carbonate
Diphenyl
Carbonate
Olefins
Conversion
Dimerization
Butane Dehydrogenation
CO O2
Methanol to
Olefins Methanol
Separation &
Isomerization
Paraxylene
Reformate or
Mixed Xylenes
Hexene-1 Comonomer
Production
Butene-1
A World of Solutions
11
Business Model Transformation
E-Gas Licensing, PDP
Network Access on Proprietary Equipment & Restricted Equipment, Modularization,
Pipe Fabrication, Tanks
Access to Equipment Network
Proprietary & Restricted Eqpt
Detail Design Support
Training
Operations Management Services Contract for single
Heritage Client
E-Gas Licensing, PDP
Basic Engineering, FEED, Detail Engineering EPC in select markets
Training, Dynamic Simulation, Operations Training Simulators
Start-Up and Operations Support, O&M Contracting
Coking, PSA, Sulfur, Olefins and
others
2012
A World of Solutions
12
Project Updates
Wabash River IGCC
POSCO Gwangyang
SNG
Reliance Jamnagar Polygen
CNOOC Huizhou
Hydrogen
13 A World of Solutions
THANK YOU Wabash River IGCC
262 MW IGCC
Single train, petcoke
Operational since 1995
CB&I provides
Operations Management
services
A World of Solutions
14
Wabash River Plant Reliability by Process Area
Continued strong
operation in
Gasification core
processes at the
18 year old
Wabash facility.
2011 2012 To Aug
2013
Syngas Cooler 99.9% 98.1% 100.0%
Gasifier 94.3% 99.4% 98.8%
Slurry Prep & Pumping 100.0% 99.9% 99.9%
Particulate Removal 99.8% 100.0% 96.2%
Slag Handling 98.7% 100.0% 99.9%
HG Path 99.2% 100.0% 100.0%
Single Train TBL Reliability
92.1% 97.4% 94.9%
SRU 98.2% 99.7% 100.0%
LTHR 97.5% 99.8% 99.3%
AGR 99.8% 100.0% 100.0%
ASU 99.8% 83.0% 96.5%
Single Train Reliability considering Forced Outages
A World of Solutions
15
POSCO SNG Project at Gwangyang
500,000 mtpy SNG 2+1 trains sub-bituminous coal
Site Photo
Sept. 30, 2013
A World of Solutions
16
Reliance Industries Jamnagar
Polygen for power, hydrogen, SNG and chemicals
10 + 0 gasification trains
Petcoke
A World of Solutions
17
Now in construction.
E-Gas Proprietary and Restricted Equipment orders placed, long lead deliveries in mid-2014
Reliance Industries Jamnagar
18 A World of Solutions
Strong Economic Drivers for Coke Gasification
Basis: 320 kbd refinery expansion, 25% taxes, 15 year depreciation
A World of Solutions
19
Potential Global Growth in Petcoke Gasification
* Includes projects in construction
** Includes projects in planning
A World of Solutions
20
First E-Gas Award at CB&I
One of four CB&I technologies licensed to this project
Hydrogen and Chemicals Production
2+1 Gasification trains
Bituminous coal / petcoke
CNOOC Huizhou Refinery
A World of Solutions
21
For more information on the E-Gas technology, contact us at the following addresses, write us at [email protected] or visit www.cbi.com/technologies/gasification-technology
CB&I - Lummus Refining & Gasification Two Riverway Plaza, Suite 1300 Houston, Texas 77056 - Phil Amick [email protected]
CB&I – Lummus Technology Gurgaon Infinity Tower Gurgaon, India - Anil Sarin, [email protected]
CB&I Oostduinlaan 75 2596JJ The Hague, Netherlands - Maurice Korpelshoek, [email protected]
CB&I has offices, fabrication facilities, and projects throughout the world
Further Information
CB&I – Lummus Technology Level 3, Building 4, Universal Plaza 10 Jiuxianquiao Lu, Chaoyang District Beijing 10016 - YingSu Zhang, [email protected] CB&I – Lummus Technology CBI (Thailand) Limited 142 Two Pacific Place Unit 1104, 11th Floor Sukhumvit Road Klongtoey, Bangkok 10110, Thailand - Ubolrat Wiwattanakul, [email protected]