Introduction

Setting

Stakeholders

Issues

Existing (& Future) Conditions

Proposed Project(s)

Regulatory Compliance

Outline

Page 3: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 4: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 5: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 6: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 7: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 8: E3 humpharies c   2nd presenter - lec sneapa  final presentation2

• Town of Chilmark

- Board of Selectmen, Conservation Commission,

Planning Board, Town Counsel and Town Committee

on Squibnocket

• Landowners

- Squibnocket Farm Homeowners, Vineyard Open Land

Foundation, Friends of Squibnocket and Pond abutters

• Consultants

- 3 Coastal Geologists, 2 Env. firms, 2 Survey/Eng. firms,

2 Law firms, 1 Coastal Eng. and 1 Geotechnical Eng.

Stakeholders & Consultants

Page 9: E3 humpharies c   2nd presenter - lec sneapa  final presentation2

• Access to Squibnocket Farms

• Loss of Public Beach

GOAL: Adaptive Management

aka Managed Retreat

Two Immediate Problems

Page 10: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 11: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 12: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 13: E3 humpharies c   2nd presenter - lec sneapa  final presentation2

Wetland Resource Area Boundaries

Page 14: E3 humpharies c   2nd presenter - lec sneapa  final presentation2

Flood Prone Areas

Page 15: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 16: E3 humpharies c   2nd presenter - lec sneapa  final presentation2

Erosion Prone Area

Page 17: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 18: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 19: E3 humpharies c   2nd presenter - lec sneapa  final presentation2

• Remove coastal engineering structures

• Relocate and construct at-grade roadway

• Construct elevated roadway

• Reconstruct primary frontal dune

• Fill and replicate freshwater wetlands

• Relocate and construct parking lot

• Install underground utilities

• Provide canoe/kayak ramp to pond

Proposed Project(s)

Page 20: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 21: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 22: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 23: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 24: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 25: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 26: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 27: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 28: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 29: E3 humpharies c   2nd presenter - lec sneapa  final presentation2

Reconstructed Dune with Roadway

Page 30: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 31: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 32: E3 humpharies c   2nd presenter - lec sneapa  final presentation2
Page 33: E3 humpharies c   2nd presenter - lec sneapa  final presentation2

Wetland Resource Areas/Activities Matrix

Page 34: E3 humpharies c   2nd presenter - lec sneapa  final presentation2

Other State, Reg. and Fed. Regs./Activities

Matrix

Page 35: E3 humpharies c   2nd presenter - lec sneapa  final presentation2

What to do?

Page 36: E3 humpharies c   2nd presenter - lec sneapa  final presentation2

• Remove all coastal engineering structures.

• Restore/reconstruct the barrier beach.

• Construct access road or bridge that can be

permitted now*, but is sustainable into the

future.

* Under the Chilmark Wetlands Protection Bylaw and

the MA Wetlands Protection Act, at a minimum.

Three Long-term Solutions