e3 humpharies c 2nd presenter - lec sneapa final presentation2
TRANSCRIPT
Introduction
Setting
Stakeholders
Issues
Existing (& Future) Conditions
Proposed Project(s)
Regulatory Compliance
Outline
• Town of Chilmark
- Board of Selectmen, Conservation Commission,
Planning Board, Town Counsel and Town Committee
on Squibnocket
• Landowners
- Squibnocket Farm Homeowners, Vineyard Open Land
Foundation, Friends of Squibnocket and Pond abutters
• Consultants
- 3 Coastal Geologists, 2 Env. firms, 2 Survey/Eng. firms,
2 Law firms, 1 Coastal Eng. and 1 Geotechnical Eng.
Stakeholders & Consultants
• Access to Squibnocket Farms
• Loss of Public Beach
GOAL: Adaptive Management
aka Managed Retreat
Two Immediate Problems
Wetland Resource Area Boundaries
Flood Prone Areas
Erosion Prone Area
• Remove coastal engineering structures
• Relocate and construct at-grade roadway
• Construct elevated roadway
• Reconstruct primary frontal dune
• Fill and replicate freshwater wetlands
• Relocate and construct parking lot
• Install underground utilities
• Provide canoe/kayak ramp to pond
Proposed Project(s)
Reconstructed Dune with Roadway
Wetland Resource Areas/Activities Matrix
Other State, Reg. and Fed. Regs./Activities
Matrix
What to do?
• Remove all coastal engineering structures.
• Restore/reconstruct the barrier beach.
• Construct access road or bridge that can be
permitted now*, but is sustainable into the
future.
* Under the Chilmark Wetlands Protection Bylaw and
the MA Wetlands Protection Act, at a minimum.
Three Long-term Solutions