eastchester union free school district

24
Eastchester Union Free School District Board of Education Work Session 2022 Capital Project Planning 26 October, 2021

Upload: others

Post on 02-May-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Eastchester Union Free School District

Eastchester Union Free School DistrictBoard of Education Work Session2022 Capital Project Planning

26 October, 2021

Page 2: Eastchester Union Free School District

2

Agenda

• Assessments and Findings

• Goals

• Scope and Value of Work

• Project Cost

• Timeline

• Discussion and Next Steps

Page 3: Eastchester Union Free School District

3

Assessments & Findings

Page 4: Eastchester Union Free School District

4

Assessments & Findings * Buildings lack mechanical ventilation and filtration. Opening

windows is not best practice for providing clean, fresh air to

classrooms.

▪ 2018 - 2019 Safety & Security Bond Planning

▪ 2020 State Education Department (SED) Building Conditions Survey, Unsatisfactory, Non-functioning and Critical Failing Items that need to be corrected 2021

▪ District-Wide Facilities Survey & Assessment –extensive analysis of buildings conditions beyond SED requirements, corrective measures, best practice, and bringing buildings up to an acceptable standard.

Process & Assessments01

* Scope of the 2020 BCS and 2021 Facilities Survey & Assessment excludes instructional and/or program related improvements.

Most systems met code at the time of installation, but do not meet current code - Buildings lack accessibility, like non-accessible toilet facilities

Aging infrastructure: Original Mechanical, Electrical, and Plumbing systems, deteriorating floors and ceilings. Existing HVAC systems were somewhat adequate pre-pandemic but don’t address current concerns related to health & wellness and safety & security.

General needs include site and athletic field stormwater improvements, site security, parking and paving.

Findings02Buildings lack basic school safety components and layering of safety measures

All buildings deemed Unsatisfactory by SED Standards.

Page 5: Eastchester Union Free School District

5

Goals

Health & Wellness and Safety & Security of

students, faculty and staff through corrected and

improved infrastructure

Page 6: Eastchester Union Free School District

6

Building Age

Square footage of buildings older than 1970 or 50+ years is 346,877 sq ft.

01

* 66% of district school buildings are 50+ years or older.

Goal: Existing Building Infrastructure

District Capital Investments

Over the last 25 years, most funds were spent on building additions to address enrollment.

02

Since 1996, $63.6M of $73.3M, or 87% of capital fundswas spent on building additions/new construction.

Of the remaining 13%, none was spent on modernizing building infrastructure and systems other than critical-failing items, like boiler and roof replacements.

Page 7: Eastchester Union Free School District

7

Scope & Value of WorkExisting building infrastructure is failing and will

continue to fail unless an investment is made on

District’s assets. A maintenance plan does not work

unless building infrastructure is fixed.

Page 8: Eastchester Union Free School District

8

Scope of WorkSafety & Security

Layering Approach - Secure entrance vestibules,

exterior door replacement, interior door

replacements with intruder locksets, exterior

lighting and security devices.

01

Health & Wellness

Ventilation, clean filtered air, better lighting

quality, cleaner drinking water, healthy building

materials, and equity.

02

Accessibility

Toilet rooms, interior and exterior stairs and

ramps, ADA parking spaces

03

Infrastructure & Building Maintenance

Steam conversion to hot water, mechanical

equipment, domestic water piping, electrical

panels, electric service upgrades, backflow

preventors, expanded fire alarm systems,

asbestos abatement, ceilings and lighting,

classroom casework and flooring

04

Site Improvements & Storm Drainage

Stormwater improvements, select re-paving, HS

baseball & softball field improvements, HS bus

loop improvements

05

Systems are mostly original to the buildings

Includes basic components related to clean air and thermal comfort,

and a key strategy for maintaining healthy environments to learn, while minimizing the spread of

airborne particles

Page 9: Eastchester Union Free School District

9

Scope of WorkSafety & Security

Secure entrance vestibules, interior door replacements

with intruder locksets, exterior door replacement, exterior

lighting and security devices

01 Layering Approach - Secure entrance vestibules,

exterior door replacements, interior door

replacements with intruder locksets, exterior

lighting and security devices

Page 10: Eastchester Union Free School District

E n t r yS e c u r e V e s t ib u le

S e c u r i t y O f f i c e

S e c u r e E n t r y

1 Locked exterior doors

Check-in with security officer

Locked interior vestibule door. Release activated by security officer2 3

2

31

3

3

1

2

Middle/High School

ADA Accessible

Lobby

Lobby

Anne Hutchinson

1

Lobby

2

3

Security Office

Secure Vestibule

Security Office

Greenvale

1

2

3Lobby

Secure Vestibule

1

2

3

Secure Vestibule

Waverly

Lobby

Security Office

Page 11: Eastchester Union Free School District

11

Scope of WorkHealth & Wellness

02 Ventilation, clean filtered air, better lighting

quality, cleaner drinking water, healthy building

materials, and equity.

Page 12: Eastchester Union Free School District

12

Scope of WorkAccessibility

03 Toilet rooms, interior and exterior stairs and

ramps, ADA parking spaces

Page 13: Eastchester Union Free School District

13

On-going infrastructure and systems

replacements, upgrades and repair.Scope of WorkInfrastructure & Building Maintenance

04

Page 14: Eastchester Union Free School District

14

Stormwater improvements, select re-paving, HS

baseball & softball field improvements, HS bus

loop improvementsScope of WorkSite Improvements & Storm Drainage

05

Page 15: Eastchester Union Free School District

15

Eastchester High School

Third FloorSecond Floor

Proposed secure entrance addition Safety & Security Planning

First FloorBasement Floor

Secure vestibule addition

Boiler Room repairs

Electrical Room egress alterations

Toilet Room renovations

New unit ventilators / casework replacement

Classroom ceiling and lighting replacement for hot water piping installation

Corridor renovations for hot water piping installation

Area of 2019 addition & alterations – no work

Masonry opening for new until ventilator

Interior door replacement

Heating & Ventilation Replacement

Page 16: Eastchester Union Free School District

16

Eastchester Middle School

Second FloorFirst Floor

Locker Room renovations

Toilet Room renovations

New unit ventilators / casework replacement

Classroom ceiling and lighting replacement for hot water piping installation

Corridor renovations for hot water piping installation

Area of 2019 addition & alterations – no work

Masonry opening for new until ventilator

Interior door replacement

Classroom 211

Page 17: Eastchester Union Free School District

17

Anne Hutchinson Elementary School

Secure vestibule renovations

Auditorium renovations; ceilings & lighting

Electrical Room renovations

Toilet Room renovations Masonry opening for new ventilation fans

First Floor

Cafeteria wall tile replacement

Exterior door replacement

Masonry opening for new until ventilator

Ground Floor

New unit ventilators / casework replacement

Classroom ceiling and lighting replacement for hot water piping installation

Corridor renovations for hot water piping installation

Heating & Ventilation Replacement

tr

tr

Page 18: Eastchester Union Free School District

18

Greenvale Elementary School

First Floor

Second Floor

Secure vestibule renovations

Trenching for electrical service/room

Electrical Room renovations

New unit ventilators / casework replacementClassroom ceiling and lighting replacement for hot water piping installation

Corridor renovations for hot water piping installation

Masonry opening for new until ventilator

Window replacementExterior stair repair / reconstruction

Interior system replacement

Toilet Room renovations

Third Floor

Fourth Floor

Page 19: Eastchester Union Free School District

19

Second FloorFirst Floor

Waverly Elementary School

Secure vestibule renovations & addition

Toilet Room renovations

New unit ventilators / casework replacement

Classroom ceiling soffit renovations for hot water piping installation

Masonry opening for new until ventilator

Interior system replacement

Page 20: Eastchester Union Free School District

20

Project Cost Summary

Page 21: Eastchester Union Free School District

21

Page 22: Eastchester Union Free School District

Timeline

Page 23: Eastchester Union Free School District

23

Timeline

Page 24: Eastchester Union Free School District

24

Discussion & Next Steps