eb - broward county, florida s fede ra l hw y provide nb queue jump from existing right-turn lane...
TRANSCRIPT
Schematic Corridor Improvements Page 37
")
")
P!
")
")
I
0 100 20050
FeetNEXT PAGE 38
PREVIOUS PAGE 36
CURRENT PAGE 37BCT SOUTH US 1 BRT
SE 5TH AVE
NE 1S
T CT
NE 2N
D ST
NE 2N
D ST
E HA
LLAN
DALE
BEA
CH B
LVD
NE 1S
T ST
N FEDERAL HWY
EB
EB
Convert outside through lane to a BAT lane and shift curb at NB Enhanced Bus station to eliminate pullout
Convert existing outside through lane to a second right-turn lane. Allow bus through movement from that lane.
Add BAT lane using existing right-turn lanes and some shifting of curb between intersections. Connect BAT lane to proposed second NB right-turn lane.
Extend start of southbound lane to the north to existing bus pullout at NE 1st Ct (affects one building)
28
N Federal H
wy
E Hallandale Beach Blvd
T
428
105
Convert outside southbound through lane to a right-turn only lane with a bus queue jump
HALLANDALE BEACH
Schematic Corridor Improvements Page 38
")
")
")
I
0 100 20050
FeetNEXT PAGE 39
PREVIOUS PAGE 37
CURRENT PAGE 38BCT SOUTH US 1 BRT
HIBI
SCUS
ST
SEABISCUIT TRL
SE 2N
D ST
SE 3R
D ST
SEAB
ISCU
IT T
RL
OLD FEDERAL HWY
S FEDERAL HWY
Provide NB queue jump from existing right-turn lane
Add BAT lane using existing right-turn lanes and some shifting of curb between intersections
105
HALLANDALE BEACH
Schematic Corridor Improvements Page 39
")
")
")
I
0 100 20050
FeetNEXT PAGE 40
PREVIOUS PAGE 38
CURRENT PAGE 39BCT SOUTH US 1 BRT
CACT
US A
VE
DERB
Y LN
COCO
NUT A
VE
BREE
ZE W
AY
VIA
LA F
ORTU
NASE
9TH
ST
SE 8T
H ST
SE 5T
H ST
S FEDERAL HWY
Add BAT lane using existing right-turn lanes and some shifting of curb between intersections
Provide NB queue jump from existing right-turn lane
HALLANDALE BEACH
Schematic Corridor Improvements Page 40
")
")
")
I
0 100 20050
FeetNEXT PAGE 41
PREVIOUS PAGE 39
CURRENT PAGE 40BCT SOUTH US 1 BRT
NE 21
3TH
ST
BISCAYNE BLVD
MORN
ING
LINE
S FEDERAL HWY
Add BAT lane using existing right-turn lanes and some shifting of curb between intersections
Add BAT lane using existing right-turn lanes and some shifting of curb between intersections
HALL
ANDA
LE B
EACH
AVEN
TURA
Schematic Corridor Improvements Page 41
")
")
")
")I
0 100 20050
FeetNEXT PAGE 42
PREVIOUS PAGE 40
CURRENT PAGE 41BCT SOUTH US 1 BRT
NE 20
9TH S
T
BISCAYNE BLVD
NE 20
9TH S
T
EB
Provide new right-turn lane and place Enhanced Bus station within the new lane. Use as a SB queue jump.
Add BAT lane using existing right-turn lanes and some shifting of curb between intersections
EB
105
AVENTURA
Schematic Corridor Improvements Page 42
")
I
0 100 20050
FeetNEXT PAGE 43
PREVIOUS PAGE 41
CURRENT PAGE 42BCT SOUTH US 1 BRT
NE 20
7TH
ST
NE 20
8TH
ST
NE 20
6TH
ST
NE 20
8TH
TER
BISCAYNE BLVD
NE 28TH AVE
NE 20
7TH
ST
NE 20
8TH
TER
NE 20
8TH
ST Convert 4th outside lane to a BAT lane
Provide bus queue jump from existing NB right-turn lane
Route modification
105
105
AVENTURA
Construct direct ramp from WB NE 203rd St to NB US-1
Schematic Corridor Improvements Page 43
I
0 100 20050
FeetNEXT PAGE 44
PREVIOUS PAGE 42
CURRENT PAGE 43BCT SOUTH US 1 BRT
US 1
RAMP
NE 27
TH C
T
W
NE 203RD ST
BISC
AYNE
BLV
D
Construct direct ramp from WB NE 203rd St to NB US-1
Convert 4th outside lane to a BAT lane
TSP Proposed for Low and Medium Cost/Impact Scenario
Modify route to use ramp from SB US-1 to NE 203rd St. Modify curb and implement traffic signals to allow bus to make a left-turn from ramp underneath overpass to EB frontage road along south side of NE 203rd St. Provide a direct connec-tion to NE 29th PL. Does not appear to affect any structures.
Route modification
Route modification and stripe a bus-only lane within existing roadway
PD&E study ongoing for modifications to this intersection
Modify northbound approach to convert outside through lane to a right-turn lane to NE 203rd St
AVENTURA
Schematic Corridor Improvements Page 44")
")
")
")
")
")
")
I
0 100 20050
FeetNEXT PAGE 45
PREVIOUS PAGE 43
CURRENT PAGE 44BCT SOUTH US 1 BRT
AVEN
TURA
BLV
D
NE 29TH CT
NE 203RD ST
AVEN
TURA
BLV
D
NE 29TH PLNE 29TH PL
Modify curbs and roadway alignment to provide an additional approach lane as a queue jump
Provide signal coordination or utilize one controller
Provide signal coordination
Provide queue jump for SB buses to enter right-turn lane to NE 29th Pl
NE 29th Pl
NE 203rd St
T
NE 29th Pl
NE 203rd St
T
Geometric modification for queue jump
105119
28105119
EB
EB
99
AVENTURA
Schematic Corridor Improvements Page 45
")
")
P!
I
0 100 20050
FeetNEXT PAGEPREVIOUS PAGE
44
CURRENT PAGE45BCT SOUTH US 1 BRT
Future parking structure with ground floor Miami-Dade transit terminal
NE 29TH PL
NE 29TH PL
EB
EB
EB
AVENTURA