ebec2015 helsinki. concept of big room, granlund oy
TRANSCRIPT
Granlund OyConsultancy
• MEP Design• Facilities Management• Energy and Sustainability
Software• Manager– Facilities Management• Designer – MEP Design• RIUSKA – Energy Analysis• BSPro – IFC middleware
Numbers• ~532 person, 45 MEUR (2014)
• R&D 3,6 MEUR
MEP Design, Tero Järvinen
Departments
HVAC ElectricalBuilding
Automation
Facility Management
Energy andSustainability
SoftwareDevelopment
Innovation and
Development
Innovaatiotoiminta, Tero Järvinen
EBEC 2015
Task:a Collaborative Workspace for Multiparty Construction Design Team, eq. ”Big Room” concept
21.3.2015
Tero Järvinen, BIM Manager, Granlund
EBEC 2015, Helsinki
EBEC 2015, Helsinki
Task• To develop a concept for a collaborative and innovative
work environment for a Construction Design Team
• Often this kind of workplaces are called ”Big Room”
TATE-tietomallinnus, Tero Järvinen
Origin: DPR Construction inc.
• To get Common Understanding of construction project, different partiesshould be involved in an early phase.
• The decision of building investmentcosts and sustainability are made in an early phase of the project.
• To achieve these requirements, deepcollaboration is needed.
EBEC 2015, Helsinki
Requirements• A collaborative and innovative workplace for a
Construction Design Team
• ICT heavily in use. BIM (Building Information Model) is a mandatory work tool for everyone.
• Social aspect: How to raise team spirit? How to handledifferent personalities?
EBEC 2015, Helsinki
Requirements• Design team includes people from different companies. All
members do not work in a Big Room every day
Discipline Number of people
Week schelude, how many days persons are in Big Room
Architect 4 2 persons 5 day a week2 persons 3 day a week
Structural Engineer 3 2 persons 5 day a week1 person 2 day a week
HVAC Engineer 4 2 persons 5 day a week2 person 2 day a week
Electrical Engineer 3 2 persons 5 day a week1 person 1 day a week
Building Owner 2 2 persons 1 day a week
End User of building 2 2 persons 1 day a week
Random companies 3 3 persons 5 day a week
EBEC 2015, Helsinki
Something to remember• Team Members are randomly working also in other projects
• A project in a Big Room can last 1-2 years
• Big Room is a temporary building / space. When the project is over, the use of the Big Room is also over
• The Big Room can be located in a new or existing building
DRP Construction inc.: Mission Bay Hospital, San Francisco Skanska USA.: San Carlos Medical Clinic, San Carlos
EBEC 2015, Helsinki
ResultsFree Presentation methods, teams decide how to make the presentation
• A concept of a Big Room
• A layout of a Big Room, what kind of room(s)/function(s) are needed?
• How ICT is used? What kind of technical equipments areneeded?
• How people communicate with each other?
• How to work effectively together? How to encourage teamspirit?
• How to translate ”Big Room” into Finnish language?
Innovaatiotoiminta, Tero Järvinen
BIM; Building Information Model
Combied Model
Sustainability Marketing materialHollywood BIM
Models with simulation
Technical visualization
Service Area Charts
Drawings
BIM software(marketing picture)
Real view of BIM Software Combied model with info Equipment schedules
Simulations
Diagrams
Facility Management