eca ma ok mk facade materials 2a1 & 2a2

12
Gallaudet University JBG Smith 6th Street Development Stage Two PUD Application 22 November 2021 ECA / MA / OK/ HMK Future Green / Bowman PUD Stage 2 Parcel 2 2A Material Palette - University Facade 2A Material Palette - Residential Facade Metal Window Trim Window System Metal Panel Cladding Metal Window Trim Brick Cladding Window System Art Stable, Seattle, Olson Kundig 2A University Facade 2A Residential Facade Neal Place NE Facades Facade Materials 2A1 & 2A2 Brick Cladding ZONING COMMISSION District of Columbia CASE NO.15-24B EXHIBIT NO.42A3

Upload: others

Post on 07-Jun-2022

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ECA MA OK MK Facade Materials 2A1 & 2A2

Gallaudet UniversityJBG Smith

6th Street DevelopmentStage Two PUD Application

22 November 2021

ECA / MA / OK/ HMKFuture Green / Bowman

PUD Stage 2Parcel 2

2A Material Palette - University Facade

2A Material Palette - Residential Facade

Metal Window Trim

Window System

Metal Panel Cladding

Metal Window Trim

Brick Cladding

Window System

Art Stable, Seattle, Olson Kundig

2A University Facade

2A Residential Facade

Neal Place NE Facades

Facade Materials 2A1 & 2A2

Brick Cladding

ZONING COMMISSIONDistrict of ColumbiaCASE NO.15-24BEXHIBIT NO.42A3

Page 2: ECA MA OK MK Facade Materials 2A1 & 2A2

Gallaudet UniversityJBG Smith

6th Street DevelopmentStage Two PUD Application

22 November 2021

ECA / MA / OK/ HMKFuture Green / Bowman

PUD Stage 2Parcel 2

2B Material Palette

Metal Panel Cladding

Masonry or Concrete Frame

Metal Window Trim

Window System

9th & Thomas, Seattle, Olson Kundig2B Facade

Facade Materials 2B

Page 3: ECA MA OK MK Facade Materials 2A1 & 2A2

Gallaudet UniversityJBG Smith

6th Street DevelopmentStage Two PUD Application

22 November 2021

ECA / MA / OK/ HMKFuture Green / Bowman

PUD Stage 2Parcel 2

2A Facade Details

Building 2A - 6th Street Facade Detail

glazing with applied warehouse muntin grid and alternating metal panel infill

Infill panel

retail louver band & canopy

retail glazing

window system & frame trim

retail signage zone

metal mesh rooftop screening with solar panel connected to screen wall

Art Stable, Seattle, Olson Kundig

2A Residential Facade

MT-5, Penthouse / Rooftop, Balconies

MT-3, 6th Street Facade, Balconies

metal panel cladding

MT-1, Facade

MT-6, Retail

operable window, typical

Page 4: ECA MA OK MK Facade Materials 2A1 & 2A2

Gallaudet UniversityJBG Smith

6th Street DevelopmentStage Two PUD Application

22 November 2021

ECA / MA / OK/ HMKFuture Green / Bowman

PUD Stage 2Parcel 2

2A Facade Details

2A University Facade

2A Residential Facade

glazing with applied warehouse muntin grid and alternating metal panel infill

brick cladding (residential)

retail louver band & canopy

window system & frame trim

glazing with applied warehouse muntin grid

metal mesh rooftop screening with solar panel connected to screen wall

MT-5, Penthouse / Rooftop

B-3, Facade

B-1, Podium

MT-6, Retail

timber screen

brick cladding (podium)

operable window, typical

Building 2A - Campus Facade Detail

Page 5: ECA MA OK MK Facade Materials 2A1 & 2A2

Gallaudet UniversityJBG Smith

6th Street DevelopmentStage Two PUD Application

22 November 2021

ECA / MA / OK/ HMKFuture Green / Bowman

PUD Stage 2Parcel 2

2B Facade Details

glazing with applied warehouse muntin grid and alternating metal panel infill

metal panel cladding

window system & frame trim

retail louver band & canopy

retail signage zone

retail glazing

masonry or concrete frame

metal mesh rooftop screening with solar panel connected to screen wall

9th & Thomas, Seattle, Olson Kundig

2B Facade

MT-5, Penthouse / Rooftop, Balconies

B-2, Frame

MT-2, Facade

MT-6, RetailBuilding 2B - Facade Detail

Page 6: ECA MA OK MK Facade Materials 2A1 & 2A2

Gallaudet UniversityJBG Smith

6th Street DevelopmentStage Two PUD Application

22 November 2021

ECA / MA / OK/ HMKFuture Green / Bowman

PUD Stage 2Parcel 2

2A Bridge Details

timber screen

wood soffit with bridge lighting

green roof

AMENITY

DN

COMMUNICATING STAIR TO 2A2 LOBBY

AMENITY

RESIDENTIAL UNIT

RESIDENTIAL UNIT RESIDENTIAL UNIT

RESIDENTIAL CORRIDOR RESIDENTIAL CORRIDOR

FULLY ENCLOSED, CONDITIONED AMENITY

SPACE

date: project: title:6th Street DC08/12/20 ENLARGED AMENITY

SCALE: 1/8" = 1'-0"02 AMENITY - FITNESS

2A1 2A2 2B

date: project: title: sheet number:6th Street DC08/12/20 ENLARGED AMENITY A-2.36

SCALE: 1/8" = 1'-0"02 AMENITY - FITNESS

FULLY ENCLOSED CONDITIONED AMENITY SPACE

GREEN FINGER BELOW

GREEN FINGER BELOWPODIUM BELLOW

PODIUM BELLOW

RESIDENTIAL

AMENITY

CIRCULATION

LANDSCAPE PROGRAM

AREA LEGEND

2A1 2A2 2B

AMENITY AMENITY

Page 7: ECA MA OK MK Facade Materials 2A1 & 2A2

Gallaudet UniversityJBG Smith

6th Street DevelopmentStage Two PUD Application

22 November 2021

ECA / MA / OK/ HMKFuture Green / Bowman

PUD Stage 2Parcel 2Landscape

Page 8: ECA MA OK MK Facade Materials 2A1 & 2A2

Gallaudet UniversityJBG Smith

6th Street DevelopmentStage Two PUD Application

22 November 2021

ECA / MA / OK/ HMKFuture Green / Bowman

PUD Stage 2Parcel 2

LANDSCAPE MASTER PLAN

N

1 ” = 8 0 ’ - 0 ”

PARCEL 3

PARCEL 2

6TH STREET

5TH STREET

PE

NN

STR

EE

T

MO

RS

E S

TRE

ET

TAP

SC

OTT

STR

EE

T

GR

EE

N F

ING

ER

NE

AL

PLA

CE

*

Public art

*

Public art will be located within the highlighted

corridor

Page 9: ECA MA OK MK Facade Materials 2A1 & 2A2

SPECIALTY PAVING AT RAISED CROSSING TEXTURED PAVING AT TRANSITIONS BOLLARDS PLANTING BUFFER AT BIKE LANE WOOD DECKING IN FLEX ZONE

Public ArtCorridor

Gallaudet UniversityJBG Smith

6th Street DevelopmentStage Two PUD Application

22 November 2021

ECA / MA / OK/ HMKFuture Green / Bowman

PUD Stage 2Parcel 2

6TH STREET (ZIPPER)

BioswaleWood Decking Paving TapestryRaised crossing table

Bike racksWood decking

Rumble strip and bollards

at pedestrian crossing

Relocated Capital Bike

Share

Contrast paving at doorswing zone2-way cycletrack

Contrast paving at crossing

Concrete sidewalk with 5’x8 score pattern

Cobble

N

P R E C E D E N T S

1 ” = 4 0 ’ - 0 ”

NOTE: In compliance with the Union Market Streetscape Design Guidelines. Public Art location is approximate and it may be relocated in consultation with adjacent property owners.

Tapscott St.

Neal P

lace

6th Street

5th Street

6TH STREET

MO

RS

E S

T

TAP

SC

OTT

ST

UNION MARKETPARCEL 3

PARCEL 2

Page 10: ECA MA OK MK Facade Materials 2A1 & 2A2

0’ 20’ 40’10’

0’ 20’ 40’10’

Ch. 5 - Guidelines | Street SectionsUnion Market Streetscape Design Guidelines

Zipper (6th St)

Connector Street (Penn St)

0’ 20’ 40’10’

0’ 20’ 40’10’

77

NOTE: In compliance with the Union Market Streetscape Design Guidelines

8’-0”3’-0” 8’-6” 8’-0” 11’-0” 11’-0” 8’-0” 5’-6” 9’-0” 9’-0” 8’-0”2’-0”

TEN

AN

T Z

ON

E

1/8” = 1’

CIRCULATIONZONE

FLEXZONE

PARALLELPARKING

DRIVE LANE DRIVE LANE PARALLELPARKING

TREE PIT

TWO-WAYBIKE LANE

FLEX ZONE CIRCULATIONZONE

TEN

AN

T Z

ON

E

CU

RB

CU

RB

UNION MARKET STREETSCAPE DESIGN GUIDELINES

Tapscott St.

Neal P

lace

6th Street

5th Street

Gallaudet UniversityJBG Smith

6th Street DevelopmentStage Two PUD Application

22 November 2021

ECA / MA / OK/ HMKFuture Green / Bowman

PUD Stage 2Parcel 2

6TH STREET (ZIPPER)

Page 11: ECA MA OK MK Facade Materials 2A1 & 2A2

Gallaudet UniversityJBG Smith

6th Street DevelopmentStage Two PUD Application

22 November 2021

ECA / MA / OK/ HMKFuture Green / Bowman

PUD Stage 2Parcel 2

PLANTING PALETTE - 6TH STREET

P E R E N N I A L SS H R U B S

T R E E S

Page 12: ECA MA OK MK Facade Materials 2A1 & 2A2

Tapscott St.

Neal P

lace

6th Street

5th Street

Gallaudet UniversityJBG Smith

6th Street DevelopmentStage Two PUD Application

22 November 2021

ECA / MA / OK/ HMKFuture Green / Bowman

PUD Stage 2Parcel 2

MORSE STREET & GREEN FINGER CONCEPT PLAN

Circulation node

Tree in Planter

Wood Bench

Concrete Bench

Lush planting

Conversation eddy with wood decking

and flexible seating

Cafe tables & chairs

Wayfinding signage to creativity way

Wayfinding signage to creativity way

N

CLEAR PASSAGE DEFINED BY LUSH PLANTING

“EDDIES” ALONG A CENTRAL CIRCULATION ROUTE1 ” = 2 0 ’ - 0 ”

11’-2”8’-0” 10’-0”5’-6” 18’-10”

40’-0”13’-6”

* *

Gate at University Entrance

Gate at University Entrance

MO

RS

E S

TRE

ET

GR

EE

N F

ING

ER

6TH STREET

PARCEL 2

PARKING

LOADING

CREATIVITY WAY