ecsel call 2017: phases 1 and 2

12
ECSEL Call 2017-1 and 2017-2 08.02.2017

Upload: tekes-programmes-and-campaigns

Post on 14-Apr-2017

133 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: ECSEL Call 2017: phases 1 and 2

ECSEL

Call 2017-1 and 2017-2

08.02.2017

Page 2: ECSEL Call 2017: phases 1 and 2

Scope and Objectives

The call will be open for the following topics:

Page 3: ECSEL Call 2017: phases 1 and 2

ECSEL Call 2017-1 Innovation Actions

2 phases: Project Outline (PO), Deadline at 17:00:00 Brussels time on 11 May 2017 Full Project Proposal (FPP), Deadline at 17:00:00 Brussels time on 21

September 2017

Description: An ECSEL Innovation Action (IA) primarily consists of activities aiming at

pilot lines, test beds, demonstrators, innovation pilots and zones of full-scale testing. These activities produce plans and arrangements or designs for new, altered or improved products, processes, methods and tools or services. For this purpose they may include prototyping, testing, demonstrating, piloting, large-scale product validation and market replication.

The activities have their centre of gravity at the TRL 5-8.

Page 4: ECSEL Call 2017: phases 1 and 2

ECSEL Call 2017-2 Research and Innovation Actions

2 phases: Project Outline (PO), Deadline at 17:00:00 Brussels time on 11 May 2017 Full Project Proposal (FPP), Deadline at 17:00:00 Brussels time on 21

September 2017

Description: An ECSEL Research and Innovation Action (RIA) primarily consists of

activities aiming to establish new knowledge and/or to explore the feasibility of a new or improved technology, product, process, service , method, tool or solution. For this purpose they may include applied research, technology development and/or method/tool and integration, testing and validation on a small-scale prototype in a laboratory or simulated environment.

The activities have their centre of gravity at TRL 3-4.

Page 5: ECSEL Call 2017: phases 1 and 2

National Eligibility FinlandLegal requirements for the eligibility of a partner

or a project1) Type or nature of participants• Companies (enterprises)• Industry associations• Universities and polytechnics• Public research institutes and similar research organizations

2) Legal, administrative and financial conditions• A company has considerable industrial or R&D&I activities in

Finland• A company has a clear financial record and has the financial

capability to cover its own expenses during the project (e.g. the company must show positive equity at decision taking)

Page 6: ECSEL Call 2017: phases 1 and 2

National Eligibility cont.

3) Consortium configuration• A public research institute, university or a polytechnic shall be accompanied in the project by at least two eligible companies in Finland

• Research and Innovation Actions (RIA) projects: The project volume (costs) of public research institutes, universities and polytechnics from Finland combined shall not exceed 50 %

of the total volume (costs) of Finnish participants based on national (Tekes) funding rules

• Innovation Action (IA) projects: The project volume (costs) of public research institutes, universities and polytechnics from Finland combined shall not exceed 30 % of the total volume (costs) of Finnish participants based on national (Tekes) funding rules

Page 7: ECSEL Call 2017: phases 1 and 2

National Eligibility cont.

4) Other conditions• The project should have sufficient positive impact on the Finnish economy or society.

• Priority is given to the topics that are not covered by already funded ECSEL projects.

Page 8: ECSEL Call 2017: phases 1 and 2

ECSEL JU Funding

For ECSEL Call 2017-1.

Finland: Estimated allocation 2.5 M€EU: Estimated expenditure: 92.5 M€ Estimated public expenditure (EU + national) 185 M€

Innovation Actions

Large Enterprises

Small and Medium Enterprises

Public Research Institutes and Universities

Tekes (national funding rules)

20 % grant or

Max. 50 % loan

35 % grant or

Max. 50 % loan38 % grant

ECSEL JU (H2020 eligible costs)

20 % grant 25 % grant 35 % grant

Page 9: ECSEL Call 2017: phases 1 and 2

ECSEL JU Funding

For ECSEL Call 2017-2.

Finland: Estimated allocation 2.5 M€ EU: Estimated expenditure: 67.5 M€Estimated public expenditure (EU + national) 135 M€

Research and Innovation

Actions

Large Enterprises

Small and Medium Enterprises

Public Research Institutes and Universities

Tekes (national funding rules)

20 % grant 35 % grant 38 % grant

ECSEL JU (H2020 eligible costs)

25 % grant 30 % grant 35 % grant

Page 10: ECSEL Call 2017: phases 1 and 2

Call 2017 Schedule22 February Call launch

(http://www.ecsel-ju.eu/web/index.php)

2 March ECSEL CALL FORUM 20173 March COORDINATORS INFO DAY 2017

11 May Deadline PO phaseOnly proposals which successfully

passed the PO phase are eligible to the FPP phase.

13-14 June ECSEL JU Symposium 2017

21 September Deadline FPP phase5 October Deadline Tekes funding application

Page 11: ECSEL Call 2017: phases 1 and 2

ECSEL CALL 2017 EVENTS http://www.ecsel-ju.eu/web/events/events_upcoming_2017.php

Page 12: ECSEL Call 2017: phases 1 and 2

ECSEL CALL 2017 EVENTS

http://www.ecsel-ju.eu/web/events/ESC2017.php