69 FULLER Fuller Middle School, Framingham, Massachusetts Educational Program Fuller Middle School Educational Visioning Workshop Overview and Notes In October 2017, the Framingham Public Schools Educational Working Group (EWG), a group of approximately 20 FPS administrative leaders, teachers, administrators, students, parents, and community partners, participated in an Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a collaborative session designed to inform the Fuller Middle School design process. Participants were led through a step-by-step visioning process aimed at capturing their best thinking about FPS’s current and future educational goals and priorities, and connecting them to previous visioning work done by the district, as well as to best practices and possibilities in innovative school facility design. On October 20, 2017, the Framingham Public Schools EWG participated in Educational Visioning Workshop One and explored the following topics: Priority Goals for the renovated/new facility 21 st Century and Future Ready Teaching and Learning Practices that are key to the districts forward thinking educational vision Future Ready Learning Goals that distill the group’s best thinking with regard to Framingham Public Schools and Fuller Middle School’s current and future educational programming and priorities Strengths, Challenges, Opportunities, and Goals (SCOG Analysis) associated with Framingham Public Schools and Fuller Middle School’s current academic programs as well as the vision for its new facility On October 26, 2017, the Framingham Public Schools EWG participated in Educational Visioning Workshop Two and explored the following topics: Design Patterns that innovative schools throughout the country have put into practice in order to make their forward-thinking learning goals come alive on the level of facility design Guiding Principles 1.0 for design of the new facility The following pages offer a summary of notes taken and information gathered during each workshop. If you would like to add comments or ideas to this evolving narrative please contact Joel Seeley at [email protected] . Note: The agendas for Educational Visioning Workshops One and Two can be found at the end of this document as well as a listing of workshop attendees.

Upload: others

Post on 10-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

69FULLERFuller Middle School, Framingham, MassachusettsEducational Program

newvistadesign | 10.26.17 1 | P a g e

FullerMiddleSchoolEducationalVisioningWorkshopOverviewandNotes

InOctober2017,theFraminghamPublicSchoolsEducationalWorkingGroup(EWG),agroupofapproximately20FPSadministrativeleaders,teachers,administrators,students,parents,andcommunitypartners,participatedinanEducationalVisioningWorkshopsrunbyNewVistaDesignandJonathanLeviArchitects.TheworkshopwasacollaborativesessiondesignedtoinformtheFullerMiddleSchooldesignprocess.Participantswereledthroughastep-by-stepvisioningprocessaimedatcapturingtheirbestthinkingaboutFPS’scurrentandfutureeducationalgoalsandpriorities,andconnectingthemtopreviousvisioningworkdonebythedistrict,aswellastobestpracticesandpossibilitiesininnovativeschoolfacilitydesign.OnOctober20,2017,theFraminghamPublicSchoolsEWGparticipatedinEducationalVisioningWorkshopOneandexploredthefollowingtopics:• PriorityGoalsfortherenovated/newfacility• 21stCenturyandFutureReadyTeachingandLearningPracticesthatarekeytothedistrictsforwardthinking

educationalvision• FutureReadyLearningGoalsthatdistillthegroup’sbestthinkingwithregardtoFraminghamPublicSchoolsand

FullerMiddleSchool’scurrentandfutureeducationalprogrammingandpriorities• Strengths,Challenges,Opportunities,andGoals(SCOGAnalysis)associatedwithFraminghamPublicSchoolsand

FullerMiddleSchool’scurrentacademicprogramsaswellasthevisionforitsnewfacility

OnOctober26,2017,theFraminghamPublicSchoolsEWGparticipatedinEducationalVisioningWorkshopTwoandexploredthefollowingtopics:• DesignPatternsthatinnovativeschoolsthroughoutthecountryhaveputintopracticeinordertomaketheir

forward-thinkinglearninggoalscomealiveontheleveloffacilitydesign• GuidingPrinciples1.0fordesignofthenewfacility

Thefollowingpagesofferasummaryofnotestakenandinformationgatheredduringeachworkshop.IfyouwouldliketoaddcommentsorideastothisevolvingnarrativepleasecontactJoelSeeleyatjseeley@smma.com.

Note:TheagendasforEducationalVisioningWorkshopsOneandTwocanbefoundattheendofthisdocumentaswellasalistingofworkshopattendees.

Page 2: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

newvistadesign | 10.26.17 2 | P a g e

VisioningSummaryandRecommendations

FullerMiddleSchool(FMS)ispresentlyinitsfourthyearofdesignandimplementationofaSTEAM(Science,Technology,Engineering,ArtsandMathematics)curriculuminitiative,whichispartofadistrict-wideeffortwithinFraminghamPublicSchools(FPS)todeliverinstructionthroughaproject-based,interdisciplinarymodelthatengagesstudentthroughinquiryandemphasizes21CenturySkills.Theopportunityfortheschooltodesignarenovatedand/ornewfacilitythroughtheMSBAFeasibilityStudyprocess,hasFMSteachers,administrators,studentsandparentshighlyexcitedabouttheprospectofcreatingaphysicalenvironmentthatwillbringtheschool’sdynamicandevolvingeducationalprogramfullytolife.Additionally,thedistrictseesthisprojectasanopportunitytore-imagineFullerMiddleSchoolintheeyesofFraminghamresidents,andhaveitserveasbothabeaconandaresourcetothecommunity.

GuidingPrinciples

TheFMSEducationalWorkingGroupdeterminedsixGuidingPrinciplesandprioritiesfortherenovatedand/ornewbuilding:

1. TransdisciplinaryInstructiono Insupportofgradelevelteachingteams,integratedcurriculumdelivery,andproject-basedlearning.

2. PersonalizedandCollaborativeo Insupportofdifferentiatedinstruction,personalizedlearning,andtheneedsofEnglishLanguage

Learners.

3. WholeChild,WholeCommunityo Insupportofsocialemotionallearning,enrichmentprogrammingandwhole-brainlearning.

4. VisibleLearningo Insupportofshowcasingstudentlearningandbuildingcommunitywithintheschool.

5. CommunityandCivicHubo Insupportofcreatingamuch-neededcommunityresourceandcivichub.

6. Adaptabilityo Insupportofevolvingpractices,technologyandprogramming.

EachoftheseGuidingPrincipleswillplayanimportantroleinestablishingspatialprioritiesandadjacencieswithinthebuildingplan.

FacilityDesignVisioningWorkshopOneNotesOctober20,2017

Page 3: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

71FULLERFuller Middle School, Framingham, MassachusettsEducational Program

newvistadesign | 10.26.17 3 | P a g e

GoalsandOpportunities

Highlightsofothergoalsandopportunitiesthathavebeenestablishedforthebuildinginclude:

A. DesignabuildingthatsupportsandconnectstoFraminghamPublicSchool’seducationalvisionforSTEAMteachingandlearning,andservesasastate-widemodel.

B. Createasafe,welcomingandflexiblebuildingtoserveasbothasymbolof,andaresourcetotheFraminghamcommunity.

C. Ensurethatstudentsareknownwellandfeelasenseofbelongingandownershipbycreatingsmallerlearningcommunities/neighborhoodsas“sacredspaces.”

D. Designagileclassrooms,withgoodstorage,technologyandmodularfurniture,inserviceofarangeofindividual,smallgroupandwholegroupinstructionmodalities,includingproject-basedlearning.

E. Promotecollaborationbyprovidingmovablewallsbetweensomeclassrooms,aswellasbreakoutroomsandprofessionalcollaborationroomsthatareadjacentorincloseproximity.

F. PositiontheMediaLabatthe“hub”oftheschool.G. DeliverSpecialEducationservicesinmoreintegratedandinnovativeways.H. Dispersesupportstaffthroughoutthefacilityinordertofacilitatethecreationofcommunityand

connections.

DesignPatterns

AvarietyofDesignPatternswereprioritizedfortherenovatedand/ornewbuilding,including:

1. OpenandWelcomingEntry

2. DistributedDining

3. LearningCommons

4. ClassroomasMakerSpace

5. DisplayandExhibition

6. OutdoorConnectivity

7. BreakoutSpaces

8. DistributedResources

9. FlexibleFurniture

10. UniversalAccessandEquity

11. Push-InSpecialEducation

12. VisibleLearning

13. VerticallyIntegratedNeighborhoods

14. Paired/FlexibleClassrooms

15. UbiquitousLearning

EachoftheseDesignPatternswillplayanimportantroleinestablishingspatialprioritiesandadjacencieswithinthebuildingplan.

Page 4: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

newvistadesign | 10.26.17 4 | P a g e

PriorityGoals

Thefollowinglistofprioritygoalsforthedesignoftherenovatedand/ornewFullerMiddleSchoolwasrecordedduringtheparticipantintroductionsectionoftheEducationalWorkingGroup’s(EWG)WorkshopOnethattookplaceonOctober20,2017.TheEWGisagroupofapproximately20participantsthatincludesFraminghamPublicSchoolsleadership,aswellasFullerMiddleSchooladministrators,teachers,andcommunitypartners.

• Understandthelong-rangevisionofdistrictandhowitalignswiththatofFMS

• Definewhattheschool’svisionmeansateachlevel-beyondjargon

• EnsurethatFullerMiddleSchoolconnectstotheElementaryandHighSchoolo ThisisaK-12initiative

• Createacentralhubfortheschool• Exploredifferentwaystothinkaboutthenew

school’smediacenter?• Aschoolthatintegratesmediaandtechnology

inacomprehensiveway• Aschoolthatintegratesacrossdisciplines(now

wearecompartmentalizedandsiloed)• AscheduleandbuildingthatallowsforSTEAM

tohappen• Promoteflexibility,connectivity,and

sustainability• Bemindfulofandadapttofuturechange• Facilitatecollaborationwithinthedistrictand

thefacility• Createstrongcommunityconnections:they

areveryimportant,especiallyforFMS

• Abuildingthatisenvironmentallyandaestheticallyfriendly,appealing,inviting,warmo Allowscreativitytoblossomo Relateswellwithyounglearners

• Abuildingthatservesasa“secondhome”forallstakeholders

• Asenseofownershipandbuy-infromeveryone

• Beyondownershipof“your”space,everyonetakesownershipofthefacilityasawhole

• Abuildingandprogramthehonorsdiversityandequityo Studentso Staffo Resourcesandmaterials

• Makesurethecafeteriaandfoodserviceisapriority-secondhomepieceo Over50%ofstudentsarefreeandreduced

luncho Thisneedstobetheresecondhome

• Weneedspacesthathelpusworkwithkidsthatarelostandtraumatized,andthathavesocialemotionalandspecialneeds

• Createaschoolthatoffersstudentsthepossibilityofdevelopingarangeofskills

FacilityDesignVisioningWorkshopOneNotesOctober20,2017

Page 5: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

73FULLERFuller Middle School, Framingham, MassachusettsEducational Program

newvistadesign | 10.26.17 5 | P a g e

• • • •

PriorityGoals(Continued)

• Supportalternativewaysofmotivatingandteachingstudentso Multiplemeansofteachingandlearningo Integrationofdisciplines

• Notjustaplacethathousesstudents,thebuildingitselfbecomesalearningtoolforstudentso Studentlearningisatthecenter

• Abuildingthatismulti-culturalinitsdesignandopennesso FamiliesthatarenotAmericancultured

canfeelconnection• Robustareasforstaffcollaboration• Interdisciplinaryco-planning• Promoteinter/transdisciplinaryteachingand

learning• Inclusive• FromSPEDperspective-ensureaccessibility

foreveryone• Abuildingthatsupportsdifferentiated

instruction• Beyondacademicsupport-community

connectionsandserviceso Socialservices–counseling

• Buildingdesignedasenvironmentfriendlyandlearninginstrumento Outdoorclassroomso Extendedday/adulteducation/ESLo CommunityEDo FullerMiddleSchooliscentrallocation

• Ideaofopenspaceandconnectiontonatureo Courtyard,openspaceo Pond-watersamplingo Outdoorspaceaspartoflearning

enrichment• Adaptabletoadulteducation

o Openfrom7-11o BoardofHealthisnowinbuildingbutwe

lostthevisioncenter

o Areallyimportantelement-kidsremaininschool

o Immunizationso Havealotofnewcomers-don'tknowhow

toaccess• Considerthepossibilityofachildcarecenter

o DeterminewhatwemaywanttofundbeyondtheMSBAtemplate

• Seethisasawayofreachingournewidentityo WeareallaproductoftheHoraceMann

modelandit’shardtoseebeyondito Explorewhatkindofenvironmentwewant

• Providesomespaceintheschoolthatisequippedtoengageaglobalclassroomlesson

• Also,somethinglikeactuallyseeingsurgeryhappeningrealtime

• HigherEDisstrugglingwithbricksandmortar–theworldthatstudentswilloccupyischangingsorapidlyo OurcurrentFMSislargelylecturemodelo Timeforusnottotrysame,samething

SomeQuestionsPosedbytheArchitecturalTeam:

1.Whatisaclassroom?o Whatisthevalueofaclassroomina

MS/HS?

2.Whatarethegrades?o Whatisthevalueofbulkheadsofgrades?

3.IsFMSthekindofschoolthatwantstoteachthinkingdirectly-orputitsfaithwithinHoraceManndisciplines?o Hasthismodelbeensuccessful?o Howarestandardschanging?

FacilityDesignVisioningWorkshopOneNotesOctober20,2017

Page 6: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

newvistadesign | 10.26.17 6 | P a g e

SCOGAnalysis

TheEducationalWorkingGroup(EWG)conducteda“SCOGAnalysis”ofwhatitseesasthecurrentstrengths,challenges,opportunitiesandgoalswithregardtoFraminghamPublic

Schools’andFullerMiddleSchool’sacademicprogramsandfacilities.TheEWGisagroupofapproximately20participants

thatincludesFraminghamPublicSchoolsleadership,aswellasFullerMiddleSchooladministrators,teachers,andcommunity

partners.Thefollowingisacompilationofparticipants’responsesandideas.

FraminghamPublicSchools FraminghamMiddleSchool

• Greatstaffo Adiverseandspecializedstaffthat

cardsgreatlyaboutkids• Alwayslearning

o Tremendousdesireforprofessionallearning/collaboration

• Commitmenttosocialemotionallearning• Offersavarietyofprogramstomeet

studentneeds• Strongschoolcommittee

o Supportforacademicvision• Supportfordiversity• Longevityofstaffandinstitutional

knowledge• Adaptability–bornoutofthefactthatour

student’sneedsarechanging• Artsareverystrong• EvolvingasaSTEAMdistrict

o

FullerMiddleSchool

• Educationalprogram• Safety• HighLevelofconversationandcompetence• Apositivehappycommunity• Truecommunityschool(reflectsthe

community)o Theonlyoneinthedistrictwithsuch

diversedemographics• EveningEnglishasaSecondLanguage(ESL)• Centrallylocatedgeographically• Transitionalbilingualprogramming• Anunderstandingofourstudents• Alreadyabeliefinandcommitmentto

STEAM• HavingJoseDuartecomefromBoston

o Understandingofneedsofstudents.

STRENGTHS

FacilityDesignVisioningWorkshopOneNotesOctober20,2017

Page 7: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

75FULLERFuller Middle School, Framingham, MassachusettsEducational Program

newvistadesign| 10.26.17 7 | P a g e

SCOGAnalysis(Continued)

• Diversity• Locationofschoolrelativetowherestudents

resideo TheSouthendoftownhasmorekidsbut

fewerschools70/30• Negativejudgementsabouttheschoolwithin

someelementsoftheFraminghamcommunity,connectedtostudentdemographics

• Perceptionfromoutside–thereputationofFullerstudentsasnotbeingabletodowhatotherstudentsdo

• Resourceallocationwithinthedistrictisnotalignedtoindividualneedsofschools/communitieso Notalwaysefficient/equitable

• ThereisaNorth/SouthdivideinFraminghamplaysoutinvariedways(i.e.foodnotbeingmadeaFuller)

• Systemsandprocesses,orlackofthemcanbeachallenge

• Thisisthe"waywehavealwaysdoneit"mentality

• Lackoftranslationservices

• • •

• NewdayforSTEAM• AwaytomarketthewholeFPSdistrictand

shift/rebrandthereputationofFullerMiddle• School• UseproximitytoMcCarthy,Farley,MassBay

andFraminghamStatetoexplorepossiblecampusconnections

• Useourdiversity-andshowitcanbeourgreateststrength

• Createopportunitiesforpeopletocomeinandseewhatishappeningattheschool

• Considerahybridmodelthatretainstheauditoriumandgym

• Usetheauditoriumandgymassellingpointstohelppassdebtexclusionvote

• OpenthedoorsofFullertohelpconnectaPK-12vision(i.e.HS/elementarycometoschool)

• Definewhatequityreallylookslikeacrossallthreemiddleschools(aspresentlythereisnotequity)

• ExpandtheFulleridentity-tapintocommunityresourcesandprograms

• CreateaTeacherPathwayprogram• Serveasaresourceforcommunity-after

hoursandonweekends• Focusoureducationaleffortonrenewaland

re-conception• Supportawholenewwayofteachingand

learningforFMSstaff

CHALLENGES OPPORTUNITIES&GOALS

FacilityDesignVisioningWorkshopOneNotesOctober20,2017

Page 8: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

newvistadesign| 10.26.17 8 | P a g e

21stCenturyLearningGoals

Thefollowingsetofpriority“21stCenturyLearningGoals1.0”forFullerMiddleSchoolstudentswasdevelopedbytheEducationalWorkingGroup(EWG)duringWorkshopOne.Fourteamsof5participantsreviewedthatFuller5CsLearningGoals,aswellasassortedother21stcenturylearninggoalscreatedbyavariedofschoolnetworksaroundthecountry,thenworkedtocreatetheirownsetoflearninggoals.Eachteampresentedtheirlearninggoalstothelargergroup.Thesegoalsaregroupedbelowbylikegoals,witheachgoalreceiving5pointsforappearingonanoriginallist.

• WholeChildLearningo AsanOrganizingPrincipleforallOtherLearning

Goals

• CollaborationandCommunication(25

votes)o EffectiveCommunicationo HaveaVoiceo ToEffectPositiveChangeo EmergefromLanguageIsolationto

CollaborativeParticipationo StaffandStudentso UnderstandHow,WhatandWhywe

Communicate

• SocialandCivicCompetence(25votes)o WithinFullerandintheCommunityo CivicandCommunityEngagemento Local,Community-BasedProjectLearningo Communityo Empathy,EthicsandCivicResponsibility

• CreativityandImagination(20votes)o ImaginativeandJoyousRisk-Takingo InitiativeandCuriosityo CreateJoyandOwnership

• CriticalThinking(15votes)

o HigherOrderThinkingo PermeatedwithHabitsofMindo ProblemSolvingo AnalyzeInformationo ExecutiveFunction–AbilitytoPrioritizeand

Strategize

• LoveofLearning(15votes)o ContentisNotasImportantastheAbilityto

LoveLearningo Self-Motivationo StudentDriveandOwned

• Multi-CulturalLiteracy(5votes)

• TechnologyTransformingtheBasics(5votes)

FacilityDesignVisioningWorkshopOneNotesOctober20,2017

Page 9: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

77FULLERFuller Middle School, Framingham, MassachusettsEducational Program

newvistadesign| 10.26.17 9 | P a g e

OpportunitiesandGoals2.0

ThefollowingadditionalOpportunitiesandGoalsforthedesignoftherenovatedand/ornewFullerMiddleSchoolwerebrainstormedbytheEducationalWorkshopgroupduringWorkshopTwo.

• DeliverSpecialEducationservicesininnovativewaysthatarewelcomingandintegrative

o Don’tdefineSpecialEducationtoomucho Flexibleuseofspace

• Dispersesupportstaff,includingspecialists,throughouttheschoolfacility• Createsmallerlearningcommunitiesas“sacredspaces”

o ProvidecentrallylocatedBreakoutSpaces• Createaflexiblebuildingwithmovablewalls

o Classroomsnot“owned”byteacherso Professionalcollaborationspacesforteachers

• Discoverwhatitreallymeanstobea“STEAM”school• UtilizetheSTEAMexperienceofKingElementarySchool

o Thinkabouthowto“eventheplayingfield”fornon-KingstudentsenteringFMS• PositiontheMediaLabasthehuboftheschool• Buildwiththelargercommunityinmind

o FMSprojectascommunitydevelopmentprojecto Thinkabouthowtobestfacilitatecommunityuseaswellascreatebiggerpicture

connectionstothecommunity• Makedecisionsholisticallyaboutwhatisincludedinthedesign

o WhateverwecreatehereconnectstotheFPSvisiono Includewhatwedointherestofthedistrictaspartofthevisioningprocess

• SeeFarleybuildingasaresourceforthisprojectforthingsthatcannotbeaccommodatedatFMS• SupportFMSstaffintermsofprofessionaldevelopmentandtraining

o Supportamindsetshifto Ongoingsupportonhowtocollaborateo Newmindsettoshareclassrooms

• SupportHabitsofSuccess,UniversalDesignsforLearning(UdL),andcognitiveskilldevelopmento Approachestopersonalizedlearningshouldbehorizontallyandverticallyaligned

OPPORTUNITIES&GOALS

FacilityDesignVisioningWorkshopTwoNotesOctober26,2017

Page 10: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

newvistadesign| 10.26.17 10 | P a g e

21stCenturyDesignPatterns1.0Thefollowingsetofpriority“21stCenturyDesignPatterns”forthedesignofthenewFullerMiddleSchoolwasdevelopedbytheEducationalWorkingGroup(EWG)duringWorkshopTwo.ThreeteamsoffiveparticipantseachworkedtocreatetheirownsetofpriorityDesignPatterns,afterwhicheachteampresentedtothelargergroup.Thesearelistedbelowinorderofthefrequencywithwhicheachpatternappearedonateamlist,witheachDesignPatternreceiving5votesforeverytimeitappearedonateamlist.

• OpenandWelcomingEntry(15votes)

o LikeDearborno FirstImpressionGreetingSpace

• DistributedDining(15votes)

o DistributedGatheringSpaceso SatelliteCafeterias/CaféStyleo CyberDining

• LearningCommons(15votes)

o WithArt,MusicandHealth,etc.o FlexibleLearningStyleso QuietSpaces

• ClassroomasMakerSpace(15votes)

o MakerandCollaborationSpaceso CollaborativeLearningSpacesIncludingMakerSpaces

• DisplayandExhibition(10votes)

o WallsBuiltforDisplayofStudentWorko EntireSchoolasDisplay

• OutdoorConnectivity(10votes)

o OutdoorSpaceUse

• ProfessionalTeacherSpaces(10votes)

o SharedwithColleagueso TeacherCollaborationSpace

FacilityDesignVisioningWorkshopTwoNotesOctober26,2017

Page 11: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

79FULLERFuller Middle School, Framingham, MassachusettsEducational Program

newvistadesign| 10.26.17 11 | P a g e

21stCenturyDesignPatterns1.0(Continued)

• BreakoutSpaces(10votes)

o Non-LearningSpaceso AccessibletoClassrooms

• DistributedResources(10votes)

o DistributedAdults

• FlexibleFurniture(10votes)

o VariableSeating

• UniversalAccessandEquity(5votes)

• Push-InSpecialEducation(5votes)

o LikeDearborn

• VisibleLearning(5votes)o SpacestoShowWorkinProgress

• VerticallyIntegrated(5votes)

• Paired/FlexibleClassrooms(5votes)

• UbiquitousLearning(5votes)

Page 12: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

newvistadesign| 10.26.17 12 | P a g e

DRAFTGuidingDesignPrinciples1.0

ThefollowingsetofDRAFT“GuidingDesignPrinciples1.0”fordesignoftherenovatedand/ornewFullerMiddleSchoolwasdevelopedbytheEducationalWorkingGroup(EWG)duringtheEducationalVisioningWorkshopTwo.GuidingDesignPrinciplesofferaframeworkofeducationalprioritiesthatproveinvaluableinhelpingstakeholdersanddesignteammemberstosetdesigngoalsandfocustheirwork.ThisfirstiterationofGuidingPrinciplesmaycontinuetodevelopasthedesignprocessunfolds.

1. TransdisciplinaryInstructiono Project-BasedandReal-WorldLearningo Mastery-BasedandAppliedLearning

2. PersonalizedandCollaborativeLearningo AddressesVariedLearningStyleso PersonalizedLearningPlanso StudentVoiceandChoice

3. WholeChild,WholeCommunityo EducatingAllAspectsofaChildo SocialEmotionalLearningSkillso PrideWithinCohortandLargerSchool

4. VisibleLearningo Connectivityo Indoor/OutdoorTransparencyand

Connections

5. CommunityandCivicHubo CivicCampusandCommunityResourceo SymbolicHubofSouthFraminghamo IntergenerationalandCommunity

Connections

6. Adaptabilityo PlannedforEvolutiono FutureReady

FacilityDesignVisioningWorkshopTwoNotesOctober26,2017

Page 13: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

81FULLERFuller Middle School, Framingham, MassachusettsEducational Program

newvistadesign| 10.26.17 13 | P a g e

Thefollowing“PlacesforLearning”havebeenexcerptedfromExecutiveSummaryoftheDistrict-WidePreK-8EducationalVisioningReportpreparedbyFrankLockerEducationalPlanninginJune2016.

PLACESFORLEARNINGSeveralexemplarswerehighlyfavored,selectedbythreeorfourofthesixTableTeamsasmostappropriate.Mostoftheschoolscitedasmostappropriatesharedthesecharacteristics:• LearningspacesarrangedasSmallLearningCommunities

• Classroomsarecomponentsof“suitesofspaces,”supportedbyotherspacesimmediatelyadjacent

• Circulationtobeusedforlearning

• Classroomsaretobeflexible,interconnected,andsupportedbyauxiliaryspacesincluding

Collaboration/Breakout/CommonsSpaces

• Interdisciplinarypossibilities

• Openpresentationareas

• Varietyoffurnishings,offeringstudentsandteachersmorechoicesinsupportinglearning

• Possibilityofstudentgroupsworkinginmultipleplacesundertheguidanceoftheteacher

• Teachercollaborationsupportedbythefacilities,throughconnectionsbetweentheroomsandstrategicplacementofrelatedfunctionsTeacherPlanningCenterstosupportteachercollaborationandsenseofcommunity

Page 14: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

newvistadesign| 10.26.17 14 | P a g e

ThefollowingGuidingPrinciples,DistrictPlanningGoalsandEffectiveLearningModalitieshavebeenexcerptedfromExecutiveSummaryoftheDistrict-WidePreK-8EducationalVisioningReportpreparedbyFrankLockerEducationalPlanninginJune2016.

GUIDINGPRINCIPLES

1. ExtendInnovative21stCenturyPracticesThisfuture-orientedEducationalVisionincorporatesanumberofinnovative21stcenturyeducationalpracticessuchasSTEMprogramsalreadyinoperationinclassroomsinFraminghamPublicSchools.Extendthosepractices.

2. AchieveEquityandEqualOpportunitiesAchieveequityandequalopportunitiesforallstudents,nomatterwheretheyresideintownorwhattheirsocio-economicbackgroundisCreateacommonunderstandingofthisEducationalVisionamongadministrators,faculty,parents,andstudentstocontinueshiftingtheeducationalmodelfromonethatisfairlytraditionaltoonethatismoretransformed.

3. PrepareStudentsforSuccessPreparestudentsforsuccessinthe21stcentury,anemergingworldofglobalcompetition,uncertainemploymentprospects,infiniteaccesstoinformation,andrapidchangeintechnology.

4. Teach21stCenturySkillsTeach21stcenturyskillsatthesametimeastraditionalcontent.

5. BuildRelationshipswithStudents,FamiliesandCommunitiesBuildrelationshipswithstudents,families,andcommunitiesthroughschoolstructureandprograms

6. FosterIndependentLifelongLearningAspirebeyondtheCommonCoreandbeyondtheMassachusettsDepartmentofElementaryandSecondaryEducationguidelinestodowhatisbestforstudentlearning,andtoinstillalife-longsenseofwonderandpurpose.Createindependent,life-longlearners.

7. ProvideProfessionalDevelopmentEstablishaprogramofstaffProfessionalDevelopmenttosupporttheeducationaldeliveriesoutlinedhere.

Page 15: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

83FULLERFuller Middle School, Framingham, MassachusettsEducational Program

newvistadesign| 10.26.17 15 | P a g e

FacilityDesignVisioningWorkshopOne

October20,2017

Agenda

Time Activity Purpose7:45–8:00

CoffeeandInformalSocializing

Meetandorientfortheday.

8:00–8:45

WorkshopGoalsandIntroductions• Workshopoverview• ReviewofGuidingPrinciplesand

PlanningGoalsfromK-8District-WideVisioning

• Introductions• PriorityGoalsfortherenovated

and/ornewfacility

Introduceparticipants,andclarifyagendaanddesiredoutcomesforthisworkshopandsubsequentworkshops.SharesomeofourPriorityGoalsforthenewfacility.

8:45–9:30

FutureReadySchools• Presentation:FutureReadyTeaching

andLearning• WorkThatMatters:PBLVideo

Identifyanddiscusschangingparadigmsineducation,andelementsofforwardthinkingteachingandlearningasconnectedtheFMS’sprofessionaldevelopmentefforts,2-4yearSTEAMPlan,andschoolvision.

9:30–10:00

21stCenturyLearningGoals• Smallgroupreviewof21stcentury

learninggoalsandoutcomesandcreationofprioritylistings

• Largegroupprioritization

GroundourthinkingaboutdesignguidelinesanddesiredbuildingfeaturesinadiscussionandexplorationofpriorityLearningGoalsforFullerMiddleSchool.

EXPECTEDOUTCOMES:Bytheendofthesessionwewillhavebegunto…

§ ReviewGuidingPrinciplesandPlanningGoalsfromK-8District-WideVisioningprocess§ SharePriorityGoalsforthedesignofFullerMiddleSchool’s(FMS’s)renovatedand/ornewfacility§ Discuss21stcenturyteachingandlearningasconnectedtoFMS’srecentprofessionaldevelopmentgoalsandefforts,and

identify21stCenturyLearningGoalsforFMSandFraminghamPublicSchools(FPS)§ ReviewFMS’smostessentialandInnovativeInitiativesandProgramsanddiscusshowtheyconnecttoprioritiesset

duringthedistrict’sPK-8EducationalVisioningprocess,andtheimplicationstheyholdforthedesignoftherenovatedand/ornewfacility

§ AssessFMS’sStrengths,Challenges,Opportunities,andGoalswithregardtothedevelopmentofitsacademicprogramsandthedesignofanewand/orrenovatedfacility

Page 16: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

newvistadesign| 10.26.17 16 | P a g e

10:00–10:15

BREAK

10:15–11:00

DeepDiveintoFMS’sPresentandFutureEducationalPriorities• Minipresentationsby

departments/programs• Groupdiscussionandrecordingof

essentialandinnovativeeducationalapproachesandinitiativespresentlyinpracticeoronthehorizonatFMS

• ReviewofSTEAM2-4YearSTEAMPlan

Identifypresentandfutureeducationalinitiatives,programsandtraditionsatFullerMiddleSchoolanddiscusstheireffectonthedesignofthenewand/orrenovatedfacility.

11:00–11:40

FullerMiddleSchoolSCOGAnalysis• BrainstormFullerMiddleSchool’s

Strengths,Challenges,Opportunities,andGoalswithrespecttoitsacademicprogrammingandmakingthemostofthefacilitydesignopportunity

IdentifywhatispresentlyworkingwellwithinFullerMiddleSchoolandFraminghamPublicSchools,whatischallenging,andwhatopportunitiesexistwithregardtothefurtherdevelopmentofprogramsandfacilities.

11:40–12:00

NextStepsandExitTicket• Discussoneormorewaysinwhich

youwouldliketoseeFullerMiddleSchoolevolvewithinitsrenovatedand/ornewfacility

Reviewnextstepsforvisioning.Reflectonthewaysinwhichparticipantswouldliketoseetheschooldevelopasitmeetsitsfuture.

Page 17: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

85FULLERFuller Middle School, Framingham, MassachusettsEducational Program

newvistadesign| 10.26.17 17 | P a g e

FacilityDesignVisioningWorkshopOne

ParticipantList1. KimTaylor KingElementaryPrincipal [email protected]. BobTremblay FPSSuperintendent [email protected]. LauraSpear OfficeofSpecialEducation [email protected]. MarkMcGillivray FraminghamHighSchool [email protected]. NancyPiasecki OfficeoftheSuperintendent [email protected]. EdGotgart ChiefOperatingOfficer [email protected]. MattTorti DirectorofBuildingsandGrounds [email protected]. GeorgeCarpenter ITDirector [email protected]. LaurellFlannagan [email protected]. JeffHolzer FMSTeacher [email protected]. AnneLudes DirectorofSecondaryEducation [email protected]. LisaCogliandro FullerMSMathDirector/Teacher [email protected]. WilliamKline FMS [email protected]. HeatherSullivan FMSHumanitiesTeacher [email protected]. MarkSpillane FMSTeacher [email protected]. JoséP.Duarte FMAPrincipal [email protected]. LisaColumbo FMSTeacher [email protected]. AntonioJMarin FMATeacher [email protected]. JosephCorazzini OfficeofParentInformation [email protected]. DonnaWresinski DirectorofFineandPerf.Arts [email protected]. PhilipGray JLA [email protected]. JonathanLevi JLA [email protected]. JoelSeeley SMMA [email protected]. DavidStephen NewVistaDesign [email protected]

Page 18: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

newvistadesign| 10.26.17 18 | P a g e

FacilityDesignVisioningWorkshopTwoOctober26,2017

Agenda

Time Activity Purpose7:45–8:00

CoffeeandInformalSocializing

Meetandorientfortheday.

8:00–8:30

WorkshopGoalsandWSOneDebrief• Introductionofnewmembers• Reviewof:

o DesignPrioritieso LearningGoalso SCOGAnalysis

• Whatstrikesus?What’smissing?

DebrieftheOctober20thworkshopactivitiesanddiscusskeythemesandtakeaways.

8:30–9:45

21stCenturySchoolFacilityDesignPatterns• PresentationandQ&A• Smallgroupreviewofassortedfacility

DesignPatterns• Creationofprioritylistings• Largegroupprioritization

GroundourthinkingaboutdesignguidelinesanddesiredbuildingfeaturesinadiscussionandexplorationofpriorityDesignPatternsforthenewand/orrenovatedFullerMiddleSchoolfacility.

EXPECTEDOUTCOMES:Bytheendofthesessionwewillhavebegunto…

§ ReviewacompilationofnotesfromWorkshopOne,includingFullerMiddleSchool’sPriorityGoals,21stCenturyLearningGoals,andSCOGAnalysis

§ ExploreandprioritizearangeofarchitecturalDesignPatternsthatsupportfuturereadyteachingandlearning§ Brainstormalistofno-holds-barredBlueSkyIdeasforthedesignoftherenovatedand/ornewFMSfacility§ ExploreandprioritizeasetofGuidingPrinciplesandprioritiesfordesignoftherenovatedand/ornewFMSfacility§ EngageinaBubbleDiagrammingActivitytoidentifyimportantspacesandadjacencieswithintherenovated

and/ornewFMSfacility

Page 19: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

87FULLERFuller Middle School, Framingham, MassachusettsEducational Program

newvistadesign| 10.26.17 19 | P a g e

9:45–10:00

BREAK

10:00–10:30

BlueSkyIdeas• Whatno-holds-barred,over-the-top,

idea(s)and/orspace(s)wouldyouliketoseetakeshapeintherenovatedand/ornewFMSfacility.

Sharecreativeideas,theseedsofwhichmaybegintotakerootinourideasforthenewand/orrenovatedfacility.

10:30–11:30

GuidingPrinciplesforDesign• PresentationandQ&A• Smallgroupreviewofassorted

GuidingPrinciples,FPSPK-8GuidingPrinciples

• Creationofprioritylistings• Largegroupsharingandprioritization

ExploretheconnectionsbetweenGuidingPrinciplesandschooldesignsolutions.TranslateourFMSLearningGoals,DesignPatterns,andFPSPK-8GuidingPrinciplesintoalistingofpriorityGuidingPrinciplesfordesignofthenewbuilding.

11:30–11:55

BubbleDiagramming• Individualandsmallgroup

diagrammingofkeyspacesand/ordesiredadjacencieswithintherenovatedand/ornewFMSfacility

• Largegroupsharing

Identifyimportantadjacenciesanddesignideasthatcanbeexploredfurtherintheplanninganddesignprocess.

11:55–12:00

NextStepsOverview

Reviewnextstepsandtimelinefordesign.

Page 20: Educational Visioning Workshop Overview and Notes · Educational Visioning Workshops run by New Vista Design and Jonathan Levi Architects. The workshop was a ... D. Design agile classrooms,

newvistadesign| 10.26.17 20 | P a g e

FacilityDesignVisioningWorkshopTwo

ParticipantList1 KimTaylor KingElementaryPrincipal [email protected] LauraSpear OfficeofSpecialEducation [email protected] EdGotgart ChiefOperatingOfficer [email protected] MattTorti DirectorofBuildingsandGrounds [email protected] GeorgeCarpenter ITDirector [email protected] JeffHolzer FMSTeacher [email protected] AnneLudes DirectorofSecondaryEducation [email protected] LisaCogliandro FullerMSMathDirector/Teacher [email protected] WilliamKline FMS [email protected] HeatherSullivan FMSHumanitiesTeacher [email protected] MarkSpillane FMSTeacher [email protected] JoséP.Duarte FMAPrincipal [email protected] LisaColumbo FMSTeacher [email protected] JosephCorazzini OfficeofParentInformation [email protected] DonnaWresinski DirectorofFineandPerf.Arts [email protected] MichelleMelick CameronMiddleSchoolPrincipal [email protected] PatrickJohnson WalshMiddleSchoolPrincipal [email protected] 18 PhilipGray JLA [email protected] JonathanLevi JLA [email protected] JoelSeeley SMMA [email protected] DavidStephen NewVistaDesign [email protected]