eil@eltechinvestments brochure.pdf · and piping plants. minestone: 1990 - 1999 supply of...
TRANSCRIPT
Engineering Modern Zambia
www.eltechinvestments.com
Substations
Transformers
Generators
(HV, MV & LV)
Electrification and Renewable Energy
Civil Engineering and Transportation
Generator Maintenance Substations Grid Extension
Business Overview
ELTECH is among the leading EPC contractors and suppliers in Zambia's electrical infrastructure
market, and our main goal is simply to provide the best customer service. From a solid and
competitive position based on over two decades of experience, we have developed a strong
reputation for growth, innovation and flexibility by anticipating and meeting the ever more complex
demands of our customers and the ever-changing business environment. Our success owes much
to the experience gained from our large installed base of electrical equipment and systems
country-wide ranging from large industrial power transmission and distribution systems to various
other end-user installations.
ELTECH supplies and also distributes on behalf of a number of manufacturers in Europe, America
and Asia. This includes a complete range of equipment, systems and services for the transmission
and distribution of electricity from power plants to large businesses and various other end users.
We also facilitate both mainstream and new renewable energy sectors.
Other business areas include civil engineering, mechanical engineering and industrial
transportation.
Electrical Engineering Projects
ELTECH designs, develops and maintains control schemes as well as complete turn-key projects
in high voltage, medium voltage and low voltage electrical installations. These works include,
amongst others, the installation and maintenance of:
Outdoor switchgear systems
Protection relays
Substations – Turnkey as well as rehabilitation
Power factor correction equipment and load flow management systems.
Generator installation and maintenance
National Power Grid - ELTECH provides a complete range of equipment, systems and
services for the transmission and distribution of electricity from power plants to large
businesses and various other end users. We are able to handle all areas in high, medium
and low voltage end user requirements.
Equipment supply - ELTECH supplies and distributes electrical equipment on behalf of a
number of manufacturers around the world
Transformer/Generator Installation and Maintenance
We are specialists in transformer and generator supply and installation, as well as maintenance.
BARLOWORLD Equipment Limited: 2001 -To Date. Generator Installation
ELTECH has been appointed by Barloworld Equipment as its Nominated Sub Contractor for Generator
Installation. Amongst several other works, we have been previously sub contracted for the following
Construction of Generator Rooms in George Compound Clinic, Matero Clinic, Kamwala Clinic and
Chilenje Clinic for the Ministry of Health, sponsored by CIDRZ (April 2004 – July 2004)
Installation of a 550 KVA standby generator for new Government Complex Ministries along
Independence Avenue.
Installation of 110 KVA Stand by Diesel Generator for Angola Embassy.
Installation of 110 KVA Generator for Danish Embassy.
Installation of 550 KVA Stand by Generator for UNDP.
Installation of 1.5 MVA Stand by diesel generator at Albidon Mine.
Installation of 550 KVA Stand by diesel generator at Albidon Mine.
Installation of 150 KVA, 88KVA Stand by diesel generators for the World Bank.
Installation of 30KVAs, 50 KVAs, 88 KVAs standby diesel generators for various customers on
behalf of Barloworld Equipment.
Installation and commissioning of 4 MVA Back up Standby Power Generator Plant with step up
Transformers for Zambian Breweries. This was a Turn Key Project which included all civil,
mechanical, electrical works and commissioning.
TAP PRODUCTS LIMITED: 2003
Supply of several motor control centerboards, starter panels, for the automation of their asbestos sheeting
and piping plants.
MINESTONE: 1990 - 1999
Supply of Electrical Distribution Boards, feeder pillars and starter panels.
Sub contracted to design, supply, installation and commissioning of a control system for the
automatic firefighting equipment at Zimco Sports Complex.
NAPSA: 1999 – 2002 - CHOMA DEPOT, LUSAKA DEPOT, CHONGWE DEPOT
Carried out refurbishment of the electrical installation.
Serviced the building after it was gutted
Rewiring external lighting
Supply and installation of 7.5 Horse Power Pump plus Motor and Control Panel
ZAMBIA REVENUE AUTHORITY - LUSAKA: 2000
Installation of 75KVA and 30 KVA Generator sets at Livingstone, Victoria Falls Boarder posts, Kazungula
Boarder post and Kabwe respectively.
NATIONAL AIRPORTS CORPORATION – MFUWE: 2003 - 2013
Maintenance, testing and repairing of 11KV/400 volts transformers and 11KV oil circuit breakers. Complete
service of all M.V Air Circuit Breakers and repair of Battery Charger Unit. Service and repair of standby
Generator set, 11KV cable fault locating and cable jointing.
TIGER FEEDS LUSAKA – 2014, GENERATOR
MAINTENANCE
ZAMBIA SUGAR PLC-MAZABUKA: September 2003 to December 2003.
Supply, installation and commissioning of 33/3.3KV Transformer Relay Control Panels.
Protection, maintenance and Current Transformer verification tests.
Supply, installation, repair and comprehensive maintenance of 33KV and 3.3KV Oil Circuit
Breakers.
Construction of 33/0.4KV substation including commissioning.
Construction of 11KV lines.
TOTAL ZAMBIA: 2003
Rewiring star-delta panels for compressors
Installation of standby generator set at Total Headquarters
Installation of Air-compressor
TRANSMISSION, DISTRIBUTION & SUBSTATIONS
ELTECH provides a complete range of equipment, systems and services for the transmission and
distribution of electricity from power plants to large businesses and various other end users. We are able to
perform turnkey projects in generation, transmission and distribution phases.
Recent Projects
Kaoma Substation – rehabilitation works in 2013 Mumbwa – TBZ – Kaoma 33KV & 11 KV transmission
lines (over 380 KM covered) - 2014
Rural Electrification Projects: Mumbwa – TBZ – Kaoma (2011 – 2014)
This project (pictures above) included over 380 KM of 33 KV and 11 KV transmission and distribution lines
to the areas of Mumbwa, Kaoma and TBZ, including the rehabilitation of Kaoma 33 KV Substation.
Zesco Grid Extension Projects – 2012 – 2015
Eltech continues to be one of the main sub-contractors for nation grid extensions across Zambia
ABB POWER LINE (ZIMBABWE): December 2003 to May 2004
Sub contracted by ABB Power line to construct 60km of 11kv overhead line for Kitwe Rehabilitation project.
Copperbelt Energy – Luano Substation Rehabilitation – 2002
ELTECH was sub-contracted under the Norwegian Government’s Norad Funded Power Rehabilitation
Project Transmission System component by the main contractor Jacobsen Elektro As.
The project involved the following:
Replacement of conventional electro mechanical relays with modern numerical relays, and station
control replacements with computerized substation condition monitoring and control systems (SAT)
Replacement of the bulk oil 330kv oil circuit breakers with modern GEC Alsthom SF6 circuit
breakers and refurbishment of the existing air circuit breakers and rated at 330kv.
Replacement of old control cables with new ones and installations of new relay panels, outdoor
marshalling kiosks and all the termination and wiring involved.
Installation of protection relays for transformers, line bays and substation control equipment.
Mobile Tower Electrification
ABB ZAMBIA April: 2006
Sub contracted by ABB to erect 11kv lines to connect Cel Tel Sites in MAAMBA K1 SITE ,WATER WORKS
AND MASUKU SITE including installation and commissioning of 3nos 25kva,11kv/400 volt Transformers.
MTN and Airtel ZAMBIA: Mobile Tower Electrification - 2005 – till date
Sub contracted by MTN and Airtel to electrify their Cell sites by constructing 33kv and 11 kv lines and
installing PMT Transformers and connecting to ZESCO 33/11kv line network across Zambia. To date we
have electrified more than 300 towers for both mobile providers. Some of the sites that have been
energized in various provinces so far include:
Nampundwe mine, Lilayi basic, Kasisi Girls, Mukosha (Kabwe), Kitwe Boys, Kitwe ZNS, Ibex Hill,
Chalala Site, Walubwe (Katete), Kasama Institute, Kabulamwanda(Southern), Tuunga (Southern),
Mbabala(Southern), Mbala (Northern), Litiya (Western), Nambala (western), Twasekela(copperbelt),
Ten miles, Chiparamba Sub-Boma, Nyanje mission, Mbwindi, kalonge pump station, katunga,
Serenje Hill, Mayoba, Mpula, Chozi, Matumbo, Mapopo, St Francis, St Dorothy, Kapwila, Munyezi,
Mukwela, Mulambwe, Messengers, manyinga, mutanda Research, Kyawama, Mapanza, Mufumbwe
BB Site, Mwandi, Chipembi, Mumbwa Cotton Ginnery, malengwa Holy cross, katongo, Lukulu,
Katuba, Mwangwe, Kohima, MTN Highrise e.t.c.
CIVIL AND MECHANICAL ENGINEERING
We are specialists in Civil engineering works for all sorts of industries and purposes. Some of our projects
have included the following:
NATIONAL AIRPORTS CORPORATION: 2004
Renovations of the Central Stores Department
Construction of a storage slab at the Central Stores
Supply and fitting of Steel doors
Construction of DME/VOR foundation plinths at Ndola Airport (August 2005)
Renovations and roofing to Anansi ni Nkondo warehouse at Lusaka international Airport.
ZESCO – KITWE – CONTROL BUILDING: 2003
Renovations to the Building and reinforcement of the foundation building, under pinning of the control
building.
SPECTRA OIL: 2003 – To Date
Sub contracted to install steel fuel tanks of over 50,000 liters capacity in filling stations and
construction of reinforceable slabs.
CIDRZ: 2006
Construction of generator rooms at George compound clinic, Matero clinic, Kamwala clinic and
Chilenje Clinic.
Refurbishment and partitioning of the offices at HEAD OFFICE.
UNDP Headquarters: 2005
Extension of the generator room, Alick Nkhata Road Offices
CONCERN WORLDWIDE Headquarters: 2006
Renovations to country Directors house in Kalundu
Renovations and painting to concern offices (6610 Manchinchi Road, Northmead)
Corporate Social Responsibility
Our remote project teams who normally go out in the field will always experience cross cultural diversity
and different lifestyles of local communities. This is especially so because we always engage local man
power on projects such as Rural Electrification. Even though some infrastructure works may at times
interfere with certain local structures such as farmland, it is always our responsibility and priority to engage
with locals in order to justify the infrastructure developments, and we take such matters very seriously with
a goal to satisfy all stakeholders. We are also always looking for ways to contribute positively to local
communities – be it simply by social interactions, engaging in sport with the youth or contributing to a local
charity or school.
ELTECH Investments Limited
Stand 14674 Bombay Road (Opposite Farmer’s Market), Kamwala South
Lusaka, Zambia. P.O. Box 34701
www.eltechinvestments.com
+26 211 846048