ERDMP OF IGL Experience and Lessons for other CGDs. EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010. 1. OVERVIEW. ABOUT IGL. 1. 2. CLASSIFICATION OF EMERGENCIES. CASE STUDY. 3. BEST PRACTICES & IGL INITIATIVES. 4. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/1.jpg)
1
EMERGENCY RESPONSE AND
DISASTER MANAGEMENT PLAN(ERDMP)
As per PNGRB Notification GSR 39(E), 2010
ERDMP OF IGL
Experience and Lessons for other CGDs
![Page 2: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/2.jpg)
OVERVIEW
1
CASE STUDY
2 CLASSIFICATION OF EMERGENCIES
3
ABOUT IGL
BEST PRACTICES & IGL INITIATIVES4
5 EMERGENCY PREPAREDNESS IN IGL
![Page 3: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/3.jpg)
INDRAPRASTHA GAS LIMITED (IGL)
Incorporated on 23rd December 1998 for
supply of natural gas to domestic,
commercial and automobile sectors
(CNG).
Immediate target - implementation of
Supreme Court order
GAIL22.50%
BPCL22.50%Govt. of Delhi
5.00%
Institutional16.54%
FII17.87%
Individuals10.27%Body Corporate
5.32%
![Page 4: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/4.jpg)
AURAIYA
DADRI
VIJAIPUR
BORERI
ANTA
(OFCL)SHAHJAHANPUR
(IFFCO) AONLA
TCL-BABRALA
MATHURA
AGRA/FEROZ
DESU/Delhi/MARUTI
FARIDABAD NTPC DADRI
CFCL
DAHEJ
HVJ PIPELINEDESIGN CAPACITY:33.4 MMSCMDDESIGN PRESSURE:92 KG/SQ CM
LENGHTH:2800 KMS
EXISTING LINE
JAGDISHPUR
NTPC AUR
NEW LINE
36”*640 km Existing HBJ Additional Compression
Hazira VAGHODIA JHABUA
KHERA
42”*610 km
CHAINSA
![Page 5: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/5.jpg)
At present IGL is having more than 8000 kms of pipeline network spread across Delhi & NCR
![Page 6: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/6.jpg)
CNG STATIONS OF DELHI & NCR STATUS
NO. OF STATIONSMOTHER : 68
ONLINE : 152
DAUGHTER BOOSTER : 46
TOTAL : 266
NOS. OF CNG VEHICLES : 5.4 Lakhs (APPROXIMATELY)
AVERAGE CNG SALE, (MILLION SCM/DAY) : 2.56
(As On Sep’12(As On Sep’12)
![Page 7: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/7.jpg)
Delhi-CNG Infrastructure
• Buses 17,106
• Auto 1,46,412
• RTV’s 36,981 & Taxi’s
• Private 3,35,297 Cars
The present infrastructure caters to more than 5,30,000 vehicles from NCT Of Delhi and NCR.
![Page 8: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/8.jpg)
PNG Segment (Number of Connections)
• Domestic Connections – 3,55,920
• Commercial Connections – 731
• Industrial Connections – 280
![Page 9: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/9.jpg)
CGD Line Diagram
City Gas Station
District Regulating
Station ( DRS )
Regulating / Metering
Kitchen Burner
G.I. / Cu Piping 21 mbar
CNGDispensing
200 BarM.D.P.E
4 Bar
Transmission Gas
HVJ Pipeline ,Pressure - 60 bar
Steel Pipe Network
Pressure 19 to 26 Bar
![Page 10: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/10.jpg)
PNG - A Typical Gas Supply Scheme
![Page 11: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/11.jpg)
OVERVIEW
1
CASE STUDY
2 CLASSIFICATION OF EMERGENCIES
3
ABOUT IGL
BEST PRACTICES & IGL INITIATIVES4
5 EMERGENCY PREPAREDNESS IN IGL
![Page 12: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/12.jpg)
As per PNGRB Gazette Notification GSR 39 (E)LEVELS OF EMERGENCIES …L1, L2, L3
As per PNGRB Gazette Notification GSR 39 (E)LEVELS OF EMERGENCIES …L1, L2, L3
• Level 1: This is an emergency or an incident which - – Can be effectively and safely managed and contained within the site, location or
installation by the available resources;– Has no impact outside the site, location or installation.
• Level 2: This is an emergency or an accident which –– Cannot be effectively and safely managed or contained at the location or installation by
available resources and additional support is alerted or required;– Is having or has the potential to have an effect beyond the site, location or installation and
where external support of mutual aid partner may be involved.– Is likely to be danger to life, the environment or to industrial assets or reputation.
• Level 3: This is an emergency or an incident with off-site impact which could be catastrophic and is likely to affect the population, property and environment inside and outside the installation, and management and control is done by district administration. Although the Level-III emergency falls under the purview of District Authority but till they step in, it should be responsibility of the unit to manage the emergency.
• Note: Level-I and Level-II shall normally be grouped as onsite emergency and level-III as off-site emergency.
![Page 13: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/13.jpg)
IGL’s ERDMP Classification of EmergencyIGL’s ERDMP Classification of Emergency
• Level 1: Level 1 Emergency may include the following Scenarios at our CNG stations & PNG Sites:
These are the emergencies arising at CNG/PNG sites and controlled by the IGL’s available staff / manpower there with own resources.
• Minor Gas Leakage in CNG Equipments / Pipeline / Vehicles (due to vehicle’s fittings failure or Safety Disc Rupture) / due to third party damage.
• Minor Fire due to Gas Leak
• Short Circuit in CNG vehicle or any Station Equipment
• Hose pulling / Hose Snaking
• Failure of Joints of Tubings / Nozzles / Break away Coupling / Bursting of Dispensing Hose
• Minor Gas Leak in MDPE Line (Third party damage)
• Minor First Aid Injuries to Workers or Employees
![Page 14: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/14.jpg)
• Level 2: Level 2 Emergency may include the following Scenarios at our CNG stations & PNG Sites:
When the Level 1 Emergency could not be controlled and situation becomes uncontrolled and require intervention of external sources / help:
• Gas Leakage due to Safety Disc Rupture/Fitting failure in a Bus at CNG station and caught Fire.
• Gas Leakage due to Station Tubing Joint /Ferrule Failure and subsequently caught fire, engulfing CNG Equipments & Vehicles came of refuelling at CNG Station.
• Failure of Steel Pipeline and subsequent Fire.
• Fire in PNG Customer premises (Domestic, Commercial, Industrial).
• Gas Leak and Fire due to the LCV Accident on Road.
• Ehtyl Mercaptan leakage while handling.
IGL’s ERDMP Classification of EmergencyIGL’s ERDMP Classification of Emergency
![Page 15: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/15.jpg)
• Level 3: Level 3 Emergency may include the following Scenarios at our CNG stations & PNG Sites:
When the Level 2 Emergency could not be controlled and situation becomes uncontrolled and disastrous and require help of district authorities like NDRF, etc.
• Ethyl Mercaptan Leakage & Spillage at the time of Handling, Unloading / Dosing.
• Main Pipeline Failure and Isolation could not be done due to -– Natural Calamities like Floods, Earthquake.– Sabotage and Arson during riots– Aerial Attack– Terrorist Attack
• Rupture of CNG Cylinders - Onboard Vehicle Cylinders, Mobile Cascade Cylinder, Stationary Cascade Cylinders leading multiple casualties.
IGL’s ERDMP Classification of EmergencyIGL’s ERDMP Classification of Emergency
![Page 16: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/16.jpg)
2011 2012 (As on Aug’12)
LEVEL OF EMERGENCY
TYPE CNG PNG CNG PNG
LEVEL 3 OFFSITE 0 0 1 0
LEVEL 2FATAL 0 0 0 0
MAJOR 1 0 0 1
LEVEL 1MINOR / NEARMISS / FIRST AID
223 183 226 217
2012-L-3 (Sabotage & Arsoning):Incident took place at IFC-II CNG Station on 02.09.2012.
2012 – L-2 (Major Leak):12” Steel pipeline puncture near Kapashera on 23.05.2012.
2011- L-2 (Major Fire):Fire took place at Rohini-25 CNG station on 23.04.2011 due to gas leak during filter cleaning.
2009 –L-2 (Major Fire): 1. Fire took place in a Bus at Pragati Maidan CNG Station on 17.01.2009 due to gas leakage and fire in the
Bus being refilled, involved our CNG station.2. Fire inside customer’s kitchen on 03.12.2009 at Jawahar CGHS, Dwarka.
INCIDENT STATISTICS IN IGL (LAST TWO YEARS)INCIDENT STATISTICS IN IGL (LAST TWO YEARS)
![Page 17: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/17.jpg)
OVERVIEW
1
CASE STUDY
2 CLASSIFICATION OF EMERGENCIES
3
ABOUT IGL
BEST PRACTICES & IGL INITIATIVES4
5 EMERGENCY PREPAREDNESS IN IGL
CASE STUDY3
![Page 18: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/18.jpg)
View of totally damaged CNG
Station
![Page 19: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/19.jpg)
View of totally damaged CNG
Station
![Page 20: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/20.jpg)
PASCHIM VIHAR CNG STATION FIRE
![Page 21: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/21.jpg)
CHATRASAL CNG STATION FIRE
![Page 22: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/22.jpg)
![Page 23: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/23.jpg)
Root Cause of Incidents
![Page 24: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/24.jpg)
(Safety Disc)
Failure of Safety Disc of CNG Cylinders results in High Pressure (up to 200 kg/cm2) Gas Leak resulting in damage to vehicles as well as CNG
station
![Page 25: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/25.jpg)
Unprotected Battery Terminals
![Page 26: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/26.jpg)
OVERVIEW
1
CASE STUDY
2 CLASSIFICATION OF EMERGENCIES
3
ABOUT IGL
BEST PRACTICES & IGL INITIATIVES4
5 EMERGENCY PREPAREDNESS IN IGL
![Page 27: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/27.jpg)
DCP FLOODING SYSTEM
![Page 28: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/28.jpg)
OPERATION OF DCP FLOODING SYSTEM FOR
BUS DISPENSER
![Page 29: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/29.jpg)
DCP SYSTEM FOR CASCADES
![Page 30: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/30.jpg)
OPERATION OF DCP FLOODING SYSTEM FOR
CASCADES
![Page 31: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/31.jpg)
• Safety Practices in IGL are reviewed by Top Management and Safety is
top agenda in all Board Meetings.
![Page 32: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/32.jpg)
TRAINING
![Page 33: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/33.jpg)
![Page 34: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/34.jpg)
•
![Page 35: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/35.jpg)
IGL Employees Training
![Page 36: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/36.jpg)
36
Training is given Prime Importance and Regular Trainings are imparted to IGL Employees, Contract workers, CNG & PNG Consumers, Security Guards and Delhi Fire Service personnel.
Multi-discipline Core Safety Groups trained from NEBOSH, UK ensures implementation of Safety Management System.
![Page 37: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/37.jpg)
FOR THE SAFETY OF SCHOOL CHILDREN
![Page 38: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/38.jpg)
![Page 39: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/39.jpg)
Fire & Safety Training to Security Guards
![Page 40: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/40.jpg)
CNG Fire Training to Delhi Fire Service Personnel
![Page 41: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/41.jpg)
IGL’S INITIATIVES FOR CONSUMER SAFETY
![Page 42: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/42.jpg)
![Page 43: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/43.jpg)
IGL’S INITIATIVES FOR CONSUMER SAFETY
TRAINING PROGRAMS FOR RESIDENTIAL SOCIETY CUSTOMERS
![Page 44: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/44.jpg)
TRAINING PROGRAMS FOR DRIVERS OF UPSRTC BUSES
![Page 45: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/45.jpg)
TRAINING PROGRAMS FOR STAFF OF RETAIL OUTLET OF OMCs
![Page 46: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/46.jpg)
TRAINING PROGRAMS FOR RESIDENTS OF SPG (SPECIAL PROTECTION GROUP) SOCIETY
![Page 47: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/47.jpg)
Safety Awareness Programmes at RASHTRAPATI BHAWAN for the staff and the residents.
Safety Awareness Programmes at TIHAR JAIL for the staff and the residents.
![Page 48: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/48.jpg)
![Page 49: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/49.jpg)
DISTRIBUTING SAFETY PAMPHLETS
![Page 50: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/50.jpg)
IN LINE WITH THE REQUIREMENT OF CHECKING THE STATUS OF CYLINDER HYDRO-TESTING OF CNG VEHICLES, WHICH IS VERY CRITICAL ISSUE –
IGL HAS RECENTLY CONDUCTED VARIOUS EDUCATIONAL PROGRAMME ACROSS DELHI & NCR TO MAKE THE CONSUMERS AWARE ABOUT THE REQUIREMENT OF HYDRO TESTING OF CYLINDERS.
![Page 51: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/51.jpg)
![Page 52: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/52.jpg)
BROADCASTING SAFETY SLOGANS ON RADIO FM
![Page 53: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/53.jpg)
![Page 54: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/54.jpg)
CONDUCTING SAFETY CHECKUP CAMPS
![Page 55: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/55.jpg)
CHECKUP CAMP OF CNG CARS
![Page 56: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/56.jpg)
56
FREE CHECKUPS OF CNG CARS
![Page 57: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/57.jpg)
DISTRIBUTING CDS OF SAFETY ANIMATED FILMS
![Page 58: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/58.jpg)
ANIMATED FILM ON SAFETY
![Page 59: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/59.jpg)
• Safety Audits– Internal & External Safety Audits are conducted for PNG & CNG
Installations.
• Safety Committees– Meetings are conducted on quarterly basis in each Zone.– Constituted with equal participation of Executives as well as Non-
Executives.
• Safety Work Permit System– Followed for all activities in CNG and PNG Shutdowns.– Around 30 Permits are issued on an average per day for all the CNG
Control Rooms.
• Accident/Incident Reporting and Investigation– IGL has a well laid down Accident Reporting and Investigation procedure.– All Incidents are investigated to find out the root cause and action taken
on priority to comply the recommendations.
![Page 60: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/60.jpg)
OVERVIEW
1
CASE STUDY
2 CLASSIFICATION OF EMERGENCIES
3
ABOUT IGL
BEST PRACTICES & IGL INITIATIVES4
5 EMERGENCY PREPAREDNESS IN IGL
![Page 61: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/61.jpg)
61
Emergency Preparedness by IGL
• 5 nos. Emergency Control Centers (one in each zone) are established at strategic locations which are manned round the clock.
![Page 62: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/62.jpg)
• 2 nos. Emergency Response Vehicles are provided for catering any emergency in NCT & NCR of Delhi.
![Page 63: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/63.jpg)
EMERGENCY RESPONSE VEHCILES (ERV)
![Page 64: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/64.jpg)
ECC and ERV Locations
![Page 65: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/65.jpg)
MOCK DRILLS
![Page 66: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/66.jpg)
![Page 67: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/67.jpg)
![Page 68: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/68.jpg)
![Page 69: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/69.jpg)
![Page 70: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/70.jpg)
![Page 71: EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010](https://reader033.vdocuments.net/reader033/viewer/2022061602/5681598e550346895dc6d8b8/html5/thumbnails/71.jpg)
71
THANK YOU