emiliano zapata elementary academy
TRANSCRIPT
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report) . Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report.
Facility Assessment Report
Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors
Campus Summary
Main 1996 73,845 $3,217,3532
4-Classroom Modular 0 4,900 $178,9821
Branch 1908 23,318 $779,3582
SITE $391,131
Campus Total $4,566,824102,063
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost Group
Entrance
Entrance Control - Audio 6EA1 $497
Exterior Doors - Exterior Steel Door 6EA4 $1,922
Exterior Doors - Overhead Rolling/ Garage Door 5EA1 $3,942
Exterior Doors - Side lite 7EA28 $0
Exterior Doors - Store Front 6EA26 $14,198
Exterior Doors - Transom Lite 7EA26 $0
Exterior Stairs - Stone 7LF6 $0
Foundation
Foundation - Concrete 7LF1,256 $0
Superstructure - Steel 7SF73,845 $0
Lighting
Exterior Lighting - Wall Mounted 5EA7 $2,992
Exterior Lighting - Wall Mounted 6EA8 $2,310
Roof System
Chimney - Metal Flue 6LF40 $6,326
Page 1 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost Group
Roof System
Coping - Stone 6LF1,640 $52,673
Downspouts - Interior Downspouts 6LF496 $16,484
Parapet - 16" - 30" Height 7LF1,640 $0
Roof - Modified Bitumen 3SF39,731 $1,089,150
Roof Structure - Steel / Metal Deck/ Concrete Topping 7SF39,731 $0
Walls
Canopy - Metal 5SF800 $42,831
Exterior Walls - Brick 7SF43,304 $0
Exterior Walls - Stone-Cast 7SF7,536 $0
Windows
Clerestory - Glass Double-Pane 7SF96 $0
Curtain wall - Insulated Panel 7SF448 $0
Guard - Guards perforated 5SF5 $0
Guard - Guards perforated 6SF1,939 $24,761
Lintels - Steel 7LF1,049 $0
Windows - Casement Aluminum Double-pane 6SF6,732 $50,252
Windows - Louver 7SF210 $0
Building Exterior Subtotal: $1,308,337
Building: Main
Category: Electrical System
Item - Type Quantity Unit Rank Cost Group
Emergency System
Automatic Transfer Switch 6EA1 $408
Emergency A/C Power - Corridors and Stairs 6SF16,325 $4,902
Emergency A/C Power - Gym 6SF3,444 $1,280
Emergency A/C Power - Lunchrooms 6SF2,689 $1,000
Emergency Battery Packs - Corridors and Stairs 6EA20 $4,050
Emergency Battery Packs - Gym 6EA2 $405
Emergency Battery Packs - Lunchrooms 6EA2 $405
Emergency Battery Packs - Students Toilets 6EA4 $810
Exit Signs - Corridors and Stairs 2EA35 $19,092
Exit Signs - Gym 2EA2 $1,157
Exit Signs - Lunchroom 2EA2 $1,091
Security System - CCTV 6SF73,845 $22,176
Page 2 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Main
Category: Electrical System
Item - Type Quantity Unit Rank Cost Group
Emergency System
Security System - Intrusion Detection 6SF73,845 $19,008
Main Service
Independent Electrical Service for emergency power 6EA1 $2,921
Main Electrical Service - 1600 A 277/480/3PH 6EA1 $5,977
PA System 6SF73,845 $24,288
Power Distribution
Lighting and Power Panels - 100 A 6EA2 $598
Lighting and Power Panels - Above 100 A 6EA12 $5,964
Main Distribution Panels - 400 - 600 amp 6EA2 $1,055
Transformers - 277/480 - 120/208 6EA4 $5,060
Electrical System Subtotal: $121,646
Building: Main
Category: Safty System
Item - Type Quantity Unit Rank Cost Group
Fire Alarm
Fire Alarm Panel 3EA1 $49,477
Fire Alarm Strobe Lights 6SF73,845 $26,400
Fire Alarm_System 6SF73,845 $35,903
Fire Pump Controller 6EA1 $1,823
Pump Room Assembly
Fire Pump - 25-50 hp 6EA1 $1,558
Jockey Pump 6EA1 $758
Sprinkler System
Sprinkler Heads 7SF73,845 $0
Sprinkler Piping 6SF73,845 $13,728
Wet Sprinkler System 6SF73,845 $19,008
Safty System Subtotal: $148,654
Building: Main
Category: Mechanical System
Item - Type Quantity Unit Rank Cost Group
Page 3 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Main
Category: Mechanical System
Item - Type Quantity Unit Rank Cost Group
Air Conditioning
Condensing Unit- Roof Mounted - 11-20 tons 5EA1 $11,065
Condensing Unit- Roof Mounted - 5-10 tons 5EA1 $9,590
Condensing Unit- Roof Mounted - Greater than 50 tons 5EA2 $34,206
Condensing Unit- Roof Mounted - Less than 5 tons 6EA1 $3,334
Air Handling Systems
Air Handling Unit-Package Single Zone- Indoor- Hot Water and DX Cooling Coils - 12001-20000 cfm
5EA2 $97,184
Air Handling Unit-Package Single Zone- Indoor- Hot Water and DX Cooling Coils - 4000-8000 cfm
6EA1 $3,350
Air Handling Unit-Package Single Zone- Indoor- Hot Water and DX Cooling Coils - 8001-
12000 cfm
6EA1 $3,350
Air Intake 7EA4 $0
Fan Power Box - Fan Power Box with Hot Water Coil 6EA42 $20,697
Indoor Return Fans- Centrifugal Inline - 5000 - 10000 CFM 6EA2 $3,714
Indoor Return Fans- Centrifugal Inline - Greater than 20000 CFM 6EA1 $2,433
Indoor Return Fans- Centrifugal Inline - Less than 5000 CFM 6EA2 $2,564
Make Up Air Unit- Roof Mounted- Gas Heating - Less than 6000 cfm 6EA1 $3,350
Zone Dampers 6EA10 $8,330
Boiler Systems
Boiler Auxiliary- Non Condensing Hot Water - 1001 - 2000 MBH 6EA3 $6,139
Combustion Dampers 6EA7 $2,863
Glycol Feed System 6EA1 $539
Non Condensing- Water Tube- Flexible Tube- Force Draft- Hot Water Boiler - 1001 - 2000 MBH
6EA3 $2,994
Water Fill System 6EA1 $1,168
Gas Booster
Gas Booster 6EA2 $998
Heating Devices
Cabinet Heaters - With Hot Water Coil 6EA8 $2,835
Fin Tube - Hot Water 6LF220 $2,076
Unit Heater - Hot Water 6EA6 $1,675
Mechanical Plumbing
Hot Water Pump - 10 - 20 HP 6EA2 $2,485
Hydronic Supply and Return - Copper 6LF540 $28,332
Hydronic Supply and Return - Steel 6LF160 $12,284
Page 4 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Main
Category: Mechanical System
Item - Type Quantity Unit Rank Cost Group
Temperature Control
DDC System 5SF73,845 $121,438
Thermostats - DDC 6EA50 $0
Ventilation
Exhaust Fans- Roof Mounted - 1501 - 8000 CFM 6EA1 $592
Exhaust Fans- Roof Mounted - 500 - 1500 CFM 6EA4 $2,370
Exhaust Fans- Roof Mounted - Less than 500 CFM 6EA7 $2,073
Roof Mounted Duct Work 6LF20 $7,580
Type I Exhaust Hood- Kitchen 7EA2 $0
Mechanical System Subtotal: $401,609
Building: Main
Category: Plumbing System
Item - Type Quantity Unit Rank Cost Group
Hot Water
Electric Heater - 20 - 50 KW 5EA1 $2,504
Gas Heater - Greater than 600000 BTU/HR 5EA1 $2,249
Piping
Domestic Piping-Cold Water from Risers to Fixtures 6SF73,845 $14,784
Domestic Piping-Cold Water Horizontal Lines 6SF73,845 $17,952
Domestic Piping-Cold Water Risers 6SF73,845 $13,728
Domestic Piping-Hot Water from Risers to Fixtures 6SF73,845 $11,616
Domestic Piping-Hot Water Horizontal Lines 6SF73,845 $13,728
Domestic Piping-Hot Water Return Lines 6SF73,845 $10,560
Domestic Piping-Hot Water Return Risers 6SF73,845 $10,560
Sanitary Piping 6SF73,845 $67,583
Storm Piping 6SF73,845 $64,415
Vent Piping 6SF73,845 $49,631
Pumps
Pumps - Domestic Booster Pump-Duplex 6EA1 $1,977
Plumbing System Subtotal: $281,286
Building: Main
Category: Classrooms
Page 5 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Category: Classrooms
Item - Type Quantity Unit Rank Cost Group
Art Room (1 room)
Casework 6LF5 $126
Ceiling - Lay-in 6SF921 $2,766
Chalk Board 4LF24 $2,203
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Tile/Sheet 6SF921 $922
Lighting - Lay-in 7EA14 $0
Storage/ Closet 6SF116 $841
Walls - Concrete Block 6SF609 $1,785
Walls - Metal Panel 6SF304 $2,269
Walls - Plaster/Drywall 6SF304 $839
Work Sink 6EA1 $379
Computer Lab (1 room)
Casework 6LF66 $1,667
Ceiling - Lay-in 6SF1,053 $3,162
Doors - Side-lite 6SF6 $100
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Tile/Sheet 6SF1,053 $1,054
Lighting - Lay-in 6EA12 $1,428
Marker Board 6LF20 $428
Walls - Concrete Block 6SF980 $2,873
Walls - Plaster/Drywall 5SF50 $221
Walls - Plaster/Drywall 6SF265 $731
Kindergarten (2 rooms)
Casework 6LF30 $758
Ceiling - Lay-in 6SF1,842 $5,532
Chalk Board 4LF36 $3,305
Doors - Side-lite 6SF12 $201
Doors - Wood Doors inclu hw 6EA2 $602
Floor - Tile/Sheet 6SF1,842 $1,844
Lighting - Lay-in 7EA28 $0
Storage/ Closet 6SF111 $805
Walls - Concrete Block 6SF2,436 $7,141
Work Sink 6EA6 $2,274
Music Room (1 room)
Ceiling - Lay-in 6SF921 $2,766
Chalk Board 4LF20 $1,836
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Tile/Sheet 6SF921 $922
Page 6 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost Group
Music Room (1 room)
Lighting - Lay-in 7EA9 $0
Walls - Concrete Block 5SF914 $9,384
Walls - Metal Panel 6SF304 $2,269
Regular Classroom (24 rooms)
Casework 6LF976 $24,648
Ceiling - Lay-in 6SF21,719 $65,222
Chalk Board 4LF254 $23,319
Doors - Side-lite 6SF120 $2,006
Doors - Wood Doors inclu hw 6EA23 $6,923
Floor - Carpet 6SF426 $908
Floor - Tile/Sheet 6SF21,293 $21,314
Lighting - Lay-in 6EA162 $19,274
Lighting - Lay-in 7EA124 $0
Marker Board 6LF168 $3,599
Marker Board 7LF120 $0
Storage/ Closet 5SF56 $903
Storage/ Closet 6SF36 $261
Walls - Concrete Block 5SF60 $845
Walls - Concrete Block 6SF18,757 $54,986
Walls - Metal Panel 6SF307 $2,292
Walls - Plaster/Drywall 6SF8,467 $23,368
Work Sink 6EA19 $7,201
Science Lab Level 3 (1 room)
Casework 6LF40 $1,010
Ceiling - Lay-in 6SF1,236 $3,712
Chalk Board 4LF16 $1,469
Doors - Side-lite 6SF12 $201
Doors - Wood Doors inclu hw 6EA2 $602
Floor - Tile/Sheet 6SF1,236 $1,237
Lighting - Lay-in 6EA15 $1,785
Science Lab Elements 6SF1,236 $8,378
Walls - Concrete Block 6SF840 $2,462
Walls - Plaster/Drywall 6SF613 $1,692
Work Sink 6EA3 $1,137
Special Education (2 rooms)
Casework 6LF14 $354
Page 7 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost Group
Special Education (2 rooms)
Ceiling - Lay-in 6SF626 $1,880
Chalk Board 6LF12 $268
Doors - Wood Doors inclu hw 6EA2 $602
Floor - Carpet 6SF626 $1,334
Lighting - Lay-in 6EA10 $1,190
Marker Board 6LF12 $257
Walls - Concrete Block 6SF415 $1,217
Walls - Metal Panel 6SF307 $2,292
Walls - Plaster/Drywall 6SF734 $2,026
Weight (1 room)
Casework 6LF15 $379
Ceiling - Lay-in 6SF921 $2,766
Doors - Side-lite 6SF6 $100
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Weight/ Fitness Room Floor Matting 6SF921 $4,820
Lighting - Lay-in 7EA12 $0
Marker Board 7LF12 $0
Storage/ Closet 5SF56 $903
Walls - Concrete Block 6SF1,218 $3,571
Work Sink 6EA3 $1,137
Classrooms Subtotal: $370,485
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost Group
Administrative Suites/Offices
AC Unit 6EA1 $496
Ceiling - Lay-in 5SF14 $112
Ceiling - Lay-in 6SF3,508 $10,535
Ceiling - Plaster/Drywall 6SF92 $318
Doors - Side-lite 6SF114 $1,906
Doors - Steel Doors incl hw 6EA3 $903
Doors - Store Front 6EA1 $1,208
Doors - Wood Doors inclu hw 6EA13 $3,913
Floor - Carpet 6SF2,026 $4,317
Page 8 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost Group
Administrative Suites/Offices
Floor - Tile Ceramic/ Porcelain 6SF150 $317
Floor - Tile/Sheet 6SF1,438 $1,439
Lighting - Lay-in 6EA11 $1,309
Lighting - Lay-in 7EA42 $0
Power Distribution 6EA8 $16,999
Power Distribution 7EA114 $0
Storage/ Closet 6SF21 $152
Walls - Concrete Block 6SF5,009 $14,684
Walls - Plaster/Drywall 6SF4,374 $12,072
Work SInk 6EA2 $1,016
Gymnasia
Bleacher Seating 6EA96 $2,779
Ceiling - Exposed 6SF3,444 $5,122
Doors - Steel Doors incl hw 6EA4 $1,204
Floor - Sport Flooring 6SF3,444 $7,437
Lighting - Metal Halide/Sodium Vapor 7EA12 $0
Scoreboards 6EA1 $2,244
Sound System 6EA1 $41,654
Storage/ Closet 6SF170 $1,233
Walls - Concrete Block 6SF7,218 $21,160
Kitchen
Ceiling - Lay-in 6SF660 $1,982
Doors - Steel Doors incl hw 6EA1 $301
Floor - Concrete 6SF660 $349
Lighting - Lay-in 7EA17 $0
Storage/ Closet 6SF225 $1,631
Walls - Concrete Block 6SF1,022 $2,996
Library
Casework 6LF230 $5,808
Ceiling - Lay-in 6SF2,983 $8,958
Doors - Wood Doors inclu hw 6EA3 $903
Floor - Carpet 6SF2,983 $6,356
Lighting - Lay-in 6EA28 $3,331
Storage/ Closet 6SF114 $827
Walls - Concrete Block 6SF1,342 $3,934
Walls - Plaster/Drywall 6SF1,342 $3,704
Page 9 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost Group
Library
Locker/Shower Room
Accessories 6SF222 $870
Benches, ped mounted 6LF4 $436
Ceiling - Lay-In 5SF18 $125
Ceiling - Lay-In 6SF175 $526
Ceiling - Plaster/ Drywall 6SF29 $100
Doors - Steel Doors incl hw 6EA3 $903
Floor - Tile Ceramic/ Porcelain 6SF260 $550
Floor Drain 6EA3 $3,177
Lavatory 6EA2 $639
Lighting - Lay-in 7EA6 $0
Partitions 6EA2 $594
Showers 6EA1 $311
Student Lockers 6EA16 $0
Walls - Concrete Block 6SF979 $2,870
Water Closet 6EA2 $672
Lunch & Multipurpose Room
Ceiling - Exposed 6SF2,159 $3,211
Ceiling - Lay-in 6SF530 $1,592
Doors - Steel Doors incl hw 6EA4 $1,204
Doors - Wood Doors inclu hw 6EA2 $602
Floor - Tile/Sheet 6SF2,689 $2,692
Lighting - Lay-in 7EA15 $0
Lighting - Pendent/Surface 7EA6 $0
Serving Line 6LF12 $714
Walls - Concrete Block 6SF6,390 $18,732
MDF_IDF
AC Unit 6EA1 $496
Doors - Wood Doors inclu hw 6EA1 $301
Finishes 6SF91 $649
Ventilation and Cooling 6EA1 $1,855
Mechanical/ Service Rooms
Janitor's Closet 6SF196 $1,404
Mechanical/ Service Rooms 6SF2,364 $16,936
Storage Room 6SF472 $3,382
Page 10 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost Group
Mechanical/ Service Rooms
Vaults 6SF228 $1,633
Restroom
Accessories 6SF1,797 $16,575
Ceiling - Lay-in 6SF356 $1,069
Ceiling - Plaster/Drywall 6SF1,441 $4,987
Doors - Wood Doors inclu hw 6EA10 $3,010
Floor - Tile Ceramic/ Porcelain 6SF1,797 $3,803
Floor Drain 6EA18 $19,065
Hand Dryer 6EA8 $1,840
Lavatory 6EA34 $10,867
Lighting - Lay-in 6EA23 $2,736
Lighting - Lay-in 7EA27 $0
Partitions 6EA22 $6,532
Urinals 6EA8 $2,688
Walls - Structural Glazed Tile 6SF5,264 $16,561
Walls - Tile Ceramic/ Porcelain 6SF1,654 $3,737
Water Closet 6EA34 $11,423
Rooms (Other Than Classrooms) Subtotal: $367,676
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost Group
Corridor
Ceiling - Lay-in 6SF14,752 $44,300
Doors - Steel Doors incl hw 6EA16 $4,816
Doors - Wood Doors include hw 6EA2 $602
Drinking Fountains - Single Fountain 6EA10 $2,757
Floor - Tile Ceramic/ Porcelain 6SF525 $1,464
Floor - Tile/Sheet 6SF14,752 $8,016
Lighting - Lay-in 6EA86 $10,232
Lighting - Lay-in 7EA98 $0
Walls - Concrete Block 5SF100 $1,409
Walls - Concrete Block 6SF25,766 $75,533
Safety
Camera Viewing Station 5EA4 $11,741
Page 11 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost Group
Safety
Security Cameras 5EA2 $1,375
Security Cameras 6EA14 $2,717
Stairs
Ceiling - Lay-in 6SF1,000 $3,003
Floor - Terrazzo 6SF1,048 $8,797
Handrails 6LF208 $1,802
Lighting - Lay-in 6EA8 $952
Stairs - Terrazzo 6LF104 $965
Walls - Concrete Block 6SF6,120 $17,941
Vertical Conveyance
Elevator - Hydraulic Elevator 6EA1 $19,238
Building Interior Subtotal: $217,660
Total Building Cost $3,217,353
Building: 4-Classroom Modular
Category: Building Exterior
Item - Type Quantity Unit Rank Cost Group
Entrance
Exterior Doors - Exterior Steel Door 6EA4 $1,922
Exterior Stairs - Concrete 6LF6 $491
Stair Handrail - Steel_Stair Handrail 7LF35 $0
Foundation
Foundation - Masonry 7LF280 $0
Superstructure - Steel 7SF4,900 $0
Lighting
Exterior Lighting - Wall Mounted 5EA3 $1,282
Exterior Lighting - Wall Mounted 6EA3 $866
Roof System
Coping - Metal 6LF270 $10,127
Coping - Metal 7LF280 $0
Downspouts - Exterior Downspouts 6LF190 $6,314
Roof - EPDM/ Synthetic Rubber 6SF4,900 $41,481
Page 12 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: 4-Classroom Modular
Category: Building Exterior
Item - Type Quantity Unit Rank Cost Group
Roof System
Roof Structure - Steel / Metal Deck/ Concrete Topping 7SF4,900 $0
Walls
Exterior Walls - Prefabricated Metal Panel Wall 6SF2,670 $15,158
Windows
Guard - Guards wire guard 6SF320 $4,086
Windows - Sash Aluminum Double-pane 6SF320 $2,389
Building Exterior Subtotal: $84,117
Building: 4-Classroom Modular
Category: Electrical System
Item - Type Quantity Unit Rank Cost Group
Emergency System
Emergency Battery Packs - Corridors and Stairs 6EA12 $2,430
Exit Signs - Corridors and Stairs 6EA6 $898
Security System - CCTV 6SF4,900 $1,471
Security System - Intrusion Detection 6SF4,900 $1,261
Main Service
Independent Electrical Service for emergency power 6EA1 $2,921
PA System 6SF4,900 $1,612
Power Distribution
Lighting and Power Panels - Above 100 A 7EA2 $0
Electrical System Subtotal: $10,594
Building: 4-Classroom Modular
Category: Safty System
Item - Type Quantity Unit Rank Cost Group
Fire Alarm
Fire Alarm Panel 6EA1 $6,406
Fire Alarm Strobe Lights 6SF4,900 $1,752
Fire Alarm_System 6SF4,900 $2,382
Sprinkler System
Sprinkler Heads 7SF4,900 $0
Page 13 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: 4-Classroom Modular
Category: Safty System
Item - Type Quantity Unit Rank Cost Group
Sprinkler System
Sprinkler Piping 6SF4,900 $911
Wet Sprinkler System 6SF4,900 $1,261
Safty System Subtotal: $12,712
Building: 4-Classroom Modular
Category: Mechanical System
Item - Type Quantity Unit Rank Cost Group
Temperature Control
Electric Thermostat 6EA4 $0
Unit Ventilation
Unit Ventilators - Vertical Package Electric Heat & Self Contained Cooling 6EA4 $0
Ventilation
Exhaust Fans- Roof Mounted - 500 - 1500 CFM 6EA5 $2,962
Mechanical System Subtotal: $2,962
Building: 4-Classroom Modular
Category: Plumbing System
Item - Type Quantity Unit Rank Cost Group
Hot Water
Electric Heater - Less than 20 KW 6EA1 $682
Piping
Domestic Piping-Cold Water Horizontal Lines 6SF4,900 $1,191
Domestic Piping-Hot Water Horizontal Lines 6SF4,900 $911
Sanitary Piping 6SF4,900 $4,484
Storm Piping 6SF4,900 $4,274
Vent Piping 6SF4,900 $3,293
Plumbing System Subtotal: $14,836
Building: 4-Classroom Modular
Category: Classrooms
Item - Type Quantity Unit Rank Cost Group
Page 14 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: 4-Classroom Modular
Category: Classrooms
Item - Type Quantity Unit Rank Cost Group
Pre School (4 rooms)
Ceiling - Lay-in 6SF3,200 $9,610
Doors - Wood Doors inclu hw 6EA4 $1,204
Floor - Tile/Sheet 6SF3,200 $3,203
Lighting - Chandelier, Incandescent 4EA3 $3,170
Lighting - Chandelier, Incandescent 6EA1 $478
Lighting - Lay-in 7EA64 $0
Marker Board 6LF12 $257
Marker Board 7LF24 $0
Storage/ Closet 6SF304 $2,204
Walls - Vinyl Coated Gypsum Panel 6SF3,320 $9,163
Classrooms Subtotal: $29,288
Building: 4-Classroom Modular
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost Group
Mechanical/ Service Rooms
Mechanical/ Service Rooms 6SF52 $373
Restroom
Accessories 6SF323 $2,979
Ceiling - Plaster/Drywall 6SF323 $1,118
Doors - Wood Doors inclu hw 6EA2 $602
Floor - Tile/Sheet 6SF323 $323
Floor Drain 6EA2 $2,118
Hand Dryer 6EA2 $460
Lavatory 6EA4 $1,278
Lighting - Pendent/Surface 7EA3 $0
Partitions 6EA7 $2,078
Urinals 6EA2 $672
Walls - Vinyl Coated Gypsum Panel 6SF907 $2,503
Water Closet 6EA6 $2,016
Rooms (Other Than Classrooms) Subtotal: $16,521
Building: 4-Classroom Modular
Category: Building Interior
Page 15 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Category: Building Interior
Item - Type Quantity Unit Rank Cost Group
Corridor
Ceiling - Lay-in 6SF628 $1,886
Doors - Steel Doors incl hw 6EA4 $1,204
Drinking Fountains - Single Fountain 6EA2 $551
Floor 6SF628 $0
Lighting - Lay-in 7EA7 $0
Walls - Vinyl Coated Gypsum Panel 6SF1,421 $3,922
Safety
Security Cameras 6EA2 $388
Building Interior Subtotal: $7,951
Total Building Cost $178,982
Building: Branch
Category: Building Exterior
Item - Type Quantity Unit Rank Cost Group
Entrance
Entrance Control - Audio 5EA1 $994
Entrance Control - Audio and Video 6EA1 $702
Exterior Doors - Exterior Steel Door 6EA6 $2,883
Exterior Doors - Overhead Rolling/ Garage Door 5EA1 $3,942
Exterior Doors - Store Front 6EA2 $1,092
Exterior Doors - Transom Lite 6EA1 $313
Exterior Doors - Transom Lite 7EA1 $0
Exterior Stairs - Stone 6LF24 $2,712
Fire Escape
Fire Escape 6LF26 $16,426
Foundation
Foundation - Masonry 7LF435 $0
Superstructure - Heavy Timber 7SF23,318 $0
Lighting
Exterior Lighting - Wall Mounted 6EA11 $3,176
Roof System
Chimney - Brick Chimney- Concrete/ Mortar Liner 7LF45 $0
Coping - Stone 6LF410 $13,168
Coping - Terra Cotta 6LF109 $3,501
Page 16 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Branch
Category: Building Exterior
Item - Type Quantity Unit Rank Cost Group
Roof System
Downspouts - Exterior Downspouts 6LF250 $8,308
Parapet - 16" - 30" Height 6LF387 $15,462
Parapet - Parapet < 16" Height 6LF72 $1,534
Parapet - Parapet > 30" 6LF60 $3,835
Roof - Asphalt Gravel Ballast 6SF2,241 $22,785
Roof - Modified Bitumen 6SF6,588 $61,989
Roof Structure - Heavy Timber 7SF8,829 $0
Walls
Canopy - Concrete/ Stucco 6SF86 $2,846
Cornice - Masonry Projecting Limestone 6LF676 $23,442
Exterior Walls - Brick 6SF20 $182
Exterior Walls - Brick 7SF15,936 $0
Exterior Walls - Concrete Block 7SF50 $0
Exterior Walls - Stone-Cast 7SF300 $0
Windows
Guard - Guards perforated 6SF362 $4,623
Lintels - Brick 7LF160 $0
Lintels - Steel 7LF392 $0
Windows - Casement Aluminum Double-pane 6SF360 $2,687
Windows - Casement Steel 6SF80 $597
Windows - Decorative 6SF1,828 $13,645
Windows - Louver 6SF16 $119
Windows - Sash Aluminum 6SF1,008 $7,524
Windows - Sash Lexan 5SF117 $3,435
Building Exterior Subtotal: $221,923
Building: Branch
Category: Electrical System
Item - Type Quantity Unit Rank Cost Group
Emergency System
Automatic Transfer Switch 6EA1 $408
Emergency A/C Power - Corridors and Stairs 6SF2,191 $658
Emergency A/C Power - Lunchrooms 6SF3,937 $1,464
Emergency Battery Packs - Corridors and Stairs 6EA12 $2,430
Emergency Battery Packs - Lunchrooms 6EA4 $810
Page 17 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Branch
Category: Electrical System
Item - Type Quantity Unit Rank Cost Group
Emergency System
Emergency Battery Packs - Students Toilets 6EA2 $405
Exit Signs - Corridors and Stairs 6EA6 $898
Exit Signs - Lunchroom 6EA3 $449
Security System - CCTV 6SF23,318 $7,002
Security System - Intrusion Detection 6SF23,318 $6,002
Main Service
Independent Electrical Service for emergency power 6EA1 $2,921
PA System 6SF23,318 $7,669
Power Distribution
Lighting and Power Panels - 100 A 6EA2 $598
Lighting and Power Panels - Above 100 A 6EA2 $994
Main Distribution Panels - 400 - 600 amp 6EA1 $528
Electrical System Subtotal: $33,237
Building: Branch
Category: Safty System
Item - Type Quantity Unit Rank Cost Group
Fire Alarm
Fire Alarm Panel 7EA1 $0
Fire Alarm Strobe Lights 6SF23,318 $8,336
Fire Alarm_System 6SF23,318 $11,337
Sprinkler System
Sprinkler Heads 7SF23,318 $0
Sprinkler Piping 7SF23,318 $0
Wet Sprinkler System 7SF23,318 $0
Safty System Subtotal: $19,673
Building: Branch
Category: Mechanical System
Item - Type Quantity Unit Rank Cost Group
Air Handling Systems
Air Handling Unit- Package Single Zone- Indoor- Steam Coils - 4000-8000 cfm 6EA1 $3,350
Air Intake 7EA1 $0
Page 18 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Branch
Category: Mechanical System
Item - Type Quantity Unit Rank Cost Group
Air Handling Systems
Boiler Systems
Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - Less than 50 HP 6EA1 $2,046
Chemical Feed System 6EA1 $1,078
Chemical Feeder 6EA1 $1,078
Combustion Dampers 7EA1 $0
Condensate Pump 6EA1 $2,021
Non Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - Less than 50 HP 6EA1 $2,046
Piping - Condensate Pipe- Steel 5LF200 $2,440
Piping - Steam Pipe- Steel 5LF200 $2,817
Steam Traps 5EA49 $64,430
Heating Devices
Radiators - Steam 5EA37 $61,987
Temperature Control
Electric Controls 6SF23,316 $0
Electric Thermostat 6EA1 $0
Ventilation
Exhaust Fans- Roof Mounted - Less than 500 CFM 6EA1 $296
Type II Exhaust Hood- Warming Kitchen 2EA1 $9,916
Mechanical System Subtotal: $153,505
Building: Branch
Category: Plumbing System
Item - Type Quantity Unit Rank Cost Group
Hot Water
Gas Heater - Less than 150000 BTU/HR 5EA1 $2,249
Piping
Domestic Piping-Cold Water from Risers to Fixtures 6SF23,318 $4,668
Domestic Piping-Cold Water Horizontal Lines 6SF23,318 $5,669
Domestic Piping-Cold Water Risers 6SF23,318 $4,335
Domestic Piping-Hot Water from Risers to Fixtures 6SF23,318 $3,668
Domestic Piping-Hot Water Horizontal Lines 6SF23,318 $4,335
Sanitary Piping 6SF23,318 $21,341
Storm Piping 6SF23,318 $20,340
Page 19 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Branch
Category: Plumbing System
Item - Type Quantity Unit Rank Cost Group
Piping
Vent Piping 6SF23,318 $15,672
Plumbing System Subtotal: $82,277
Building: Branch
Category: Classrooms
Item - Type Quantity Unit Rank Cost Group
Library (1 room)
Casework 6LF12 $303
Ceiling - Plaster/Drywall 6SF593 $2,052
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Tile/Sheet 6SF593 $594
Lighting - Pendent/Surface 6EA9 $1,115
Walls - Plaster/Drywall 5SF50 $255
Walls - Plaster/Drywall 6SF1,269 $3,502
Regular Classroom (9 rooms)
AC Units 6EA6 $2,973
Ceiling - Plaster/Drywall 6SF7,802 $27,000
Chalk Board 4LF8 $734
Doors - Transom Window 6SF124 $2,099
Doors - Wood Doors inclu hw 6EA10 $3,010
Floor - Tile/Sheet 6SF7,802 $7,810
Lighting - Pendent/Surface 6EA50 $6,195
Lighting - Pendent/Surface 7EA108 $0
Marker Board 6LF84 $1,799
Marker Board 7LF190 $0
Storage/ Closet 6SF270 $1,958
Walls - Plaster/Drywall 5SF158 $807
Walls - Plaster/Drywall 6SF15,928 $43,960
Classrooms Subtotal: $106,467
Building: Branch
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost Group
Page 20 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Branch
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost Group
Administrative Suites/Offices
Ceiling - Plaster/Drywall 6SF1,944 $6,727
Doors - Wood Doors inclu hw 6EA4 $1,204
Floor - Carpet 6SF390 $831
Floor - Tile/Sheet 6SF1,554 $1,556
Lighting - Pendent/Surface 6EA38 $4,708
Power Distribution 7EA30 $0
Storage/ Closet 6SF30 $218
Walls - Metal Panel 6SF1,000 $7,465
Walls - Plaster/Drywall 5SF50 $255
Walls - Plaster/Drywall 6SF2,739 $7,559
Kitchen
Ceiling - Plaster/Drywall 6SF351 $1,215
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Tile/Sheet 6SF351 $351
Lighting - Pendent/Surface 6EA6 $743
Storage/ Closet 6SF50 $363
Walls - Plaster/Drywall 6SF742 $2,048
Lunch & Multipurpose Room
Ceiling - Plaster/Drywall 6SF3,937 $13,624
Doors - Steel Doors incl hw 6EA2 $602
Floor - Tile/Sheet 6SF3,937 $3,941
Lighting - Pendent/Surface 6EA29 $3,593
Serving Line 6LF8 $476
Stage 6SF298 $1,722
Storage/ Closet 6SF270 $1,958
Walls - Metal Panel 6SF500 $3,732
Walls - Plaster/Drywall 6SF1,175 $3,243
Mechanical/ Service Rooms
Boiler Room 6SF450 $3,224
Janitor's Closet 6SF30 $215
Storage Room 6SF450 $3,224
Restroom
Accessories 6SF604 $5,571
Ceiling - Lay-in 6SF133 $399
Ceiling - Plaster/Drywall 6SF471 $1,630
Page 21 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Branch
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost Group
Restroom
Doors - Wood Doors inclu hw 6EA3 $903
Floor - Tile Ceramic/ Porcelain 6SF471 $997
Floor - Tile/Sheet 6SF133 $133
Floor Drain 6EA2 $2,118
Hand Dryer 6EA4 $920
Lavatory 5EA1 $1,590
Lavatory 6EA7 $2,237
Lighting - Pendent/Surface 6EA4 $496
Partitions 6EA6 $1,782
Urinals 6EA3 $1,008
Walls - Concrete Block 6SF346 $1,014
Walls - Structural Glazed Tile 6SF859 $2,702
Water Closet 6EA9 $3,024
Rooms (Other Than Classrooms) Subtotal: $101,621
Building: Branch
Category: Building Interior
Item - Type Quantity Unit Rank Cost Group
Corridor
Ceiling - Plaster/Drywall 6SF1,900 $11,765
Ceiling - Splined 6SF157 $454
Doors - Steel Doors incl hw 6EA1 $301
Doors - Store Front 6EA2 $2,416
Doors - Transom Window 6EA15 $254
Drinking Fountains - Single Fountain 6EA1 $276
Floor - Tile Ceramic/ Porcelain 6SF85 $237
Floor - Tile/Sheet 6SF1,915 $1,041
Lighting - Lay-in 7EA1 $0
Lighting - Pendent/Surface 7EA17 $0
Stairs - Wood 6LF6 $70
Walls - Plaster/Drywall 6SF6,352 $28,158
Safety
Camera Viewing Station 6EA1 $683
Security Cameras 6EA5 $970
Page 22 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Building: Branch
Category: Building Interior
Item - Type Quantity Unit Rank Cost Group
Stairs
Ceiling - Plaster/Drywall 5SF15 $307
Ceiling - Plaster/Drywall 6SF390 $2,855
Floor - Tile/Sheet 6SF191 $104
Handrails 6LF150 $1,300
Lighting - Pendent/Surface 6EA1 $124
Lighting - Pendent/Surface 7EA2 $0
Lighting - Wall Mounted 7EA1 $0
Stairs - Rubber 6LF48 $516
Stairs - Tile 6LF18 $167
Walls - Plaster/Drywall 5SF350 $1,936
Walls - Plaster/Drywall 6SF2,435 $6,720
Building Interior Subtotal: $60,654
Total Building Cost $779,358
SITE
Category: Site
Item - Type Quantity Unit Rank Cost Group
Civil/Drainage
Civil/ Drainage - Catch Basin 6EA18 $19,689
Civil/ Drainage - Site Drain 6EA6 $1,862
Civil/ Drainage - Site Manhole 7EA13 $0
Fencing
Fencing - Chain Link 6LF1,215 $22,813
Fencing - New Standard Ornamental 6LF795 $25,363
Landscape
Benches 6EA6 $2,580
Landscape - Grass 6SF29,472 $24,444
Landscape - Hardscape- Concrete 6SF1,456 $7,516
Landscape - Hardscape- Pavers 6SF7,388 $41,837
Lighting - Pole Mounted 5EA4 $8,139
Lighting - Pole Mounted 6EA8 $8,670
Parkway trees 6EA14 $9,241
Planting Beds/ Area 6SF3,038 $4,996
Page 23 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
SITE
Category: Site
Item - Type Quantity Unit Rank Cost Group
Landscape
Play Area - Asphalt/ Hardscape 6SF1,363 $3,294
Retaining Wall - Concrete 7SF1,440 $0
Trash Receptacles 6EA1 $312
Parking Lot
Concrete Curbs 7LF2,862 $0
Interior Plantings 6LF140 $5,956
Lighting - Pole Mounted 5EA6 $16,784
Surface - Asphalt 6SF33,407 $80,735
Surface - Concrete 7SF992 $0
Trash Enclosure - Chain Links 6SF400 $7,018
Vehicular Screening 6LF418 $32,912
Playground
Equipment - Combo 3-12 6EA1 $7,092
Equipment - School Age 5-12 6EA1 $3,546
Equipment - Swingset 6EA1 $1,182
Surface - Square Rubber Mats 5SF100 $1,010
Surface - Square Rubber Mats 6SF4,261 $22,971
Sidewalks
Sidewalks - Internal Walks 6LF1,658 $19,916
Sidewalks - Perimeter Sidewalks 5SF400 $3,300
Sidewalks - Perimeter Sidewalks 6SF3,168 $6,297
Signage
Flag Pole - Flag Pole 6EA1 $1,657
Marquee - Free Standing Back Lighted 6EA1 $0
Monument - Sign 6EA1 $0
Site Subtotal: $391,131
Total Site Cost $391,131
Campus Total ² ³ $4,566,824
Page 24 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space
reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates;
it does not reflect a complete project cost.
³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are
estimates only and are based solely on the data that was collected as of the assessment date in the footer below.
¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in this report; by the time the report is compiled, they have been resolved.
Definitions
● Quantity
● Unit
means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because,
depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and
additional work triggered by building codes.
means, for each item, the total number (or amount) of that item that exists and was evaluated.
means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like
chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).
● Cost
● For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.
● Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to
alleviate overcrowding; these are viewed as separate capital needs.
Page 25 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Classroom Summary
Smart-
Board
Power
Strip
Window
Stop
Operable
Window
Area
Glazed
Window
Area
Noise
Level
Elect.
Outlets
Data
Outlets
Voice
Outlets
Area (SF)Floor Plan
Room
Number
Room
Number
Intended UsageCurrent Usage Room
Location
Main
NNN40841761421921113113Regular ClassroomArt Room 1st Floor
YYN402115440411,053215215Regular ClassroomComputer Lab 2nd Floor
NNN40181321021921103103Regular ClassroomKindergarten 1st Floor
NYN40181321021921105105Regular ClassroomKindergarten 1st Floor
NYN40181321021921115115Regular ClassroomMusic Room 1st Floor
NYN40361081021920101101Regular ClassroomRegular Classroom 1st Floor
NYN40361081021920102102Regular ClassroomRegular Classroom 1st Floor
NYN40361081021920104104Regular ClassroomRegular Classroom 1st Floor
NYN40361081021920106106Regular ClassroomRegular Classroom 1st Floor
NYN40181321021921107107Regular ClassroomRegular Classroom 1st Floor
NYN40361081021920108108Regular ClassroomRegular Classroom 1st Floor
NYN40361081021920110110Regular ClassroomRegular Classroom 1st Floor
NYN40361081021920112112Regular ClassroomRegular Classroom 1st Floor
NYN40361081021920114114Regular ClassroomRegular Classroom 1st Floor
NYN40361081021920116116Regular ClassroomRegular Classroom 1st Floor
NYN40361081021426201201Regular ClassroomRegular Classroom 2nd Floor
NYN40361081021920202202Regular ClassroomRegular Classroom 2nd Floor
NYN40181321021921203203Regular ClassroomRegular Classroom 2nd Floor
NYN40361081021920204204Regular ClassroomRegular Classroom 2nd Floor
NYN40181321021921205205Regular ClassroomRegular Classroom 2nd Floor
NYN40361081021920206206Regular ClassroomRegular Classroom 2nd Floor
NYN40181321021921207207Regular ClassroomRegular Classroom 2nd Floor
NYN40361081021920208208Regular ClassroomRegular Classroom 2nd Floor
NYN40181321021921209209Regular ClassroomRegular Classroom 2nd Floor
YYN40361081021920210210Regular ClassroomRegular Classroom 2nd Floor
NYN402115412211,048209 A211Regular ClassroomRegular Classroom 2nd Floor
NYN40361081021920212212Regular ClassroomRegular Classroom 2nd Floor
NYN40361081021920214214Regular ClassroomRegular Classroom 2nd Floor
NYN40361081021920216216Regular ClassroomRegular Classroom 2nd Floor
NYN402417640411,236213213Science Lab Level 3Science Lab Level 3 2nd Floor
NYN40361081021415201201ARegular ClassroomSpecial Education 2nd Floor
NYN4000621211224224Special EducationSpecial Education 2nd Floor
NYN40181321021921109109Regular ClassroomWeight 1st Floor
4-Classroom Modular
NYN4036761611800N/AM301Regular ClassroomPre School 1st Floor
NYN4036761611800N/AM302Regular ClassroomPre School 1st Floor
Page 26 of 27ZAPATA Assessment Date: 12/2/2015
Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623
Classroom Summary
Smart-
Board
Power
Strip
Window
Stop
Operable
Window
Area
Glazed
Window
Area
Noise
Level
Elect.
Outlets
Data
Outlets
Voice
Outlets
Area (SF)Floor Plan
Room
Number
Room
Number
Intended UsageCurrent Usage Room
Location
4-Classroom Modular
NNN4036761611800N/AM303Regular ClassroomPre School 1st Floor
NYN4036761611800N/AM304Regular ClassroomPre School 1st Floor
Branch
NNN40927820593NA404Regular ClassroomLibrary 1st Floor
NYN40251251021887NA401Regular ClassroomRegular Classroom 1st Floor
NNN4024721641739NA402Regular ClassroomRegular Classroom 1st Floor
NYN40301501021887NA403Regular ClassroomRegular Classroom 1st Floor
NYN4030901021876501501Regular ClassroomRegular Classroom 2nd Floor
NYN40402001021887502502Regular ClassroomRegular Classroom 2nd Floor
NYN4030901021876503503Regular ClassroomRegular Classroom 2nd Floor
NYN40301501021887504504Regular ClassroomRegular Classroom 2nd Floor
NYN4030901021876505505Regular ClassroomRegular Classroom 2nd Floor
NYN40301501021887506506Regular ClassroomRegular Classroom 2nd Floor
Page 27 of 27ZAPATA Assessment Date: 12/2/2015