Emulsion Full Depth Reclamation and Granular Base Stabilization – An Engineered Approach 47 th Idaho Asphalt Conference Rocktober 25 th , 2007 Full Depth Reclamation (FDR) Full Depth Reclamation (FDR) What is it? Rehabilitation technique in which the full thickness of the asphalt pavement and a predetermined portion of the underlying materials are uniformly pulverized and blended to provide as upgraded, homogeneous material. Emulsion Full Depth Reclamation Process Spray Bar Overlay/Seal Granular base 6-10 inch emulsion stabilized material Soil What is Granular Base St bili ti (GBS)? Stabilization (GBS)? FDR, hold the RAP Simply – Full Depth Reclamation without any Recycled Asphalt Pavement. Just treatment of the Base Material.

Upload: trankhanh

Post on 03-Aug-2019

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Emulsion Full Depth Reclamation Process What is Granular .... Wayne_FDR... · FDR and GBS Granular pavement FDR and GBS needing upgrading Overlay GBS Emulsion stabilized material

Emulsion Full Depth Reclamation and pGranular Base Stabilization – An Engineered Approachg pp

47th Idaho Asphalt ConferenceRocktober 25th, 2007

Full Depth Reclamation (FDR)Full Depth Reclamation (FDR)What is it?Rehabilitation technique in which the full thickness of the asphalt pavement and a p ppredetermined portion of the underlying materials are uniformly pulverized and blended to provide as upgraded, p pg ,homogeneous material.

Emulsion Full Depth Reclamation Process

Spray p yBar

Overlay/Seal

Granular base

6-10 inch emulsion stabilized material

Soil

What is Granular Base St bili ti (GBS)?Stabilization (GBS)?

FDR, hold the RAPSimply – Full Depth Reclamation without p y pany Recycled Asphalt Pavement. Just treatment of the Base Material.

Page 2: Emulsion Full Depth Reclamation Process What is Granular .... Wayne_FDR... · FDR and GBS Granular pavement FDR and GBS needing upgrading Overlay GBS Emulsion stabilized material

FDR and GBSGranular pavement

FDR and GBS

needing upgrading

OverlayGBS

OverlayEmulsion stabilized material (4-10 inches)

Bituminous pavement needing repair

Granular base

Soilg p

FDRFDR

What is FDR?

Aggregate Base

HMA

Aggregate Base

Subgrade

T pes of Stabili ationTypes of StabilizationMechanical stabilization - 1st step inMechanical stabilization 1st step in

reclamation; also used to describe FDR without addition of a binder (Pulverization)

Chemical stabilization - FDR with chemical additive (Calcium or Magnesium Chloride, Lime, Fly Ash, Kiln Dust, Portland Cement, etc.)

Bituminous stabilization - FDR with asphalt emulsion, emulsified recycling agent, or foamed / d d h lt dditi/ expanded asphalt additive

Combination stabilization -Any 2 or more of aboveAny 2 or more of above

What types of Pavement Distresses b t t d ith FDR?can be treated with FDR?

CrackingPoor Ride QualityPoor Ride QualityPermanent DeformationsPoorly BondedPoorly BondedPoor SurfaceShoulder Drop OffInadequate Structure Capacityq p y

Page 3: Emulsion Full Depth Reclamation Process What is Granular .... Wayne_FDR... · FDR and GBS Granular pavement FDR and GBS needing upgrading Overlay GBS Emulsion stabilized material

Where do you get into trouble ith FDR?with FDR?

Poor DrainagePoor DrainagePoor DrainagePoor Drainage

Things to consider in designing FDR P j t?an FDR Project?

Historical InformationHistorical InformationPavement AssessmentStructural Capacity AssessmentStructural Capacity AssessmentMaterial Properties AssessmentGeometryGeometryTrafficConstructability AssessmentConstructability AssessmentEnvironmental ImplicationsE i A tEconomic Assessment

Mi DesignMix Design

Emulsion CompatibilityPerformancePerformanceAASHTO and ASTM Testing that directly relate to performance characteristics ofrelate to performance characteristics of the roadValidated by extensive field testing andValidated by extensive field testing and experience in many states

Structural Coefficients, AASHTO Example

Existing Road Material

Very Dirty Rounded Agi h i

Med Quality Agd i

High Quality Agi h

AASHTO Example

Base TreatmentVery Dirty High Fines Med. Fines High RAP

Untreated < 0.10 0.10 - 0.12 0.12 - 0.14 ≥ 0.14

Hydrated Lime 0.12 0.14 N/A N/A

Cement (CTB) (soil cement) 0.14 - 0.23depends on % cement & material; lower for less cracking

Emulsion (Solvent Bearing)* 0.12 0.12 - 0.16 0.16 - 0.20 0.20 - 0.23

Engineered GBS N/A 0.18 - 0.20 0.21 - 0.22

Engineered FDR N/A 0 22 0 24 0 25 0 28Engineered FDR N/A 0.22 - 0.24 0.25 - 0.28

Foam* 0.25

Cold-In-Place Recycling (CIR)

0.28 - 0.33+(CIR)HMA, NovaChip® 0.34 - 0.40 0.40 - 0.44* Values are from the literature. All values here

generalized; each agency has own point of view.Engineered process values validated by FWD

Coefficients depend upon:1. Material quality2. Passing the mix design criteria3. Passing quality control requirements

Page 4: Emulsion Full Depth Reclamation Process What is Granular .... Wayne_FDR... · FDR and GBS Granular pavement FDR and GBS needing upgrading Overlay GBS Emulsion stabilized material

Specifications and Mix Design GuidelinesGuidelines

Performance ParameterCriteria

Determine if appropriate early curing is occurring

Short Term Strength byCohesiometer ASTM D1560

Relative indicator of quality

Resistance to moisture damageRetained Strength - ITS ASTM D4867

I di t T il T t (IDT)

Relative indicator of qualityStrain or deflection w/ applied

load for structural design

Resilient Modulus ASTM D4123

Thermal cracking resistanceIndirect Tensile Test (IDT) AASHTO T 322

R li bilitConstruction QA/QC ReliabilityQ /QRequirements

E i d E l i T h lEngineered Emulsion Technology

Formulated for: Chemical break /SolventlessSolventless

Earlier strength than conventional emulsionsemulsionsAdhesion characteristicsResistant to moisture damageDispersion

Engineered Emulsion Technology, tcont.

Formulated for: High asphalt

t tcontent Good dispersion with higher film thicknessD blDurableFlexible

Climate-specific pbinderFormulated for each FDR projecteach FDR project

The P ocessThe Process

Padfoot Roller Wheel Roller Steel RollerReclaimer

Blade

Water Truck

Page 5: Emulsion Full Depth Reclamation Process What is Granular .... Wayne_FDR... · FDR and GBS Granular pavement FDR and GBS needing upgrading Overlay GBS Emulsion stabilized material

Construction Production RatesConstruction Production Rates

Typical production ratesReclaimer rate (~30-90 ft/min)( )Daily production approximately 0.5 - 0.75 centerline miles (reclaimer)

Q alit Cont olQuality ControlSpecific tests & testing frequency determined by p g q y yagency & road requirements

Water content

Depth

Top size

Emulsion content

Compaction

M difi d P t fModified Proctor for target density

Traffic return

Pioneer Parkway, Santa Clara City, UtahFull Depth Recycling with Engineered Emulsion p y g g

FDR

August 2007

Pioneer Parkway, Santa Clara City, Utah y, y,Project Location

Pioneer Parkway

Page 6: Emulsion Full Depth Reclamation Process What is Granular .... Wayne_FDR... · FDR and GBS Granular pavement FDR and GBS needing upgrading Overlay GBS Emulsion stabilized material

Project BackgroundProject Background

Pioneer Parkway, Santa Clara City, UTPioneer Parkway, Santa Clara City, UTFDR Project Limits: 1.2 MilesRoadway width is 28 feetRoadway width is 28 feetReclamation depth is 5.0”One lane in each directionContractor: A-T AsphaltContractor: A T Asphalt

T affic Vol meTraffic Volume2006 AADT: 4,310 vehicles per day2006 AADT: 4,310 vehicles per day w/10% Trucks

Existing Pavement ConditionExisting Pavement Condition

Primary Pavement Distress:Primary Pavement Distress:severe cracking - alligatoroxidationoxidation

Mix Design InformationMix Design Information

Roadway SamplesRoadway SamplesAsphalt Consistency – 2 to 2-1/2” depthExisting base depth 7 to 10 inchesExisting base depth – 7 to 10 inches

FDR Mix Design:3 2% t i j t d ith l i d i3.2% water was injected with reclaimer during pre-milling operation to ensure moisture content for proper compactionp4.5% FDR Engineered Emulsion injected with reclaimerCompacted to 97% of maximum field density

Page 7: Emulsion Full Depth Reclamation Process What is Granular .... Wayne_FDR... · FDR and GBS Granular pavement FDR and GBS needing upgrading Overlay GBS Emulsion stabilized material

FDR Construction ProcessFDR Construction Process

Emulsion

ReclaimerWirgen

EmulsionTruck

WR2000

Construction process (Cont.)Construction process (Cont.)

Establish Rolling Pattern, 3 rollersPadfoot Roller – Vibratory to ensure bottom up compactionPneumatic Rubber Tire Roller – Kneading ActionSteel Wheel Roller – Finishing of SurfaceSteel Wheel Roller Finishing of Surface

Use a Road Grader to maintain the desired smoothness of surface

C i t L l B iConvenience to Local BusinessesThe LocalThe Local Landscape Business and Rock Quarry were able to

iremain open for business withoutwithout interruption.

Their Quote, “It was nice of the city to select a process Q , y pthat did not interfere with our daily business.”

HMA Paving Operation

Paving of Roadway when moisture in

d t iprocessed mat is within specified tolerancestolerances.

Typically paving can take place within 2 to 3 days after the FDR process is completed. (This is climate and(This is climate and weather dependant.)

Page 8: Emulsion Full Depth Reclamation Process What is Granular .... Wayne_FDR... · FDR and GBS Granular pavement FDR and GBS needing upgrading Overlay GBS Emulsion stabilized material

Full DepthReclamation vs. Reconstruction

3” HMA over 5” FDRFDR: 10,950 S.Y. @

$5 35 $58 600

4” HMA over 10” UTBCRoad Ex: 10,220 CY @

$17 $173 750$5.35 = $58,600Emulsion: 300 Tons @

$575 = $172 100

$17 = $173,750UTBC: 14,200 Tons @

$16 = $227 100$575 = $172,100HMA: 4260 Tons @

$85 = $361,900

$16 = $227,100HMA: 5,680 Tons @

$85 = $482,550$ $ ,TOTAL: $592,600

$ $ ,TOTAL: $883,400

SAVINGS: $290,800 (33%)

A Cost Effective Way of Rehabilitating RoadwaysRehabilitating Roadways

Full Depth pReclamationFollowed with an HMA Overlay

Then Now!

S mmaSummaryFortress FDR/GBSo t ess /G S

Builds structure down into pavementSite assessment, sampling & mix design keys to successsuccessPerformance-related design tests & specs improve reliability & performance

Early StrengthCured StrengthCracking ResistancegMoisture ResistanceConstruction QualityQA / QCQ / Q

Thank You