Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
3
ENCLOSURE: 1- FORM-1
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
4
FORM 1
(I) Basic Information
S. No. Item Details
1. Name of the project/s Expansion of Formaldehyde and
Resin Manufacturing Plant
2. S. No. in the schedule 5 (f)
3. Proposed capacity/ area/length/ tonnage to
be handled/ command area/ lease area/
number of wells to be drilled
Capacity after Expansion:
Formaldehyde – 300 TPD
Resin – 300 TPD
4. New/ Expansion/ Modernization Expansion
5. Existing Capacity/ Area etc. Existing Capacity:
Formaldehyde – 150 TPD
Resin – 80 TPD
6. Category of Project i.e. ‘A’ or ‘B’ B
7. Does it attract the general condition? If yes,
please specify.
No
8. Does it attract the specific condition? If yes,
please specify.
Not Applicable
9. Location ELDECO SIDCUL Industrial Park
Sitarganj
Plot/ Survey/ Khasra No. PLOT NO. C-34, C-34 (a) to (d), C-
6(a), 6(b), C-3 & 5
Village
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
5
Tehsil Sitarganj
District Udham Singh Nagar
State Uttarakhand
10. Nearest railway station/ airport along with
distance in kms.
Railway Station – Lalkuan 20 Km W
Airport – Pant nagar 16 Km W
11. Nearest Town, city, District Headquarters
along with distance in kms.
Sitarganj, Kichha
US Nagar District Headquarters
12. Village Panchayats, Zilla Parishad, Municipal
Corporation, Local body (complete postal
addresses with telephone nos. to be given)
SIDCUL nodal agency of
Uttarakhand
13. Name of the applicant M/s Balaji Action Buildwell
14. Registered Address G-11, Udyog Nagar, Main Rohtak
Road, New Delhi - 110041
15. Address for correspondence: G-11, Udyog Nagar, Main Rohtak
Road, New Delhi - 110041
Name Mr. V.K. Aggarwal
Designation (Owner/Partner/ CEO) General Manager
Address Admin Block, C-34 A, ELDECO
SIDCUL Industrial Park Sitarganj,
Uttarakhand
Pin Code 110041
E-mail [email protected]
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
6
Telephone No. 9720168017
Fax No.
16. Details of Alternative Sites examined, if any.
Location of these sites should be shown on
a topo sheet.
None, as it is expansion of already existing unit.
17. Interlinked Projects Yes, it is interlinked project to the
MDF/HDF and particle board
manufacturing unit.
18. Whether separate application of interlinked
project has been submitted?
No
19. If yes, date of submission Not applicable
20. If no, reason No, because environmental
clearance is not required for
MDF/HDF and particle board
manufacturing unit.
21. Whether the proposal involves
approval/clearance under: if yes, details of
the same and their status to be given.
(a) The Forest (Conservation) Act, 1980?
(b) The Wildlife (Protection) Act, 1972?
(c) The C.R.Z. Notification, 1991?
Not Applicable
Not Applicable
Not Applicable
22. Whether there is any Government Order/
Policy relevant/ relating to the site?
No.
23. Forest land involved (hectares) Not Applicable
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
7
24. Whether there is any litigation pending
against the project and/ or land in which the
project is propose to be set up?
(a) Name of the Court
(b) Case No.
(c) Orders/ directions of the Court, if any and its relevance with the proposed project.
No
(II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will
cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate
quantities /rates, wherever
possible) with source of information
data
1.1 Permanent or temporary change in
land use, land cover or topography
including increase in intensity of land
use (with respect to local land use
plan)
Yes
This is expansion of existing
formaldehyde and resin
manufacturing unit. The existing
industry manufacture agro wood
based product for which glue and
formaldehyde required. Separate
environmental clearance has been
taken for formaldehyde & Resin
Plant and agro wood products are
exempted from Environmental
clearance. Now, due to increase in
demand of MDF/HDF board,
demand of formaldehyde and resin
increased. Environmental
Clearance had been granted for
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
8
Formaldehyde plant from SEIAA,
Uttarakhand for capacity 150 TPD
on plot area 5378.06 sqm. Also,
Environmental Clearance had been
granted for Glue plant for capacity
80 TPD on plot area 75452 sqm.
In expansion Formaldehyde plant
will be on the same plot area and
Glue plant will be on new plot
adjacent to the existing plot. As the
land itself in industrial area of
ELDECO SIDCUL Industrial area,
hence land use already been
changed to industrial unit.
Industrial sheds are already laid as
per CTE granted. After expansion
plot area will change to
3,37,351.12 sqm.
1.2 Clearance of existing land, vegetation
and buildings?
No No clearance is required, as the
project itself in ELDECO SIDCUL
Industrial area
1.3 Creation of new land uses? Yes New land has been purchased from
ELDECO SIDCUL by M/s Balaji
Action Buildcon. It is expansion of
existing unit, which will be install on
the new land adjacent to the
existing land. Land is in ELDECO
SIDCUL Industrial area, hence land
use already been changed for
industrial purpose. Industrial sheds
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
9
are already laid as per the CTE
granted.
1.4 Pre-construction investigations e.g.
bore houses, soil testing?
No Preconstruction soil investigation
has already been carried out.
1.5
Construction works? Yes Construction for expansion will be
done as per approved Plan.
1.6 Demolition works? No Not Required
1.7 Temporary sites used for construction
works or housing of construction
workers?
No During expansion of proposed
plant, 100 Nos. of contractor’s
labour will be engaged.
As it is an expansion project of
already existing unit 28 No. of
employees are working after
expansion population will 52.
Employees shall work in shifts and
thus there will be no need of
housing conditions for staff/labour.
1.8 Above ground buildings, structures or
earthworks including linear structures,
cut and fill or excavations
Yes Processing section building shall be
made at above ground level for
expansion also.
1.9 Underground works including mining
or tunnelling?
No Not applicable
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
10
1.13 Production and manufacturing
processes?
Yes Production details of both existing
and proposed are given in Pre-
Feasibility Report.
1.14 Facilities for storage of goods or
materials?
Yes All the raw material shall be stored
in leak proof MS/SS tanks at a
secured and contained location
with proper safety measures.
Storage for raw material and
proper storage of product with
exhaust system and control
measures shall be done.
Storage of all chemicals shall not
exceed their threshold limit.
This shall be done with compliance
to MSIHC Rules, 1989.
1.15 Facilities for treatment or disposal of
solid waste or liquid effluents?
No Three types of solid waste shall be
generated from the proposed unit,
Municipal waste, process waste &
Hazardous waste.
Municipal solid waste: In existing
unit approx. 4 kg/day of municipal
waste is being generated. Total 7.3
kg/day Municipal solid waste will be
generated after expansion out of
which 5.3 kg/day of Bio-Degradable
waste will be sent to waste
management site of industrial area,
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
11
Recyclable Waste of 2 Kg/day shall
be given to Authorized Recycler.
Hazardous waste generated
includes Used oil/ ETP sludge and
liners contaminated with
hazardous wastes/ chemicals. The
industry has agreement with M/s
Bharat oil & Waste Management
Ltd for hazardous waste
management and disposal.
Industrial process wastes include
formaldehyde sediments which is
being disposed off at TSDF
approves sites and urea bag and
electrolyte sediments which
includes silver and mud which is
being given to approved recycler.
Same shall be done after
expansion.
Details are given in pre-feasibility
Report.
Total waste water generated in
existing unit is 40.8 KLD (0.8 KLD
Domestic and 40 KLD Trade Effluent)
& after expansion it will increase to
81.6 KLD (80 KLD from Trade Effluent
and 1.6 KLD from Domestic). In
existing plant, 300 KLD STP has
already been provided to treat
domestic waste. The effluent in
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
12
existing is being treated in existing
500 KLD ETP, treated waste from
the ETP is being reuses in the plant.
After expansion, existing ETP & STP
shall be reused and also it will
remain a zero-liquid discharge unit.
Detail is given in Pre-feasibility
Report.
1.16 Facilities for long term housing of
operational workers?
No In existing plant, all the staff
members work in shifts and same
will continue after expansion, thus
there will be no need of housing for
staff.
1.17 New road, rail or sea traffic during
construction or operation?
No Not applicable
1.18 New road, rail, air waterborne or other
transport infrastructure including new
or altered routes and stations, ports,
airports etc?
No Not applicable
1.19 Closure or diversion of existing
transport routes or infrastructure
leading to changes in traffic
movements?
No No such closure or diversion of
existing transport is required.
1.20 New or diverted transmission lines or
pipelines?
No No new or diversion of
transmission lines or pipelines will
be done.
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
13
1.21 Impoundment, damming, culverting,
realignment or other changes to the
hydrology of watercourses or
aquifers?
No No impoundment, damming,
culverting, realignment or other
changes to the hydrology of surface
watercourse is required.
1.22 Stream crossings?
No No stream crossing the site.
1.23 Abstraction or transfers of water from
ground or surface waters?
Yes Source of Water: Ground Water
Existing: 208 KLD of ground water
is being used in the process and
domestic use.
After Expansion: 447 KLD of
ground water shall be used in the
process and domestic use.
Application for the borewell
permission already applied in
CGWA.
1.24 Changes in water bodies or the land
surface affecting drainage or run-off?
No There will be no changes in water
bodies or the land surface effective
drainage or run-off.
1.25 Transport of personnel or materials for
construction, operation or
decommissioning?
Yes In existing unit, all raw materials
are transported using road trucks
from various parts of India and
imported raw materials are
transported using ship and then
road trucks. All the finished
products are transported using
road trucks to various parts of India
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
14
and ship for exports. Same will be
continue after expansion.
1.26 Long-term dismantling or
decommissioning or restoration
works?
No Not Applicable
1.27 Ongoing activity during
decommissioning which could have an
impact on the environment?
No Not Applicable.
1.28 Influx of people to an area in either
temporarily or permanently?
No There will be temporary influx of
100 nos. per day of labour for
installing the unit during expansion.
During operational phase, there is
already temporary influx of approx.
28 people in existing unit, after
expansion of unit there will be
influx of approx. 52 people.
1.29 Introduction of alien species?
No There is no alien species at the
proposed site.
1.30 Loss of native species or genetic
diversity?
No No loss of native species or genetic
diversity.
1.31 Any other actions? No None
2. Use of Natural resources for construction or operation of the Project (such as land, water,
materials or energy, especially any resources which are non-renewable or in short
supply):
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
15
S. No Information/checklist
confirmation
Yes/No Details thereof (with approximate quantities /rates,
wherever possible) with source of information data
2.1 Land especially
undeveloped or
agricultural land (ha)
No No undeveloped and agriculture land.
2.2 Water (expected source &
competing users) unit:
KLD
Yes Source of Water: Ground Water.
After Expansion, total water required will be 782
KLD, from which 447 KLD shall be taken from the
ground water and 335 KLD of treated water from
the ETP & STP in the premises.
2.3 Minerals (MT) No Not applicable
2.4 Construction material –
stone, aggregates, sand /
soil (expected source –
MT)
Yes For construction of expansion part, material like
cement, bricks, aggregate etc. shall be bought from
local market.
2.5 Forests and timber
(source – MT)
Yes Wood for Doors, windows will be used.
2.6 Energy including electricity
and fuels (source,
competing users) Unit:
fuel (MT), energy (MW)
Yes Existing:
Connected load– 319 KW
Proposed:
Connected Load– 325 KW
Total:
Connected load– 644 KW
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
16
The electricity is being provided by Uttarakhand
Power Corporation Ltd.
D.G. sets capacity for power back-up: existing – 320
KVA & Proposed – 320 KVA
Fuel Consumption per day
Existing Proposed Total
Diesel Litres/hr 70 70 140
2.7 Any other natural
resources (use
appropriate standard
units)
Yes Solar lights will be installed for lighting in the road
area.
3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.
S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate
quantities/rates, wherever
possible) with source of
information data
3.1 Use of substances or materials, which
are hazardous (as per MSIHC rules) to
human health or the environment
(flora, fauna, and water supplies)
Yes All the chemicals shall be stored
under threshold limit. All
provisions mentioned in MSDS
shall be complied.
Details of material and threshold
limit give in pre-feasibility report.
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
17
3.2 Changes in occurrence of disease or
affect disease vectors (e.g. insect or
water borne diseases)
No Suitable drainage and waste
management measures has been
adopted. This restricts stagnation
of water or accumulation of
water. No occurrence of Diseases
is anticipated.
3.3 Affect the welfare of people e.g. by
changing living conditions?
No The project affects the nearby
people in positive ways through
employment generation.
3.4 Vulnerable groups of people who
could be affected by the project e.g.
hospital patients, children, the elderly
etc.,
No No vulnerable group of people
will be affected by the project
3.5 Any other causes No None
4. Production of solid wastes during construction or operation or decommissioning (MT/month)
S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate
quantities/rates, wherever
possible) with source of
information data
4.1 Spoil, overburden or mine wastes No Not applicable
4.2 Municipal waste (domestic and or
commercial wastes)
Yes Municipal solid waste: Municipal
solid waste: In existing unit,
approx. 4 kg/day of municipal
waste is being generated. Total
7.3 kg/day Municipal solid waste
will be generated after expansion
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
18
out of which 5.3 kg/day of Bio-
Degradable waste will be
disposed -off at ELDECO industrial
area management site,
Recyclable Waste of 2 Kg/day
shall be given to Authorized
Recycler.
4.3 Hazardous wastes (as per Hazardous
Waste Management Rules)
Yes Hazardous waste generated
includes Used oil and ETP sludge.
The industry has agreement with
M/s Bharat oil & Waste
Management Ltd for hazardous
waste management and disposal.
Details are given in pre-feasibility
report.
4.4 Other industrial process wastes Yes Industrial process wastes include
formaldehyde sediments which is
being disposed off at approved
TSDF site at Mauza Makimpur,
Roorkee, Haridwar through M/s
Bharat Oil & Waste Management
Ltd.
It also includes urea bag and
electrolyte sediment which
include silver and mud which is
being given to approved recycler.
Same shall be done after
expansion.
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
19
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other sludge from
effluent treatment
Yes 131 kg/ month of ETP sludge shall
be generated which shall be given
to M/s Bharat oil & Waste
Management Ltd for
management and disposal.
4.7 Construction or demolition wastes Yes Construction waste generated
will be used to the extent
possible. Rest of the waste will be
sent to municipal landfill site.
4.8 Redundant machinery or equipment No Not applicable
4.9 Contaminated soils or other
materials
No Not applicable
4.10 Agricultural wastes
No Not applicable
4.11 Other solid wastes
No Not applicable
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate
quantities/rates, wherever
possible) with source of
information data
5.1 Emissions from combustion of fossil
fuels from stationary or mobile
sources
Yes The major air pollutants sources
are D.G. sets: existing - 320 KVA &
proposed - 320 KVA and Boiler of
capacity 2 TPH (existing) & 2 TPH
(proposed). For mitigation of
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
20
impacts of air pollution, stack
height of 10 m above ground
Level has been provided and
same shall be provided for
proposed DG sets.
Boiler is gas boiler, steam shall be
reused in the process. To control
the air emission stack height of
35 m above ground level has
been provided for 2 TPH boiler &
same shall be provided for
proposed 2 TPH boiler.
5.2 Emissions from production processes Yes Flue gasses is being generated in
the formaldehyde production
from reactor bed which contains
Nitrogen, Hydrogen, Carbon
dioxide, Carbon Monoxide which
is being used in boiler for steam
production. Same shall be done
in the expansion part.
Air Pollution Control Devices has
been installed in existing unit and
same will be done for expansion.
Detail of source and quantity of
emission, air pollution control
measures in existing and
proposed unit are given in Pre-
Feasibility Report.
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
21
5.3 Emissions from materials handling
including storage or transport
Yes Dust will be generated from the
movement of transport vehicles.
Water sprinklers will be used for
dust suppression.
5.4 Emissions from construction
activities including plant and
equipment.
Yes Dust is likely to be generated from
materials handling including
transportation. Water will be
sprinkled to reduce dust emission.
5.5 Dust or odours from handling of
materials including construction
materials, sewage and waste
Yes During loading & unloading of raw
material dust is likely to be
generated during construction
phase. Water will be sprinkled
and tarpaulin cover will be
provided over stored raw material
to reduce dust emission. Proper
ducts & vent pipe has been
provided in STP & shall be
provided in ETP to avoid odour.
Area has been properly ventilated
to avoid the odour.
5.6 Emissions from incineration of waste No Not applicable
5.7 Emissions from burning of waste in
open air (e.g. slash materials,
construction debris)
No Not applicable
5.8 Emissions from any other sources No Not applicable
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
22
S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate
quantities/rates, wherever
possible) with source of
information data with source of
information data 6.1 From operation of equipment e.g.
engines, ventilation plant, crushers
No All the machinery has in built
control for noise and vibration.
Noise generating equipment are
provided with enclosures and
vibration dampening. The D.G.
sets have been kept in
acoustically treated room. Ear
plugs & ear mufflers is being
provided to the workers. The
same shall be followed for
achiness & equipment for
expansion also.
6.2 From industrial or similar processes
No Heat is being dissipated from
Boiler during fuel burning.
Cooling tower has been installed.
6.3 From construction or demolition No Not required.
6.4 From blasting or piling No No blasting or piling will be done.
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
23
6.5 From construction or operational
traffic
Yes Some amount of noise will be
generated from vehicular
movement in the construction
and operational phase & will be
within permissible limit. Green
belt developed at the periphery
of the project site will act as
barrier to noise.
6.6 From lighting or cooling systems Yes From cooling tower, some noise
shall be generated. Proper
Management has been taken.
6.7 From any other sources No None
7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No. Information/Checklist confirmation Yes/No Details thereof (with
approximate quantities/rates,
wherever possible) with source
of information data
7.1 From handling, storage, use or
spillage of hazardous materials
Yes Raw material methanol is being
stored in leak proof MS tanks
and Leak proof RL/Zinc
Aluminum alloy tanks which are
provided for storage of finished
product formaldehyde. Same
shall be used for the expansion.
Used oil from machineries/D.G.
Set will be stored in Steel drums
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
24
and kept in proper rooms. It will
be sold to authorize vendors
only. Special care will be taken
to prevent leakages and spills.
Leak proof handling is practiced
including spillage control. To
prevent and control risk and
damage, all the raw material is
being stored in leak proof MS/SS
tanks at a secured and
contained location with proper
safety measures. MSDS is
displayed at all the prominent
sites.
7.2 From discharge of sewage or other
effluents to water or the land
(expected mode and place of
discharge)
No In existing 300 KLD STP & 500
KLD ETP has already been
provided to treat domestic
waste & process waste
respectively. Treated waste is
being reused in the premises for
cooling towers and gardening
purposed. After expansion,
same shall be maintained to
remain a zero-liquid discharge
unit.
7.3 By deposition of pollutants emitted to
air into the land or into water
No All spillage control measures
have been taken. All effluent is
channelized to ETP. In existing it
is a Zero Liquid Discharge Unit and
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
25
the same shall be maintained after
expansion also.
All the exhaust gas emissions
will be channelized all through
the process and will be reused
for various purposes like heating
& remained chemical utilization
and the remaining gases will
exhaust from one chimney and
shall contain only Nitrogen,
Hydrogen, Carbon dioxide,
Carbon Monoxide and traces of
Formaldehyde and Methanol.
7.4 From any other sources No None
7.5 Is there a risk of long term build-up of
pollutants in the environment from
these sources?
No None
8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S. No. Information/Checklist confirmation Yes/No Details thereof (with
approximate quantities/rates,
wherever possible) with source
of information data
8.1 From explosions, spillages, fires etc
from storage, handling, use or
production of hazardous substances
No Fire may result into loss of
machine and the damage by fire
my high economic losses. To
prevent and control this loss all
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
26
the raw material is being stored
in leak & fire proof MS/SS tanks
at a secured and contained
location with proper firefighting
system. Fire system and hydrant
also install in the premises.
8.2 From any other causes No None
8.3 Could the project be affected by
natural disasters causing
environmental damage (e.g. Floods,
earthquakes, landslides, cloudburst
etc)?
No The area under study falls in
Zone-IV, according to the Indian
Standard Seismic Zoning Map.
Suitable seismic coefficients in
horizontal and vertical directions
respectively, will be adopted
while designing the structure for
expansion.
9. Factors which should be considered (such as consequential development) which could
lead to environmental effects or the potential for cumulative impacts with other existing or
planned activities in the locality
S. No. Information/Checklist confirmation Yes/No Details thereof (with
approximate quantities/rates,
wherever possible) with source
of information data
9.1 Lead to development of supporting.
Lities, ancillary development or
development Stimulated by the
Yes
Roads, power network exists in
the area. STP & ETP already exist
at the site.
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
27
project which could have impact on
the environment e.g.:
• Supporting infrastructure (roads,
power supply, waste or waste water
treatment, etc.)
• Housing development
• Extractive industries
• Supply industries
• Other
9.2 Lead to after-use of the site, which
could have an impact on the
environment
No Proper care shall be taken to
avoid any adverse impact on the
environment.
9.3 Set a precedent for later
developments
Yes After expansion, also it will be an
Environmentally sustainable
project. It will attract people to
develop more organized similar
type of Industries.
9.4 Have cumulative effects due to
proximity to other existing or
planned projects with similar
effects
No No impact
(III) Environmental Sensitivity
S. No. Areas Name/
Identity
Aerial distance (within 15 km.)
Proposed project location boundary
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
28
1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value
None
None
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests
Water bodies:
Nanak Sagar Dam
Dhora Dam
Gola River
Sukhi/Baingul River
Kajlas River
Saryu/Deoha River
Forests
Gola Reserve Forest
Barkoli Reserve Forest
Forest patch near Dhainpur village
14.7 Km SE
14 Km SW
12 Km W
2.5 Km W
0.6 Km E
7 Km E
6 Km W
7.2 Km NW
6.5 Km SE
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration
Forests
Gola Reserve Forest
Barkoli Reserve Forest
Forest patch near Dhainpur village
Nandhaur Wildlife Sanctuary
6 Km W
7.2 Km NW
6.5 Km SE
11.82 Km NE
4 Inland, coastal, marine or underground waters
None None
5 State, National boundaries Uttar Pradesh
17.5 Km S
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
29
6 Routes or facilities used by the public for access
to recreation or other tourist, pilgrim areas
NH 125
Railway Station – Lalkuan
Airport – Pant Nagar
13 Km S
20 Km W
16 Km W
7 Defence installations None
None
8 Densely populated or built-up area
Sitarganj
Tegor Nagar
Nirmal Nagar
Sisona
12.5 Km S
3.96 Km
4.77 Km
5.57 Km
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities)
Government Hospital
Government College
13 Km SSE
4.8 SW
10 Areas containing important, high quality or scarce resources (Ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)
Water bodies:
Nanak Sagar Dam
Dhora Dam
Gola River
Sukhi/Baingul River
Kajlas River
Saryu/Deoha River
Forests
Gola Reserve Forest
Barkoli Reserve Forest
14.7 Km SE
14 Km SW
12 Km W
2.5 Km W
0.6 Km E
7 Km E
6 Km W
7.2 Km NW
6.5 Km SE
Expansion of Formaldehyde & Resin Manufacturing Unit M/s Balaji Action Buildwell
30
Forest patch near Dhainpur village
11 Areas already subjected to pollution or environmental damage. (Those where existing legal environmental standards are exceeded)
Existing Industrial Area
12 Areas susceptible to natural hazard which could cause the project to present environmental problems
(Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)
None
The project area falls in seismic zone –IV.