enclosure 2 - presentation for pre-submittal meeting - non

62
ENCLOSURE 2 M210134 Presentation for Pre-Submittal Meeting Non-Proprietary Information INFORMATION NOTICE Enclosure 2 is a non-proprietary version of the Presentation for Pre-Submittal Meeting from Enclosure 1, which has the proprietary information removed. Portions that have been removed are indicated by open and closed double brackets as shown here [[ ]].

Upload: others

Post on 18-Nov-2021

22 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

ENCLOSURE 2

M210134

Presentation for Pre-Submittal Meeting

Non-Proprietary Information

INFORMATION NOTICE Enclosure 2 is a non-proprietary version of the Presentation for Pre-Submittal Meeting from Enclosure 1, which has the proprietary information removed. Portions that have been removed are indicated by open and closed double brackets as shown here [[ ]].

Page 2: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

Non-Proprietary Information

LANCR02 (L02) Model and Qualification TRs – Revision 4

LANCR02/PANAC11 (P11) Application Methodology TR –Revision 0

NRC Pre-submittal MeetingSeptember 2021

Page 3: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

2LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

Safety Minute – Maintaining a Questioning Attitude

https://www.nytimes.com/2019/06/01/business/boeing-737-max-crash.html

Page 4: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

3LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

Original Agenda

Time Topic Speaker 9:00 am - 9:10 am Introductions GEH, NRC 9:10 am - 9:45 am LANCR Methods Topical Report (TR) and Qualification

TR Update Summary GEH

9:45 am - 10:15 am LANCR Qualification TR Revision Highlights GEH 10:15 am - 10:45 am LANCR/PANAC Application TR Strategy and Objectives GEH 10:45 am - 12:00 pm LANCR/PANAC Application TR Walk-through GEH 12:00 pm – 1:00 pm Questions/Discussions GEH, NRC 1:00 pm Adjourn

Agenda has been updated as discussed on slides that follow.

The same material will be covered, but more context on licensing approach will be provided before diving into details in any area.

Page 5: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

Agenda and Objectives

Non-Proprietary Information

Page 6: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

5LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

Updated Agenda and High-Level Meeting ObjectivesMeeting Agenda

• Part 1 – Methods Licensing Overview (~15 mins)

• Part 2 – LANCR02 and PANAC11 TRs Strategy and Objectives (~30 mins)

• Part 3 – LANCR02 Model and Qualification TR Update Summary (~45 mins)

• Part 4 – LANCR02/PANAC11 Application TR Introduction and Walkthrough (~90 mins)

Meeting Objectives

• Communicate how these submittals fit into the overall GNF Methods’ framework

• Describe the rationale for the TRs’ respective content and the strategy for their usage going forward

• Make the scope of the changes to the LANCR02 TRs clear while emphasizing the drivers for the changes

• Introduce the L02/P11 TR while connecting it to historical approaches and approvals

Page 7: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

Part 1:Methods Licensing Overview

Non-Proprietary Information

Page 8: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

7LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

Part 1 Content

• Technology Nomenclature and Change Drivers

• “Nuclear Methods” Submittal Status and Timeline

• “Downstream Methods” Submittal Strategy

Part 1 Objectives

• Clarify the scope of this submittal as it relates to overall GNF BWR analysis methodologies and near-term industry needs

• Communicate status of “Nuclear Methods” related submittals

• Introduce “Downstream Methods” scope and timeline for future communications. Obtain feedback on expected relative efficiency associated with implementation options.

Part 1 Duration

• ~15 minutes

Methods Licensing OverviewContent and Objectives

Page 9: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

8LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

Fuel Rod Thermal-Mechanical• Thermal Mechanical Behavior of Fuel Rod

• PRIME03 – Approved Production Tool

2D Lattice Physics• Nuclear Behavior of Fuel Rods Within Bundle

• TGBLA06 – Approved Production Tool• LANCR02 – Model and Qualification TRs Approved

3D Core Simulation• Nuclear + Thermal-Hydraulic Behavior of Bundles in

Core• PANAC11 – Approved Production Tool• AETNA02 – Internally Qualified, no TRs

3D Plant Simulation• Best Estimate Analysis of Operational Transients (ODYN

and TRACG)• Frequency Domain Analysis of Core Stability (ODYSY)

• TGBLA06/PANAC11 is GNF’s approved steady state nuclear methodology in use today

• GESTAR Amendment 26 – Initial Approval of T6/P11 following MFN# 098-96

• NEDC-33173-P-A (IMLTR) - Approval for Expanded Operating Domains

• IMLTR Supplements 2-6 – Removed penalties associated with IMLTR

• TGBLA06 application range limited w/r/t the next phase of fuel development (e.g., LEU+/HBU, Advanced Geometry, Non-Zirc Clad)

• LANCR02 approved [[

]]

Methods Licensing OverviewTechnology Nomenclature and Change Drivers

Downstream Methods

Nuclear Methods

Page 10: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

9LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

TR Development Status

Initial Studies and Automation Development

LANCR02 MTR and QTR Revision – Technical Compilation

LANCR02 MTR and QTR Revision – Design Review and Release

L02/P11 ATR Design Review Part 1 – Strategy and Scope Review

L02/P11 ATR Technical Development (~95% complete)

L02/P11 ATR – Technical Compilation

L02/P11 ATR Design Review Part 2 – Final Review and Release (~25% complete)

Submittal Timeline

• Pre-Submittal Meeting: 9/24/2021

• Submittal of LANCR MTR/QTR Revisions: [[ ]]

• Submittal of LANCR02/PANAC11 ATR: [[ ]]

Methods Licensing OverviewCurrent Status and Timeline

Page 11: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

10LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

• [[

]]

Methods Licensing OverviewDownstream Methods Submittal Strategy

Page 12: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

11LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

Methods Licensing OverviewDownstream Methods Submittal Strategy – “Method C” Introduction

[[

]]

Page 13: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

Part 2:LANCR02 and PANAC11 TRs

Strategy and Objectives

Non-Proprietary Information

Page 14: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

13LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

Part 2 Content

• PANAC11 Current Approval Bases and Supplemental Documentation

• The Case for Incremental Improvements

• Clarifying the present to build momentum for the future

Part 2 Objectives

• Clarify the current approval bases for PANAC11 while providing historical context on related documentation (“Where are we now?”)

• Explain the drivers that lead to this submittal (“How did we get here?”)

• Introduce the high-level documentation strategy for these TRs with an emphasis on what they need to enable to be considered successful (“Where do we go from here?”)

Part 2 Duration

• ~30 minutes

LANCR02 and PANAC11 TRs Strategy and ObjectivesContent and Objectives

Page 15: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

14LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 and PANAC11 TRs Strategy and ObjectivesPANAC11 Current Approval Bases and Supplemental Documentation

• The regulatory approval basis for a core simulator has three primary components:• Methods Description• Performance Demonstration • Uncertainty Quantifications for Application Purposes

• The components associated with the production version of TGBLA06/PANAC11 in use today have evolved over time across a range of topical reports that have a variety of explicit approval statuses

• The slide that follows maps that evolution of component approvals to clarify the current regulatory basis for the use of TGBLA06/PANAC11 today.

Page 16: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

15LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 and PANAC11 TRs Strategy and ObjectivesPANAC11 Current Approval Bases and Supplemental Documentation

[[

]]

Page 17: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

16LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 and PANAC11 TRs Strategy and ObjectivesThe Case for Incremental Improvements

• [[

]]

Page 18: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

17LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 and PANAC11 TRs Strategy and ObjectivesClarifying the Present to Build Momentum for the Future – Methods Descriptions

Clarify the Present• [[

]]

Enable the Future• [[

]]

[[

]]

Page 19: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

18LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 and PANAC11 TRs Strategy and ObjectivesClarifying the Present to Build Momentum for the Future – Performance Demonstration

Clarify the Present• [[

]]

Enable the Future• [[

]]

[[

]]

Page 20: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

19LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 and PANAC11 TRs Strategy and ObjectivesClarifying the Present to Build Momentum for the Future – Uncertainty Quantifications

Clarify the Present• [[

]]

Enable the Future• [[

]]

[[

]]

Page 21: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

20LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 and PANAC11 TRs Strategy and ObjectivesHigh Level Summary

[[

]]

Page 22: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

Part 3:LANCR02 Model and Qualification TR

Update Summary

Non-Proprietary Information

Page 23: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

22LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

Part 3 Content

• Specific Revision Objectives

• Change Details

• Development and Documentation Strategy

• Side-by-Side Comparison Highlights

Part 3 Objectives

• Describe the drivers for this revision and details of changes to the TRs

• Present the approach taken for revisions to attempt to streamline the review

• Provide highlights of Revision 3 versus Revision 4 results to demonstrate impacts of changes to these TRs

Part 3 Duration

• ~45 minutes

LANCR02 Model and Qualification TR Update SummaryContent and Objectives

Page 24: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

23LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 Model and Qualification TR Update SummaryRevision Objectives

[[

]]

Page 25: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

24LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 Model and Qualification TR Update SummaryChange Details – Expand Cold Critical Benchmarking

[[

]]

Page 26: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

25LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 Model and Qualification TR Update SummaryChange Details – Implement Improved Benchmarking Tools: MCNP-06P

[[

]]

Page 27: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

26LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 Model and Qualification TR Update SummaryChange Details – Implement Improved Benchmarking Tools: MCNP6_Depletion

[[

]]

Page 28: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

27LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 Model and Qualification TR Update SummaryChange Details – Update Background Cross Section Treatment

[[

]]

Page 29: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

28LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 Model and Qualification TR Update SummaryChange Details – “Inflow” Transport Approximation

[[

]]

Page 30: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

29LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 Model and Qualification TR Update SummaryChange Details – Depletion Case Matrix Expansion

[[

]]

Page 31: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

30LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 Model and Qualification TR Update SummaryDevelopment and Documentation Strategy

Development Strategy

• [[

]]

Documentation Strategy

• [[

]]

[[

]]

Page 32: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

31LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 Model and Qualification TR Update SummarySide-by-Side Comparison Highlights – Test Suite 1 (Baseline): Eigenvalue Comparison

[[

]]

Page 33: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

32LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 Model and Qualification TR Update SummarySide-by-Side Comparison Highlights – Test Suite 1 (Baseline): CDOP Comparison

[[

]]

Page 34: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

33LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 Model and Qualification TR Update SummarySide-by-Side Comparison Highlights – Test Suite 9 (Enrichment): Eigenvalue Comparison

[[

]]

Page 35: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

34LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 Model and Qualification TR Update SummarySide-by-Side Comparison Highlights – Depletion Example Comparison (7099v0)

[[

]]

Page 36: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

35LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 Model and Qualification TR Update SummarySide-by-Side Comparison Highlights – Depletion Statistics Comparison

[[

]]

Page 37: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

36LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02 Model and Qualification TR Update SummaryFinal Review

[[

]]

Page 38: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

Part 4:LANCR02/PANAC11 Application TR

Introduction and Walkthrough

Non-Proprietary Information

Page 39: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

38LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

Part 4 Content

• Introduction and Table of Contents Review

• Section-by-Section Walkthrough

Part 4 Objectives

• Describe the TR structure while highlighting features that are used to meet overall TR Objectives

• Provide a Section-by-Section Walkthrough on content to highlight important features and make connections between this work and historical approvals.

Part 4 Duration

• ~90 minutes

Note: L02/P11 ATR is currently undergoing design review, so content subject to change

LANCR02/PANAC11 Application TR Intro and WalkthroughContent and Objectives

Page 40: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

39LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughIntroduction and Table of Contents Review

[[

]]

Page 41: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

40LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Methods Description: Overview

[[

]]

Page 42: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

41LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Methods Description: PANAC11

[[

]]

Page 43: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

42LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Methods Description: Adaption

[[

]]

Page 44: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

43LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Performance Demonstrations: Overview

[[

]]

Page 45: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

44LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Performance Demonstrations: Case Matrix Highlights

[[

]]

Page 46: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

45LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Performance Demonstrations: Case Matrix Highlights

[[

]]

Page 47: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

46LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Performance Demonstrations: Results Highlights

[[

]]

Page 48: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

47LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Performance Demonstrations: Results Highlights

[[

]]

Page 49: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

48LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Performance Demonstrations: Results Highlights

[[

]]

Page 50: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

49LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Uncertainty Quantifications: Overview

[[

]]

Page 51: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

50LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Uncertainty Quantifications: Overview

[[

]]

Page 52: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

51LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Uncertainty Quantifications: Plant System Uncertainties

[[

]]

Page 53: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

52LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Uncertainty Quantifications: Plant System Uncertainties

[[

]]

Page 54: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

53LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Uncertainty Quantifications: Plant System Uncertainties

[[

]]

Page 55: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

54LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Uncertainty Quantifications: Power Dist Model Uncertainties

[[

]]

Page 56: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

55LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Uncertainty Quantifications: Power Dist Model Uncertainties

[[

]]

Page 57: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

56LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Uncertainty Quantifications: Monitoring Uncertainties

[[

]]

Page 58: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

57LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Uncertainty Quantifications: Combined Uncertainties

[[

]]

Page 59: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

58LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Uncertainty Quantifications: Shutdown Margin Uncertainty

[[

]]

Page 60: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

59LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughSection-by-Section Walkthrough – Licensing Considerations

[[

]]

Page 61: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

60LANCR02 and PANAC11 LTRs – Pre-submittal Meeting

Non-Proprietary Information

LANCR02/PANAC11 Application TR Intro and WalkthroughFinal Review

[[

]]

Page 62: Enclosure 2 - Presentation for Pre-Submittal Meeting - Non

End of Material

Open Discussion

Non-Proprietary Information