197 of 263 Ordinary Meeting - 17 May 2016 5.11. WATER AND WASTEWATER QUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2016 REPORT AUTHOR(S): Wouter van der Merwe, Manager Water and Wastewater GENERAL MANAGER: Paul Hoye, General Manager Operations DEPARTMENT: Water and Wastewater RECOMMENDATION It is recommended that the Quarterly Report of the Water and Wastewater branch for the period ending 31 March 2016 be received and noted. EXECUTIVE SUMMARY This report documents progress on key operational and service delivery areas as well as the Regulatory compliance status within the Water and Wastewater Branch for the period January to March 2016. Whilst the results are generally positive the areas for improvement are noted and will be the focus of the branch over the next quarter. During this reporting period, significant process was noted in all of the 36 Water and Wastewater capital improvements projects. The progress of these projects is reported in a separate Council report. Several capital items were delivered and partly installed, inter alia the two Calcium Hypochlorite projects to facilitate automated chlorination at Flagstaff and Rocky Point reservoirs. Capital projects associated with SCADA, telemetry and server upgrades across all Water and Wastewater plants are in the final testing and fault finding phases. The Water and Wastewater Branch successfully fulfilled regulatory reporting during this quarter. The Council endorsed Drinking Water Quality Management Plan (DWQMP) was approved on 1 March 2016 by the Department of Energy and Water Supply (DEWS). BACKGROUND This report is the 3 rd Quarterly Report submitted by the Water and Wastewater Branch during the 2015/2016 Financial Year. This report highlights progress against key performance areas required by the Department of Energy and Water Supply and required compliance levels by the Department of Environment and Heritage Protection. COMMENT This report enables Councillors and the community to obtain a strategic view of activities within the Water and Wastewater Branch. The 3 rd Quarterly Report documents progress on key operational and service delivery aspects and regulatory compliance levels. The Water and Wastewater Quarterly Report does not include comprehensive progress reporting in terms of the Capital Works Programs, Operational Plan and financial statements as these are dealt with in separate Quarterly Reports to Council.

Upload: others

Post on 27-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

197 of 263

Ordinary Meeting - 17 May 2016

5.11. WATER AND WASTEWATER QUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2016 REPORT AUTHOR(S): Wouter van der Merwe, Manager Water and WastewaterGENERAL MANAGER: Paul Hoye, General Manager OperationsDEPARTMENT: Water and Wastewater RECOMMENDATION It is recommended that the Quarterly Report of the Water and Wastewater branch for the period ending 31 March 2016 be received and noted.

EXECUTIVE SUMMARY This report documents progress on key operational and service delivery areas as well as the Regulatory compliance status within the Water and Wastewater Branch for the period January to March 2016. Whilst the results are generally positive the areas for improvement are noted and will be thefocus of the branch over the next quarter. During this reporting period, significant process was noted in all of the 36 Water and Wastewater capital improvements projects. The progress of these projects is reported in a separate Council report.

Several capital items were delivered and partly installed, inter alia the two Calcium Hypochlorite projects to facilitate automated chlorination at Flagstaff and Rocky Point reservoirs. Capital projects associated with SCADA, telemetry and server upgrades across all Water and Wastewater plants are in the final testing and fault finding phases.

The Water and Wastewater Branch successfully fulfilled regulatory reporting during this quarter. The Council endorsed Drinking Water Quality Management Plan (DWQMP) was approved on 1 March 2016 by the Department of Energy and Water Supply (DEWS). BACKGROUND This report is the 3rd Quarterly Report submitted by the Water and Wastewater Branch during the 2015/2016 Financial Year. This report highlights progress against key performance areas required by the Department of Energy and Water Supply and required compliance levels by the Department of Environment and Heritage Protection. COMMENT This report enables Councillors and the community to obtain a strategic view of activities within the Water and Wastewater Branch. The 3rd Quarterly Report documents progress on key operational and service delivery aspects and regulatory compliance levels. The Water and Wastewater Quarterly Report does not include comprehensive progress reporting in terms of the Capital Works Programs, Operational Plan and financial statements as these are dealt with in separate Quarterly Reports to Council.

Page 2: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

198 of 263

Ordinary Meeting - 17 May 2016

FINANCIAL/RESOURCE IMPLICATIONS Failure to comply with required standards and to respond quickly and effectively to water and wastewater incidents may result in harm to the community and substantial penalties. RISK MANAGEMENT IMPLICATIONS Council as a registered water service provider has a statutory obligation to ensure it is able to provide water and wastewater services to customers. Council’s reputation would suffer if it is unable to maintain service levels at prescribed standards. This Quarterly Water and Wastewater report provides information on strategies implemented by the Water and Wastewater branch to minimise occupational health and safety risks and risks to Council infrastructure. SUSTAINABILITY IMPLICATIONS Economic: It is essential to adequately maintain water and wastewater

infrastructure in order to provide satisfactory services in support of economic development in the Shire.

Environmental: Failing to provide adequate and compliant water and wastewater

services can lead to environmental harm and breaching of licence conditions.

Social: The Community expects fully operational and compliant water and

wastewater services. CORPORATE/OPERATIONAL PLAN, POLICY REFERENCE This report has been prepared in accordance with the following: Corporate Plan 2014-2019 Initiatives: Theme 5 - Governance

5.2.1 - Provide Councillors and community with accurate, unbiased and factual reporting to enable accountable and transparent decision-making.

5.3.4 - Develop practices and skill levels to ensure safety and wellbeing in the workplace. Operational Plan 2015-2016 Actions: WW1 - Rehabilitation of sewer network in Mossman & Port Douglas.

WW2 - Wastewater and Water Treatment Plants Server SCADA Citec upgrade and Programmable Logic Controller (PLC) SCADA Citec upgrade.

WW3 - Drinking Water Storage: Investigate and repair vermin proofing at all water storage/ reservoirs in the Water Supply Schemes.

WW4 - Review and amend Drinking Water Quality Management Plan (DWQMP).

Page 3: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

199 of 263

Ordinary Meeting - 17 May 2016

COUNCIL’S ROLE Council can play a number of different roles in certain circumstances and it is important to be clear about which role is appropriate for a specific purpose or circumstance. The implementation of actions will be a collective effort and Council’s involvement will vary from information only through to full responsibility for delivery. The following areas outline where Council has a clear responsibility to act: Information Provider Bringing people together to develop solutions to problems. CONSULTATION Internal: Nil External: Water and Wastewater quality parameters are tested by an

accredited laboratory and test results and service levels are required to be reported to the Department of Energy and Water Supply and the Department of Environment and Heritage Protection.

Community: Nil ATTACHMENTS Attachment 1 Water and Wastewater Quarterly Report for the period ending 31

March 2016.

Page 4: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

1

Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016

The aim of the Water and Wastewater Quarterly Report is to inform Councillors and the community on the progress of key operational and service delivery areas as well as regulatory compliance status within the Water and Wastewater Branch. The Water and Wastewater Quarterly Report does not include comprehensive progress reporting in terms of the Capital Works Programs and the Operational Plan which are dealt with in separate Quarterly Reports to Council. This report highlights certain aspects of the activities of the Water and Wastewater Branch that are generally industry benchmark indicators as well as key performance areas and compliance monitoring parameters as required by the Department Energy Water Supply and the Department of Environment and Heritage Protection.

Water

1. Water reticulation services General maintenance was carried out on all schemes this quarter including intake maintenance and cleaning/flushing of dead end mains. Hydrant maintenance and painting of sluice valves have been continuing in all locations throughout the Shire.

Table 1. Water Reticulation Services

Douglas Shire Reticulation (all schemes)

Settlement meter reads 88

New water services connections 11

Service repairs 91

Water mains repairs 6

Water Quality Complaints 4

Flushing Events: Mossman/Port Douglas/ Cooya/ Newell 3

Flushing Events: Whyanbeel/Wonga 1

Flushing Events: Daintree/ De Meio 2

Attachment 5.11.1 200 of 263

Ordinary Meeting - 17 May 2016

Page 5: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

2

Table 2. Water Complaints

Address CRM

Number & Date

Nature of water

complaint How was it resolved

Response Time

46 Andrews St Newell Beach

22952 21/3/16

Distinctive taste

Flushed Newell Scheme and at meter. Residual Chlorine after flushing: 0.05 mg/l.

90 mins

50 Andrews St Newell Beach

22958 21/3/16

Taste like iodine

Flushed hydrant points and at meter. Residual Chlorine: 0.07 mg/l. Water quality team notified.

30 mins

42 Andrews St Newell Beach

23160 23/3/16

Bad taste in water

Flushed at hydrant points and at mete. Residual Chlorine: 0.07mg/l. Water quality team notified.

35 mins

1291R Mossman- Daintree Rd Rocky Point

23317 29/3/16

Smelly-itchy feeling

Flushed whole area. Flushed at meter. Residual Chlorine: 0.08mg/l. Water quality team notified.

30 mins

2. Water schemes and potable water consumption

Raw Water quality is good in all intakes averaging below 1.0 NTU.

Rain periods developed during the start of the reporting period with some heavy falls causing localised flooding in the water plant intake creeks. A number of significant high raw water turbidity events occurred as a result of isolated heavy rains causing operational issues at the water plants. With all intakes at capacity, water restrictions were lifted in early January 2016. This also coincided with a decrease in consumption from all water schemes typical of wet season demand trends. With forecasts indicating a below average wet season and increased possibility of an extended dry season, water restrictions may need to be re-visited within the next three months. Mossman/Port Douglas Schemes Rex Creek intake level has adequate capacity to meet maximum extraction flows of >220L/s with no impact on production at this stage.

Fig 1. Rex Creek Intake level for the period January to March 2016

0

200

400

600

800

1000

1200

1/01/2016 1/02/2016 1/03/2016

Dat

um

Gau

ge r

ead

ing

in

mm

trendaverage

Attachment 5.11.1 201 of 263

Ordinary Meeting - 17 May 2016

Page 6: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

3

Mossman Water Treatment Plant is meeting demand capacity. Net treated water outflow from the Mossman WTP for the reporting period was 844.16 Megalitres. This represents consumption of 194.06 Megalitres for the Mossman scheme and 650.09 Megalitres for the Port Douglas scheme. Mossman Water Supply The total monthly consumption of water in Mossman, Cooya Beach and Newell Beach areas can be seen in Fig 2.

Fig 2. Mossman Scheme Monthly Consumption Figures

Port Douglas Water Supply The total monthly consumption of water in Port Douglas can be seen in Fig 3. Fig 3. Port Douglas Scheme Monthly Consumption Figures

0

10

20

30

40

50

60

70

80

90

Mar-15 May-15 Jul-15 Sep-15 Nov-15 Jan-16 Mar-16

Meg

a lit

res

MAR 2015 - MAR 2016

MAR 2014 - MAR 2015

0

50

100

150

200

250

300

350

Mar-15 May-15 Jul-15 Sep-15 Nov-15 Jan-16 Mar-16

Meg

a lit

res

MAR 2015 - MAR 2016

MAR 2014 - MAR 2015

Attachment 5.11.1 202 of 263

Ordinary Meeting - 17 May 2016

Page 7: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

4

Whyanbeel Scheme Whyanbeel Water Treatment Plant is fully operational and meeting demand. Net treated water outflow from the Whyanbeel WTP for the reporting period was 66.38 Megalitres and represents consumption for the entire Whyanbeel and Wonga water supply scheme.

Whyanbeel Water Supply The total monthly consumption of water in the Whyanbeel scheme can be seen in Fig 4.

Fig 4. Whyanbeel Scheme Monthly Consumption Figures

Daintree Scheme Daintree Water Treatment Plant is fully operational and meeting demand. Intake levels at Intake Creek have increased and are adequate for full plant production capacity. Net treated water outflow from the Daintree WTP for the reporting period was 3.51 Megalitres. This represents consumption for the entire Daintree water supply scheme.

Daintree Water Supply The total monthly consumption of water in the Daintree scheme can be seen in Fig 5.

Fig 5. Daintree Scheme Monthly Consumption Figures

0

5

10

15

20

25

30

35

40

Mar-15 May-15 Jul-15 Sep-15 Nov-15 Jan-16 Mar-16

Meg

a lit

res

MAR 2015 - MAR 2016

MAR 2014 - MAR 2015

0

0.5

1

1.5

2

2.5

Mar-15 May-15 Jul-15 Sep-15 Nov-15 Jan-16 Mar-16

Meg

alit

res

MAR 2015 - MAR 2016

MAR 2014 - MAR 2015

Attachment 5.11.1 203 of 263

Ordinary Meeting - 17 May 2016

Page 8: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

5

3. Water quality monitoring and results The Water and Wastewater Branch successfully fulfilled annual regulatory reporting during this quarter. The Council endorsed Drinking Water Quality Management Plan (DWQMP) was approved on 1 March 2016 by the Department of Energy and Water Supply (DEWS). Drinking water is sampled at intakes, reservoirs, treatment plants and in the reticulation network to ensure compliance with the Australian Drinking Water Guideline (ADWG). For the period 1 January to 31 March 2016, a total of 325 treated and raw water samples were taken in the 3 water supply schemes. A total of 250 samples were tested in the Douglas Water Laboratory and 75 treated and raw water samples were tested by a NATA accredited laboratory for physical, chemical and microbiological parameters. All tested parameters in water samples taken during the reporting period were compliant with Australian Drinking Water Guidelines (ADWG) and standards required by the Water Supply Regulator and Queensland Health. Mossman/Port Douglas Supply Scheme Average monthly values for key operational and compliance parameters can be seen In Table 3, 4 and 5 for treated water at the Mossman Treatment Plant, Port Douglas Reservoirs and Port Douglas/Mossman Reticulation network, respectively. Fig 6 indicates the daily turbidity trends at the intake and treated water as recorded at the Mossman Water Treatment Plant for the period January to March 2015. Table 3. Average monthly values for key operational and compliance parameters in treated water at Mossman Treatment Plant.

Month pH Temp

°C

Total Alkalinity

mg CaCO3/L

Free chlorine

mg/L

Total chlorine

mg/L

E.coli CFU/ 100ml

Hetero-trophic Plate

CFU/mL

Total coliforms CFU/100

ml

Standard 6.5-8.5 10-30 0-25 0.1-4.0 Max 5.0 <1 - 0-10

Jan-16 7.31 23.4 5 0.83 0.89 <1 <1 <1

Feb-16 7.64 24.5 5 0.78 0.98 <1 <1 <1

Mar-16 7.35 24.2 7 0.90 0.96 <1 1 <1

Table 4. Average monthly values for key operational and compliance parameters in the Port Douglas Reservoirs.

Month pH Temp

°C

Total Alkalinity

mg CaCO3/L

Free chlorine

mg/L

Total chlorine

mg/L

E.coli CFU/ 100ml

Hetero-trophic Plate CFU/mL

Total coliforms CFU/100ml

Standard 6.5-8.5 10-30 0-25 0.1-4.0 Max 5.0 <1 - 0-10

Jan-16 7.34 25.3 7 0.76 0.82 <1 <2 <1

Feb-16 7.26 26.7 6 0.71 0.78 <1 1 <1

Mar-16 6.97 26.1 6.5 0.76 0.81 <1 <1 <1

Attachment 5.11.1 204 of 263

Ordinary Meeting - 17 May 2016

Page 9: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

6

Table 5. Average monthly values for key operational and compliance parameters in the Mossman/Port Douglas Reticulation Network.

Month pH Temp

°C

Free chlorine

mg/L

Total chlorine

mg/L

E.coli CFU/100

ml

Hetero-trophic Plate Count

CFU/mL

Total coliforms CFU/100

ml

Standard 6.5-8.5 10-30 0.1-4.0 Max 5.0 <1 - 0-10

Jan-16 7.60 26.7 0.48 0.53 <1 <1 <1

Feb-16 7.50 28.2 0.61 0.66 <1 <1 <1

Mar-16 7.75 274 0.43 0.47 <1 52 <1

Fig 6. Turbidity trends at the Rex Creek intake and treated water at the Mossman Water Treatment Plant

Whyanbeel Supply Scheme

Average monthly values for key operational and compliance parameters can be seen In Table 6., Table 7. and Table 8. for treated water at the Whyanbeel Treatment Plant, Whyanbeel Reservoir and Whyanbeel Reticulation Network, respectively. Fig 7. indicates the daily turbidity trends at the intake and treated water as recorded at the Whyanbeel Water Treatment Plant for the period January to March 2016. Table 6. Average monthly values for key operational and compliance parameters in treated water at Whyanbeel Treatment Plant.

Month pH Temp °C

Total Alkalinity

mg CaCO3/L

Free chlorine

mg/L

Total chlorine

mg/L

E.coli CFU/ 100ml

Hetero-trophic Plate

CFU/mL

Total coliforms CFU/100

ml

Standard 6.5-8.5 10-30 0-25 0.1-4.0 Max 5.0 <1 - 0-10

Jan-16 6.96 23.7 <5 0.87 0.94 <1 <1 <1

Feb-16 6.93 23.6 <5 1.04 1.21 <1 <1 <1

Mar-16 7.00 24.8 6 0.85 0.95 <1 <1 <1

0

0.5

1

1.5

2

2.5

3

3.5

Turb

idit

y N

TU

raw water

treated water

Attachment 5.11.1 205 of 263

Ordinary Meeting - 17 May 2016

Page 10: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

7

Table 7. Average monthly values for key operational and compliance parameters in the Whyanbeel Reservoir.

Month pH Temp °C

Total Alkalinity

mg CaCO3/L

Free chlorine

mg/L

Total chlorine

mg/L

E.coli CFU/ 100ml

Hetero-trophic Plate

CFU/mL

Total coliforms

CFU/100ml

Standard 6.5-8.5 10-30 0-25 0.1-4.0 Max 5.0 <1 - 0-10

Jan-16 7.37 26.2 8 0.35 0.40 <1 10 <1

Feb-16 7.55 27.1 8 0.84 0.87 <1 26 1

Mar-16 7.37 28.0 6 0.38 0.43 <1 1 <1

Table 8. Average monthly values for key operational and compliance parameters in the Whyanbeel Reticulation Network.

Month pH Temp °C Free

chlorine mg/L

Total chlorine

mg/L

E.coli CFU/100

ml

Hetero-trophic Plate

CFU/mL

Total coliforms CFU/100

ml

Standard 6.5-8.5 10-30 0.1-4.0 Max 5.0 <1 - 0-10

Jan-16 8.13 27.2 0.22 0.30 <1 <3 <1

Feb-16 8.01 28.3 0.19 0.23 <1 8 <1

Mar-16 8.05 28.8 0.22 0.26 <1 <10 <1

Fig 7. Turbidity trends at the Little Falls Creek intake and treated water at the Whyanbeel Water Treatment Plant

Daintree Supply Scheme Average monthly values for key operational and compliance parameters can be seen In Table 9. and Table 10. for treated water at the Daintree Treatment Plant and Daintree Reticulation network, respectively. Fig 8. indicates the daily turbidity trends at the intake and

0

2

4

6

8

10

12

14

16

Turb

idit

y N

TU

raw watertreated water

Attachment 5.11.1 206 of 263

Ordinary Meeting - 17 May 2016

Page 11: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

8

treated water as recorded at the Daintree water treatment plant for the period January to March 2016. Table 9. Average monthly values for key operational and compliance parameters in treated water at Daintree Treatment Plant.

Month pH Temp °C

Total Alkalinity

mg CaCO3/L

Free chlorine

mg/L

Total chlorine

mg/L

E.coli CFU/ 100ml

Hetero-trophic Plate

CFU/mL

Total coliforms

CFU/100ml

Standard 6.5-8.5 10-30 0-25 0.1-4.0 Max 5.0 <1 - 0-10

Jan-16 7.27 26.0 17 0.96 1.02 <1 1 <1

Feb-16 7.39 26.9 19 0.85 0.91 <1 <1 <1

Mar-16 7.28 27.4 18 0.98 1.04 <1 <1 <1

Table 10 Average monthly values for key operational and compliance parameters in the Daintree Reticulation Network.

Month pH Temp °C Free

chlorine mg/L

Total chlorine

mg/L

E.coli CFU/100

ml

Hetero-trophic Plate

CFU/mL

Total coliforms CFU/100

ml

Standard 6.5-8.5 10-30 0.1-4.0 Max 5.0 <1 - 0-10

Jan-16 7.61 26.1 0.69 0.74 <1 61 <1

Feb-16 7.65 26.5 0.56 0.61 <1 17 <1

Mar-16 7.44 28.0 0.65 0.71 <1 <1 <1

Fig 8. Turbidity trends at the Intake/Martin Creek intake and treated water at the Daintree Water Treatment Plant

0

1

2

3

4

5

6

7

8

Turb

idit

y N

TU raw water

treated water

Attachment 5.11.1 207 of 263

Ordinary Meeting - 17 May 2016

Page 12: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

9

Wastewater

4. Wastewater Reticulation Services

General maintenance programs were carried out at the reticulation networks and 31 pump stations in the Mossman and Port Douglas catchments. Table 11. Wastewater Reticulation Services

5. Influent and Irrigation Flows

Port Douglas Wastewater Treatment Plant

A total of 343,297 kL of influent entered the Port Douglas Wastewater Treatment Plant during the reporting period. The average daily flow was 3,772 kL/day. Tanker truck contractors delivered 429 kL of septage to the plant. Influent is treated in a Sequencing Batch Reactor (SBR) which produced compliant effluent during the reporting period. A total of 36% of the treated effluent was pumped to two resorts and the remaining discharged into the Dickson Inlet. The Sheraton Mirage received 70,917 kL and Reef Links received 50,785 kL of treated effluent during this period. Total rainfall on site during the reporting period was measured as 729 mm. On 10 March 2016, the highest rainfall on a day was recorded as 72mm. Daily SBR flows and total monthly flows for 2014/2015 are presented in Fig 9 and 10 respectively. Fig 9. Port Douglas SBR Daily Flow

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

1/0

7/2

01

416

/07/2

014

31

/07/2

014

15

/08/2

014

30

/08/2

014

14

/09/2

014

29

/09/2

014

14

/10/2

014

29

/10/2

014

13

/11/2

014

28

/11/2

014

13

/12/2

014

28

/12/2

014

12

/01/2

015

27

/01/2

015

11

/02/2

015

26

/02/2

015

13

/03/2

015

28

/03/2

015

12

/04/2

015

27

/04/2

015

12

/05/2

015

27

/05/2

015

11

/06/2

015

26

/06/2

015

11

/07/2

015

26

/07/2

015

10

/08/2

015

25

/08/2

015

9/0

9/2

01

524

/09/2

015

9/1

0/2

01

524

/10/2

015

8/1

1/2

01

523

/11/2

015

8/1

2/2

01

523

/12/2

015

7/0

1/2

01

622

/01/2

016

6/0

2/2

01

621

/02/2

016

7/0

3/2

01

622

/03/2

016

kL

Date

Port Douglas Catchment

Mossman Catchment

Pump Blockages 8 3

Sewer Chokes 2 1

Sewer Main Breaks 0 0

HCB Repairs (House Connection Branch)

1 0

Odour Complaints 0 0

Attachment 5.11.1 208 of 263

Ordinary Meeting - 17 May 2016

Page 13: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

10

Fig 10. Port Douglas Total Monthly Flow

Mossman Wastewater Treatment Plant

The Mossman Wastewater Treatment Plant received a total influent flow of 138,475 kL during the reporting period. The average daily flow was 1,521 kL/day. Influent is treated in an Oxidation Ditch system and compliant effluent is discharged into the Mossman River. A total of 836 mm of rain fell on site for the reporting period with the highest daily rainfall measured at 108mm on 16 March 2016. As a result of the high rainfall in the latter part of the reporting period, the plant intermittently didn’t comply with the dry weather flow limit due to ingress and infiltration into the sewer network. Daily flows from the Mossman Wastewater Treatment Plant and total monthly flows for 2014/2015 are presented in Fig 11 and 12 respectively.

Fig 11. Mossman Wastewater Treatment Plant Daily Flow

0

30,000

60,000

90,000

120,000

150,000

J F M A M J J A S O N D

kL

Total Inflow

Total Irrigation

0

1000

2000

3000

4000

5000

6000

01/0

7/1

41

6/0

7/1

43

1/0

7/1

41

5/0

8/1

43

0/0

8/1

41

4/0

9/1

42

9/0

9/1

41

4/1

0/1

42

9/1

0/1

41

3/1

1/1

42

8/1

1/1

41

3/1

2/1

42

8/1

2/1

41

2/0

1/1

52

7/0

1/1

51

1/0

2/1

52

6/0

2/1

51

3/0

3/1

52

8/0

3/1

51

2/0

4/1

52

7/0

4/1

51

2/0

5/1

52

7/0

5/1

51

1/0

6/1

52

6/0

6/1

51

1/0

7/1

52

6/0

7/1

51

0/0

8/1

52

5/0

8/1

50

9/0

9/1

52

4/0

9/1

50

9/1

0/1

52

4/1

0/1

50

8/1

1/1

52

3/1

1/1

50

8/1

2/1

52

3/1

2/1

50

7/0

1/1

62

2/0

1/1

60

6/0

2/1

62

1/0

2/1

60

7/0

3/1

62

2/0

3/1

6

Flo

w (

kL

)

Date

Final Effluent Flow (kL)

Dry weather flow limit

Wet weather flow limit

Attachment 5.11.1 209 of 263

Ordinary Meeting - 17 May 2016

Page 14: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

11

Fig 12. Mossman Wastewater Treatment Plant Total Monthly Flow

6. Bio-solids Production Bio-solids were produced at the dewatering plants at Mossman Wastewater Treatment Plant (18% solids) and Port Douglas Wastewater Treatment Plant (14% solids). Bio-solids were transported by Arkwood Organics to Edmonton Farms, Tablelands Regional Farms and Spring Mount Waste Facility for further treatment and beneficial land application as organic fertiliser and soil conditioner.

Port Douglas Wastewater Treatment Plant

At Port Douglas Wastewater Treatment Plant, 232 m3 of wet biosolids were produced during the reporting period and sent to farms for beneficial reuse. This amount of wet biosolids equates to 33 dry tonnes. The monthly bio-solids production trends can be seen in Fig 13. Fig 13. Port Douglas Wastewater Treatment Plant monthly bio-solids production

Mossman Wastewater Treatment Plant

At Mossman Wastewater Treatment Plant, 72.92m3 of wet biosolids were produced during the reporting period and sent to farms for beneficial reuse. This amount of wet biosolids equates to 10.20 dry tonnes. The monthly bio-solids production trends can be seen in Fig 14.

Fig 14. Mossman Wastewater Treatment Plant monthly bio-solids production

0

10,000

20,000

30,000

40,000

50,000

60,000

J F M A M J J A S O N D

kL

Total Inflow

0

50

100

150

200

250

J F M A M J J A S O N D

ton

nes

0

10

20

30

J F M A M J J A S O N D

m3

Attachment 5.11.1 210 of 263

Ordinary Meeting - 17 May 2016

Page 15: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

12

7. Effluent Quality and Compliance

During the reporting period a total number of 187 wastewater compliance samples were taken from the treatment processes, bio-solids, final effluent, receiving waters and bores in both wastewater catchments. Samples were tested by a NATA accredited laboratory for physical, chemical and microbiological parameters.

During the reporting period all parameters tested in the Port Douglas and Mossman catchment were compliant with maximum, short and long term 80th percentile concentrations as per licence definitions and conditions. Mossman WWTP intermittently didn’t comply with the dry weather flow limit due to ingress and infiltration into the sewer network.

The process and compliance is monitored each day by in-house analyses of samples at the plants. Process settings, effluent quality, flow rates, pump stations performance and maintenance aspects are monitored and controlled with SCADA Citect via an extensive telemetry network. Port Douglas Wastewater Treatment Plant

The results for final effluent key licence compliance parameters (Ammonia, Total Phosphorous, and Total Suspended Solids & BOD5) are shown in Fig 15, 16, 17 & 18

Fig 15. Port Douglas Wastewater Treatment Plant Final Effluent Test Results for Ammonia

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.00.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

1/0

7/2

01

4

21

/07/2

014

10

/08/2

014

30

/08/2

014

19

/09/2

014

9/1

0/2

01

4

29

/10/2

014

18

/11/2

014

8/1

2/2

01

4

28

/12/2

014

17

/01/2

015

6/0

2/2

01

5

26

/02/2

015

18

/03/2

015

7/0

4/2

01

5

27

/04/2

015

17

/05/2

015

6/0

6/2

01

5

26

/06/2

015

16

/07/2

015

5/0

8/2

01

5

25

/08/2

015

14

/09/2

015

4/1

0/2

01

5

24

/10/2

015

13

/11/2

015

3/1

2/2

01

5

23

/12/2

015

12

/01/2

016

1/0

2/2

01

6

21

/02/2

016

12

/03/2

016

1/0

4/2

01

6

Co

nc

en

tra

tio

n (

mg

/L)

Date

Ammonia (mg/L) 80th%ile Limit Maximum

Attachment 5.11.1 211 of 263

Ordinary Meeting - 17 May 2016

Page 16: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

13

Fig 16. Port Douglas Wastewater Treatment Plant Final Effluent Test Results for Total

Phosphorous

Fig 17. Port Douglas Wastewater Treatment Plant Final Effluent Test Results for Total Suspended Solids

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00

0.0

0.5

1.0

1.5

2.0

2.5

3.01/0

7/2

01

4

21

/07/2

014

10

/08/2

014

30

/08/2

014

19

/09/2

014

9/1

0/2

01

4

29

/10/2

014

18

/11/2

014

8/1

2/2

01

4

28

/12/2

014

17

/01/2

015

6/0

2/2

01

5

26

/02/2

015

18

/03/2

015

7/0

4/2

01

5

27

/04/2

015

17

/05/2

015

6/0

6/2

01

5

26

/06/2

015

16

/07/2

015

5/0

8/2

01

5

25

/08/2

015

14

/09/2

015

4/1

0/2

01

5

24

/10/2

015

13

/11/2

015

3/1

2/2

01

5

23

/12/2

015

12

/01/2

016

1/0

2/2

01

6

21

/02/2

016

12

/03/2

016

1/0

4/2

01

6

Co

nc

en

trati

on

(m

g/L

)

Date

Total Phosphorus (mg/L) 50th percentile Maximum

0

5

10

15

20

25

30

35

0

5

10

15

20

25

30

35

1/0

7/2

01

4

21/0

7/2

01

4

10/0

8/2

01

4

30/0

8/2

01

4

19/0

9/2

01

4

9/1

0/2

01

4

29/1

0/2

01

4

18/1

1/2

01

4

8/1

2/2

01

4

28/1

2/2

01

4

17/0

1/2

01

5

6/0

2/2

01

5

26/0

2/2

01

5

18/0

3/2

01

5

7/0

4/2

01

5

27/0

4/2

01

5

17/0

5/2

01

5

6/0

6/2

01

5

26/0

6/2

01

5

16/0

7/2

01

5

5/0

8/2

01

5

25/0

8/2

01

5

14/0

9/2

01

5

4/1

0/2

01

5

24/1

0/2

01

5

13/1

1/2

01

5

3/1

2/2

01

5

23/1

2/2

01

5

12/0

1/2

01

6

1/0

2/2

01

6

21/0

2/2

01

6

12/0

3/2

01

6

1/0

4/2

01

6

Co

nc

en

trati

on

(m

g/L

)

Date

Suspended Solids (mg/L) Long term 80th percentile Short term 80th percentile Maximum

Attachment 5.11.1 212 of 263

Ordinary Meeting - 17 May 2016

Page 17: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

14

Fig. 18 Port Douglas Wastewater Treatment Plant Final Effluent Test Results for BOD5

(Biochemical Oxygen Demand)

Mossman Wastewater Treatment Plant

The results for final effluent key licence compliance parameters (Ammonia, Total Phosphorous, Total Suspended Solids & BOD5) are shown in Figures 19, 20, 21 & 22. Fig. 19 Mossman Wastewater Treatment Plant Final Effluent Test Results for Ammonia

0

5

10

15

20

25

30

35

0

5

10

15

20

25

30

351

/07

/201

4

21/0

7/2

01

4

10/0

8/2

01

4

30/0

8/2

01

4

19/0

9/2

01

4

9/1

0/2

01

4

29/1

0/2

01

4

18/1

1/2

01

4

8/1

2/2

01

4

28/1

2/2

01

4

17/0

1/2

01

5

6/0

2/2

01

5

26/0

2/2

01

5

18/0

3/2

01

5

7/0

4/2

01

5

27/0

4/2

01

5

17/0

5/2

01

5

6/0

6/2

01

5

26/0

6/2

01

5

16/0

7/2

01

5

5/0

8/2

01

5

25/0

8/2

01

5

14/0

9/2

01

5

4/1

0/2

01

5

24/1

0/2

01

5

13/1

1/2

01

5

3/1

2/2

01

5

23/1

2/2

01

5

12/0

1/2

01

6

1/0

2/2

01

6

21/0

2/2

01

6

12/0

3/2

01

6

1/0

4/2

01

6

Co

nc

en

trati

on

(m

g/L

)

Date

BOD (mg/L) Long term 80th percentile Short term 80th percentile Maximum

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.00.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

2/0

7/2

01

4

2/0

8/2

01

4

2/0

9/2

01

4

2/1

0/2

01

4

2/1

1/2

01

4

2/1

2/2

01

4

2/0

1/2

01

5

2/0

2/2

01

5

2/0

3/2

01

5

2/0

4/2

01

5

2/0

5/2

01

5

2/0

6/2

01

5

2/0

7/2

01

5

2/0

8/2

01

5

2/0

9/2

01

5

2/1

0/2

01

5

2/1

1/2

01

5

2/1

2/2

01

5

2/0

1/2

01

6

2/0

2/2

01

6

2/0

3/2

01

6

2/0

4/2

01

6Co

nc

en

trati

on

(m

g/L

)

NH3 (mg/L) Maximum

Attachment 5.11.1 213 of 263

Ordinary Meeting - 17 May 2016

Page 18: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

15

Fig. 20 Mossman WWTP Final Effluent Test Results for Total Phosphorous

Fig. 21 Mossman WWTP Final Effluent Test Results for Total Suspended Solids

0.0

5.0

10.0

15.0

20.0

25.00.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00

0.0

5.0

10.0

15.0

20.0

25.0

2/0

7/2

01

4

2/0

8/2

01

4

2/0

9/2

01

4

2/1

0/2

01

4

2/1

1/2

01

4

2/1

2/2

01

4

2/0

1/2

01

5

2/0

2/2

01

5

2/0

3/2

01

5

2/0

4/2

01

5

2/0

5/2

01

5

2/0

6/2

01

5

2/0

7/2

01

5

2/0

8/2

01

5

2/0

9/2

01

5

2/1

0/2

01

5

2/1

1/2

01

5

2/1

2/2

01

5

2/0

1/2

01

6

2/0

2/2

01

6

2/0

3/2

01

6

2/0

4/2

01

6

Co

nc

en

trati

on

(m

g/L

)

Date

Total Phosphorus (mg/L) 50th%ile Limit Maximum

0

10

20

30

40

50

60

700 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1

0

10

20

30

40

50

60

70

2/0

7/2

01

4

2/0

8/2

01

4

2/0

9/2

01

4

2/1

0/2

01

4

2/1

1/2

01

4

2/1

2/2

01

4

2/0

1/2

01

5

2/0

2/2

01

5

2/0

3/2

01

5

2/0

4/2

01

5

2/0

5/2

01

5

2/0

6/2

01

5

2/0

7/2

01

5

2/0

8/2

01

5

2/0

9/2

01

5

2/1

0/2

01

5

2/1

1/2

01

5

2/1

2/2

01

5

2/0

1/2

01

6

2/0

2/2

01

6

2/0

3/2

01

6

2/0

4/2

01

6

Co

ncen

trati

on

(m

g/L

)

Date

SS (mg/L) 80th%ile Long Term 80th%ile Short Term Maximum

Attachment 5.11.1 214 of 263

Ordinary Meeting - 17 May 2016

Page 19: ENDING 31 MARCH 2016 5.11. WATER AND WASTEWATER QUARTERLY …€¦ · Water and Wastewater Quarterly Report 1 January 2016 - 31 March 2016 The aim of the Water and Wastewater Quarterly

16

Fig. 22 Mossman Wastewater Treatment Plant Final Effluent Test Results for BOD5

(Biochemical Oxygen Demand)

0

10

20

30

40

50

60

0

10

20

30

40

50

602

/07

/201

4

22/0

7/2

01

4

11/0

8/2

01

4

31/0

8/2

01

4

20/0

9/2

01

4

10/1

0/2

01

4

30/1

0/2

01

4

19/1

1/2

01

4

9/1

2/2

01

4

29/1

2/2

01

4

18/0

1/2

01

5

7/0

2/2

01

5

27/0

2/2

01

5

19/0

3/2

01

5

8/0

4/2

01

5

28/0

4/2

01

5

18/0

5/2

01

5

7/0

6/2

01

5

27/0

6/2

01

5

17/0

7/2

01

5

6/0

8/2

01

5

26/0

8/2

01

5

15/0

9/2

01

5

5/1

0/2

01

5

25/1

0/2

01

5

14/1

1/2

01

5

4/1

2/2

01

5

24/1

2/2

01

5

13/0

1/2

01

6

2/0

2/2

01

6

22/0

2/2

01

6

13/0

3/2

01

6

2/0

4/2

01

6

Co

nc

en

trati

on

(m

g/L

)

Date

BOD (mg/L) 80th%ile Long Term 80th%ile Short Term Maximum

Attachment 5.11.1 215 of 263

Ordinary Meeting - 17 May 2016