Page 1: Energy Efficiency Installation Process under PAS 2030:2012

Lancashire Construction Best Practice Club

Energy Efficiency Installation Process Under PAS 2030:2012David Inman BSc (Hons) MRICS CEnv AIEMA TechIOA

DIEM Ltd

30 March 2012

Page 2: Energy Efficiency Installation Process under PAS 2030:2012

Regulated by RICS

Energy Efficiency Installation Process Under PAS 2030:2012David Inman BSc (Hons) MRICS CEnv AIEMA TechIOA

DIEM Ltd

Page 3: Energy Efficiency Installation Process under PAS 2030:2012

David Inman BSc(Hons) MRICS CEnv AIEMA TechIOA

•Professional Member of the RICS (MRICS)•Chartered Environmental Surveyor•Chartered Environmentalist•IEMA Lead EMS Auditor •Registered RICS Domestic Energy Assessor•Technician Member of the Institute of Acoustics (TechIOA)

•RICS APC Doctor•Member of RICS UK Education Standards Board•Corresponding member of RICS Sustainability Task Force Europe•Member of Lancs Construction Best Practice Club Steering Group •Chairman RICS Lancashire Local Association

@DIEMLtd

Page 4: Energy Efficiency Installation Process under PAS 2030:2012

DIEM Ltd giving clients across the UKthe environmental advantage since Nov 2005

ISO 14001 implementation

Environmental training

Carbon Management

Compliance auditing

Waste strategy

Sustainability strategy

CSR

Environmental project planning

Property

Construction

Business

Transport

@DIEMLtd

Environmental & quality auditing

Page 5: Energy Efficiency Installation Process under PAS 2030:2012

@DIEMLtd

PAS 2030:2012Improving the energy efficiency of existing buildings

Specification for installation process, process management and service provision

Published February 2012

Cost £95 from BSI

154 pages

Page 6: Energy Efficiency Installation Process under PAS 2030:2012

Methodstatement

Energy efficiencymeasuredesign

specification

Installationlocationinformation

Installationmethods

@DIEMLtd

Method Statements

Page 7: Energy Efficiency Installation Process under PAS 2030:2012

Methodstatement

Unless made available by EEM specifier, the installer shall define & record the installation process in a method statement for EACH energy efficiency measure installed under PAS 2030:2012 prior to installation.

Location specific

information Installation method

Toolsrequired

Checking, handling & storage instructions

Installation instructions

to operatives

Requirement for intermediate inspection

@DIEMLtd

Training & competence required of operativesby installer

details of the sequence of tasks & responsibility

detail of any commissioning

Customer delivery & timescales

procedures for installation control

EEM design specification from EEM specifier

Page 8: Energy Efficiency Installation Process under PAS 2030:2012

procedures for installation control

Methodstatement

Location specific

information

Installation method

Toolsrequired

Checking, handling & storage instructions

Installation instructions

to operatives

Requirement for intermediate inspection

@DIEMLtd

Training & competence required of operativesby installer

details of the sequence of tasks & responsibility

detail of any commissioning

Customer delivery & timescales

EEM design specification from EEM specifier

Page 9: Energy Efficiency Installation Process under PAS 2030:2012

Energy efficiency measure design specification

@DIEMLtd

Page 10: Energy Efficiency Installation Process under PAS 2030:2012

Installation location information

@DIEMLtd

Page 11: Energy Efficiency Installation Process under PAS 2030:2012

Installation methods

@DIEMLtd

Page 12: Energy Efficiency Installation Process under PAS 2030:2012

Installation equipment and tools

@DIEMLtd

Page 13: Energy Efficiency Installation Process under PAS 2030:2012

@DIEMLtd

Checking, handling and storage

Page 14: Energy Efficiency Installation Process under PAS 2030:2012

Provision of installation instructions to operatives

@DIEMLtd

Page 15: Energy Efficiency Installation Process under PAS 2030:2012

People

@DIEMLtd

Page 16: Energy Efficiency Installation Process under PAS 2030:2012

Engagement of subcontract installers

@DIEMLtd

Page 17: Energy Efficiency Installation Process under PAS 2030:2012

Commissioning

@DIEMLtd

Page 18: Energy Efficiency Installation Process under PAS 2030:2012

Handover

@DIEMLtd

Page 19: Energy Efficiency Installation Process under PAS 2030:2012

Installation control

@DIEMLtd

Page 20: Energy Efficiency Installation Process under PAS 2030:2012

Quality Management SystemManagement Responsibilities

Resource ManagementProduct Realisation

Measurement analysis and improvementMethodstatement

Energy efficiencymeasuredesign

specification

Installationlocationinformation

Installationmethods

@DIEMLtd

Backup for Method Statements with ISO 9001:2008