enterprise cbu for power v9 - ibm www page · pdf filenew capacity backup for power enterprise...

13
Welcome to the Waitless World IBM Power Systems CBU for E880, E880C, E870 and E870C Steven Finnes [email protected] Bill Casey [email protected]

Upload: letram

Post on 23-Mar-2018

227 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Enterprise CBU for Power V9 - IBM WWW Page · PDF fileNew Capacity Backup For Power Enterprise Systems ... CBU or if alternative HA/DR solution is used, as many IBM ior AIX entitlements

Welcome to the Waitless World

IBM Power Systems CBU for E880, E880C, E870 and E870C

Steven [email protected]

Bill [email protected]

Page 2: Enterprise CBU for Power V9 - IBM WWW Page · PDF fileNew Capacity Backup For Power Enterprise Systems ... CBU or if alternative HA/DR solution is used, as many IBM ior AIX entitlements

© 2015 IBM Corporation

Welcome to the Waitless World

New Capacity Backup For Power Enterprise Systems

• New offering replaces the Capacity Backup for PowerHA offering– More flexible than previous offering– Eliminates many of the configuration requirements– Provides support for the Power E870 and new Cloud models– Provides lower hardware and hardware maintenance pricing for clients looking for

HA/DR solution– Fast failover to active memory on the CBU

o To add 256GB of memory to the partition it can take 3 or 4 minutes, the more being added the longer the time

2Primary CBU

entitlement transfer

Page 3: Enterprise CBU for Power V9 - IBM WWW Page · PDF fileNew Capacity Backup For Power Enterprise Systems ... CBU or if alternative HA/DR solution is used, as many IBM ior AIX entitlements

© 2015 IBM Corporation

Welcome to the Waitless World

Power E880C HA/DR Financial Alternatives ( 3 year TCA) ExampleProduction System

CBU SystemDedicated Capacity Backup

Fast Failover (0 extra time for Memory acquisition)

Total $571kHW $523 K

SW & SWMA $30k

HWMA $18k

Total $804kHW $748k*

SW & SWMA $30k

HWMA $25k

Total $880kHW $825*

SW & SWMA $30k

HWMA $25k

Total $1.892mHW $1.396m

SW & SWMA $365k

HWMA $131k

All Active System

Total $1.892mHW $1.396m

SW & SWMA $365k

HWMA $131k

-or- -or--or-

*includes proc/mem conversion to mobile *includes static to mobile core conversion and additional static memory activation

Power Enterprise Pools System

Flexible usage / additional workload

10-15 minutes per TB for memory acquisition

Power Enterprise Pools System

Flexible usage / additional workload

Purchase Active MemoryFast Failover (0 extra time for

Memory acquisition)

Example is a 96/128 and 3TB/4TB Power E880C production system with AIX Std, PowerVM EE & PowerVC Cloud Mgr

Page 4: Enterprise CBU for Power V9 - IBM WWW Page · PDF fileNew Capacity Backup For Power Enterprise Systems ... CBU or if alternative HA/DR solution is used, as many IBM ior AIX entitlements

© 2015 IBM Corporation

Welcome to the Waitless World

Power Systems CBU for Enterprise Servers Offering

Offering for – Power System E880, E880C, E870 & E870C customers – HA/DR deployments requiring fast failover via active standby memory

CBU offering Features:– Deeply discounted processor nodes matching the installed production

server processor nodes– No charge active standby memory = 365xNx32 GB, where N is the

number of active mobile cores on the production server renewable annually

– Mobile processor activations are transferred from production to CBU via Enterprise Pool transfers

Offering requirements overview– Primary system and CBU system must be the same machine

model and type. Same GHZ to same GHZ – Only one Enterprise CBU to the eligible primary system– Primary can be new or installed box, CBU must be a new box– A minimum of one entitlement of AIX or IBM i & PowerHA on the

CBU or if alternative HA/DR solution is used, as many IBM i or AIX entitlements as needed to support the workload (such as a middleware replication workload)

– 8 processor static activations on the CBU (no more no less)– Minimum of 25% of DIMM memory active on the CBU– No charge Memory ECOD days must be activated upon install of

CBU system and remain active for 365 days – Registration of primary system and CBU prior to CBU order

fulfillment (registration validates configuration)Primary and CBU must be within the same enterprise

Primary CBU

entitlement transfer

• All transferable entitlements must originate on the primary system and may not run concurrently on the primary system and the CBU system

• Subsequent to the initial workload deployment, production partitions may be moved to the CBU system for workload balancing etc

• The total number of processor entitlements running production across both servers can not exceed the original total licensed entitlements.

Page 5: Enterprise CBU for Power V9 - IBM WWW Page · PDF fileNew Capacity Backup For Power Enterprise Systems ... CBU or if alternative HA/DR solution is used, as many IBM ior AIX entitlements

© 2015 IBM Corporation

Welcome to the Waitless World

Production and CBU Enterprise reference table

• Production node feature code defines eligible CBU processor node feature code – CBU processor node model and type must be the same as the Primary processor node model and type (exception is when the

primary system is an E870 4.19GHZ)– The number of eligible discounted CBU processor nodes = the number of production processor nodes

• The CBU requires a CBU System Feature Code attained upon ordering the system and must be registered prior to shipment

PrimarySystem MTM ProcessorNodeFC CBUProcessorNodeFC CBUSystemFCPowerE8704.02GHz 9119-MME EPBA EPBWorEP8B EB3KPowerE8704.19GHz 9119-MME EPBC EPBTorEP8F EB3K

PowerE870C4.02GHz 9080-MME EPBAorEP8A EPBWorEP8B EB3K

PowerE8804.02GHz 9119-MHE EPBD EPBHorEP8H EB3JPowerE8804.19GHz 9119-MHE EPBS EPBTorEP8F EB3JPowerE8804.35GHz 9119-MHE EPBB EPBGorEP8D EB3J

PowerE880C4.02GHz 9080-MHE EPBDorEP8G EPBHorEP8H EB3JPowerE880C4.19GHz 9080-MHE EPBSorEP8E EPBTorEP8F EB3JPowerE880C4.35GHz 9080-MHE EPBBorEP8C EPBGorEP8D EB3J

Europeonlyfeaturecodes: EP8A,EP8G,EP8E,EP8C EP8B,EP8H,EP8F,EP8D

Page 6: Enterprise CBU for Power V9 - IBM WWW Page · PDF fileNew Capacity Backup For Power Enterprise Systems ... CBU or if alternative HA/DR solution is used, as many IBM ior AIX entitlements

© 2015 IBM Corporation

Welcome to the Waitless World

Example: Power E870 CBU for Power Enterprise Systems

Power E870 CBU System:• Two discounted processor nodes features: EPBX• 8 active static cores • 25% of DIMM memory active• 365 days x 40 mobile cores x 32 GB/mobile core =

467,200 Gbyte of no charge ECOD memory days

Power E870 Production System:• Two processor nodes feature: EPBC • 8 active static cores + 40 mobile cores• 50% DIMM memory active

CBU system specify feature code: EB3K

PowerHA cluster

Page 7: Enterprise CBU for Power V9 - IBM WWW Page · PDF fileNew Capacity Backup For Power Enterprise Systems ... CBU or if alternative HA/DR solution is used, as many IBM ior AIX entitlements

© 2015 IBM Corporation

Welcome to the Waitless World

Example: Power E880 CBU for Power Enterprise Systems

Power E880 CBU System:• Three discounted processor nodes features: EPBH• 8 active static cores • 25% of DIMM memory active• 365 days x 36 mobile cores x 32 GB/mobile core =

420,480 Gbyte of no charge ECOD memory days

Power E880 Production System:• Three processor nodes feature: EPBD • 8 active static cores + 36 mobile cores• 50% DIMM memory active

CBU system specify feature code: EB3K

PowerHA cluster

Page 8: Enterprise CBU for Power V9 - IBM WWW Page · PDF fileNew Capacity Backup For Power Enterprise Systems ... CBU or if alternative HA/DR solution is used, as many IBM ior AIX entitlements

© 2015 IBM Corporation

Welcome to the Waitless World

PowerHA data center cluster

Example topology: Two site three server (E870s) PowerHA/GDR config

• Only one CBU for Enterprise Systems may be paired to a primary/production servers• Therefore, you can use Enterprise Pools & GDR to move resources to the second site • For IBM i installations you could also choose to deploy the CBU for i at the second site

CBU feature code: EB3K

GDR to DR site

Page 9: Enterprise CBU for Power V9 - IBM WWW Page · PDF fileNew Capacity Backup For Power Enterprise Systems ... CBU or if alternative HA/DR solution is used, as many IBM ior AIX entitlements

© 2015 IBM Corporation

Welcome to the Waitless World

What is the Geographically Dispersed Resiliency (GDR) for Power Systems DR solution?

VM restartcontrol system (KSYS)

Site 1System 1

VM 1Restart

VM 1

Site 2System 2

Replication

§ Automated DR management

§ Improved economics by eliminating the need for hardware and software resources at the backup site

§ Easier deployment for disaster recovery operations; unlike clustering or middleware replication technologies, VM restart technology has no operating system or middleware dependencies.

A simplified way to manage DR

§ Support for IBM POWER7® and POWER8® Systems§ Support for heterogeneous guest OSs

– AIX– Red Hat – SUSE– Ubuntu

RestartedVM 1

For more information:[email protected]

Page 10: Enterprise CBU for Power V9 - IBM WWW Page · PDF fileNew Capacity Backup For Power Enterprise Systems ... CBU or if alternative HA/DR solution is used, as many IBM ior AIX entitlements

© 2015 IBM Corporation

Welcome to the Waitless World

Example topology: Two site two server (E870s) GDR configuration

• GDR provides the failover/restart capability to the secondary location• CBU for Enterprise Systems at the Disaster Recovery location for huge savings $$$$

CBU feature code: EB3K

Two-site GDR & CBU for Enterprise Systems

Page 11: Enterprise CBU for Power V9 - IBM WWW Page · PDF fileNew Capacity Backup For Power Enterprise Systems ... CBU or if alternative HA/DR solution is used, as many IBM ior AIX entitlements

© 2015 IBM Corporation

Welcome to the Waitless World

PowerHA cluster

Example topology: Two site three server (E870s) PowerHA cluster

• Only one CBU for Enterprise Systems may be paired to a production server• Therefore, you can use Enterprise Pools to move resources to the second site • For IBM i installations you could also choose to deploy the CBU for i at the second site

CBU system specify feature code: EB3K CBU system specify feature code: 4891

Page 12: Enterprise CBU for Power V9 - IBM WWW Page · PDF fileNew Capacity Backup For Power Enterprise Systems ... CBU or if alternative HA/DR solution is used, as many IBM ior AIX entitlements

© 2015 IBM Corporation

Welcome to the Waitless World

Order Process/Registration

• Prior to ordering the CBU with PowerHA fill in the worksheet posted on the CBU registration website to determine number of eligible discounted CBU processor nodes no charge memory ECOD activations

– Submit CBU entitlement worksheet ([email protected])– IBM verifies client configuration entitlements (discounted processor nodes and ECOD days)

• Customer agrees to CBU terms and conditions via registration website• Send configuration files to [email protected]• After project office approval, order the approved CBU configuration

– Specify the # of CBU processor nodes & feature code– Econfig will automatically add the CBU system feature code: EB3J or EB3K

• After CBU system is installed, configuration of Primary and CBU system is sent to [email protected]• CBU project office will apply the appropriate number of ECOD days to CBU for Enterprise Systems• Implement TCOD (temporary COD) via standard process

– TCOD contract signed by client– ECOD enablement codes ordered via MES

Registration website: http://www-03.ibm.com/systems/power/hardware/cbu/

Page 13: Enterprise CBU for Power V9 - IBM WWW Page · PDF fileNew Capacity Backup For Power Enterprise Systems ... CBU or if alternative HA/DR solution is used, as many IBM ior AIX entitlements

© 2015 IBM Corporation

Welcome to the Waitless World

Trademarks and notes

IBM Corporation 2015•IBM, the IBM logo and ibm.com are registered trademarks, and other company, product, or service names may be trademarks or service marks of International Business Machines Corporation in the United States, other countries, or both. A current list of IBM trademarks is available on the web at “Copyright and trademark information” at www.ibm.com/legal/copytrade.shtml

•Other company, product, and service names may be trademarks or service marks of others.

•References in this publication to IBM products or services do not imply that IBM intends to make them available in all countries in which IBM operates.

•IBM and IBM Credit LLC do not, nor intend to, offer or provide accounting, tax or legal advice to clients. Clients should consult with their own financial, tax and legal advisors. Any tax or accounting treatment decisions made by or on behalf of the client are the sole responsibility of the customer.

•IBM Global Financing offerings are provided through IBM Credit LLC in the United States, IBM Canada Ltd. in Canada, and other IBM subsidiaries and divisions worldwide to qualified commercial and government clients. Rates and availability are based on a client’s credit rating, financing terms, offering type, equipment type and options, and may vary by country. Some offerings are not available in certain countries. Other restrictions may apply. Rates and offerings are subject to change, extension or withdrawal without notice.