_____________________________________________________________________ _____________________________________________________________________ ENVIRONMENTAL COMPLIANCE AUDIT REPORT PROJECT NAME: Decommissioning of Scaw Metals Dimbaza Foundry PROJECT NO: J201508 REPORT NO: 01 DEDEAT REF: EC/11/A/LN1/27 (iv)/1308 DATE: 23/09/2015 ______________________________________________________________________ Indwe Environmental Consulting CC 12 Preston Avenue• Vincent • East London • 5247 www.indwecon.co.za Tel: 043 726 6860 Fax: 086 513 9734 Email: [email protected] Company Registration No.: 2006/074394/23 _____________________________________________________________________

Upload: others

Post on 15-Jan-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

_____________________________________________________________________

_____________________________________________________________________

  

ENVIRONMENTAL COMPLIANCE AUDIT REPORT PROJECT NAME:  Decommissioning of Scaw Metals Dimbaza Foundry 

PROJECT NO:  J2015‐08 

REPORT NO:  01 

DEDEAT REF:  EC/11/A/LN1/27 (iv)/13‐08  

DATE:  23/09/2015 

              

______________________________________________________________________

Indwe Environmental Consulting CC 12 Preston Avenue• Vincent • East London • 5247 www.indwecon.co.za Tel: 043 726 6860 Fax: 086 513 9734 Email: [email protected] Company Registration No.: 2006/074394/23 

_____________________________________________________________________ 

Page 2: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry Environmental Inspection Audit Report 

Audit Report No: 01 

Contents  

Chapter  Description  Page 

1  INTRODUCTION  ‐ 3 ‐ 

1.1  ECO Reporting Requirements  ‐ 3 ‐ 

2  REPORTNO: 01  ‐ 4 ‐ 

2.1  Aspects Inspected  ‐ 4 ‐ 

2.2  Summary of level of Contractors Compliance to EMPr  ‐ 4 ‐ 

2.3  Non‐Compliance  ‐ 4 ‐ 

2.4  Partial Compliance  ‐ 4 ‐ 

2.5  Decommissioning Activities  ‐ 4 ‐ 

2.6  Positive Aspects  ‐ 5 ‐ 

2.7  Future Expectations  ‐ 5 ‐ 

2.8  Conclusion  ‐ 5 ‐ 

3  AUDIT CHECKLIST  ‐ 6 ‐ 

3.1  Administration  ‐ 6 ‐ 

3.2  Site Camp  ‐ 7 ‐ 

3.3  Work Areas  ‐ 9 ‐ 

3.4  Close Out  ‐ 13 ‐    APPENDIX A  Supporting Photographs APPENDIX B  Distribution Register 

Page 3: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015

1 INTRODUCTION 

 

Scaw South Africa  (Pty) Ltd appointed  Indwe Environmental Consulting as an  independent Environmental  Control  Officer  (ECO)  to  monitor  compliance  with  the  Environmental Authorisation  and  Environmental  Management  Programme  (EMPr)  compiled  for  the Decommissioning of the Dimbaza Foundry  located  in Dimbaza, King Williamstown, Eastern Cape.  

 

1.1 ECO Reporting Requirements 

 

Section 3.1 of  the Environmental Authorisation stipulates  that  the applicant must appoint an independent Environmental Control Officer to monitor compliance with the conditions of authorisation.  Section  4  of  the  Environmental  Authorisation  states  that  the  ECO  must conduct monitoring sessions to ensure compliance with the conditions of authorisation, as well  as  the  Environmental  Management  Programme  prepared  for  this  project.  These monitoring  sessions must  take  place  on  a  quarterly  basis  and  the  audit  reports must  be submitted to the Department of Economic Development, Environmental Affairs and Tourism (DEDEAT) at the end of each quarter.   

Page 4: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015

2 REPORT NO: 01

2.1 Aspects Inspected 

The EMPr and Environmental Authorisation contains a host of conditions and specifications. Only those relevant to the current decommissioning activities were audited, the rest were marked as not applicable (Refer to audit checklist below).   2.2 Summary of level of Contractors Compliance to EMPr 

 Based on observations made during the site visit 100% of the planning phase aspects and 100% of the construction phase aspects audited were compliant.   It  is  evident  that  Scaw  has  been  vigilant  and  played  detailed  attention  to  the  environmental aspects and compliance of this project. 

 

2.3 Non‐Compliance 

There were no non‐compliance issues identified during this site inspection.  

 

2.4 Partial Compliance 

 There were no partial‐compliance issues identified during this site inspection.  

 

2.5 Decommissioning Activities   

The decommissioning activities inspected during this audit included: 

The dismantling and plasma cutting of the existing steel structures around the site. 

The safe removal and temporary storage of asbestos sheeting. 

The clean up and disposal of mineral waste. 

The removal of waste contained in the pits. 

SITE INSPECTION DETAILS 

Date:  23/09/2015    Report No:  01 

Project:  Decommissioning of Scaw Metals Dimbaza Foundry 

Client:  Scaw Metals  

Phase:   

Present: 

 

Indwe ECO  (Mr Blake Edwards) 

Scaw Metals  (Mr Jake Venter) 

 

Page 5: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015

  2.6 Positive Aspects 

 

All aspects of the EMPr and Environmental Authorisation have been complied with. 

Scaw have maintained brilliant housekeeping on site. 

The site has been kept free of and all solid waste has been either placed  in bins or contained and temporarily stock piled until collection and disposal. 

All documentation  including proof of adequate waste disposal has been filled and kept  in the site office. 

 2.7 Future Expectations 

Scaw are expected  to maintain a great  level of  compliance  throughout  the decommissioning 

phase of the project.    

2.8 Conclusion 

Scaw have 100 % complied with the EMPr and Environmental Authorisation for this audit and must be  commended  on  their  compliance,  although  there  has  only  been  a  small  amount decommissioned to date. 

    

Page 6: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015

3 AUDIT CHECKLIST

3.1 Administration 

DECOMMISSIONING PHASE ‐ ADMINISTRATION 

1. Environmental File  Yes 

Partial 

No 

N/A

 

Observations Corrective Action

Site Plan Layout.  X        The Environmental file has been kept up to date.  EMPr.  X       

Permits & Environmental Authorisation. 

X       

Method Statements.  X       

Community Complaints Register. 

X       

Emergency Incidents Register 

X       

Audit Reports.  X       

Environmental Correspondence. 

X       

Minutes of Meetings.  X       

Emergency Response Plan compiled and on site. 

X       

TOTAL: 10  10       

DECOMMISSIONING PHASE ‐ ADMINISTRATION 

2. Environmental Control Officer  Y

es 

Partial 

No 

N/A

 

Observations Corrective Action

Appointment of ECO  x         

Written notice to DEDEAT.  x       

TOTAL: 02  2       

 

DECOMMISSIONING PHASE ‐ ADMINISTRATION 

3. Environmental Induction & Training 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Contractor EMPr induction.  X         

Contractor’s personnel environmental awareness training toolbox talks 

X       

Record of environmental training. 

X       

TOTAL: 03  3       

    

Page 7: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015

3.2 Site Camp 

DECOMMISSIONING PHASE – SITE CAMP 

1. Site Camp Establishment 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Appropriate Site Access.        X   

Adequate Signage (i.e. Site entrance, emergency numbers, first aid, fire extinguishers). 

      X 

Adequate Fencing/ Gates/Security. 

      X 

TOTAL: 03        3 

DECOMMISSIONING PHASE – SITE CAMP 

2. Solid Waste Management 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Litter in site camp.  X         

Burning or burying of waste.  X       

Scavenger proof waste bins.  X       

Waste collection and disposal. 

X       

Documentation for waste collection and disposal. 

X       

TOTAL: 04  4       

DECOMMISSIONING PHASE – SITE CAMP 

3. Hazardous Material & Waste Management 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Neatness of hazardous material storage area. 

X        

Diesel tank adequately bunded. 

X       

Sufficient drip trays & use of drip trays.   

X       

Sufficient hazardous waste spill kits. 

X       

Hazardous waste drums.  X       

Hazardous material spills & clean‐up. 

X       

Hazardous waste collection and disposal. 

X       

Documentation for waste collection and disposal. 

X       

TOTAL: 08  8       

DECOMMISSIONING PHASE – SITE CAMP 

4. Sanitation 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Sufficient toilets available for both men & woman. 

X        

Chemical toilets anchored.  X       

Page 8: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015

Toilets clean and regularly serviced. 

X       

Documented proof that the chemical toilets are regularly serviced. 

X       

TOTAL: 04  4       

Page 9: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015

3.3 Work Areas 

DECOMMISSIONING PHASE – WORK AREAS 

1. Decommissioning Footprint 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Site plan demarcating the physical extent of the works. 

X        

Adequate demarcation of the work areas. 

X       

Decommissioning activities contained within work areas. 

X       

TOTAL: 03  3       

DECOMMISSIONING PHASE – WORK AREAS 

2. Access to Work Areas 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Adequately demarcated & sufficient signage. 

X        

Public protection.  X       

Access control.  X       

TOTAL: 03  3       

DECOMMISSIONING PHASE – WORK AREAS 

3. Solid Waste Management 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Litter in work area.  X         

Burning or burying of waste 

X       

Is there a central waste storage area and is it well managed. 

X       

Are there sufficient scavenger proof waste bins with lockable lids. 

X       

Waste collection and disposal to registered landfill site. 

X       

Documentation for waste collection and disposal. 

X       

Waste separation into different waste categories  (i.e. general waste, hazardous waste, inert rubble). 

X       

Recycling & Reuse of waste  X       

Inert Material used for fill.  X       

Fill adequately compacted.  X       

TOTAL: 10       

DECOMMISSIONING PHASE – WORK AREAS 

4. Hazardous Waste Management 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Hazardous waste from        x   

Page 10: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015

Area 2 disposed directly as a Type 1 waste to a suitably licensed Class A/H:H Landfill site. 

Hazardous waste from Area 2 treated with lime and disposed of as a Type 4 waste to a suitably licensed Class D or GLB landfill site.  

      X 

Hazardous waste from within the foundry area appropriately handled and correctly disposed of.  

X       

Documented proof of hazardous waste disposal. 

X       

Sufficient drip trays & use of drip trays. 

X       

Hazardous material spills & clean‐up (i.e. pollution of topsoil and watercourses). 

      X 

Was DEDEAT informed within 24 hours of spill. 

      X 

Was clean‐up conducted within 12 hours of spill. 

      X 

Servicing of machines and equipment outside of designated area. 

X       

Hazardous waste adequately stored at temporary storage area prior to removal and disposal. 

X       

TOTAL: 10  5      5 

DECOMMISSIONING PHASE – WORK AREAS 

5. Sanitation 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Sufficient toilets within work areas. 

X        

Chemical toilets anchored.  X       

Toilets clean and regularly serviced. 

X       

Documented proof that the chemical toilets are regularly serviced. 

X       

TOTAL: 04  4       

DECOMMISSIONING PHASE – WORK AREAS 

6. Noise & Vibration Management 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Noise levels within reasonable norms. 

X        

Surrounding business and residential areas informed of the timeframe for decommissioning. 

X       

Community complaints.  X       

Appropriate work hours.  X       

Silencers on machinery and vehicles maintained. 

X       

TOTAL: 05  5       

Page 11: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015

DECOMMISSIONING PHASE – WORK AREAS 

7. Dust Control  

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Adequate dust control measures timeously implemented. 

      x 

 

TOTAL: 01         

DECOMMISSIONING PHASE – WORK AREAS 

8. Culture & Heritage 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Have archaeological or paleontological items been detected. 

      x 

 

Has ECPHRA been informed        x 

TOTAL: 02        2 

DECOMMISSIONING PHASE – WORK AREAS 

9. Topsoil Management 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Topsoil adequately removed from work areas. 

      X  

Topsoil adequately stockpiled (i.e. does not exceed 2m high, no damming of water, no wind/soil erosion). 

      X 

Topsoil mixed with subsoil or building rubble. 

      X 

Topsoil stockpiles dampened during dry conditions. 

      X 

Driving of vehicles or heavy plant on topsoil stockpiles. 

      X 

TOTAL: 05        5 

DECOMMISSIONING PHASE – WORK AREAS 

10. Spoil Stockpiles 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Spoil material adequately stockpiled (i.e. dedicated area, no damming of water, not mixed with topsoil). 

X       

 

Spoil material removed and appropriately disposed of. 

X       

Appropriate areas for spoiling oversized material. 

X       

TOTAL: 03  3       

DECOMMISSIONING PHASE – WORK AREAS 

Page 12: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015

11. Erosion Management 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Practical anti‐erosion measures timeously implemented and maintained. 

      X 

 

Stormwater control measures implemented. 

      X 

TOTAL: 02        2 

DECOMMISSIONING PHASE – WORK AREAS 

12. Rehabilitation & Landscaping 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Shaping and re‐vegetation of disturbed surfaces immediately implemented once decommissioning activities are completed. 

      X 

 

Rehabilitated areas adequately merge with surrounding environment. 

      X 

TOTAL: 02        2 

Page 13: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015

3.4 Close Out 

DECOMMISSIONING PHASE – CLOSE OUT 

1. Site Camp 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

All site camp structures removed from site (i.e. containers, fences, building material, spoil material). 

      X 

 

Hazardous substance spills cleaned up and appropriately disposed of. 

      X 

Hardened surfaces ripped, foreign materials removed, topsoil layer replaced and shaped. 

      X 

Rehabilitated area adequately merges with surrounding environment. 

      X 

TOTAL: 04        4 

DECOMMISSIONING PHASE – CLOSE OUT 

2. Work Area 

Yes 

Partial 

No 

N/A 

Observations Corrective Action 

Decommissioned footprint rehabilitated to appropriate vegetative state. 

      X  

Area 2 hazardous waste removed and disposed of. 

      X 

Area 2 rehabilitated.        X 

TOTAL: 03        3 

Page 14: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015

APPENDIX A  

SUPPORTING PHOTOS  

Figure 1 An example of bins provided on site for solid waste. 

Figure 2 Evidence that the deisel tank is not leaking and the bunded area is in 

good condition. 

 

 

Page 15: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015

Figure 3 Hazardous waste storage area. 

Figure 4 Mineral waste stored in bags. 

Figure 5 Asbestos that has been stored and covered in black plastic sheeting. 

Figure 6 One of the pits that have recently been emptied. 

Page 16: ENVIRONMENTAL COMPLIANCE AUDIT REPORT Documents/Brochures/Audit Report/Dimbaza/Scaw... · Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015 2 REPORT NO: 01

Decommissioning of Scaw Metals Dimbaza Foundry - ECO Audit 01 - 23/09/2015

APPENDIX B  

DISTRIBUTION REGISTER 

FIRST NAME  SURNAME ORGANISATION ROLE EMAILJake  Venter  Scaw Metals  Site 

Manager [email protected] 

Briant  Noncembu  DEAET  Regional Director 

[email protected]