environmental update · environmental update general information meeting for mckenzie avenue...

12
ENVIRONMENTAL UPDATE GENERAL INFORMATION MEETING FOR MCKENZIE AVENUE EXTENSION PROJECT May 24th 2016

Upload: others

Post on 22-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENVIRONMENTAL UPDATE · environmental update general information meeting for mckenzie avenue extension project may 24th 2016

ENVIRONMENTAL UPDATE

GENERAL INFORMATION MEETING FOR MCKENZIE AVENUE EXTENSION PROJECT May 24th 2016

Page 2: ENVIRONMENTAL UPDATE · environmental update general information meeting for mckenzie avenue extension project may 24th 2016

1. Summary of environmental studies

2. Compensation concept

OBJECTIVE

2

Page 3: ENVIRONMENTAL UPDATE · environmental update general information meeting for mckenzie avenue extension project may 24th 2016

Streams according to Montreal and MDDELCC

STREAMS

3

Page 4: ENVIRONMENTAL UPDATE · environmental update general information meeting for mckenzie avenue extension project may 24th 2016

High water line delimitation

STREAMS

4

May 5th 2015

Page 5: ENVIRONMENTAL UPDATE · environmental update general information meeting for mckenzie avenue extension project may 24th 2016

10 m riparian buffer zone

STREAMS

5

Page 6: ENVIRONMENTAL UPDATE · environmental update general information meeting for mckenzie avenue extension project may 24th 2016

Wetlands identified in 2015 with new MDDELCC methodology

WETLANDS

6

Moderate

ecological

value

Low

ecological

value

Page 7: ENVIRONMENTAL UPDATE · environmental update general information meeting for mckenzie avenue extension project may 24th 2016

6 endangered plant species observed

ENDANGERED PLANTS

7

Page 8: ENVIRONMENTAL UPDATE · environmental update general information meeting for mckenzie avenue extension project may 24th 2016

• No information from CDPPNQ &MFFP databases

• No endangered animals observed

ENDANGERED ANIMALS

8

Page 9: ENVIRONMENTAL UPDATE · environmental update general information meeting for mckenzie avenue extension project may 24th 2016

PRELIMINARY PLANS

9

No overlap of the 10 m riparian buffer zone

0,27 ha wetland lost (+/- 0,1 ha for the avenue)

Page 10: ENVIRONMENTAL UPDATE · environmental update general information meeting for mckenzie avenue extension project may 24th 2016

AVOID → MINIMIZE → COMPENSATE

• Overlap of the 10m stream riparian buffer zone avoided by shifting the avenue inside the cadastral limits

• Unable to avoid wetland, minimization of perturbation by ensuring residual wetlands will continue to receive sufficient water

• Loss of wetlands requires compensation replacements

PROJECT ANALYSIS

10

Page 11: ENVIRONMENTAL UPDATE · environmental update general information meeting for mckenzie avenue extension project may 24th 2016

Possibilities are :

• Land conservation

• Re-naturalization of disturbed habitat

Best option is partial acquisition of McGill land

• For acceptation by MDDELCC, need to prove that proposed conservation is an environmental gain

COMPENSATION

11

Page 12: ENVIRONMENTAL UPDATE · environmental update general information meeting for mckenzie avenue extension project may 24th 2016

Compensation concept proposed

COMPENSATION

12

20 m buffer = 0, 38 ha

1,1 ha block (1,5 ha with bottom)