enzotech web site presentation

18
Enzotech - STPs Chennai

Upload: enzotechslides

Post on 21-Nov-2014

953 views

Category:

Technology


1 download

DESCRIPTION

Website Presentation of Enzotech

TRANSCRIPT

Page 1: Enzotech web site Presentation

Enzotech - STPs

Chennai

Page 2: Enzotech web site Presentation

Enzotech : a brief intro

Full fledged manufacturing, marketing and after sales service facilities for Packaged STPs

Strong client roster – testimony to efficacy of Patented technology

MoD approved

Packaged STPs from 5 KLD to 150 KLD in FRP and >150 KLD to 500 KLD in civil construction

Page 3: Enzotech web site Presentation

Treatment capacity 1000 L – 1,50,000 L Per Day Superior & Effective Treatment of sewage

Minimum sludge generation No stench

Low power consumption Low cost of operation

Minimum civil work Compact design – Less space requirement

Very little operation noise Treated water quality – Recyclable / Reusable Quick & easy installation Low maintenance Eco-Friendly

Key features of Enzotech plants

Page 4: Enzotech web site Presentation

Modified RBC Process

Page 5: Enzotech web site Presentation

ENZOTECH STP MODEL

Page 6: Enzotech web site Presentation

EnzotechHigh Rate Parallel Plate Clarifier

Page 7: Enzotech web site Presentation

Enzotech technologyModified Parallel plate clarifier by Enzotech

(Patented)

• Special High Rate Clarificator

• Modified parallel plate clarification with coagulation & precipitation with special polymer or Electrocoagulation.

Page 8: Enzotech web site Presentation

The Bio-ballDesign of Bio-ball media

Enzotech Bio-Ball Media – Patent Granted

Media available in market

Page 9: Enzotech web site Presentation

COMPARISON OF MEDIA CHARACTERISTIC

NAME SIZE SURFACE AREA

VOID RATIO

WEIGHT

Fujino

Spirals

50 mm 350 Sq.m/Cu.m

92 % 110 gm/L

Enzotech

Bioball

28 mm 550 Sq.m/Cu.m

95 % 27 gm/L

Page 10: Enzotech web site Presentation

Modified RBC Technology

Modified Rotating Biological Contactor by Enzotech (Patented)

Page 11: Enzotech web site Presentation

Bio remediation Establish Microbiology Lab Identification & selection of efficient bacteria for sewage

treatment Other seven species of bacteria for production of

enzymes for faster metabolism of waste.

OIL CHEMICALDETERGENT

Page 12: Enzotech web site Presentation

Bio Filtration

Bio-Media Filtration (Patented)

In secondary clarifier, bio-filtration is done using floating media.

Page 13: Enzotech web site Presentation

ASP Vs MBR

Page 14: Enzotech web site Presentation

Defining Parameters MBR Enzotech - FRP Type

Raw sewage parameters    

TSS,mg/l 200 to 250 300 to 350

BOD,mg/l 300 to 400 400 to 500

COD/mg/l 500 to 600 800 to 1000

Treated water parameters    

TSS,mg/l Nil 5 to 10

BOD,mg/l <3 < 10 to<3

COD/mg/l <50 50 to 100

Comparison of MBR and Enzotech FRP

Page 15: Enzotech web site Presentation

Defining Parameters MBR Enzotech - FRP Type

Sludge handling system requirement

 Sludge production is more. It needs Belt press or centrifugal sludge removal equipment.

Sludge removed by gravity on sludge bed

Advantages

Membrane process with extra pure outlet water quality for special use, smaller area requirement.

Classical treatment improved for higher efficiency to give better treated water for reuse, less space and less power requirement.

Disadvantage

Continuous maintenance of high MLSS, high membrane replacement cost, huge power requirement, highly trained operator required.

Chemical cost, mechanical maintenance are high

Comparison of MBR and Enzotech FRP

Page 16: Enzotech web site Presentation

Defining Parameters MBR Enzotech - FRP Type

Installation Electromechanical 6 to 8 weeksEasy installation 1 to 2

weeks

Below 150 KLD MSEP / RCC FRP

Above 150 KLD RCC RCC

Equalization Min. 8 Hrs Retention TimeMin. 12Hrs Retention Time

Biological Tank

Min. 6 Hrs Retention Time, since high MLSS is maintained

Min. 1 to1.5 Hrs Retention Time

Secondary Settlers NA Min 2 Hrs Retention time

Filter Feed Tank NAMin 15 minutes Retention

time

Treated water Tank As per required 12 hrs

Aerobic Digester NA NA

Sand Filter, m3/m2/hr NA 15 to 20

Activated Carbon filter,m3/m2/hr NA 12 to 15

Softener Input Hardness/ OBR NA

MLSS 8000 mg/l to 12000 mg/l Not required

Comparison of MBR and Enzotech FRP

Both have 6 hours total retention time

Page 17: Enzotech web site Presentation

Defining Parameters MBR Enzotech - FRP Type

OperationFully automated for critical

operations

Easy system operates on its own with periodical checks

ManpowerSkilled, not on continuous basis

Semi skilled, and not on continuous basis

Energy EfficiencySelection of energy efficient

equipment required Energy efficient

Typical cost in Rs.100 per KLD sewage treatment

Depends upon membrane selection 22.5 lakhs

Operating cost per KLD sewage treatment (power, chemicals etc. Rs.22 to24 Rs.10 to15

land requirement per 100 KLD sewage treatment 50 to 65 m2 50 to 65 m2

Comparison of MBR and Enzotech FRP

Page 18: Enzotech web site Presentation

Defining Parameters MBR Enzotech - FRP Type

Recommended ApplicationMunicipal corp., SEZ, Hotels, IT parks

,Residential projects, ETP etc

Township, Residential projects, SEZ, Hotels, Hospital ,IT parks, ETP etc

Design life of media/Membrane 3 to 7 years 15 to 20 years

Automation PLC based operation Not required

Minimum and Maximum capacities up to 6 MLD STP 10000 liter per day to all size

Availability of spare components for maintenance

Not readily, involves membranes and automation Easy

Comparison of MBR and Enzotech FRP