EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop asset registry Assess Condition and failure modes Determine residual life Determine life cycle and replacement costs Set target Levels of Service (LoS) Root cause analysis Reliability centered and Predictive maintenance Optimized decisionmaking Confidence level rating Strategic validation Optimized decision making System layout Data hierarchy Standards inventory Demand analysis Balanced scorecard Performance metric Valuation, life cycle costing Expected life tables, decay curves Condition assessment Protocol Rating methodologies Failure mode and effects analysis Business Risk Desktop / Interviews Renewal annuity Asset management plan Policies and strategies Annual budget 1. What is the current state of my assets? 2. What is the required LOS? 3. Which assets are critical? 4. What are my best CIP and O&M strategies? 5. What is my best funding strategy?

Upload: others

Post on 26-Feb-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

EPA / WERF/ WaterRF Framework

DetermineAsset Risk

OptimizeO&M

Investment

OptimizeCapital

Investment

DetermineFundingStrategy

Build AMPlan

Developasset registry

Assess Condition andfailure modes

Determineresiduallife

Determine lifecycle and 

replacement costs

Set targetLevels of

Service (LoS)

Root cause analysisReliability centered andPredictive maintenance

Optimized decision‐making

Confidence level ratingStrategic validationOptimized decision

making

System layoutData hierarchy

Standards inventory

Demand analysisBalanced scorecardPerformance metric

Valuation, lifecycle costing

Expected lifetables,

decay curves

Condition assessmentProtocol

Rating methodologies

Failure mode and effects analysisBusiness Risk

Desktop / Interviews

Renewal annuity

Asset management plan

Policies and strategiesAnnual budget

1. What is the current state of my assets? 2. What is the required LOS?

3. Which assets are critical?  4. What are my best CIP and O&M strategies?

5. What is my best funding strategy?

Page 2: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Capacity Projections

Ohio Senate Bill 2Asset Management Plan Requirements

Presented by Sherry LoosState Coordinator

Page 3: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

What is Approved Capacity?• “Approved capacity” means the allowable rate at

which water may be processed by a component of a water-supply source or a WTP.

• Approved capacity of a water-supply source or WTP is based on the limiting component.

• Approved capacity of a source/WTP system is the lesser between the approved capacity of the water-supply source and WTP.

Page 4: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Where do I find it?• It should be in your Plan

Approval letter.

• It should also be noted in your last Sanitary Survey report.

• When in doubt, call your OEPA Environmental Specialist or your engineer.

Page 5: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Draft AM Rules Requirements(a) Written approved capacity projections meeting the requirements of Ohio EPA's "Planning and Design Criteria for Establishing Approved Capacity for: 1) Surface Water And Ground Water Supply Sources, 2) Drinking Water Treatment Plants (WTPs), and 3) Source/WTP Systems" (2010 ).

(b) Identification of infrastructure needed to meet written approved capacity projections.

Page 6: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

New approved capacities will be determined by Ohio EPA only if the public water system is requesting a “change” in its water-supply source or WTP capacity – otherwise the approved capacities from the most recent plan approval will be restated in the plan approval letter.

Page 7: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

What components enable your approved capacity?

And, what is their condition? If you aren’t meeting it now, what improvements are needed?

Page 8: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

How does your production compare?Close to capacity?

• What is your limiting factor?

• This should impact your planning for future capital improvement projects to increase capacity.

• Can you make improvements to distribution to reduce water loss?

• Does a neighbor have excess capacity?

• Be honest and realistic about future demand.

Do you actually project increasing demand?

Many places in Ohio have seen reduced demand.

Page 9: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

How does your production compare?Too much capacity?

• Are you ‘downsizing’ in future capital improvement projects?

• Are there opportunities to serve others?

• Restrain optimism for grand plans of growth and speculative development. Be realistic!

Lost industrial users and population decline have left many communities with excess capacity.  Some have also overestimated future demand and overbuilt hoping for new customers.

Page 10: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Comments or Questions?

Page 11: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Capital Improvement Plans & Long Term Funding Strategies

Ohio Senate Bill 2Asset Management Plan Requirements

Page 12: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Draft AM Rules Requirements(16) Capital improvement plan (CIP).

(a) A CIP will include annual projections in five-year, ten-year and twenty-year planning horizons with detailed expenditures in each of those time frames.

(b) The projects should be listed by the year in which they are planned and include, at a minimum, the following information:

(i) Description of the project.(ii) Need for, and benefits of, the project.(iii) Estimate of project cost.(iv) Estimate of operation and maintenance.(v) Funding sources.(vi) Impact on Level of Service .

Page 13: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Draft AM Rules Requirements(17) Long-term funding strategy to support asset management plan implementation, including, but not limited to, the identification of sources and amounts of funds to finance the needed repair, rehabilitation, replacement or expansion of assets, including debt service and to provide for emergencies for each of the following ten years.

Page 14: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

How do we define a Capital Improvement?

Capital Improvement:A major, non-recurring physical expenditures for items such as equipment, tankage, structures, buildings, and collection system infrastructure.

Page 15: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Preventative & Predictive Maintenance in a CIP?

• The rehab/replacement has a long useful life (ex. 10-20 years).

• Exceeds a certain dollar threshold (ex. $25K, $50K, higher).

• Is not included in the annual O&M budget.

Page 16: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

• Predictive Maintenance is based on an estimated useful life, but the actual project is triggered when performance or condition dips below a specified threshold.

• Project financing is planned and ready for the estimated useful life.

Managing Predictive Maintenance

Page 17: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

When to finance?When to save?

• It comes down to the cost of borrowing vs. the cost of saving, and debt capacity.

• Near term projects (less than 5 years) it may not be possible to save enough.

• If the useful life of the project or purchase is less than 20 years, consider saving for 100%.

• If you are eligible for low interest loans below the rate of inflation, consider planning to save 10-15% soft costs and borrow for the rest.

• Go after grants if you are eligible, don’t count on them for the future.

Consider saving for 100% of replacement projects for things that have a shorter useful life and/or are less likely to qualify for subsidized loans.

Page 18: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Justifying a Large Reserve Fund: Your AM Plan is Your Friend

• Your Asset Management Plan provides the justification for large reserve accounts or carryover balances.

• Documentation for your Auditor.

• Proof of Need if elected officials balk at your rates!

Page 19: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

The Value of a CIP• A CIP requires a systematic evaluation of all potential

projects at the same time.

• A CIP requires a utility to prioritize, and should focus on preserving a utility’s infrastructure while ensuring the efficient use of public funds

• A CIP allows the governing board to better project future revenue needs.

• A CIP can serve as a public relations and economic development tool.

Page 20: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Steps in Completing a CIP1. Identify the team2. Decide on a format3. Establish rating criteria4. Identify projects5. Identify project costs6. Complete a project list7. Rate projects8. Prioritize projects9. Group projects

10. Complete a schedule11. Complete the report12. Implement the plan13.Update the plan

Page 21: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Your CIP• Projects already in the works• High priority projects• Consider consolidating or dividing

projects to optimize grant opportunities if eligible.

• Hand-in-hand with 5-year detailed rate study. Pay attention to inflation.

• May be too late to save enough for projects that would ideally be paid for out of reserves.

5 –Year Plan

Page 22: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Your CIP• Time to consider other more economical

alternatives.• Start to use data-driven decision making.• Build reserves for out-of-pocket projects.• Very important to factor inflationary trends.• Start to realize long-term cost savings of Asset

Management Plan implementation.

10 –Year Plan

Page 23: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Your CIP• Saving for pre-determined

reserve fund goals for each project.

• Ensuring rates and reserves keep up with inflation.

• Following a ‘Master Plan’.• Adjusting remaining

useful life and adjusting CIP schedules based on condition assessments.

• Flexibility to adopt new technology or methods.

20 –Year Plan

Page 24: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Resources• AWWA M29 – Water Utility Capital Financing (4th Edition), 2014.

• UNC Environmental Finance Center – Plan to Pay Scenarios to Fund Your CIP (free Excel spreadsheet download).

Page 25: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Resources

Especially for small systems: RCAP Funding Grid and RCAP Funding Scenarios Spreadsheet.Visit www.ohiorcap.org for latest version.

Page 26: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Resources• Recorded RCAP Asset

Management Webinar Series: Completing a Capital Improvement Plan

• Link provided on AM page of Ohio RCAP website.

https://dl.dropboxusercontent.com/s/te04310huxsoj1m/Capital%20Improvement%20Reshoot.mp4

Page 27: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Comments or Questions?

Page 28: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Operation & Maintenance Plans

Ohio Senate Bill 2Asset Management Plan Requirements

Page 29: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Draft AM Rules Requirements(11) Operation and maintenance programs.

(a) Implementation procedures and standard operating procedures (SOP’s) for daily operation of the facility.(b) Performance testing protocols and maintenance schedules for each of the following:

(i) Wells, reservoirs and intakes.(ii) Pump stations.(iii) Electrical equipment and controls.(iv) Water treatment facilities.(v) Water storage tanks.(vi) Distribution system components.(vii) Auxiliary power.

Page 30: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Draft AM Rules Requirements(11) Operation and maintenance programs (continued…)

(c) Maintenance schedules shall be based on the following:(i) The maintenance frequencies recommended by the manufacturer, for those components for which such recommendations exist.(ii) For all other components, the maintenance frequency commonly used in the water works industry such as recommendations by the American Water Works Association’s performance testing.(iii) The public water system will determine other acceptable bases for operation and maintenance if paragraphs (a) and (b) of this section are not applicable.

(d) Demonstrate an adequate maintenance log is maintained.

Page 31: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Many of These You Have Wells, reservoirs and intakesPump station manualsElectrical equipment and controlsWater treatment facilities O&M ManualWater storage tanksDistribution system componentsAuxiliary power

Page 32: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Some SOP’s you probably need…

Wells, reservoirs and intakesPump stationsElectrical equipment and controlsWater treatment facilitiesWater storage tanksDistribution system componentsAuxiliary power

Page 33: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Distribution Core SOP’s1. Hydrant – Flushing (corrective)2. Hydrant - Inspection and maintenance 3. Disinfectant Residual Sampling 4. Responding to low chlorine residual5. Responding to low pressure6. Storage tank inspection 7. Taking a coliform sample8. Valve exercising 9. Water Main Break10. Issuing a boil water order 11. Safety

a. Personal Protective Equipmentb. Traffic Controlc. Confined Spaced. Excavation and Trenching

Page 34: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Distribution: Next Level SOP’s1. Nitrification response 2. Handling a total coliform positive 3. Potential contaminant in the system4. Customer inquires & response5. Leak detection6. Water loss determination7. Location of water mains8. Meter replacement9. Meter testing10. Tapping (large taps, small taps)11. Pump station inspection, operation,

and maintenance

Page 35: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Advanced and Site Specific SOP’sChlorine mappingCross connection control plansHydrant inspection and maintenance programHydraulic modelingLeak detection/ water loss control programMapping/GIS Data ManagementPressure management programValve exercising programBooster chlorinationCathodic protection inspectionCathodic protection monitoring/inspectionCorrosion controlCutting AC pipe

Filling a storage tankFinding valvesInternal corrosion monitoring and controlHydrant repairPRVs – Inspection, Maintenance, RepairNitrification controlSoil resistivity testingStorage tank - Cleaning Taps (large and small)Unidirectional flushingValve operation 16" or largerValve repair (not under pressure)Valve repair (under pressure)

Page 36: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Are You Using Best Practices?• Following manufacturer preventative and

predictive maintenance schedules and instructions.

• Tank inspections, cathodic protection, cleaning and coating

• Distribution System recommended preventative and predictive maintenance:

o Unidirectional hydrant flushing & testing twice per yearo Valve exercising 1-2x per year, & maintenanceo Water Audits &Active Leakage Control (ALC)o Pipe condition/performance monitoring

Page 37: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Written SOP’s won’t mean much if they aren’t practiced!

• How will you support your staff with training to understand and implement SOP’s.

• Where will staff find them?

• For each maintenance or inspection task, what are the performance indicators or condition assessments that trigger follow up work?

Page 38: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Resources• SOP’s Cooperative

o Costs between $120-$3K/yr based on populationo www.sopcooperative.com

• AWWA Manuals o G200-15 Distribution Systems Operation and

Managemento M44 Distribution Valves: Selection, Installation,

Field Testing, and Maintenanceo Many others manuals and handbooks

Page 39: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Resources• National RCAP How-To Videos

o SOP training videoso Most are 3-8 minuteso https://vimeo.com/rcap

Page 40: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Has anyone completed assembling SOP’s, Testing Protocols and Maintenance Schedules?

Questions or Comments

Page 41: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Emergency Response & Contingency Plans

Ohio Senate Bill 2Asset Management Plan Requirements

Page 42: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

(12) Emergency preparedness and contingency planning program.

(a) Community public water systems shall prepare a written contingency plan meeting the requirements of Chapter 3745-85 of the Administrative Code including, but not limited to documentation demonstrating the resources and ability to implement a contingency plan as required under rule 3745-85-01 of the Administrative Code.

Draft AM Rules Requirements

Visit http://epa.ohio.gov/ddagw/security

Page 43: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Contents of the planMap of the Distribution System

Maps should include location of valves, well field, surface water intakes and emergency connections as applicable.

Page 44: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Contents of the plan

• Funds for emergency repairs & alternative water supply

• Recommend minimum 45 days, ideally 90 days, working capital to operate

• Clear rules/policies about procurement during emergencies that enable response

Budgets for Emergency Use

Page 45: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Contents of the planDetermination of the most likely circumstances that will affect the public water system.

Page 46: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

At a minimum, all public water systems shall address the following circumstances:• Short term power failure (time of interruption is less than two hours).• Extended power failure (two or more hours).• Pump or motor failure.• Loss of water from a well or other water source.• Line breaks that affect the routine delivery or treatment of water.• Natural disaster (e.g. tornado, flood and drought).• Unplanned absence of operator.• Contamination of source water including releases

of oil and hazardous substances.• Exceedances of a maximum contaminant level

(MCL) or an action level (ALE).• Violation of a treatment technique.

Page 47: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

SOP’s & The Plan• Description of the procedures to be followed

and actions necessary to maintain or restore service to customers.

• Public water systems that use automation to monitor or control the systems shall include plans to manually operate the public water system in the event of loss of automation.

• Public water systems that have auxiliary power shall include plans to operate the public water system on auxiliary power in the event of a loss of power.

Page 48: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Critical Users• Keep a list of water users having critical

needs for a continuous supply of water (e.g., hospitals, dialysis centers and nursing homes).

• Maintain list of consecutive systems which includes contact information.

• A description of the process used to determine the list of critical users.

Page 49: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

NotificationsPublic water systems shall identify the method and timing of notification of water users, Ohio EPA, local health departments and local EMAs.

The notification shall communicate that an emergency affecting the ability of the public water system to provide potable water exists.

Page 50: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

DocumentationMaintain records documenting the time and method of notifications.

If depressurization has occurred, document the procedure used to return the public water system to normal service (SOPs).

Page 51: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Review & Revise• At least annually, exercise responses to one

or more of the circumstances identified in the plan. The exercise may be discussion-based, tabletop or live.

• Consult with the county EMA regarding participation in a hazardous spill exercise.

• Maintain documentation at the public water system the exercise happened.

• Document what went well and improvements needed.

Page 52: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Triggering the PlanIf a circumstance triggers the activation of the contingency plan, public water systems shall do the following:

• Follow the contingency plan to the extent the circumstances allow.

• Notify Ohio EPA immediately, but no later than twenty-four hours from the beginning of the situation requiring activation of the contingency plan.

• Develop and maintain a written after-action report that includes an assessment of the plan's effectiveness and any changes that have been or should be made to the plan as a result of the assessment.

Page 53: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

Other Requirements• Contingency plans are not public records in

accordance with section 149.433 of the Revised Code.

• On an annual basis each public water system shall supply emergency contact who will ensure a response from the system within 30-minutes.

• In the event that emergency contact information changes, the owner, operator and operator of record of the facility shall be individually and jointly responsible for notifying Ohio EPA of the changes within 3-days.

Page 54: EPA WERF/ WaterRF Framework...EPA / WERF/ WaterRF Framework Determine Asset Risk Optimize O&M Investment Optimize Capital Investment Determine Funding Strategy Build AM Plan Develop

How many of you are confident your Contingency Plan meets the requirements?