equipment modeling using pdms- primitives and templates

6
2/21/2015 Equipment Modeling Using PDMS Primitives And Templates http://www.pipingengineering.com/equipmentmodelingusingpdmsprimitivesandtemplates.html 1/6 Home » PDMS » Equipment Modeling Using PDMS Primitives And Templates Equipment Modeling Using PDMS- Primitives And Templates Previously I gave a PDMS overview in this post. Here I will take you through the equipment modelling using PDMS. An application is supplementary program that has been tailored to provide easy control of operations that are specific to a particular discipline. The applications you will use for design work are: General Equipment Pipework Cable Trays HVAC Designer Structures Beams & Columns Panels & Plates Walls & Floors Access, Stairs & Ladders Design Templates Cabling System Equipment modelling Equipment Modeling to search type and hit enter FOLLOW US ON GOOGLE+ Or reach me on [email protected] RELATED READING Hierarchy in PDMS: World, Site, Zone Hierarchy in PDMS (Plant Design Management System): World, Site, Zone… 3D Modelling/Environment for Plant Design 3D modelling/environment for Plant Design: In today’s design world, majority… Stretch/Trim Functions in PDMS Equipment Modelling Stretch/Trim Functions in PDMS Equipment Modelling One of the important… Nozzle Orientation Drawing August 12, 2014 Tank farm: Types, Design Considerations, Plot Plan Arrangement, Dyke Enclosure Part 1 August 6, 2013 Guide to Level Instruments Principles & Application October 19, 2014 Elbow: Component for Piping Direction Change January 29, 2014 Check List for Piping Material TakeOff (MTO) February 27, 2014 Piping engineering + 335 Follow +1 SUBSCRIBE UPDATES. IT'S FREE! Your email: Enter email address... Subscribe Popular Recent Comments HOME VALVE PIPING COMPONENTS PIPING LAYOUT PIPE FITTINGS HOW TO CHECKLISTS FORUM CONTACT US ?? Search... Sign up to get latest FREE articles right to your inbox! Your email: Enter email address... Subscribe Unsubscribe ×

Upload: muthu-kumar

Post on 25-Dec-2015

115 views

Category:

Documents


15 download

DESCRIPTION

used for beginners

TRANSCRIPT

Page 1: Equipment Modeling Using PDMS- Primitives and Templates

2/21/2015 Equipment Modeling Using PDMS­ Primitives And Templates

http://www.piping­engineering.com/equipment­modeling­using­pdms­primitives­and­templates.html 1/6

⌂ Home » PDMS » Equipment Modeling Using PDMS­ Primitives And Templates

Equipment Modeling Using PDMS- Primitives AndTemplatesPreviously I gave a PDMS overview in this post. Here I will take you through the equipment modelling usingPDMS.

An application is supplementary program that has been tailored to provide easy control of operations thatare specific to a particular discipline. The applications you will use for design work are:

General

Equipment

Pipework

Cable Trays

HVAC Designer

StructuresBeams & Columns

Panels & Plates

Walls & Floors

Access, Stairs & Ladders

Design Templates

Cabling System

Equipment modelling

Equipment Modeling

to search type and hit enter

FOLLOW US ON GOOGLE+

 Or reach me on aj@piping­engineering.com

RELATED READING

Hierarchy in PDMS: World, Site, ZoneHierarchy in PDMS (Plant Design ManagementSystem): World, Site, Zone…

3D Modelling/Environment for Plant Design 3D modelling/environment for Plant Design: Intoday’s design world, majority…

Stretch/Trim Functions in PDMS EquipmentModelling Stretch/Trim Functions in PDMSEquipment Modelling One of the important…

Nozzle Orientation Drawing August 12, 2014

Tank farm: Types, Design Considerations, Plot PlanArrangement, Dyke Enclosure­ Part 1 August 6, 2013

Guide to Level Instruments Principles & Application October 19, 2014

Elbow: Component for Piping Direction Change January 29, 2014

Check List for Piping Material Take­Off (MTO) February 27, 2014

 Piping engineering

+ 335

Follow +1

SUBSCRIBE UPDATES. IT'S FREE!

Your email:

Enter email address...

Subscribe

Popular Recent Comments

HOME VALVE PIPING COMPONENTS PIPING LAYOUT PIPE FITTINGS HOW TO CHECKLISTS FORUM CONTACT US

??Search...

Sign up to get latest FREE articles right to yourinbox!

Your email:

Enter email address...

Subscribe   Unsubscribe

×

Page 2: Equipment Modeling Using PDMS- Primitives and Templates

2/21/2015 Equipment Modeling Using PDMS­ Primitives And Templates

http://www.piping­engineering.com/equipment­modeling­using­pdms­primitives­and­templates.html 2/6

In any project, different equipment are required as per the process requirement. These equipment aregeneral shown in P&ID which specific symbol. The layout engineer & designer are responsible for locatingall the equipment in the plot plan as per the process, maintenance, operation & safety requirements. PDMSdesigner than has to model this equipment at the location shown in the plot plan. PDMS designer has tomodel the equipment as per the mechanical vendor drawing received from static or rotating department.

Equipment modeling in PDMS can be done by two methods:

Using Primitives

Using Templates

Equipment Modeling Using PrimitivesPrimitives means different shapes or object which can be assembled together to create a required geometryof an equipment. These primitives can be modified to the required dimensions & orientation. The primitivescan be created using Create>Primitives

Equipment modeling using primitives

The following primitives are available for equipment modelling in PDMS

Google+

Web PageBlocked!

You have tried toaccess a web pagewhich is inviolation of yourinternet usage

WebPageBlocked!

You havetried toaccess a webpage which isin violation ofyour internetusage policy.

URL:googleads.g.doubleclick.net/pagead/ads?client=ca­pub­4041440204688525&format=300x600&output=html&h=600&slotname=8212945961&adk=3219311102&w=300&lmt=1424503265&flash=16.0.0&url=http%3A%2F%2Fwww.piping­engineering.com%2Fequipment­modeling­using­pdms­primitives­and­templates.html&dt=1424503265518&bpp=13&bdt=40590&shv=r20150217&cbv=r20141212&saldr=aa&prev_slotnames=6004242764%2C3237184362%2C1691731963&correlator=3333766856705&frm=20&ga_vid=1873135369.1424502985&ga_sid=1424503266&ga_hid=650949975&ga_fc=0&u_tz=330&u_his=1&u_java=1&u_h=900&u_w=1600&u_ah=860&u_aw=1600&u_cd=24&u_nplug=13&u_nmime=54&dff=tahoma&dfs=13&adx=974&ady=1383&biw=1592&bih=799&eid=575144603%2C317150304&oid=3&ref=http%3A%2F%2Fwww.piping­engineering.com%2Fstretch­trim­functions­in­pdms­equipment­

Page 3: Equipment Modeling Using PDMS- Primitives and Templates

2/21/2015 Equipment Modeling Using PDMS­ Primitives And Templates

http://www.piping­engineering.com/equipment­modeling­using­pdms­primitives­and­templates.html 3/6

So while modelling equipment using primitives you have check the equipment drawing and decide whichprimitives are to be used for creating the 3D view of the equipment.

Example of Equipment Modeling Using Primitives:Modeling a horizontal vessel

Equipment modeling a horizontal vessel

The above horizontal vessel can be modeled in PDMS using the primitives shown in the figure below

Page 4: Equipment Modeling Using PDMS- Primitives and Templates

2/21/2015 Equipment Modeling Using PDMS­ Primitives And Templates

http://www.piping­engineering.com/equipment­modeling­using­pdms­primitives­and­templates.html 4/6

Equipment Modeling Using TemplatesAn equipment template is a collection of primitives that make up the equipment shape grouped togetherunder a template. There are many templates of standard equipment available in the PDMS database whichcan be used depending upon the requirement.

Templates can be created using Create>Standard Equipment

Equipment modeling using templates

Example of Equipment Modeling Using Templates:The horizontal vessel shown in the above example can also be modeled using standard template.

Using Create>Standard Equipment open the required template as shown below

Page 5: Equipment Modeling Using PDMS- Primitives and Templates

2/21/2015 Equipment Modeling Using PDMS­ Primitives And Templates

http://www.piping­engineering.com/equipment­modeling­using­pdms­primitives­and­templates.html 5/6

Click on to Properties button in the Create Equipment form. This opens the Modify Properties form whereyou can input the dimensions of the equipment as per the requirement. After completing the inputs of alldimensions click on to OK. Finally click on to the Apply button in the Create Equipment form, this will createthe required equipment.

Related Posts:Hierarchy in PDMS: World, Site, Zone Hierarchy in PDMS (Plant Design Management System): World,Site, Zone…

Page 6: Equipment Modeling Using PDMS- Primitives and Templates

2/21/2015 Equipment Modeling Using PDMS­ Primitives And Templates

http://www.piping­engineering.com/equipment­modeling­using­pdms­primitives­and­templates.html 6/6

3D Modelling/Environment for Plant Design  3D modelling/environment for Plant Design: In today’sdesign world, majority…

Stretch/Trim Functions in PDMS Equipment Modelling Stretch/Trim Functions in PDMS EquipmentModelling One of the important…

PDMS­ Example for New Equipment Creation using Copy Offset… In this post, I will explain newequipment creation using…

Plant Design And Management System PDMS – An Overview Table of contents: 1. Features Of PDMS 2.How PDMS…

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Name *

Email *

Website

Check here to Subscribe to notifications for new posts

Post Comment

© copyright Piping engineering 2015 All Rights Reserved. Privacy Policy | About Us