ercot public 10/28/2015 1 2016 long-term load forecast calvin opheim ercot manager, forecasting...
TRANSCRIPT
![Page 1: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/1.jpg)
ERCOT PUBLIC10/28/2015 1
2016 Long-Term Load ForecastCalvin OpheimERCOTManager, Forecasting & Analysis
SAWGOctober 28, 2015
![Page 2: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/2.jpg)
ERCOT PUBLIC10/28/2015 2
Outline of Today’s Presentation
• Summary of Results
• Comparison to 2014 Long-Term Load Forecast
• Forecasting Framework / Model Data Input
• Normal Weather (50/50) Forecast
• Assumptions and Challenges
• Active Models
![Page 3: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/3.jpg)
Summary
![Page 4: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/4.jpg)
ERCOT PUBLIC10/28/2015 4
ERCOT Summer Peak Forecast
![Page 5: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/5.jpg)
ERCOT PUBLIC10/28/2015 5
ERCOT Annual Energy Forecast
![Page 6: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/6.jpg)
ERCOT PUBLIC10/28/2015 6
Forecast Adjustments
• Freeport LNG Facility– Incremental load of 655 MW was added to the forecast– Timeline for the load addition was from Freeport’s website
(http://www.freeportlng.com/Project_Status.asp)
– This load was not
included in the
previous forecast– No reduction in the
facility load was
assumed for 4 CP
and/or high price
intervals
![Page 7: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/7.jpg)
ERCOT PUBLIC10/28/2015 7
Summary
• Summer Peak Forecast– Consistent with the previous forecast (within ~ 1%)– Slower growth in the outer years (2023 on)– Forecasted growth rate is 1.1% (2016 – 2025)– Previous forecast growth rate was 1.3% (2014 – 2023)
• Energy Forecast– Consistent with the previous forecast (within ~ 1%)
except for 2024– The energy forecast is less than the previous forecast after 2020
![Page 8: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/8.jpg)
ERCOT PUBLIC10/28/2015 8
Historical and Forecasted Summer Peak Demand
![Page 9: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/9.jpg)
ERCOT PUBLIC10/28/2015 9
Historical and Forecasted Energy
![Page 10: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/10.jpg)
Forecasting Framework
![Page 11: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/11.jpg)
ERCOT PUBLIC10/28/2015 11
Weather Zones
• Premise models and load models
are developed for each weather
zone
![Page 12: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/12.jpg)
ERCOT PUBLIC10/28/2015 12
Forecasting Premises
• Premise Models– Forecasted premise counts are used as the driver of future
demand/energy growth in the majority of weather zones– Economic variables were used as input in the premise forecast
models– Variables used include population, non-farm employment, and
housing stock– Also included error correction term
![Page 13: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/13.jpg)
ERCOT PUBLIC10/28/2015 13
Forecasting Premises
• Monthly Economic Measures– Non-farm employment– Population– Housing stock
Moody’s base scenario was used for economic forecasts
• Data Availability– County level– Counties are mapped into a weather zone
• Growth Driver in Premise Models
![Page 14: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/14.jpg)
ERCOT PUBLIC10/28/2015 14
Forecasting Premises – Challenges
• Premise counts were increased
significantly via opt-in
• Forecasting premises is problematic
![Page 15: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/15.jpg)
ERCOT PUBLIC10/28/2015 15
Forecasting Premises – Challenges
• Premise counts were increased
significantly via opt-in
• Forecasting premises is problematic
![Page 16: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/16.jpg)
ERCOT PUBLIC10/28/2015 16
Forecasting Premises – Challenges
• Premise counts are
relatively flat
• No significant benefit in
forecasting premises
![Page 17: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/17.jpg)
ERCOT PUBLIC10/28/2015 17
Forecasting Premises – Challenges
• Premise Models - Exceptions– Unable to forecast premise counts in three weather zones – Impacted by an entity opting-in (Far West and West)– Flat premise growth (North)
• Modeling Solution– These three weather zones required traditional economic
variables (population and non-farm employment) as the driver of future demand/energy growth in the hourly models
![Page 18: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/18.jpg)
ERCOT PUBLIC10/28/2015 18
Load Forecasting Models
• Hourly Models – Hourly models were created for each weather zone– Over 48,000 hourly observations including load, weather data,
and calendar variables (day-of-week, holidays, etc.)– Historical data from January, 2010 through August, 2015 was
used to create the models
• Rationale– Typically use 5 years of historical data in model development– Allows for a more recent snapshot of appliance stock, energy
efficiency impacts, demand response impacts, price responsive load, etc.
![Page 19: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/19.jpg)
ERCOT PUBLIC10/28/2015 19
Load Forecasting Models - Data Input
• Weather Data– Temperature, Temperature Squared– Cooling Degree Days/Hours – Heating Degree Days/Hours– Cloud Cover– Wind Speed– May also include values from a previous day(s)
• Two or three weather stations located in each weather zone
![Page 20: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/20.jpg)
ERCOT PUBLIC10/28/2015 20
Load Forecasting Models - Data Input
• Calendar– Month– Day of the week – Holidays– Hour– Interact Hour with Day of the week
• Interactions– May interact weather variables with calendar variables
Example: Temperature with Hour
![Page 21: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/21.jpg)
ERCOT PUBLIC10/28/2015 21
Load Forecasting Models - Data Input
• Monthly Premise Count by Customer Class– Instead of using economic measures as the driver of future load
growth, use the actual number of premises for each customer class
– Customer class is determined by the load profile assignment– Three classes
i. Residential (includes lighting)
ii. Commercial
iii. Industrial
![Page 22: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/22.jpg)
ERCOT PUBLIC10/28/2015 22
Load Forecasting Models - Data Input
• Monthly Economic Data– For the three weather zones without a premise forecast (Far
West, West, and North), use population and non-farm employment as the driver of future load growth
• Moody’s Base Scenario
![Page 23: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/23.jpg)
Normal Weather Forecast
![Page 24: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/24.jpg)
ERCOT PUBLIC10/28/2015 24
Normal Weather (50/50) Forecast
• Performed at the Weather Zone Level– Historical weather from calendar years 2002 – 2014 is used as
input into each hourly weather zone forecast model
![Page 25: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/25.jpg)
ERCOT PUBLIC10/28/2015 25
Normal Weather (50/50) Forecast
• Performed at the Weather Zone Level– Forecasted values are sorted from high to low for each year– The sorted values are averaged by rank
Example:Below are the top 5 peak values for Coast for 2016
![Page 26: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/26.jpg)
ERCOT PUBLIC10/28/2015 26
Normal Weather (50/50) Forecast
• Performed at the Weather Zone Level
![Page 27: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/27.jpg)
ERCOT PUBLIC10/28/2015 27
Normal Weather (50/50) Forecast
• Performed at the Weather Zone Level– This process is completed for every weather zone, for each
forecasted year (2016 – 2025)
• ERCOT (50/50) Forecast– After the weather zone (50/50) hourly load forecasts are
completed, the results are mapped into a representative historical calendar by rank
– The 2003 calendar was selected (as has been our convention in the past)
![Page 28: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/28.jpg)
Assumptions and Challenges
![Page 29: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/29.jpg)
ERCOT PUBLIC10/28/2015 29
Load Forecasting Assumptions
• Current Modeling Framework Assumes:– Inherent levels from the input data for
• Appliance stock / energy efficiency• Demand Response, 4 CP Impact, behind-the-meter DG, Price
Responsive Load• Electric Vehicles
– No increase in territory to be served by ERCOT– No discrete increase for additional LNG facilities (except for
Freeport)– No discrete increase in load for a Tesla plant or other large
unanticipated load
• No incremental adjustments (positive or negative) to the load forecast have been applied for the above
![Page 30: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/30.jpg)
ERCOT PUBLIC10/28/2015 30
Load Forecasting Challenges
• Weather Volatility:– Extreme weather events (record heat and cold, drought, flood,
etc.) seem to occur fairly frequently
• Economic Uncertainty– Accuracy of economic forecasts– Recession has occurred every decade since the 60s
• Policy Impacts– Behind the meter DG growth– Energy Efficiency growth– Increased price caps– Loads in SCED
![Page 31: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/31.jpg)
Active Models
![Page 32: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/32.jpg)
ERCOT PUBLIC10/28/2015 32
Modeling Structure
• ERCOT maintains an ensemble of load forecast models– Neural Network models based on a single linear node– Linear Regression model representation of the single linear node
Neural Network model• Uses the exact same variables, relationships as the single linear
node Neural Network model• Is easier to share the model form with Market Participants (i.e., the
variables are easier to interpret than those from the Neural Network model)
• Results are very close to the Neural Network model
– Neural Network models based on linear and higher order nodes– Models are maintained for daily energy forecasting, hourly
energy forecasting, and a combination
![Page 33: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/33.jpg)
ERCOT PUBLIC10/28/2015 33
Appendix
![Page 34: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/34.jpg)
ERCOT PUBLIC10/28/2015 34
ERCOT 2016 Forecasts
![Page 35: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/35.jpg)
ERCOT PUBLIC10/28/2015 35
Weather Zone 2016 Forecasts
![Page 36: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/36.jpg)
ERCOT PUBLIC10/28/2015 36
Weather Zone 2016 Forecasts
![Page 37: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/37.jpg)
ERCOT PUBLIC10/28/2015 37
Weather Zone 2016 Forecasts
![Page 38: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/38.jpg)
ERCOT PUBLIC10/28/2015 38
Weather Zone 2016 Forecasts
![Page 39: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/39.jpg)
ERCOT PUBLIC10/28/2015 39
Weather Zone 2016 Forecasts
![Page 40: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/40.jpg)
ERCOT PUBLIC10/28/2015 40
Weather Zone 2016 Forecasts
![Page 41: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/41.jpg)
ERCOT PUBLIC10/28/2015 41
Weather Zone 2016 Forecasts
![Page 42: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/42.jpg)
ERCOT PUBLIC10/28/2015 42
Weather Zone 2016 Forecasts
![Page 43: ERCOT PUBLIC 10/28/2015 1 2016 Long-Term Load Forecast Calvin Opheim ERCOT Manager, Forecasting & Analysis SAWG October 28, 2015](https://reader035.vdocuments.net/reader035/viewer/2022062713/56649f565503460f94c7ab08/html5/thumbnails/43.jpg)
ERCOT PUBLIC10/28/2015 43
Questions?