esmd space grant educational projects esmd sg student manager-teresa parham (acting)

8
ESMD Space Grant Educational Projects ESMD SG Student Manager-Teresa Parham (Acting) ESMD SG Faculty Manager-Rich Smith (Acting) ESMD Space Grant Projects Specialist- Susan Sawyer

Upload: laith-bates

Post on 30-Dec-2015

33 views

Category:

Documents


2 download

DESCRIPTION

ESMD Space Grant Educational Projects ESMD SG Student Manager-Teresa Parham (Acting) ESMD SG Faculty Manager-Rich Smith (Acting) ESMD Space Grant Projects Specialist- Susan Sawyer. 2008 ESMD SG Faculty Cohorts. 34 applicants: Representing 18 SGC; 56% MSI - PowerPoint PPT Presentation

TRANSCRIPT

ESMD Space Grant Educational Projects

ESMD SG Student Manager-Teresa Parham (Acting)ESMD SG Faculty Manager-Rich Smith (Acting)

ESMD Space Grant Projects Specialist- Susan Sawyer

• 34 applicants: Representing 18 SGC; 56% MSI

• 10 selected (AL, CA, GA, DC, MS, NC, NM, OH, UT, VA)- 50% MSI

• Tenure at Centers: June 2- July 2; KSC July 14-17

• All 10 will attend a SG Regional and give presentation

• Objectives:

• Confirmation of existing internships & senior design project

• Locating related published research for SD projects

• KSC will pay stipends; each center will handle logistics

(badging, info on housing, computers, etc.)

• Reviewing senior design courses developed by AU & MTU

2008 ESMD SG Faculty Cohorts

ESMD Senior Design Course Development

Auburn University: Dr. Dan Beale & Dr. David HarrisConcepts for Lunar Regolith excavation equipment and propose solutions in the form of completed designs and prototypes. NASA POC - Robert Muller of KSC

Michigan Technological University: Dr. John GershensonHigh-risk, low cost development projects like those common to the Small Space Craft Program. While this will be based on a particular project, the curriculum will not be tied to only that project. NASA POC is Dr. Butler Hine of ARC

Working with ESMD 2008 Summer Faculty

Presenting in Atlanta at National Conference

Workshop in DC 2009 (day before? after?)

• Summer Internship• Total of applications received – 103• Applications that met minimum requirements – 84• Mar 14 SG will make offers to students• Mar 20 need to know if the students accept or decline

• Fall Internships• Application deadline – May 1, 2008• Process flowchart instructions on the KSC Education

website• Let us know if you will not be funding students for

NASA Internship through this site

Student Intern Application for NASA

• Students submit a Systems Engineering Paper to be evaluated by NASA judges

• Judged by NASA judges– First prize: $3500 scholarship and VIP Shuttle

launch seating– Second prize: $2500 scholarship and VIP Shuttle

launch seating– Third prize: $1500 scholarship and VIP Shuttle

launch seatingDeadlines:• Paper submission March 3, 2008• 13 teams have signed up as of Feb 28• Award ceremony mid April

Systems Engineering Paper Competition

• 34 applicants: Representing 18 SGC; 56% MSI

•10 selected (AL, CA, GA, DC, MS, NC, NM, OH, UT, VA)- 50% MSI

• Tenure at Centers: June 2- July 2; KSC July 14-17

• All 10 will attend a SG Regional and give presentation

• Objectives:

• Confirmation of existing internships & senior design project

• Locating related published research for SD projects

• KSC will pay stipends; each center will handle logistics

(badging, info on housing, computers, etc.)

• Reviewing senior design courses developed by AU & MTU

2008 ESMD SG Faculty Cohorts

2007/2008 - Select from NASA project list OR submit a project

2008/2009 - Select NASA project list ONLY List is available so select projects NOW

Choose MULTIPLE projects

Point of Contacts at KSC (Teresa or Susan)

Senior Design Project

Reporting thru Mar 30 2008

Due by April 14

NASA HQ will not release 2008/2009 ESMD funds until you have completed the status report showing adequate progress

2006/2007 money may be used until Sep 30 08

2007/2008 money may be used until Sep 30 09

Mid-Term Status Reports

Industry Contacts list for Internships

Will not be asking for personal information on students in the mid-term status reports

Other questions?

Improvements from SG Requests