estimating volumes for i-95 hot lanes in virginia prepared for: 2009 planning applications...
TRANSCRIPT
![Page 1: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/1.jpg)
Estimating Volumes forI-95 HOT Lanes in Virginia
Prepared for:2009 Planning Applications ConferenceHouston, TXMay 18, 2009
Prepared by:
Kenneth D. Kaltenbach, P.E.The Corradino Group, Inc
Jeremy Raw, P.E.Virginia Department of Transportation
Transportation & Mobility Planning Division
May 18, 2009
![Page 2: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/2.jpg)
Summary
What are HOT lanes? I-95 HOT Lanes in
Fredericksburg How do you model HOT lanes? Structure of the finished model Model performance
![Page 3: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/3.jpg)
What are HOT lanes?
High-Occupancy Toll (HOT) lanes are a class of managed lanes.
Designated lanes, usually on a freeway Separated from general purpose lanes Toll charged for low-occupancy vehicles No toll for high-occupancy vehicles Electronic toll collection
… Sell the excess HOV capacity
![Page 4: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/4.jpg)
What are the benefits?
I-95 is over capacity, widening for more general purpose is not likely
Encourage three-occupant autos Sell excess capacity in HOV lanes Create a new revenue stream by
charging those willing to pay for premium service – 50 mph guaranteed
![Page 5: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/5.jpg)
HOT Lanes Modeling in Fredericksburg
HOT Lanes already operating in Northern Virginia (Washington DC area)
HOT Lane extension to Fredericksburg is a new project
Fredericksburg Area MPO (FAMPO) needed to include the project in LRP and Air Quality Conformity.
Had to be implemented quickly, about 90 days.
![Page 6: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/6.jpg)
Extent of the Virginia I-95HOT Lanes Project
![Page 7: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/7.jpg)
Model Effort
Fredericksburg Only Daily 24 hours
No mode choice
No Transit
Daily assignment
Extend net into DC Estimate AM, PM
and off-peak periods Discrete auto
occupancy levels Virginia Railway
Express Period assignment
with toll and HOT lane allocation
“VERSION 2.0 MODEL”
“VERSION 3.0 MODEL”
![Page 8: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/8.jpg)
Model Requirements
Important Factors for HOT Lane ModelPoint of entrance/exitVariable tolling to control lane congestionHOT lane effects outside model area held
constant Include Virginia Rail Express ridership
effects (DC-oriented commuter rail)
![Page 9: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/9.jpg)
Current FAMPO Version 2.0 Model Network
Northern External is Prince William Co. Line
![Page 10: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/10.jpg)
Updated Network
I-95 External Station split into distance stations
External skims (HOT vs. Free) computed from NCRTPB model
Use of I-95 outside model area held constant
Northern External is Potomac River
![Page 11: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/11.jpg)
Modeling Assumptions/Sources Distribution of trips on I-95 corridor outside
Fredericksburg area borrowed from National Capital Region model (DC)Compiled via select link analysis
Auto occupancy rates disaggregated from FAMPO model
Time of Day directional traffic from VDOT traffic counts
Toll/free split borrowed from I-394 MnPASS Express Lane Stated Preference Survey
![Page 12: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/12.jpg)
Modeling Assumptions
Length of trip outside area influences HOT lane use within area
Vehicle occupancy alters sensitivity to tollSOV, HOV-2, HOV-3
HOT versus free lane choice made in assignment
Model AM, PM and Off-Peak periods separately Value of time based on NCRTPB model, but
adjusted to 2008 values ($10.24 - $17.06 / hr)
![Page 13: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/13.jpg)
Operating Assumptions
Goal: at least 50 mph in HOT lanes
3+ person carpools and buses: No Toll
2-person carpools and drive alone: Pay Toll
Directional operating plan for HOT lanes to conform with DC peak directions (AM-NB, PM-SB, Off-split)
Transponders -- no toll collection delay
![Page 14: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/14.jpg)
Toll Diversion
TOLL DIVERSION CURVE
Toll($)/time saved (min) Fraction Toll
0 1.000
2 0.900
5 0.400
10 0.280
20 0.100
30 0.050
40 0.020
50 0.018
60 0.015
70 0.013
80 0.010
Toll Choice (from MnPass)
0.000
0.200
0.400
0.600
0.800
1.000
1.200
0 20 40 60 80 100
Toll $/minute saved
Frac
tion
Toll
Source: I-394 MnPASS Express Lane Stated Preference Survey
![Page 15: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/15.jpg)
Toll Calculation
Function of the V/C on the managed lanes
Logit function Several toll
ranges explored Final toll rate
ranged between $.00 and $0.25 per mile
Toll Function
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2
Volume/Capacity
Toll $
per M
ile
![Page 16: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/16.jpg)
Commuter RailVirginia Railway Express
VRE post-processing model Evaluates impact of HOT lanes on
VRE Incremental logit model AM peak period trips only Cube Voyager PT network
![Page 17: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/17.jpg)
Model Performance and Sensitivity
Validation Sensitivity Toll Estimation HOT lane volumes
![Page 18: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/18.jpg)
Validation
Volume Group Volume Range RMSE Number of Observations
1 1- 5,000 56.0% 480
2 5,000- 10,000 29.1% 128
3 10,000- 20,000 18.7% 102
4 20,000- 30,000 31.0% 30
5 30,000- 40,000 18.3% 36
6 40,000- 50,000 20.6% 6
7 50,000- 60,000 9.9% 18
8 60,000- 70,000 20.3% 4
10 80,000- 90,000 18.0% 2
Total 1-500,000 34.7% 806
Usual 4-step methods – for example …
![Page 19: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/19.jpg)
Model Sensitivity
AM NORTHBOUND DIRECTION TRIPS LOADING AT FREDERICKSBURG, LEELAND RD., AND BROOKE STATIONS
AM NORTHBOUND
I-95 VEHICLES* YEAR ALTERNATIVE VRE BOARDINGS GP HOT TOTAL
VRE/ I-95
RATIO NOTE
2000 BASE - CALIBRATION 1,780 13,961 0 13,961 0.13 SURVEY/ BOARDING
COUNTS SAY 1,779 2015 BASE 3,703 20,104 0 20,104 0.18
2015 HOT 3,345 12,877 7,226 20,103 0.17 WITHOUT HOT LANES, VRE SHARE INCREASES
2025 BASE 5,293 24,148 0 24,148 0.22 AS CONGESTION INCREASES.
2025 HOT 4,195 14,976 9,267 24,243 0.17
2035 BASE 7,737 28,365 0 28,365 0.27 HOT LANES TAKE SOME VRE TRIPS, BUT
2035 HOT 4,972 18,164 10,203 28,367 0.18 VRE TRIPS STILL INCREASE.
* = At the Fredericksburg northern external station
![Page 20: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/20.jpg)
Toll Estimation
AVERAGE SPEED (MPH) MINIMUM SPEED (MPH) Facility AM PM Off-Peak AM PM Off-Peak
HOT LANES 59.84 64.58 64.94 38.75 62.27 64.38
Other Freeways 55.71 43.76 55.41 30 15.41 30 Revenue $16,313 $33,492 $31,272
Acceptable Toll Range=$ 0.05- 0.25 per mile
Peak Period Off-Peak Period Drive Alone $3.52 Drive Alone $5.02
HOV-2 $4.39 HOV-2 $5.86 Daily revenue= $81,077
AM HOT vs. GP Traffic at Fredericksburg North I-95 Station, Northbound
HOT 9,279
GP 14,963
![Page 21: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/21.jpg)
HOT Lane Volumes
HOT lanes coded explicitly
Multi-class assignment by vehicle occupancy
HOT Lanes
Band Width Plot
![Page 22: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/22.jpg)
Next Steps
Model performed well! Despite tight Air Quality conformity
timeframe Additional improvements coming up
Recalibrate from new NHTS Time of Day Modeling (AM, PM, Off-Peak) Full Mode Choice & Vehicle Occupancy
Model Spatially improved network
![Page 23: Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfed1a28abf838cb9153/html5/thumbnails/23.jpg)
Questions?
Thank You