TRANSCRIPT

  • The Belgian Challenge 2

    ETCS-Migration on a Conventional Network

    THE BELGIAN CHALLENGES

    Jo DE BOSSCHERE

    Head of Signalling Projects

  • 12th UIC ERTMS World Conference 2016

    AGENDA

    Masterplan ETCS

    Migrating the Network: Challenges

    o Level 1 version 2.3.0d

    o Level 2 version 2.3.0d

    o Level 1 Limited Supervision (Baseline 3)

    Conclusions

    3

    1

    2

    3

  • 12th UIC ERTMS World Conference 2016

    4

    MASTERPLAN ETCS

    1

  • 12th UIC ERTMS World Conference 2016

    Four steps to achieve full ETCS by 2022 1. MASTERPLAN ETCS

    1

    ETCS 1 (v2.3.0d)

    ETCS 2 (v2.3.0d)

    ETCS 1 (v3.4.0) Limited supervision

    SITUATION TODAY

    1.085 km track equipped

    TBL 1+ 99,99% 7.573 signals

    3 4

    SITUATION TODAY

    144 km HSL

    5

    2

    TO DO : +/- 1.100 km TO DO : +/- 2.500 km TO DO : +/- 1.600 km

  • 12th UIC ERTMS World Conference 2016

    Migration strategy ETCS – Key milestones 1. MASTERPLAN ETCS

    2015 2022 2025 2030 2035

    Entire Network Equipped with ETCS(**)

    TBL1+ program completed(*)

    Network accessible for ETCS equipped trains only (***)

    Converging to a full ETCS 2 equipped Network (***)

    (*) Basic implementation TBL1+ (99.9% efficiency cover) completed (**) And TBL1+ (***) not yet officially decided

    Goal achieved: all railway traffic ETCS protected

    6

  • 12th UIC ERTMS World Conference 2016

    7

    MIGRATING THE NETWORK:

    THE CHALLENGES

    2

  • 12th UIC ERTMS World Conference 2016

    Level 1 version 2.3.0d

    Complexity of roll-out in big stations Rolling out ETCS 1 on a conventional network can’t be compared with previous experiences on HS-lines:

    2. MIGRATING THE SYSTEM - CHALLENGES

    8

    Couldn’t build on previous experiences and we had

    to take the time to go through a learning process

    Complexity grows very fast with number of switches number of unique routes per signal too large

    Need for Engineering rules to cope with this challenge, to reduce complexity

  • 12th UIC ERTMS World Conference 2016

    Level 1 version 2.3.0d 2. MIGRATING THE SYSTEM - CHALLENGES

    9

    Lack of version 2.3.0d-compliant rolling stock Different causes:

    Impossibility for some RU’s to migrate their rolling stock in time

    RU’s often continue buying tailor made OBU’s, not always fully TSI-compliant

    IM has to program its trackside system to allow those trains

    to circulate, which leads to a suboptimal way of operating

    our network, not being able to use the full capacity.

  • 12th UIC ERTMS World Conference 2016

    Level 2 version 2.3.0d

    Availability of GPRS in 2.3.0d for ETCS Level 2

    Necessary to counter limited capacity of GSM-R

    2. MIGRATING THE SYSTEM - CHALLENGES

    10

    Need for a Baseline-independent solution to avoid

    operational restrictions for operators and upgrades

    for infrastructure managers

  • 12th UIC ERTMS World Conference 2016

    Level 2 version 2.3.0d

    11

    Need for full TSI-compliant rolling stock Requests from operators to make specifications for the trackside ETCS Level 2 available to them

    Risk for the development of national versions of ETCS OBU

    With a strong commitment from infrastructure managers to

    respect the TSI, operators should be encouraged to install

    a fully TSI-compliant version on their rolling stock

    2. MIGRATING THE SYSTEM - CHALLENGES

  • 12th UIC ERTMS World Conference 2016

    Level 1 Limited Supervision (Baseline 3)

    Timely availability of products

    Operators signal the inability to buy timely Baseline 3 products for their rolling stock

    2. MIGRATING THE SYSTEM - CHALLENGES

    12

    Risk that it might jeopardise the roll-out planning

    for IM’s and will necessitate dual signalling

    Risk for ETCS 2.3.0d train in STM TBL1+ not able to run on ETCS LS baseline 3 line

    Risk for lines to be equipped ETCS LS No trains running on them

  • 12th UIC ERTMS World Conference 2016

    13

    Conclusions

  • 12th UIC ERTMS World Conference 2016

    14

    Interoperability Possible Interoperability issues are well known, but need full attention of every stakeholder

    Installing ETCS on the conventional network is quite challenging due to

    complexity of stations

    Multiple transitions STM – ETCS vice versa

    Keeping operational rules in line with rules for lineside signalling

    Conclusions

  • 12th UIC ERTMS World Conference 2016

    15

    Today 19% of the Network is equipped

    By 2022 the whole network must be ETCS!

    Our planning is ambitious.

    A conventional network is continuously evolving i.e. new track-layout, reduce of number of switches, … in parallel with the Roll-out of ETCS we already need to implement changes on ETCS-equipped lines!

    Migration Migration towards ETCS and the operation of an ETCS-equipped network is extremely challenging for an organisation – need for cultural and organisational change.

    19%

    Conclusions

  • 12th UIC ERTMS World Conference 2016

    01.02.2016 16

    Thank you for your attention!